CN219470998U - Pre-buried structure of prefabricated full assembly basis dowel - Google Patents

Pre-buried structure of prefabricated full assembly basis dowel Download PDF

Info

Publication number
CN219470998U
CN219470998U CN202320767913.0U CN202320767913U CN219470998U CN 219470998 U CN219470998 U CN 219470998U CN 202320767913 U CN202320767913 U CN 202320767913U CN 219470998 U CN219470998 U CN 219470998U
Authority
CN
China
Prior art keywords
dowel
foundation
foundation beam
buried structure
strip base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320767913.0U
Other languages
Chinese (zh)
Inventor
钟志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
Changsha Broad Homes Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Broad Homes Industrial Group Co Ltd filed Critical Changsha Broad Homes Industrial Group Co Ltd
Priority to CN202320767913.0U priority Critical patent/CN219470998U/en
Application granted granted Critical
Publication of CN219470998U publication Critical patent/CN219470998U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a prefabricated full-assembled foundation dowel bar pre-buried structure. The prefabricated full-assembled foundation dowel bar pre-buried structure comprises a strip base, a foundation beam arranged on the strip base, a plurality of dowel bars connected to the strip base and the foundation beam, a side die for pouring the foundation beam and a design template for being connected with the side die, wherein a plurality of dowel bars are arranged on the length direction of the foundation beam at intervals, at least one dowel bar hole is formed in each design template, one end of each dowel bar is formed in the strip base to extend into the length L, and the other end of each dowel bar extends out of each dowel bar hole. According to the utility model, the design template is fixed on the side mould to fix the dowel bars, so that the dowel bars are prevented from being deviated when concrete is poured, the stability of the dowel bars is ensured, and the forming quality of the foundation beam is ensured.

Description

Pre-buried structure of prefabricated full assembly basis dowel
Technical Field
The utility model relates to the technical field of pre-buried construction methods of prefabricated full-assembled foundation dowel bars, in particular to a pre-buried structure of a prefabricated full-assembled foundation dowel bar.
Background
In the cast-in-situ foundation construction, dowel bars pre-buried in the connection of the main body structure are needed. Because the size of the reserved hole of the fully assembled prefabricated wallboard PK box is limited, the precision requirement on the reserved dowel bar of the foundation is higher. In the full assembly project, the embedded point positions of the dowel bars can be positioned through paying off, as shown in fig. 1 and 2, specifically, the dowel bar point positions are found out on a strip base 5 (strip foundation) through a paying off measuring method, and then the dowel bar holes 1 are formed by punching holes in the point positions. After the completion, clean up in the dowel hole 1, fix dowel 3 in dowel hole 1 of strip base 5 with mortar. And building a template support pouring concrete, and forming a foundation beam 4 on the strip base.
The method can better ensure the stability of the dowel bar under the condition that the height of the foundation beam is smaller (less than 500 mm), but when the height of the foundation beam is greater than 500mm, the self weight of the concrete and the construction of the vibrating rod easily cause the deflection of the template and the expansion of the template when the concrete is poured on the foundation beam, so that the pre-buried dowel bar is deflected along with the deflection, the stability of the dowel bar is influenced, and the forming quality is influenced.
Disclosure of Invention
The utility model aims to provide a prefabricated full-assembled foundation dowel bar pre-buried structure which can be suitable for stably installing dowel bars when the height of a foundation beam is larger than 500 mm.
The technical scheme of the utility model is as follows: the utility model provides a prefabricated full assembly foundation dowel pre-buried structure includes the strip base, locates foundation beam on the strip base, connect in a plurality of dowel bars of strip base and foundation beam, be used for pouring the side form of foundation beam, be used for the design template of being connected with the side form, the design template has been a plurality of at the length direction interval cloth of foundation beam, every be equipped with at least one dowel bar hole on the design template, the one end of dowel bar is in form in the strip base and stretch into length L, the other end of dowel bar is followed the dowel bar hole stretches out.
Preferably, the design template is connected with the side mold through a spike.
Preferably, steel bars are arranged in the foundation beam, and the dowel bars are fixed with the steel bars.
Preferably, the length L is more than or equal to 200mm.
Preferably, in the plurality of design templates spaced along the length direction of the foundation beam, the distance between every two design templates is more than or equal to 1m.
Preferably, the part of the dowel bar extending out of the dowel bar hole is a threaded section.
Compared with the related art, the utility model has the beneficial effects that: through fixed design template in order to fix the dowel on the side form, can effectively avoid making the dowel skew when pouring the concrete, guarantee the stability of dowel, guarantee the shaping quality of foundation beam.
Drawings
Fig. 1 is a schematic structural diagram of a foundation beam casting concrete in a conventional foundation dowel bar embedded structure;
fig. 2 is a schematic structural diagram of a prior art foundation dowel bar pre-embedding structure;
FIG. 3 is a schematic diagram of a pre-buried structure of a prefabricated fully assembled foundation dowel and a dowel perspective structure provided by the utility model;
FIG. 4 is an enlarged schematic view of FIG. 3 at A;
fig. 5 is a schematic view of fig. 3 from above with the strip base removed.
In the accompanying drawings: 1. dowel holes; 2. a spike; 3. a dowel bar; 4. a foundation beam; 5. a strip base; 6. reinforcing steel bars; 7. designing a template; 8. and (5) side mold.
Detailed Description
The utility model will be described in detail below with reference to the drawings in connection with embodiments. It should be noted that, without conflict, the embodiments of the present utility model and features of the embodiments may be combined with each other. For convenience of description, the words "upper", "lower", "left" and "right" are used hereinafter to denote only the directions corresponding to the upper, lower, left, and right directions of the drawings, and do not limit the structure.
As shown in fig. 3 and 5, the prefabricated fully assembled foundation dowel bar pre-buried structure provided in this embodiment includes a bar base 5, a foundation beam 4 disposed on the bar base 5, a plurality of dowel bars 3 connected to the bar base 5 and the foundation beam 4, a side mold 8 for pouring the foundation beam 4, and a design template 7 for connecting with the side mold 8.
The side forms 8 are surrounded on four sides on the strip base 5 to form a template capable of pouring the foundation beam 4.
The design templates 7 are rectangular plates, a plurality of design templates are arranged at intervals in the length direction of the foundation beam 4, and the distance between every two design templates 7 is more than or equal to 1m.
Both ends of the design template 7 are fixed with two opposite side molds 8 by the spikes 2 (as shown in fig. 4).
At least one dowel hole 1 is arranged on each design template 7. And steel bars 6 are arranged in the foundation beam 4. One end of the dowel bar 3 forms an extending length L in the strip base 5, and the length L is more than or equal to 200mm. The other end of the dowel bar 3 extends out of the dowel bar hole 1, and the extending section is a threaded section.
The construction method of the prefabricated full-assembled foundation splicing embedded structure provided by the utility model comprises the following steps: and drilling a dowel hole on the strip base 5 by adopting a measuring paying-off method. And building a side die 8 to form a cavity for pouring the foundation beam 4. Reinforcing steel bars 6 are placed in the cavity, and the number of the reinforcing steel bars 6 is a plurality of reinforcing steel bars. The design templates 7 are installed on top of the side forms 8 and are arranged at intervals along the length extension direction of the foundation beam 4. And then the dowel holes 1 corresponding to the dowel holes of the strip base 5 are formed in the design template 7 by a hanging wire method. Installing the dowel bar 3: the dowel holes 1 of the self-designed templates 7 extend into dowel holes of the strip base 5, and then the dowel 3 and the steel bars 6 are fixed in a binding or welding mode. And pouring the concrete sincery foundation beam 4. Finally, the design template 7 and the side mold 8 are removed. The deflection of the dowel bars 3 caused when pouring concrete is effectively avoided by designing the templates 7.
The foregoing description is only illustrative of the present utility model and is not intended to limit the scope of the utility model, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present utility model.

Claims (6)

1. The utility model provides a prefabricated full assembly foundation dowel pre-buried structure, includes the strip base, locates foundation beam on the strip base, connect in a plurality of dowel and the side form that is used for pouring the foundation beam of strip base and foundation beam, its characterized in that still includes the design template that is used for being connected with the side form, the interval has laid a plurality ofly on the length direction of foundation beam of design template, every be equipped with at least one dowel hole on the design template, the one end of dowel is in form in the strip base stretches into length L, the other end of dowel is followed the dowel hole stretches out.
2. The prefabricated fully assembled foundation dowel bar pre-buried structure of claim 1, wherein the design form is connected to the side forms by spikes.
3. The prefabricated fully assembled foundation dowel bar pre-buried structure according to claim 1, wherein steel bars are arranged in the foundation beam, and the dowel bars are fixed with the steel bars.
4. The prefabricated fully assembled foundation dowel bar pre-buried structure according to claim 1, wherein the length L is not less than 200mm.
5. The prefabricated fully assembled foundation dowel bar pre-buried structure according to claim 1, wherein a distance between each two of the design templates among the plurality of design templates spaced along the length direction of the foundation beam is not less than 1m.
6. The pre-buried structure of prefabricated full assembled foundation dowel according to claim 1, wherein the portion of the dowel extending out of the dowel hole is a threaded section.
CN202320767913.0U 2023-04-10 2023-04-10 Pre-buried structure of prefabricated full assembly basis dowel Active CN219470998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320767913.0U CN219470998U (en) 2023-04-10 2023-04-10 Pre-buried structure of prefabricated full assembly basis dowel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320767913.0U CN219470998U (en) 2023-04-10 2023-04-10 Pre-buried structure of prefabricated full assembly basis dowel

Publications (1)

Publication Number Publication Date
CN219470998U true CN219470998U (en) 2023-08-04

Family

ID=87465036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320767913.0U Active CN219470998U (en) 2023-04-10 2023-04-10 Pre-buried structure of prefabricated full assembly basis dowel

Country Status (1)

Country Link
CN (1) CN219470998U (en)

Similar Documents

Publication Publication Date Title
KR101401467B1 (en) The bi-prestressed concrete U-type girder and its construction method
KR20120062156A (en) Assembling method of thin plate concrete form to the shop welded rebar beam
KR102153184B1 (en) Mold for manufacturing precast concrete double wall standing and manufacturing method of precast concrete double wall using of the same
KR101765334B1 (en) Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor
CN111455876B (en) Reinforcing structure and method for small-span masonry arch bridge
CN113338535B (en) Forming die and construction method for H-shaped steel beam wrapped concrete
KR101023179B1 (en) Tee type ribbed slab, manufacturing method and construction method thereof
CN219470998U (en) Pre-buried structure of prefabricated full assembly basis dowel
KR101994089B1 (en) Precast Concrete Slab With Pullout-Shear Resistance Elements Of Mesh Rib And Manufacturing Method Thereof
KR20170108215A (en) I section steel half precast slab and manufacturing method and construction method of the same
KR101585482B1 (en) Composite girder with reinforced end unit of anti-crack and the manufacturing method thereof
CN110067206A (en) A kind of ovum type underpass bridge construction method
KR102140407B1 (en) Mamanufacturing method of PSC girder using end form steel plate
KR102209116B1 (en) Manufacturing method of precast concrete member using tube
KR101499069B1 (en) Steel form used long span slab
KR102267643B1 (en) Inverse Tee PSC Girder Prefabricated With Top Saddle PC blocks And Slab Construction Method Using Thereof
CN209971052U (en) Two T roof beam nomadic formula apparatus for producing of prestressing force
JP2020165117A (en) Concrete wall structure, manufacturing method thereof, and building structure
CN114278341B (en) Two-lining template construction structure and method based on mine tunnel special-shaped section
KR200407184Y1 (en) Precasted concrete plate
CN113756497B (en) Concrete floor slab adopting hollow template and rapid construction method thereof
CN215594609U (en) Anchor plate and stiff column fixing structure in stiff structure
CN218911791U (en) Horizontal connection node of hollow wallboard
CN114150805B (en) Cast-in-situ hollow floor slab inner mold box and construction method thereof
CN115045436B (en) Steel pipe rack combined plate and manufacturing method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant