CN219411827U - Paying-off hole die - Google Patents
Paying-off hole die Download PDFInfo
- Publication number
- CN219411827U CN219411827U CN202222681228.4U CN202222681228U CN219411827U CN 219411827 U CN219411827 U CN 219411827U CN 202222681228 U CN202222681228 U CN 202222681228U CN 219411827 U CN219411827 U CN 219411827U
- Authority
- CN
- China
- Prior art keywords
- hole
- paying
- die
- opening
- pay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a paying-off hole die, which is used for solving the defects of difficult demolding, easy falling, poor recycling rate and the like of the existing paying-off hole die, and can rapidly plug the paying-off hole in the later stage, thereby improving the efficiency, quality and safety of construction of a reserved paying-off hole. The paying-off hole die comprises a die body in the shape of an inverted cone table, the die body is divided into two symmetrical flaps, wherein two hinges are used for connecting two adjacent parts of 1 flap, the other two adjacent parts of 1 flap are connected through a buckle, the hinges and the buckle are both installed on the inner wall of the die body, the die body comprises an upper opening and a lower opening, the opening of the upper opening is larger than the lower opening, and the lower opening is used for penetrating through a concrete floor slab.
Description
Technical Field
The utility model relates to a paying-off hole die, which is particularly used for measuring paying-off of civil engineering.
Background
Currently, in the building construction process, each layer needs to be precisely positioned on the axis, and the axis of the next layer is usually projected to the previous layer. The axis of the next layer is projected to the previous layer by a plumb line through a plurality of paying-off holes. A residential building with a simple structure may need to be provided with 4 pay-off holes, a residential building may need to be provided with hundreds of pay-off holes, and a building engineering project may need to be provided with hundreds of pay-off holes. The existing paying-off hole is reserved in a square box which is generally processed by a bamboo plywood, time and labor are wasted during working, demolding is not easy, recycling is not easy, waste is caused, more importantly, reserved holes reserved in the square die are easy to fall off after later pouring, and major potential safety hazards exist. On the other hand, the pay-off hole is required to be plugged after being used, and the pay-off hole of the square box is different in size, so that a unified plugging block is not suitable for being manufactured to plug the pay-off hole in the later period, and a template is required to be built again at the pay-off hole to pour concrete for plugging, so that manpower and material resources are wasted, and the construction period is prolonged.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model aims to provide the paying-off hole die, so as to solve the defects of difficult demolding, easy falling, poor recycling rate and the like of the existing paying-off hole die, and the paying-off hole can be rapidly plugged in the later stage, thereby improving the efficiency, quality and safety of the construction of the reserved paying-off hole.
The basic conception of the technical scheme adopted by the utility model is as follows: the utility model provides a unwrapping wire hole mould for set up and then form unwrapping wire hole on every layer of concrete floor, unwrapping wire hole mould is including being the mould body of back taper platform shape, and this mould body divide into two symmetrical lamella, and wherein 1 two lamella adjacencies are connected with two hinges, and 1 two other lamella adjacencies are connected through the buckle, hinge and buckle all install in mould body inner wall, the mould body includes upper shed and lower shed, upper shed's opening is greater than the lower shed, the lower shed is used for passing concrete floor.
Preferably, the upper opening is provided with a lifting handle.
Preferably, the upper opening and the lower opening are circular, the diameter of the upper opening is 200mm, the diameter of the lower opening is 160mm, and the distance between the upper opening and the lower opening is 200mm.
The beneficial effects of the utility model are as follows: when the beam slab template is used, holes are formed in the paying-off holes after the beam slab template is installed, paying-off hole dies are installed after slab reinforcement is bound, and the dies are removed after the concrete strength reaches the requirement after concrete pouring is completed. According to the utility model, the paying-off hole mould is adopted to manufacture the paying-off hole with good forming effect and consistent size on the concrete floor slab, so that the accurate manufacturing of the paying-off hole is realized, and the measurement requirement is met. After the pay-off hole is used, the plugging block uniformly manufactured by the pay-off hole die can be used for quick plugging, so that the aim of efficient construction is fulfilled. Compared with the prior art, the utility model has the advantages of simple structure, convenient construction, convenient assembly and disassembly, time and labor saving in use, improved working efficiency, accelerated engineering progress, material saving and the like.
Drawings
The utility model is described in further detail below with reference to the attached drawing figures, wherein:
FIG. 1 is a schematic diagram of a pay-off hole die;
FIG. 2 is a rear view of FIG. 1;
FIG. 3 is an outline view of a pay-off hole die;
FIG. 4 is a schematic view of the buckle in FIG. 2;
in the figure, a 1-die body I, a 2-die body II, a 3-hinge I, a 4-hinge II, a 5-buckle, a 6-lifting handle, a 7-upper opening, an 8-lower opening, a 9-base, a 10-fixing bolt, an 11-connecting rod and a 12-clamping groove are formed.
Detailed Description
As shown in fig. 1, fig. 2, fig. 3 and fig. 4, the mold body I1 and the mold body II 2 are symmetrical two pieces, wherein 1 two piece adjacent positions are connected by a hinge I3 and a hinge II 4, and the other 1 two piece adjacent positions are connected by a buckle 5, wherein the hinge I3, the hinge II 4 and the buckle 5 are all installed on the inner walls of the mold body I1 and the mold body II 2, and the buckle 5 is composed of a base 9, a fixing bolt 10, a connecting rod 11 and a clamping groove 12. The die body I1 and the die body II 2 are folded, the paying-off hole die is in an inverted cone shape, the connecting rod 11 is placed in the clamping groove 12, the paying-off hole die is locked, the connecting rod 11 is taken out of the clamping groove 12, and the paying-off hole die can be opened. The upper opening 7 and the lower opening 8 are both circular, the diameter of the upper opening 7 is 200mm, the diameter of the lower opening 8 is 160mm, the distance between the upper opening 7 and the lower opening 8 is 200mm, and the lower opening 8 is used for penetrating through the concrete floor. The upper opening 7 is provided with a lifting handle 6, and the lifting handle 6 is grasped to pull out the paying-off hole die Shi Yongshou after the paying-off hole die is detached.
Opening DN170mm holes at the positions of the paying-off holes after the beam slab template is installed, installing the paying-off hole die (brushing a release agent before installation) after the slab reinforcement is bound, folding the die body I1 and the die body II 2, placing the connecting rod 11 in the clamping groove 12, and locking the paying-off hole die; if the plate steel bar influences the die installation during the installation, directly bypassing the plate steel bar (the method accords with the 16G101 atlas method), and taking care to ensure that the joint is tight to prevent slurry leakage during the installation; after the concrete pouring is completed, when the concrete strength reaches the requirement that a constructor removes the paying-off hole die, the connecting rod 11 is taken out from the clamping groove 12 when the connecting rod is removed, the die body I1 and the die body II 2 slightly shrink inwards, the die body I1 and the die body II 2 are rocked to separate from surrounding concrete, then the lifting handle 6 can be manually grasped to pull out the paying-off hole die, and finally the concrete on the surfaces of the die body I1 and the die body II 2 is removed, so that the next use is convenient.
After the pay-off hole is used, cleaning the interior of the pay-off hole, wetting the pay-off hole with water, uniformly smearing high-grade cement mortar on the periphery of the pay-off hole, plugging the pay-off hole by a plugging block manufactured by a pay-off hole die in advance, and finally trowelling the upper surface of the plugging block to a concrete floor by adopting the high-grade mortar, wherein the lower surface of the plugging block is scraped by putty powder.
Claims (3)
1. The utility model provides a unwrapping wire hole mould for set up and then form unwrapping wire hole on every layer of concrete floor, unwrapping wire hole mould is including being the mould body of back taper platform shape, its characterized in that, this mould body divide into two symmetrical lamella, and wherein 1 two lamella adjacencies are with two hinge connection, and 1 two in addition lamella adjacencies pass through the buckle and connect, hinge and buckle all install in mould body inner wall, the mould body includes upper shed and lower shed, upper shed's opening is greater than the lower shed, the lower shed is used for passing concrete floor.
2. The pay-off hole die as claimed in claim 1, wherein the upper opening is provided with a carrying handle.
3. The pay-off hole die as claimed in claim 1, wherein the upper opening and the lower opening are circular, the diameter of the upper opening is 200mm, the diameter of the lower opening is 160mm, and the distance between the upper opening and the lower opening is 200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222681228.4U CN219411827U (en) | 2022-09-30 | 2022-09-30 | Paying-off hole die |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222681228.4U CN219411827U (en) | 2022-09-30 | 2022-09-30 | Paying-off hole die |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219411827U true CN219411827U (en) | 2023-07-25 |
Family
ID=87234558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222681228.4U Active CN219411827U (en) | 2022-09-30 | 2022-09-30 | Paying-off hole die |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219411827U (en) |
-
2022
- 2022-09-30 CN CN202222681228.4U patent/CN219411827U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106320691B (en) | Aluminum wood template construction method | |
CN205400043U (en) | Constructional column is funnel combination tool for concreting | |
CN110552440B (en) | Safe and environment-friendly construction process for high-strength assembled integral sandwich heat-insulating shear wall | |
CN104141351A (en) | Sealing method for reserved paying-off hole and paying-off hole mold | |
CN106049862A (en) | Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method | |
CN112112360B (en) | Construction method for prefabricated and shaped building block masonry | |
CN219411827U (en) | Paying-off hole die | |
CN213390464U (en) | Gutter inlet forming tool | |
CN112412013A (en) | Construction method for plugging reserved hole of structural outer wall | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN212027114U (en) | Building templates for construction | |
CN113090025B (en) | Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure | |
CN205476491U (en) | Outer wall post template bottom consolidates uses pre -cast screw | |
CN107965143B (en) | Multifunctional paying-off hole die and method for plugging and forming paying-off hole by using die | |
CN217760029U (en) | Measure unwrapping wire hole forming die and protection integrated device | |
CN207892233U (en) | Structure and decoration integrated cast-in-place concrete elastic decorative mould system | |
CN217501051U (en) | Shaped steel mould for reserved hole of pipe shaft | |
CN220790580U (en) | Replaceable concrete retaining wall corner molding steel die | |
CN218597751U (en) | Pre-buried air conditioner hole casing instrument that can have enough to meet need use | |
CN102312578B (en) | Integral vibration-free pouring and constructing method | |
CN219773604U (en) | Cantilever scaffold I-shaped steel hole plugging template | |
CN111005558A (en) | Mould for manufacturing basic cavity concrete mould and using method thereof | |
CN217500317U (en) | Utility tunnel roof water proof coating side forms preparation instrument | |
CN203891465U (en) | Paying-off hole die | |
CN213055274U (en) | Device for shortening demoulding time in wallboard production process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |