CN219546168U - Construction waste clearing equipment - Google Patents
Construction waste clearing equipment Download PDFInfo
- Publication number
- CN219546168U CN219546168U CN202320595862.8U CN202320595862U CN219546168U CN 219546168 U CN219546168 U CN 219546168U CN 202320595862 U CN202320595862 U CN 202320595862U CN 219546168 U CN219546168 U CN 219546168U
- Authority
- CN
- China
- Prior art keywords
- construction waste
- conveying
- support roller
- conveying pipeline
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/58—Construction or demolition [C&D] waste
Landscapes
- Refuse Collection And Transfer (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses construction waste clearing equipment, and relates to the technical field of construction. This construction waste clearance equipment includes: the two conveying pipelines are arranged side by side, two ends of each conveying pipeline are both in an opening shape, and the upper side and the lower side of each conveying pipeline are connected through a supporting plate; the tensioning support roller is connected to the support plate through a rotating shaft, and the side support roller is rotationally connected to the inner wall of one side, close to the two conveying pipelines, of the side support roller through the rotating shaft; and the conveying belt penetrates through the conveying pipeline from the inside of the conveying pipeline and penetrates out of the opening of the end part of the conveying pipeline, and the conveying belt is coated outside the tensioning support roller and the side support roller. This construction waste clearance equipment is through the setting of a plurality of construction waste supporting platform for construction waste can be continuous transfer, carries out the transport of material, raises the efficiency, and need not occupy the building lift alone, has improved the efficiency of rubbish clearance.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to building rubbish clearing equipment.
Background
The construction waste refers to waste soil, waste materials, sludge and other wastes generated in the process of constructing, laying or dismantling various buildings, structures, pipe networks and the like by construction units or individuals.
Building rubbish of building, spoil, abandon material, silt is concentrated usually, later adopts equipment such as building peripheral for construction lift or tower crane to transport this building rubbish downwards, especially high-rise building, needs the transportation of one trip, can not clear in succession, adopts this kind of rubbish to clear mode inefficiency.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a construction waste clearing device, which solves the problems that the existing construction waste clearing needs one-trip transportation and cannot be cleared continuously, and the efficiency is lower by adopting the way of clearing the construction waste.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: a construction waste clearing apparatus comprising:
the two conveying pipelines are arranged side by side, two ends of each conveying pipeline are both in an opening shape, and the upper side and the lower side of each conveying pipeline are connected through a supporting plate;
the tensioning support roller is connected to the support plate through a rotating shaft, and the side support roller is rotationally connected to the inner wall of one side, close to the two conveying pipelines, of the side support roller through the rotating shaft;
the conveying belt penetrates through the inner part of the conveying pipeline and penetrates out of the end opening of the conveying pipeline, and the conveying belt is coated outside the tensioning support roller and the side support roller;
the construction waste supporting platform is connected with the conveyor belt at one side of the construction waste supporting platform, and the conveyor belt rotates to drive the construction waste supporting platform to descend in one conveying pipeline and ascend from the other conveying pipeline;
the garbage truck, garbage truck is located the pipeline just downside, is provided with the support string bag that is used for buffering rubbish in the garbage truck.
Further, a hanging hook body is arranged on the outer wall of the upper end of the conveying pipeline.
Further, still include driving motor, driving motor fixed mounting is in the backup pad, driving motor's output all installs the band pulley with one of them tensioning backing roll tip, and is connected through the belt between two band pulleys.
Further, the outer wall edge of the conveying belt is provided with a reinforcing chain, the construction waste supporting platform is rotationally connected with the conveying belt through a pin shaft, and a cable-stayed rope is connected between one end, far away from the conveying belt, of the construction waste supporting platform and the reinforcing chain.
Further, a supporting boss is arranged on the surface of one end, far away from the conveying belt, of the construction waste supporting platform, and one end of the cable-stayed rope is connected with the supporting boss.
Further, the outer wall downside of two pipeline all connects branch, two connect the buffering boss between the bottom of branch, buffering boss upper surface is protruding cambered surface form.
(III) beneficial effects
The utility model provides construction waste clearing equipment. The beneficial effects are as follows:
(1) The construction waste clearing equipment enables construction waste to be continuously lowered through the arrangement of the plurality of construction waste supporting platforms, materials are conveyed, efficiency is improved, a construction lifter is not required to be occupied independently, and waste clearing efficiency is improved;
(2) The construction waste clearing and transporting equipment adopts the conveying pipeline to protect the periphery, can prevent construction waste from being scattered from the periphery to cause harm to lower personnel and equipment in the transportation process, and has a certain dust-raising prevention effect;
(3) This construction waste clearance equipment, according to the demand of use, can offer a plurality of logical grooves on pipeline for lead to the groove and correspond with each floor of building, each floor is put in construction waste from leading to inslot to idle construction waste supporting platform on, thereby makes each floor homoenergetic use this equipment.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the feed pipe, support plate, tension support roller, side support roller, and drive motor of the present utility model;
fig. 3 is a schematic structural view of the connection between the conveyor belt and the construction waste support platform of the present utility model.
In the figure: 1. a delivery conduit; 2. a support plate; 3. tensioning a supporting roller; 4. a side support roller; 5. a drive motor; 6. a belt; 7. a transmission belt; 8. a construction waste supporting platform; 9. a support boss; 10. a cable-stayed rope; 11. reinforcing the chain; 12. a support rod; 13. a buffer boss; 14. hanging hook body; 15. a garbage truck; 151. supporting the net bag.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: a construction waste clearing apparatus comprising:
the two conveying pipelines 1 are arranged side by side, two ends of each conveying pipeline 1 are all in an opening shape, and the upper side and the lower side between the two conveying pipelines 1 are all connected through a supporting plate 2; as shown in fig. 1, the left side conveying pipeline 1 is used for lowering construction waste, the right side conveying pipeline 1 is used for conveying the construction waste supporting platform 8 upwards, and the conveying pipeline can be switched according to the use requirement.
The tensioning support roller 3 and the side support roller 4, wherein the tensioning support roller 3 is connected to the support plate 2 through a rotating shaft, and the side support roller 4 is rotatably connected to the inner wall of one side, close to the two conveying pipelines 1, through the rotating shaft; the tensioning support roller 3 and the side support roller 4 are supported inside the conveying belt 7, so that the conveying belt 7 is prevented from being in direct contact with the conveying pipeline 1, and friction is reduced. In order to avoid the construction waste from falling too fast, friction plates can be arranged on the peripheries of the tensioning support roller 3 and the side support roller 4 and attached to the outer walls of the tensioning support roller 3 and the side support roller 4, so that damping is increased.
A conveyor belt 7 passing from the inside of the conveying pipe 1 and out of the end opening of the conveying pipe 1, the conveyor belt 7 being wrapped around the outside of the tension support roller 3 and the side support roller 4; in this solution, the conveyor belt 7 is rotated anticlockwise, as shown in figure 1.
The construction waste supporting platform 8, one side of the construction waste supporting platform 8 is connected with the outer wall of the conveying belt 7, and the conveying belt 7 rotates to drive the construction waste supporting platform 8 to descend in one conveying pipeline 1 and ascend from the other conveying pipeline 1. The construction waste supporting platform 8 is used for bearing construction waste, is made of metal plates, and can be kept stable, so that construction waste on the construction waste supporting platform is prevented from being scattered due to the fact that the construction waste is pressed down and inclined;
the garbage truck 15, garbage truck 15 is located the pipeline 1 just under, is provided with in the garbage truck 15 and is used for the support string bag 151 to rubbish buffering. The box body of the garbage truck 15 is in an upper open shape and is used for receiving the construction garbage falling off from the conveying pipeline 1, and the supporting net bag 151 plays a role in buffering the construction garbage.
Preferably, a hanging hook body 14 is arranged on the outer wall of the upper end of the conveying pipeline 1. The hanger body 14 is used to hang on a building wall.
Preferably, the belt tensioning device further comprises a driving motor 5, the driving motor 5 is fixedly arranged on the supporting plate 2, the output end of the driving motor 5 and the end part of one tensioning supporting roller 3 are respectively provided with a belt wheel, and the two belt wheels are connected through a belt 6. Under the action of gravity of the construction waste, the construction waste supporting platform 8 can be pressed down, so that the conveying belt 7 rotates, and the conveying belt can be driven by the driving motor 5 in an auxiliary mode to keep stable rotation.
As shown in fig. 1 and 3, a reinforcing chain 11 is arranged at the edge of the outer wall of the conveyor belt 7, the construction waste supporting platform 8 is rotatably connected with the conveyor belt 7 through a pin shaft, and a cable-stayed rope 10 is connected between one end, far away from the conveyor belt 7, of the construction waste supporting platform 8 and the reinforcing chain 11. In this connection mode, when the construction waste supporting platform 8 is located in the left conveying pipeline 1, the construction waste supporting platform is in a flat state and is used for bearing construction waste, and when the construction waste supporting platform is located in the right conveying pipeline 1, the construction waste supporting platform is in a downward falling state, so that space occupation can be reduced.
Preferably, a supporting boss 9 is arranged on the surface of one end of the construction waste supporting platform 8 far away from the conveying belt 7, and one end of the cable-stayed rope 10 is connected with the supporting boss 9. The setting of supporting boss 9 separates certain distance between with building rubbish supporting platform 8, conveyer belt 7, when building rubbish supporting platform 8 gets into left pipeline 1 in, because supporting boss 9 supports for building rubbish supporting platform 8 slope, thereby can anticlockwise rotate until being straight state, then bear building rubbish above it.
Preferably, the lower sides of the outer walls of the two conveying pipelines 1 are connected with the supporting rods 12, a buffer boss 13 is connected between the bottom ends of the two supporting rods 12, and the upper surface of the buffer boss 13 is in an upward protruding cambered surface shape. The buffer boss 13 plays a role in buffering falling construction waste.
When the lifting hook is in operation, the lifting hook body 14 is hung on the outer wall of a building, the conveying pipeline 1 is supported, building garbage is put on the building garbage supporting platform 8 in the conveying pipeline 1 at the left side, the building garbage supporting platform 8 is pressed down under the gravity action of the building garbage, the conveying belt 7 is enabled to rotate anticlockwise (the driving motor 5 drives the conveying belt 7 to rotate as auxiliary driving, and when the conveying belt 7 cannot rotate, the driving motor 5 can be started to work). Meanwhile, a notch can be formed in the lower side of the left conveying pipeline 1, the driving motor 5 drives the conveying belt 7 to rotate clockwise, building materials are stored on the left side of the conveying pipeline to the building rubbish supporting platform 8 through the notch, and the conveying pipeline can be used as a feed, but care needs to be taken away in time, and rising materials are prevented from entering the right conveying pipeline 1 and falling directly.
The construction waste support platform 8 in the left conveying pipeline 1 is gradually lowered, and when the construction waste support platform 8 reaches the lowest side, the construction waste support platform 8 is gradually inclined, so that the construction waste on the construction waste support platform 8 falls on the buffer boss 13.
When the construction waste support platform 8 enters the right conveying pipeline 1, the construction waste support platform 8 rotates clockwise around a pin shaft on the construction waste support platform 8, so that the construction waste support platform 8 sags and approaches the conveying belt 7, and the construction waste support platform and the conveying belt circulate reciprocally.
The construction waste falling in the conveying pipeline 1 is collected and cleared intensively by the waste transport vehicle 15.
To sum up, this construction waste clearance equipment is through the setting of a plurality of construction waste supporting platform 8 for construction waste can be continuous the transfer, carries out the material, raises the efficiency, and does not need to occupy the building lift alone, has improved the efficiency of rubbish clearance.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. A construction waste clearing apparatus, comprising:
two conveying pipelines (1) which are arranged side by side, wherein both ends of the conveying pipelines (1) are in an opening shape, and the upper side and the lower side of the two conveying pipelines (1) are connected through a supporting plate (2);
the tensioning support roller (3) and the side support roller (4), wherein the tensioning support roller (3) is connected to the support plate (2) through a rotating shaft, and the side support roller (4) is rotatably connected to the inner wall of one side, close to the two conveying pipelines (1), through the rotating shaft;
the conveying belt (7) penetrates through the conveying pipeline (1) and penetrates out of an end opening of the conveying pipeline (1), and the conveying belt (7) is coated on the outer parts of the tensioning support roller (3) and the side support roller (4);
the construction waste supporting platform (8), one side of the construction waste supporting platform (8) is connected with the outer wall of the conveying belt (7), and the conveying belt (7) rotates to drive the construction waste supporting platform (8) to descend in one conveying pipeline (1) and ascend from the other conveying pipeline (1);
the garbage truck (15), garbage truck (15) are located conveyer pipe (1) directly under, are provided with in garbage truck (15) and are used for supporting string bag (151) to rubbish buffering.
2. A construction waste clearing apparatus according to claim 1, wherein: a hanging hook body (14) is arranged on the outer wall of the upper end of the conveying pipeline (1).
3. A construction waste clearing apparatus according to claim 1, wherein: still include driving motor (5), driving motor (5) fixed mounting is on backup pad (2), the band pulley is all installed with one of them tensioning backing roll (3) tip to the output of driving motor (5), and is connected through belt (6) between two band pulleys.
4. A construction waste clearing apparatus according to claim 1, wherein: the outer wall edge of the conveying belt (7) is provided with a reinforcing chain (11), the construction waste supporting platform (8) is rotationally connected with the conveying belt (7) through a pin shaft, and a cable-stayed rope (10) is connected between one end, far away from the conveying belt (7), of the construction waste supporting platform (8) and the reinforcing chain (11).
5. A construction waste clearing apparatus according to claim 4, wherein: the construction waste supporting platform (8) is far away from the supporting boss (9) on the surface of one end of the conveying belt (7), and one end of the cable stayed (10) is connected with the supporting boss (9).
6. A construction waste clearing apparatus according to claim 1, wherein: the lower sides of the outer walls of the two conveying pipelines (1) are connected with supporting rods (12), buffer bosses (13) are connected between the bottom ends of the supporting rods (12), and the upper surfaces of the buffer bosses (13) are in an upward-protruding cambered surface shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320595862.8U CN219546168U (en) | 2023-03-23 | 2023-03-23 | Construction waste clearing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320595862.8U CN219546168U (en) | 2023-03-23 | 2023-03-23 | Construction waste clearing equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219546168U true CN219546168U (en) | 2023-08-18 |
Family
ID=87704432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320595862.8U Active CN219546168U (en) | 2023-03-23 | 2023-03-23 | Construction waste clearing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219546168U (en) |
-
2023
- 2023-03-23 CN CN202320595862.8U patent/CN219546168U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202030294U (en) | Multifunctional conveyor | |
CN102381538B (en) | Hoisting machine of tower crane | |
CN107905250A (en) | A kind of environmentally-friendly asphalt Concrete Highway builds integrated construction machine with retaining wall | |
CN219546168U (en) | Construction waste clearing equipment | |
CN102381539B (en) | Multifunctional tower crane elevator | |
CN207194567U (en) | A kind of carrier vehicle disk draw off gear | |
CN210654811U (en) | Solid material conveying device capable of being driven | |
CN108263865A (en) | A kind of cantilevered windrow machine equipment | |
CN219136203U (en) | Sewer grating plate carrying device | |
CN209009578U (en) | A kind of reinforced mesh eedle threader | |
CN202321479U (en) | Multifunctional tower crane hoist | |
CN212245108U (en) | Equipment for cleaning accumulated coal at bottom of main conveying belt | |
CN211619152U (en) | High-order vertical elevator | |
CN210884809U (en) | Material conveyor for construction | |
CN219822615U (en) | Bentonite flexible container slant promotes conveyer | |
CN111301991A (en) | Equipment for cleaning accumulated coal at bottom of main conveying belt | |
CN210825163U (en) | Hanging material carrying equipment for building construction | |
CN216861522U (en) | Material conveyor for construction | |
CN214988460U (en) | Garbage bin promotes transfer device | |
CN211141401U (en) | Building material's promotion conveyer | |
CN211647386U (en) | High-rise building construction operation device | |
CN213706874U (en) | Automatic lubricating device for lifting chain of large-barrel waste hoist | |
CN216945926U (en) | Face perpendicular conveyer in limit | |
CN212245055U (en) | Continuous material feeding unit of bottom building for building engineering | |
CN108821083B (en) | Novel slope type material lifting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |