CN210825163U CN201921944982.4U CN201921944982U CN210825163U CN 210825163 U CN210825163 U CN 210825163U CN 201921944982 U CN201921944982 U CN 201921944982U CN 210825163 U CN210825163 U CN 210825163U
Authority
CN
China
Prior art keywords
fixedly connected
threaded rod
hanging
driving motor
hanging material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921944982.4U
Other languages
Chinese (zh)
Inventor
解文彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921944982.4U priority Critical patent/CN210825163U/en
Application granted granted Critical
Publication of CN210825163U publication Critical patent/CN210825163U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a haulage equipment technical field just discloses a construction is with hanging material haulage equipment, deposit the platform including hanging the material, hang the lower fixed surface of material deposit platform and be connected with the transmission case, the left side fixedly connected with main drive motor of transmission incasement bottom lateral wall, the first conical gear of main drive motor's output fixedly connected with, the drive wheel transmission shaft has been cup jointed in the left side of transmission case. This material haulage equipment hangs for construction drives hoist and mount wire rope through the rotation of hoist and mount driving motor and upwards lifts, has realized the quick lifting to hanging the material for shipment speed has reduced operating time, has improved work efficiency, drives through first threaded rod and second threaded rod and hangs the material and remove left, has realized greatly accelerating shipment speed to hanging the automatic shipment of material, has reduced the waste of time and human cost, has improved work efficiency.

Description

Hanging material carrying equipment for building construction
Technical Field
The utility model relates to a haulage equipment technical field specifically is a material haulage equipment hangs for construction.
Background
In the building construction process, the hanging materials are often required to be carried, and the existing hanging material carrying equipment has the defects of inconvenient use, large volume and time and labor waste in hanging material carrying, so that the hanging material carrying equipment for building construction, which is convenient to use, small in volume and convenient to operate, is urgently needed to be researched and developed, and the hanging material carrying equipment for building construction is required; at present, hoisting equipment is generally adopted to hoist the hanging materials to the carrying equipment for transportation in the building construction process; at present, hoisting equipment is adopted to hoist the hanging materials to the carrying equipment for transportation in the building construction process, a complex loading and transporting process is needed, the operation is very complex, and a large amount of time and labor cost are wasted.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction is with hanging material haulage equipment has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a hanging material carrying device for building construction comprises a hanging material storage platform, wherein a transmission device box is fixedly connected to the lower surface of the hanging material storage platform, a main driving motor is fixedly connected to the left side of the bottom side wall in the transmission device box, a first bevel gear is fixedly connected to the output end of the main driving motor, a driving wheel transmission shaft is sleeved on the left side of the transmission device box, a second bevel gear is sleeved in the middle of the driving wheel transmission shaft and meshed with the first bevel gear, driving wheels are fixedly connected to the front end and the rear end of the driving wheel transmission shaft, a transmission crawler belt is sleeved on the outer surface of each driving wheel, lifting supports are fixedly connected to the four corners of the upper surface of the hanging material storage platform, a first fixing support is fixedly connected to the upper surface of the lifting support on the front side, and a second fixing support is fixedly connected to the upper surface of the lifting support on the rear, the inner side surface of the first fixed bracket is rotationally connected with a first threaded rod, the inner side surface of the second fixed bracket is rotationally connected with a second threaded rod, the right side of the outer surface of the first threaded rod is in threaded connection with a first threaded pipe, the right side of the outer surface of the second threaded rod is in threaded connection with a second threaded pipe, the upper surfaces of the first threaded pipe and the second threaded pipe are fixedly connected with the lower surface of the fixing plate, the middle part of the upper surface of the fixed plate is fixedly connected with a supporting frame, the top part of the inner side of the supporting frame is rotatably connected with a rotating shaft, the outer surface of the rotating shaft is provided with a hoisting steel wire rope, the rear side of the upper surface of the fixed plate is fixedly connected with a hoisting driving motor, the left top fixedly connected with driving motor fixed plate of hoisting support, the last fixed surface of driving motor fixed plate is connected with two sets of miniature driving motor.
Preferably, the upper surface of the fixing plate is provided with a rectangular through hole, and the aspect ratio of the size of the rectangular through hole is two to one.
Preferably, the hoisting steel wire rope is uniformly wound on the outer surface of the rotating shaft, and the bottom end of the hoisting steel wire rope is fixedly connected with a lifting hook.
Preferably, the hoisting support is made of high-strength cast iron, and the outer surface of the hoisting support is uniformly provided with an antirust coating.
Preferably, the transmission track is composed of a plurality of groups of track connecting blocks, and the circumference of the driving wheel is equal to one fourth of the length of the transmission track.
Preferably, the outer surfaces of the first threaded rod and the second threaded rod are lubricated, and lubricating oil is arranged on the outer surfaces of the first threaded rod and the second threaded rod.
(III) advantageous effects
Compared with the prior art, the utility model provides a construction is with hanging material haulage equipment possesses following beneficial effect:
1. this material haulage equipment hangs for construction drives hoist and mount wire rope through the rotation of hoist and mount driving motor and upwards lifts, has realized the quick lifting to hanging the material for shipment speed has reduced operating time, has improved work efficiency, drives through first threaded rod and second threaded rod and hangs the material and remove left, has realized greatly accelerating shipment speed to hanging the automatic shipment of material, has reduced the waste of time and human cost, has improved work efficiency.
2. This material haulage equipment hangs for construction drives the transmission track through the drive wheel and rotates, has realized carrying out the ability of carrying under various complicated topography circumstances, has improved the loading capacity who hangs material haulage equipment, has reduced the influence of topography to hanging material haulage equipment in the construction for the transport speed, the waste of time and human cost has been reduced, has improved work efficiency.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the driving structure of the present invention;
fig. 3 is a schematic view of the carrying structure of the present invention.
In the figure: 1. a hanging material storage platform; 2. a transmission equipment box; 3. a main drive motor; 4. a first bevel gear; 5. a drive wheel drive shaft; 6. a second bevel gear; 7. a drive wheel; 8. a drive track; 9. hoisting a support; 10. a first fixed bracket; 11. a second fixed bracket; 12. a first threaded rod; 13. a second threaded rod; 14. a first threaded pipe; 15. a second threaded pipe; 16. a fixing plate; 17. a support frame; 18. a rotating shaft; 19. hoisting a steel wire rope; 20. hoisting a driving motor; 21. a driving motor fixing plate; 22. a miniature drive motor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a hanging material carrying device for building construction comprises a hanging material storage platform 1, a transmission device box 2 is fixedly connected to the lower surface of the hanging material storage platform 1, a main driving motor 3 is fixedly connected to the left side of the bottom side wall of the transmission device box 2, a first bevel gear 4 is fixedly connected to the output end of the main driving motor 3, a driving wheel transmission shaft 5 is sleeved on the left side of the transmission device box 2, a second bevel gear 6 is sleeved in the middle of the driving wheel transmission shaft 5, the first bevel gear 4 is meshed with the second bevel gear 6, driving wheels 7 are fixedly connected to the front end and the rear end of the driving wheel transmission shaft 5, a driving crawler 8 is sleeved on the outer surface of the driving wheel 7, the driving crawler 8 is composed of a plurality of crawler connecting blocks, the perimeter of the driving wheel 7 is equal to one fourth of the length of the driving crawler 8, the driving wheel 7 drives the driving crawler 8 to rotate, the loading capacity of the hanging material carrying equipment is improved, the influence of the terrain on the hanging material carrying equipment in building construction is reduced, the carrying speed is accelerated, the waste of time and labor cost is reduced, the working efficiency is improved, four corners of the upper surface of the hanging material storage platform 1 are fixedly connected with the hanging supports 9, the materials of the hanging supports 9 are high-strength cast iron, the outer surfaces of the hanging supports 9 are uniformly provided with antirust coatings, the hardness of the materials is higher, the antirust effect is better, the loss caused by corrosion is prevented, the upper surface of the hanging support 9 positioned on the front side is fixedly connected with a first fixed support 10, the upper surface of the hanging support 9 positioned on the rear side is fixedly connected with a second fixed support 11, the inner side surface of the first fixed support 10 is rotatably connected with a first threaded rod 12, the inner side surface of the second fixed support 11 is rotatably connected with a second threaded rod 13, and the outer surfaces of the first threaded rod 12 and the second threaded rod 13, the outer surfaces of the first threaded rod 12 and the second threaded rod 13 are both provided with lubricating oil, the first threaded rod 12 and the second threaded rod 13 drive the hanging material to move leftwards, automatic loading and transporting of the hanging material is realized, the loading and transporting speed is greatly accelerated, the waste of time and labor cost is reduced, and the working efficiency is improved, the right side thread of the outer surface of the first threaded rod 12 is connected with a first threaded pipe 14, the right side thread of the outer surface of the second threaded rod 13 is connected with a second threaded pipe 15, the upper surfaces of the first threaded pipe 14 and the second threaded pipe 15 are both fixedly connected with the lower surface of a fixed plate 16, the upper surface of the fixed plate 16 is provided with a rectangular through hole, the aspect ratio of the size of the rectangular through hole is two to one, the hanging material is convenient to be better lifted, the working efficiency is improved, the middle part of the upper surface of the fixed plate 16 is fixedly, the surface of axis of rotation 18 is provided with hoist and mount wire rope 19, hoist and mount wire rope 19 evenly twines the surface at axis of rotation 18, hoist and mount wire rope 19's bottom fixedly connected with lifting hook, hoist and mount wire rope 19 ascending uplift through hoist and mount driving motor 20 rotation drive, realized the quick lifting to hanging the material, the shipment speed has been accelerated, operating time has been reduced, work efficiency has been improved, the rear side fixedly connected with hoist and mount driving motor 20 of the 16 upper surfaces of fixed plate, the left top fixedly connected with driving motor fixed plate 21 of hoisting support 9, the last fixed surface of driving motor fixed plate 21 is connected with two sets of micro driving motor 22.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the lifting device is used, the main driving motor 3 is controlled to be started, the output end of the main driving motor 3 rotates to drive the first bevel gear 4 to rotate, the first bevel gear 4 rotates to drive the second bevel gear 6 to rotate, the second bevel gear 6 rotates to drive the driving wheel transmission shaft 5 to rotate, the driving wheel transmission shaft 5 rotates to drive the driving wheel 7 to rotate, the driving wheel 7 rotates to drive the transmission crawler 8 to rotate, the transmission crawler 8 rotates to move the lifting material handling equipment to a specified position, the micro driving motor 22 is controlled to be started, the output end of the micro driving motor 22 rotates to drive the first threaded rod 12 and the second threaded rod 13 to rotate, the first threaded rod 12 and the second threaded rod 13 rotate to drive the first threaded pipe 14 and the second threaded pipe 15 to move, the first threaded pipe 14 and the second threaded pipe 15 move the fixing plate 16 to a specified position, the lifting driving motor 20 is controlled to be started, the output end of the lifting driving, the rotating shaft 18 rotates to loosen a hoisting steel wire rope 19 downwards, a hoisting material to be carried is fixed on a lifting hook, the hoisting driving motor 20 is controlled to rotate to drive the hoisting steel wire rope 19 to be tightened upwards, the output end of the micro driving motor 22 rotates to drive the first threaded rod 12 and the second threaded rod 13 to rotate, the first threaded rod 12 and the second threaded rod 13 rotate to drive the first threaded pipe 14 and the second threaded pipe 15 to move, the first threaded pipe 14 and the second threaded pipe 15 move the fixing plate 16 to the left side to a designated position, the hoisting driving motor 20 is controlled to rotate to drive the hoisting steel wire rope 19 to be loosened downwards, the hoisting material is placed on the hoisting material storage platform 1, the main driving motor 3 is controlled to start, the output end of the main driving motor 3 rotates to drive the first bevel gear 4 to rotate, the first bevel gear 4 rotates to drive the second bevel gear 6 to rotate, the second bevel gear 6 rotates to drive the driving wheel 5 to rotate, the driving wheel transmission shaft 5 rotates to drive the driving wheel 7 to rotate, the driving wheel 7 rotates to drive the transmission crawler belt 8 to rotate, the transmission crawler belt 8 rotates to convey hanging materials on the hanging material conveying equipment to a specified position, and after operation is completed, the power supply is turned off, and work is finished.
To sum up, this hanging material haulage equipment for construction drives hoist wire rope 19 through hoist and mount driving motor 20 rotation and upwards lifts, has realized having accelerated the shipment speed to hanging the quick lifting of material for operating time has reduced work efficiency, drives through first threaded rod 12 and second threaded rod 13 and hangs the material and remove left, has realized greatly accelerating shipment speed to hanging the automatic shipment of material, has reduced the waste of time and human cost, has improved work efficiency.
This material haulage equipment hangs for construction drives transmission track 8 through drive wheel 7 and rotates, has realized carrying out the ability of carrying under various complicated topography circumstances, has improved the loading capacity who hangs material haulage equipment, has reduced the influence of topography to hanging material haulage equipment in the construction for the transport speed, the waste of time and human cost has been reduced, has improved work efficiency.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction is with hanging material haulage equipment, includes that it deposits platform (1) to hang the material, its characterized in that: the lower surface of the hanging material storage platform (1) is fixedly connected with a transmission equipment box (2), the left side of the inner bottom side wall of the transmission equipment box (2) is fixedly connected with a main driving motor (3), the output end of the main driving motor (3) is fixedly connected with a first bevel gear (4), the left side of the transmission equipment box (2) is sleeved with a driving wheel transmission shaft (5), the middle part of the driving wheel transmission shaft (5) is sleeved with a second bevel gear (6), the first bevel gear (4) is meshed with the second bevel gear (6), the front end and the rear end of the driving wheel transmission shaft (5) are both fixedly connected with driving wheels (7), the outer surface of the driving wheels (7) is sleeved with a transmission crawler (8), four corners of the upper surface of the hanging material storage platform (1) are both fixedly connected with hoisting supports (9), the upper surface of the hoisting support (9) positioned on the front side is fixedly connected with a first fixing support (, the upper surface of a hoisting support (9) positioned at the rear side is fixedly connected with a second fixed support (11), the inner side surface of the first fixed support (10) is rotatably connected with a first threaded rod (12), the inner side surface of the second fixed support (11) is rotatably connected with a second threaded rod (13), the right side thread of the outer surface of the first threaded rod (12) is connected with a first threaded pipe (14), the right side thread of the outer surface of the second threaded rod (13) is connected with a second threaded pipe (15), the upper surfaces of the first threaded pipe (14) and the second threaded pipe (15) are both fixedly connected with the lower surface of a fixed plate (16), the middle part of the upper surface of the fixed plate (16) is fixedly connected with a support frame (17), the top of the inner side of the support frame (17) is rotatably connected with a rotating shaft (18), and the outer surface of the rotating shaft (18) is provided, the rear side fixedly connected with hoist and mount driving motor (20) of fixed plate (16) upper surface, the left top fixedly connected with driving motor fixed plate (21) of hoisting support (9), the upper surface fixedly connected with two sets of miniature driving motor (22) of driving motor fixed plate (21).
2. The hanging material conveying apparatus for building construction according to claim 1, characterized in that: the upper surface of the fixing plate (16) is provided with a rectangular through hole, and the aspect ratio of the size of the rectangular through hole is two to one.
3. The hanging material conveying apparatus for building construction according to claim 1, characterized in that: the hoisting steel wire ropes (19) are uniformly wound on the outer surface of the rotating shaft (18), and the bottom ends of the hoisting steel wire ropes (19) are fixedly connected with lifting hooks.
4. The hanging material conveying apparatus for building construction according to claim 1, characterized in that: the hoisting support (9) is made of high-strength cast iron, and the outer surface of the hoisting support (9) is uniformly provided with an antirust coating.
5. The hanging material conveying apparatus for building construction according to claim 1, characterized in that: the transmission crawler (8) is composed of a plurality of groups of crawler connecting blocks, and the circumference of the driving wheel (7) is equal to one fourth of the length of the transmission crawler (8).
6. The hanging material conveying apparatus for building construction according to claim 1, characterized in that: the outer surfaces of the first threaded rod (12) and the second threaded rod (13) are lubricated, and lubricating oil is arranged on the outer surfaces of the first threaded rod (12) and the second threaded rod (13).
CN201921944982.4U 2019-11-12 2019-11-12 Hanging material carrying equipment for building construction Expired - Fee Related CN210825163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921944982.4U CN210825163U (en) 2019-11-12 2019-11-12 Hanging material carrying equipment for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921944982.4U CN210825163U (en) 2019-11-12 2019-11-12 Hanging material carrying equipment for building construction

Publications (1)

Publication Number Publication Date
CN210825163U true CN210825163U (en) 2020-06-23

Family

ID=71262363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921944982.4U Expired - Fee Related CN210825163U (en) 2019-11-12 2019-11-12 Hanging material carrying equipment for building construction

Country Status (1)

Country Link
CN (1) CN210825163U (en)

Similar Documents

Publication Publication Date Title
CN218539059U (en) Gantry container crane with locking mechanism
CN210825163U (en) Hanging material carrying equipment for building construction
CN102381539B (en) Multifunctional tower crane elevator
CN105460841B (en) A kind of multifunctional manual material lifting rotation vehicle
CN217148283U (en) Material transfer device is used in architectural decoration construction
CN211139373U (en) Water feed pump maintenance trolley for power plant
CN211619152U (en) High-order vertical elevator
CN213950331U (en) Two-degree-of-freedom rotary supporting and taking lifting appliance
CN210214621U (en) Railway vehicle wheel lifting appliance
CN209522501U (en) A kind of mechanical equipment mast-up
CN212074052U (en) Transfer device suitable for district commodity circulation is transported
CN213112286U (en) Raw material elevator is used in cement manufacture processing
CN220502498U (en) Aluminum alloy decoration hoisting mechanism
CN217516516U (en) Hoisting device of marine crane
CN214456338U (en) Novel anti-drop's material for construction lifts by crane device
CN215249038U (en) Automobile parts hoists transfer device
CN211078319U (en) Improved carrying device for hydraulic engineering pile foundation construction
CN218320386U (en) Newly-built former material machine of lifting for transformation
CN213265499U (en) Die plate balance lifting mechanism
CN220723377U (en) Lifting appliance device
CN214057643U (en) High industry grease processing of stability is with fortune material device
CN213565996U (en) Simple hoisting trolley for constructional engineering
CN218320393U (en) Special article lifting device
CN219546168U (en) Construction waste clearing equipment
CN220334554U (en) Special cleaning lifting appliance for workpieces with holes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200623