CN219470689U - Construction hanging basket special for bridge stay cable - Google Patents

Construction hanging basket special for bridge stay cable Download PDF

Info

Publication number
CN219470689U
CN219470689U CN202320614119.2U CN202320614119U CN219470689U CN 219470689 U CN219470689 U CN 219470689U CN 202320614119 U CN202320614119 U CN 202320614119U CN 219470689 U CN219470689 U CN 219470689U
Authority
CN
China
Prior art keywords
plate
mounting
fixed
arc
stay cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320614119.2U
Other languages
Chinese (zh)
Inventor
李桂菊
姬凯
姬双成
肖洪辉
李国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxiang Yinghao Construction Machinery Co ltd
Original Assignee
Xinxiang Yinghao Construction Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxiang Yinghao Construction Machinery Co ltd filed Critical Xinxiang Yinghao Construction Machinery Co ltd
Priority to CN202320614119.2U priority Critical patent/CN219470689U/en
Application granted granted Critical
Publication of CN219470689U publication Critical patent/CN219470689U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a construction hanging basket special for a bridge stay cable, which comprises a stay cable, a climbing machine and a fixed plate, wherein a first arc-shaped plate is fixed at one end of the climbing machine, third mounting plates are arranged at two sides of the first arc-shaped plate, second fastening bolts are arranged in the third mounting plates, a second arc-shaped plate is fixed at one end of the fixed plate, fourth mounting plates are arranged at two sides of the second arc-shaped plate, a second threaded sleeve is fixed at the lower end face of the fourth mounting plate, and the bottom ends of the second fastening bolts are arranged in the second threaded sleeve. According to the utility model, the first locking plate is driven to move by the first telescopic component in the first arc-shaped plate, and the second locking plate is driven to move by the second telescopic component in the second arc-shaped plate, so that the first locking plate and the second locking plate lock the stay rope, the reverse sliding phenomenon of the construction hanging basket is prevented, the safety of the construction hanging basket is improved, and the safety accident is avoided.

Description

Construction hanging basket special for bridge stay cable
Technical Field
The utility model relates to the technical field of construction hanging baskets, in particular to a construction hanging basket special for a bridge stay cable.
Background
The stay cable is also called a stay cable or a stay cable, is a connecting device of a main girder bridge deck of the cable-stayed bridge, can directly transfer the weight of the bridge deck to a main bearing part on a tower, and can be composed of parallel steel wires, parallel steel cables, single steel cable, steel wire ropes, closed steel cables or solid steel bars.
Because the stay cables are all in an open-air environment for working, the influence of factors such as environmental erosion, material aging, long-term load effect and the like is easy, the damage to the cable structure and the bearing capacity degradation are extremely easy to cause, so that the corrosion or fracture of the stay cable steel wires are caused, and the normal use of the cable-stayed bridge is influenced, so that the stay cables are required to be regularly detected and maintained, and when overhauled, overhauling staff can complete overhauling work by aid of the aid of a hanging basket;
the existing hanging basket used for the maintenance of the stay cable is usually provided with a climbing machine outside the stay cable, then the climbing machine drives the hanging basket to move along the stay cable through a rope, and if the climbing machine stops working in the climbing process, the climbing machine can slide backwards, the maintenance of the stay cable is in high altitude, and safety accidents are easily caused, so the inventor provides a special construction hanging basket for the bridge stay cable, which is used for solving the problems.
Disclosure of Invention
The utility model aims to provide a construction hanging basket special for a bridge stay cable, which aims to solve the problems that a climbing machine is usually arranged outside the stay cable and then driven to move along the stay cable by a rope, and if the climbing machine stops working in the climbing process, the climbing machine can slip backwards and the stay cable is overhauled in high altitude, so that safety accidents are very easy to occur.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a special construction hanging basket of bridge suspension cable, includes suspension cable, climbing machine and fixed plate, the one end of climbing machine is fixed with first arc, the both sides of first arc are provided with the third mounting panel, the internally mounted of third mounting panel has the second fastening bolt, just the one end of fixed plate is fixed with the second arc, the both sides of second arc are provided with the fourth mounting panel, the lower terminal surface of fourth mounting panel is fixed with the second screw sleeve, just the bottom of second fastening bolt is installed inside the second screw sleeve, just the inside of first arc is provided with two sets of first mounting grooves, the internally mounted of first mounting groove has first flexible subassembly, the output of first flexible subassembly is installed first locking plate, just the inside of second arc is provided with the second mounting groove, the internally mounted of second mounting groove has the flexible subassembly of second, the output of the flexible subassembly of second is provided with the second locking plate to the surface that the suspension cable is in order to first locking plate and second locking plate.
As a technical scheme of the utility model, two climbing machines are arranged on the surface of the stay cable, and the two climbing machines are fixedly connected through a fixing rod so as to be convenient for the fixing rod to fix the two climbing machines.
As a technical scheme of the utility model, one side of the climbing machine is provided with a first mounting piece, and a mounting shaft is movably mounted in the first mounting piece so that the mounting shaft is movably mounted in the first mounting piece.
According to the technical scheme, one side of the fixing plate is provided with the second mounting piece, and the second mounting piece is rotatably mounted on the surface of the mounting shaft, so that the fixing plate is rotatably mounted on the surface of the mounting shaft through the second mounting piece.
As a technical scheme of the utility model, a first mounting plate is arranged on the other side of the climbing machine, and a first fastening bolt is arranged in the first mounting plate so that the first fastening bolt is arranged in the first mounting plate.
As a technical scheme of the utility model, a second mounting plate is arranged on the other side of the fixing plate, a first threaded sleeve is arranged on the lower end face of the second mounting plate, and a first fastening bolt is arranged in the first threaded sleeve so that one end of the first fastening bolt is arranged in the first threaded sleeve.
As a technical scheme of the utility model, the bottom end of the fixing plate is fixed with the supporting rod, the two ends of the bottom of the supporting rod are provided with the connecting rods, and the bottom end of the connecting rod is provided with the hanging basket so that the hanging basket is fixed at the two ends of the supporting rod through the connecting rods.
Compared with the prior art, the utility model has the beneficial effects that: install the inside at the third mounting panel through with second fastening bolt, install the one end of second fastening bolt inside terminal surface second screw sleeve under the fourth mounting panel, make second fastening bolt pass through third mounting panel and fourth mounting panel with first arc and second arc install the surface at the suspension cable, when climbing machine stop work, the inside first flexible subassembly of first arc drives first locking plate and removes, the inside second flexible subassembly of second arc drives the second locking plate and removes, make first locking plate and second locking plate lock the suspension cable, prevent that the construction hanging flower basket from taking place the slip phenomenon, thereby improve the security of construction hanging flower basket, avoid the emergence of incident.
Drawings
FIG. 1 is a schematic view of a front partial cross-sectional structure of the present utility model;
FIG. 2 is a schematic view of the rear exterior structure of the present utility model;
FIG. 3 is a schematic cross-sectional view of the anti-rollback apparatus of the present utility model;
FIG. 4 is an enlarged schematic view of the structure of FIG. 1A according to the present utility model;
fig. 5 is an enlarged schematic view of the structure of fig. 2B according to the present utility model.
In the figure: 1. stay cables; 2. a climbing machine; 201. a fixed rod; 3. a first mounting member; 4. a mounting shaft; 5. a second mounting member; 6. a fixing plate; 7. a first mounting plate; 8. a first fastening bolt; 9. a second mounting plate; 10. a first threaded sleeve; 11. a first arcuate plate; 12. a third mounting plate; 13. a second fastening bolt; 14. a second arcuate plate; 1401. a fourth mounting plate; 15. a second threaded sleeve; 16. a first mounting groove; 17. a first telescoping assembly; 18. a first locking plate; 19. a second mounting groove; 20. a second telescoping assembly; 21. a second locking plate; 22. a support rod; 23. a connecting rod; 24. and (5) hanging a basket.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, an embodiment of the present utility model is provided: the special construction hanging basket for the bridge stay cable comprises a stay cable 1, a climbing machine 2 and a fixed plate 6, wherein a first arc-shaped plate 11 is fixed at one end of the climbing machine 2, third mounting plates 12 are arranged at two sides of the first arc-shaped plate 11, second fastening bolts 13 are arranged in the third mounting plates 12, a second arc-shaped plate 14 is fixed at one end of the fixed plate 6, fourth mounting plates 1401 are arranged at two sides of the second arc-shaped plate 14, a second threaded sleeve 15 is fixed at the lower end surface of the fourth mounting plates 1401, the bottom ends of the second fastening bolts 13 are arranged in the second threaded sleeve 15, two groups of first mounting grooves 16 are arranged in the first arc-shaped plate 11, a first telescopic assembly 17 is arranged in the first mounting grooves 16, a first holding dead plate 18 is arranged at the output end of the first telescopic assembly 17, a second mounting groove 19 is arranged in the second arc-shaped plate 14, a second telescopic assembly 20 is arranged in the second mounting groove 19, and a second holding dead plate 21 is arranged at the output end of the second telescopic assembly 20;
when the climbing machine is used, the second fastening bolt 13 is arranged in the third mounting plate 12, one end of the second fastening bolt 13 is arranged in the second threaded sleeve 15 on the lower end surface of the fourth mounting plate 1401, so that the second fastening bolt 13 is used for arranging the first arc-shaped plate 11 and the second arc-shaped plate 14 on the surface of the suspension cable 1 through the third mounting plate 12 and the fourth mounting plate 1401, when the climbing machine 2 stops working, the first telescopic component 17 in the first arc-shaped plate 11 drives the first locking plate 18 to move, and the second telescopic component 20 in the second arc-shaped plate 14 drives the second locking plate 21 to move, so that the first locking plate 18 and the second locking plate 21 lock the suspension cable 1;
two climbing machines 2 are arranged on the surface of the stay cable 1, and the two climbing machines 2 are fixedly connected through a fixing rod 201;
when the climbing device is used, the fixing rod 201 is arranged between the two climbing machines 2, so that the fixing rod 201 fixes the two climbing machines 2;
a first mounting piece 3 is arranged on one side of the climbing machine 2, and a mounting shaft 4 is movably mounted in the first mounting piece 3;
when in use, the first mounting piece 3 is fixed on one side of the climbing machine 2, so that the mounting shaft 4 is movably mounted in the first mounting piece 3;
a second mounting piece 5 is arranged on one side of the fixed plate 6, and the second mounting piece 5 is rotatably mounted on the surface of the mounting shaft 4;
in use, the second mounting member 5 is fixed on one side of the fixed plate 6, so that the fixed plate 6 is rotatably mounted on the surface of the mounting shaft 4 through the second mounting member 5;
the other side of the climbing machine 2 is provided with a first mounting plate 7, and a first fastening bolt 8 is arranged in the first mounting plate 7;
in use, the first fastening bolt 8 is mounted inside the first mounting plate 7 by fixing the first mounting plate 7 to the other side of the climbing machine 2;
the other side of the fixed plate 6 is provided with a second mounting plate 9, the lower end surface of the second mounting plate 9 is provided with a first threaded sleeve 10, and a first fastening bolt 8 is arranged in the first threaded sleeve 10;
when in use, one end of the first fastening bolt 8 is arranged inside the first threaded sleeve 10 by fixing the second mounting plate 9 on the other side of the fixed plate 6 and arranging the first threaded sleeve 10 on the lower end surface of the second mounting plate 9;
the bottom end of the fixed plate 6 is fixed with a supporting rod 22, two ends of the bottom of the supporting rod 22 are provided with connecting rods 23, and the bottom end of each connecting rod 23 is provided with a hanging basket 24;
in use, the support rods 22 are arranged at the bottom ends of the fixing plates 6, so that the hanging baskets 24 are fixed at the two ends of the support rods 22 through the connecting rods 23.
When the embodiment of the application is used, the following steps are adopted: firstly, the climbing machine 2 is installed on the surface of the suspension cable 1 through the fixing plate 6, and the first fastening bolt 8 is installed in the first threaded sleeve 10, so that the climbing machine 2 and the fixing plate 6 are fixed, then the climbing machine 2 and the fixing plate 6 drive the first arc plate 11 and the second arc plate 14 to be installed on the surface of the suspension cable 1, and one end of the second fastening bolt 13 is installed in the second threaded sleeve 15, so that the first arc plate 11 and the second arc plate 14 are fixed, then the supporting rod 22 at the bottom end of the fixing plate 6 drives the hanging basket 24 to move through the connecting rod 23, when the climbing machine 2 stops working, the first telescopic assembly 17 in the first arc plate 11 drives the first locking plate 18 to move, and meanwhile, the second telescopic assembly 20 in the second arc plate 14 drives the second locking plate 21 to move, so that the first locking plate 18 and the second locking plate 21 are locked on the surface of the suspension cable 1, and therefore the hanging basket special for construction of the suspension cable is completed.
The embodiments of the present utility model have been shown and described for the purpose of illustration and description, it being understood that the above embodiments are illustrative and not to be construed as limiting the utility model, and that variations, modifications, alternatives and variations may be made therein by one of ordinary skill in the art without departing from the scope of the utility model.

Claims (7)

1. The utility model provides a bridge suspension cable special construction hanging flower basket, includes suspension cable (1), climbing machine (2) and fixed plate (6), its characterized in that: the climbing machine is characterized in that a first arc plate (11) is fixed at one end of the climbing machine (2), a third mounting plate (12) is arranged on two sides of the first arc plate (11), a second fastening bolt (13) is arranged in the third mounting plate (12), a second arc plate (14) is fixed at one end of the fixing plate (6), a fourth mounting plate (1401) is arranged on two sides of the second arc plate (14), a second threaded sleeve (15) is fixed on the lower end face of the fourth mounting plate (1401), the bottom end of the second fastening bolt (13) is arranged inside the second threaded sleeve (15), two groups of first mounting grooves (16) are formed in the first arc plate (11), a first telescopic assembly (17) is arranged in the first mounting groove (16), a first locking plate (18) is arranged at the output end of the first telescopic assembly (17), a second mounting groove (19) is arranged in the second arc plate (14), and a second telescopic assembly (20) is arranged at the second locking assembly (20).
2. The construction basket special for a bridge stay cable according to claim 1, wherein: the surface of the stay cable (1) is provided with two climbing machines (2), and the two climbing machines (2) are fixedly connected through a fixing rod (201).
3. The construction basket special for a bridge stay cable according to claim 1, wherein: one side of the climbing machine (2) is provided with a first mounting piece (3), and a mounting shaft (4) is movably mounted in the first mounting piece (3).
4. The construction basket special for a bridge stay cable according to claim 1, wherein: one side of the fixed plate (6) is provided with a second mounting piece (5), and the second mounting piece (5) is rotatably mounted on the surface of the mounting shaft (4).
5. The construction basket special for a bridge stay cable according to claim 1, wherein: the climbing machine is characterized in that a first mounting plate (7) is arranged on the other side of the climbing machine (2), and a first fastening bolt (8) is mounted in the first mounting plate (7).
6. The construction basket special for a bridge stay cable according to claim 1, wherein: the opposite side of fixed plate (6) is provided with second mounting panel (9), the lower terminal surface of second mounting panel (9) is provided with first screw sleeve (10), the internally mounted of first screw sleeve (10) has first fastening bolt (8).
7. The construction basket special for a bridge stay cable according to claim 1, wherein: the bottom end of the fixed plate (6) is fixed with a supporting rod (22), two ends of the bottom of the supporting rod (22) are provided with connecting rods (23), and the bottom end of each connecting rod (23) is provided with a hanging basket (24).
CN202320614119.2U 2023-03-27 2023-03-27 Construction hanging basket special for bridge stay cable Active CN219470689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320614119.2U CN219470689U (en) 2023-03-27 2023-03-27 Construction hanging basket special for bridge stay cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320614119.2U CN219470689U (en) 2023-03-27 2023-03-27 Construction hanging basket special for bridge stay cable

Publications (1)

Publication Number Publication Date
CN219470689U true CN219470689U (en) 2023-08-04

Family

ID=87462464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320614119.2U Active CN219470689U (en) 2023-03-27 2023-03-27 Construction hanging basket special for bridge stay cable

Country Status (1)

Country Link
CN (1) CN219470689U (en)

Similar Documents

Publication Publication Date Title
CN214091279U (en) Electric pole correction device for electric power engineering
CN218102518U (en) High-strength aluminum alloy spacer
CN219470689U (en) Construction hanging basket special for bridge stay cable
CN108631231B (en) Supporting and fixing device for cable bridge
CN201952742U (en) Suspension bridge cable changing device
CN212053828U (en) Steel construction engineering component rotating device
CN213879245U (en) Linkage device for lifting of lightning receptor and anemometer
CN207869058U (en) A kind of photovoltaic module fixing device suitable for flexible support
CN211852675U (en) Connector for stay cable wire rope
CN210140398U (en) Multifunctional suspension equipment for mechanical engineering
CN203655151U (en) Core drilling machine
CN208142715U (en) A kind of cable pay-off rack
CN207490436U (en) The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex
CN112209217A (en) Cable wind device
CN214576653U (en) Protective window convenient to escape
CN201526261U (en) Outdoor isolating switch repair ladder
CN220893512U (en) Hydraulic engineering water level monitoring device
CN209308383U (en) It is a kind of for prevent damage exterior finish split blade type hydraulic lifting climbing frame
CN220620988U (en) Support frame for elevator installation
CN220209319U (en) Power engineering maintenance transmission line grounding wire device
CN216616562U (en) Crossbeam structure for steel construction factory building
CN212799390U (en) Rope skipping prevention device for tower crane trolley
CN214456361U (en) Wall head crane with rotatable suspension arm
CN217629488U (en) Long sling unloading device for suspension bridge
CN210577608U (en) Bus bridge positioning support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant