CN219411253U - Building board house - Google Patents

Building board house Download PDF

Info

Publication number
CN219411253U
CN219411253U CN202320492888.XU CN202320492888U CN219411253U CN 219411253 U CN219411253 U CN 219411253U CN 202320492888 U CN202320492888 U CN 202320492888U CN 219411253 U CN219411253 U CN 219411253U
Authority
CN
China
Prior art keywords
wallboard
stand
dovetail
close
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320492888.XU
Other languages
Chinese (zh)
Inventor
柳传
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Wufang Construction Co ltd
Original Assignee
Zhejiang Wufang Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Wufang Construction Co ltd filed Critical Zhejiang Wufang Construction Co ltd
Priority to CN202320492888.XU priority Critical patent/CN219411253U/en
Application granted granted Critical
Publication of CN219411253U publication Critical patent/CN219411253U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a building board house relates to the field of house construction technology, and it is including setting up in subaerial base, wallboard and roof, be provided with the stand that is used for fixed adjacent wallboard on the base, the stand is located one side of keeping away from ground on the base, wallboard is close to one side of stand an organic whole and is provided with first forked tail piece, offer the first forked tail piece of confession and insert and joint on the stand, one side of being close to the stand on the roof is provided with the fixed block that is used for connecting roof and stand, the fixed block passes through bolt fastening with the stand, the stand passes through bolt fastening with the base. This application has the effect that improves the installation effectiveness of board house.

Description

Building board house
Technical Field
The application relates to the field of building construction technology, in particular to a building board house.
Background
The movable plank house is an environment-friendly and economic movable plank house which takes color steel plates as a framework, sandwich plates as enclosure materials, standard modulus series for space combination, and components are connected by bolts, and is of a brand new concept.
In the related art, the installation of the board house generally fixes the base to the ground through a brick foundation or a concrete foundation. And then a steel skeleton is erected on the base by welding. And then the wallboards are fixed on the steel skeleton one by one through bolts, so that the building of the board house is completed.
With respect to the related art in the above, the inventors consider that: the wallboard is fixed on the steel skeleton through the bolt, and a plurality of personnel are needed to support the wallboard simultaneously and then use the bolt to fix, consume a large amount of manpowers, lead to the installation effectiveness of board house low, still improve the space.
Disclosure of Invention
In order to improve the installation effectiveness of the board house, the application provides a building board house.
The application provides a building board room adopts following technical scheme:
the utility model provides a building board house, sets up in subaerial base, wallboard and roof, be provided with the stand that is used for fixed adjacent wallboard on the base, the stand is located one side of keeping away from ground on the base, wallboard is close to the integrative first dovetailed block that is provided with in one side of stand, offer the first dovetailed block that supplies first dovetailed block to insert and joint on the stand, one side of being close to the stand on the roof is provided with the fixed block that is used for connecting roof and stand, the fixed block passes through the bolt fastening with the stand, the stand passes through the bolt fastening with the base.
Through adopting above-mentioned technical scheme, insert and the joint with first dovetail in first dovetail to make the wallboard insert between two stands, improve the installation effectiveness of building board house. Two adjacent columns clamp the wallboard, thereby improving the stability of connection between wallboard and column. Install the roof on the stand, through bolt fastening stand and fixed block to improve the stability of being connected between roof and the stand.
Optionally, the side symmetry that is close to the wallboard on the stand is provided with the splint that are used for centre gripping wallboard.
Through adopting above-mentioned technical scheme, install the wallboard on the stand to make the wallboard install into between the splint, and make splint centre gripping fixed wallboard, improve the area of contact between stand and the wallboard, thereby improve the stability of being connected between wallboard and the stand.
Optionally, a pressing plate which is clamped and fixed with the wallboard is integrally arranged on one side, close to the wallboard, of the top plate.
Through adopting above-mentioned technical scheme, install the roof in the wallboard one side of keeping away from the base to make the roof support and press all around wallboard, thereby spacing in first dovetail, improve the stability of being connected between wallboard and the stand. The pressing plate is pressed against the fixed wallboard, so that the wallboard is connected with the top plate, and the stability of connection between the wallboard and the top plate is improved.
Optionally, a second dovetail block is integrally arranged on one side, close to the upright post, of the top plate, and a second dovetail groove for clamping the second dovetail block is formed in the upright post.
By adopting the technical scheme, the top plate is arranged on the wallboard, so that the second dovetail block is inserted into the second dovetail groove, and the second dovetail block is clamped in the second dovetail groove, so that the top plate is connected with the upright post, and the connection stability between the top plate and the upright post is improved.
Optionally, the fixed block is close to the integrative spliced pole that is provided with in one side of stand, offer on the stand and supply spliced pole male column groove, the fixed block is used for spacing in first dovetail with first dovetail.
Through adopting above-mentioned technical scheme, insert the post in inserting the post groove to be connected fixed block and stand, improve the stability of being connected between fixed block and the stand. Install the fixed block on the stand to make the fixed block limit first dovetail block in first dovetail, make the fixed block limit second dovetail block in second dovetail, and then improve the stability of being connected between wallboard and the stand, improve the stability of roof and stand connection.
Optionally, an extension board for pressing the top board is integrally arranged on one side, close to the top board, of the fixing block, and an extension groove for the extension board to enter is formed in the top board.
Through adopting above-mentioned technical scheme, install the fixed block on the stand to make the extension board get into the extension inslot, make the extension board support the roof and press on the wallboard, improve the stability of being connected between roof and the wallboard.
Optionally, a fixing column is integrally arranged on one side of the extension plate, which is close to the top plate, a fixing hole for inserting the fixing column is formed in the top plate, and the fixing hole is mutually communicated with the extension groove.
Through adopting above-mentioned technical scheme, make the extension board get into in the extension groove to in making the fixed column insert the fixed orifices, make the fixed block be connected with the roof, and then improve the stability of being connected between fixed block and the roof.
Optionally, a limit post is integrally arranged on one side, close to the first dovetail block, of the fixed block, and a limit hole for the limit post to be inserted is formed in the first dovetail block.
Through adopting above-mentioned technical scheme, install the fixed block on the stand, when making the fixed block support and press first forked tail piece, make spacing post insert spacing downthehole simultaneously to make the fixed block be connected with first forked tail piece, improve the stability of being connected between first forked tail piece and the fixed block.
Optionally, sealing rings are arranged between the wallboard and the upright post and between the wallboard and the top plate, a sealing groove for installing the sealing ring is formed in the wallboard, and the thickness of the sealing ring is larger than the depth of the sealing groove.
Through adopting above-mentioned technical scheme, install wallboard on the stand to make the inseparable conflict stand of sealing washer, and then improve the leakproofness between wallboard and the stand. Install the roof on the stand to make the inseparable roof of contradicting of sealing washer, and then improve the leakproofness between wallboard and the roof. Install the sealing washer in the seal groove to confirm the mounted position of sealing washer, improve the stability of being connected between sealing washer and the wallboard.
Optionally, a fixed plate for fixing the upright post and the base is integrally arranged on one side, close to the base, of the upright post, the fixed plate and the base are fixed through bolts, and a yielding groove for the fixed plate to enter is formed in the wallboard.
Through adopting above-mentioned technical scheme, fix the fixed plate on the base through the bolt to make the stand install on the base, improve the stability of being connected between base and the stand. The wallboard is arranged between the upright posts, and the fixing plate enters the relief groove, so that the tightness between the wallboard and the base is improved.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the first dovetail block is inserted into the first dovetail groove, so that the wallboard is installed between the upright posts, and the installation efficiency between the wallboard and the upright posts is improved. The clamping plates clamp the wallboard, so that the stability of connection between the wallboard and the upright post is improved;
2. the second dovetail block is inserted into the second dovetail groove, so that the top plate is connected with the upright post, and the installation efficiency between the top plate and the upright post is improved. The pressing plate is pressed against the fixed wallboard, so that the stability of connection between the top plate and the wallboard is improved;
3. through installing the fixed block on the stand, make the fixed block limit first dovetail in first dovetail, make the fixed block limit second dovetail in second dovetail to improve the stability of being connected between wallboard and the stand, improve the stability of being connected between roof and the stand.
Drawings
Fig. 1 is an overall schematic of a building board house in an embodiment of the present application.
Fig. 2 is an exploded view of a wall panel, roof panel and column in an embodiment of the present application.
Fig. 3 is an enlarged schematic view of the portion a in fig. 2.
Fig. 4 is an enlarged schematic view of the portion B in fig. 2.
Fig. 5 is an enlarged schematic view of the portion C in fig. 2.
Reference numerals illustrate: 1. a base; 2. a wallboard; 3. a column; 4. a first dovetail block; 5. a first dovetail groove; 6. a clamping plate; 7. a top plate; 8. a pressing plate; 9. a second dovetail block; 10. a second dovetail groove; 11. a fixed block; 12. inserting a column; 13. a column groove; 14. an extension plate; 15. an extension groove; 16. fixing the column; 17. a fixing hole; 18. a limit column; 19. a limiting hole; 20. a seal ring; 21. sealing grooves; 22. a fixing plate; 23. a back-off groove.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-5.
Referring to fig. 1 and 2, an embodiment of the present application discloses a building board house, which includes a base 1, a wall plate 2, a column 3 and a top plate 7. The base 1 is fixed on the ground by a brick foundation or a concrete foundation. The upright posts 3 are arranged in four, and the upright posts 3 are fixed at four corners of the base 1 through bolts. The wall panels 2 are provided in four, and the wall panels 2 are installed between the columns 3. A top plate 7 is mounted at the end of the upright 3 remote from the base 1, the top plate 7 being used to cover the wall plate 2.
Referring to fig. 2 and 3, the column 3 is integrally provided with a fixing plate 22. The fixing plate 22 is located at one end of the upright 3 near the base 1. The fixing plate 22 is fixed to the base 1 by bolts, thereby fixing the column 3 to the base 1. The wall plate 2 is provided with a relief groove 23. The relief groove 23 is located on the side of the wall plate 2 adjacent to the fixing plate 22. The fixing plate 22 is put into the escape groove 23 when the wall plate 2 is installed between the columns 3.
Referring to fig. 2 and 4, a first dovetail block 4 is integrally provided on the wall plate 2, and the first dovetail block 4 is located on one side of the wall plate 2 close to the upright post 3. The upright post 3 is provided with a first dovetail groove 5, and the first dovetail groove 5 is positioned on one side of the upright post 3, which is abutted against the first dovetail block 4. The first dovetail block 4 is inserted into the first dovetail groove 5, and the first dovetail block 4 is clamped in the first dovetail groove 5, so that the wallboard 2 is installed between the two upright posts 3.
Clamping plates 6 are symmetrically arranged on the upright posts 3, and the clamping plates 6 are positioned on one side of the upright posts 3 close to the wallboard 2. When the wallboard 2 is installed on the upright post 3, the clamping plate 6 is used for clamping the wallboard 2, so that the connection between the wallboard 2 and the upright post 3 is more stable.
Referring to fig. 2 and 4, a sealing ring 20 is mounted on the wall plate 2. The sealing ring 20 is positioned on the side of the wall plate 2 close to the upright post 3 and on the side of the wall plate 2 close to the top plate 7. The wall plate 2 is provided with a sealing groove 21. The sealing groove 21 is positioned on one side of the wallboard 2, which is abutted against the sealing ring 20. The seal groove 21 is used for installing the seal ring 20, and the thickness of the seal ring 20 is larger than the depth of the seal groove 21. Therefore, when the wallboard 2 is installed on the upright post 3, the sealing ring 20 is tightly abutted against the upright post 3, and the purpose of sealing the wallboard 2 and the upright post 3 is achieved. When the top plate 7 is mounted on the upright post 3, the sealing ring 20 is tightly abutted against the top plate 7, so that the purpose of sealing the wall plate 2 and the top plate 7 is achieved. In order to make the connection between the seal ring 20 and the seal groove 21 more stable, epoxy glue may be applied in the seal groove 21, thereby bonding the seal ring 20 in the seal ring 20.
Referring to fig. 4 and 5, a second dovetail block 9 is integrally provided on the top plate 7. The second dovetail block 9 is located on the side of the top plate 7 that is adjacent to the stud 3. The upright post 3 is provided with a second dovetail groove 10. The second dovetail groove 10 is located on the side of the upright 3 that abuts against the second dovetail block 9. The second dovetail block 9 is inserted into the second dovetail groove 10, thereby connecting the top plate 7 with the four columns 3.
The top plate 7 is integrally provided with a pressing plate 8. The pressing plates 8 are symmetrically arranged on one side of the top plate 7 close to the wallboard 2. When the top plate 7 is mounted on the upright post 3, the wallboard 2 is made to enter between the pressing plates 8, and the pressing plates 8 are pressed and fixed with the wallboard 2, so that the top plate 7 is connected with the wallboard 2.
Referring to fig. 4 and 5, a fixing block 11 is mounted on the top plate 7. The fixed block 11 is located on the side of the top plate 7 close to the upright 3. The fixed block 11 is integrally provided with a plug 12. The plunger 12 is located on the side of the fixed block 11 adjacent to the upright 3. The upright post 3 is provided with a post groove 13. The column groove 13 is positioned on the side of the upright column 3 which is abutted against the inserted column 12. The insert posts 12 are inserted into the post slots 13 such that the fixed blocks 11 are mounted on the posts 3 and such that the fixed blocks 11 confine the first dovetail blocks 4 to the first dovetail slots 5 and such that the fixed blocks 11 confine the second dovetail blocks 9 to the second dovetail slots 10. The fixed block 11 is fixed with the upright 3 by bolts.
Referring to fig. 4 and 5, the fixed block 11 is integrally provided with a stopper post 18. The limit post 18 is located on the side of the fixed block 11 near the first dovetail block 4. The first dovetail block 4 is provided with a limiting hole 19. The limiting hole 19 is located at a position where the first dovetail block 4 is abutted against the limiting post 18. When the fixed block 11 abuts against the first dovetail block 4, the limiting post 18 is inserted into the limiting hole 19, so that the fixed block 11 is connected with the first dovetail block 4.
Referring to fig. 4 and 5, the fixing block 11 is integrally provided with an extension plate 14. The extension plate 14 is located on the side of the fixed block 11 close to the top plate 7. The top plate 7 is provided with an extension groove 15. The extension groove 15 is located at a position where the top plate 7 collides with the extension plate 14. When the fixing block 11 is mounted on the upright 3, the extension plate 14 is made to enter the extension groove 15, so that the extension plate 14 is made to press against the fixing top plate 7.
Referring to fig. 4 and 5, the extension plate 14 is integrally provided with a fixing post 16. The fixing post 16 is located at a side of the extension plate 14 close to the top plate 7. The top plate 7 is provided with a fixing hole 17. The fixing hole 17 is located at a position where the top plate 7 collides with the fixing post 16, and the fixing hole 17 communicates with the extension groove 15. When the extension plate 14 enters the extension groove 15, the fixing post 16 is inserted into the fixing hole 17, so that the fixing block 11 is connected with the top plate 7.
The installation process of the building board house provided by the embodiment of the application is as follows:
1. the bolts are threaded through the fixing plates 22 to the base 1, thereby mounting the column 3 on the base 1.
2. The wall plate 2 is installed between the adjacent columns 3 so that the first dovetail block 4 is inserted into the first dovetail groove 5 and the clamping plate 6 clamps the wall plate 2 so that the sealing ring 20 closely abuts against the columns 3.
3. The top plate 7 is installed on the upright post 3, so that the second dovetail block 9 is inserted into the second dovetail groove 10, the top plate 7 is abutted against the wallboard 2, the abutting plate 8 is abutted against the wallboard 2 to be fixed, and the sealing ring 20 is tightly abutted against the top plate 7.
4. The insert posts 12 are inserted into the post slots 13, the limit posts 18 are inserted into the limit holes 19, so that the fixing block 11 limits the first dovetail block 4 in the first dovetail slot 5, the fixing block 11 limits the second dovetail block 9 in the second dovetail slot 10, the extension plate 14 enters the extension slot 15, the fixing posts 16 are inserted into the fixing holes 17, and the fixing block 11 is connected with the top plate 7. The bolts penetrate through the fixing blocks 11 to be connected with the upright posts 3 in a threaded manner, and finally the installation of the building board house is completed.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (10)

1. The utility model provides a building board house, including setting up in subaerial base (1), wallboard (2) and roof (7), its characterized in that: be provided with stand (3) that are used for fixed adjacent wallboard (2) on base (1), stand (3) are located one side of keeping away from ground on base (1), one side that wallboard (2) are close to stand (3) an organic whole is provided with first forked tail piece (4), offer on stand (3) and supply first forked tail piece (4) to insert and first dovetail (5) of joint, one side that is close to stand (3) on roof (7) is provided with fixed block (11) that are used for connecting roof (7) and stand (3), fixed block (11) pass through bolt fastening with stand (3), stand (3) pass through bolt fastening with base (1).
2. A building board house according to claim 1, characterized in that: clamping plates (6) used for clamping the wallboard (2) are symmetrically arranged on one side, close to the wallboard (2), of the upright post (3).
3. A building board house according to claim 1, characterized in that: one side of the top plate (7) close to the wallboard (2) is integrally provided with a pressing plate (8) which is clamped and fixed with the wallboard (2).
4. A building board room according to claim 3, characterized in that: a second dovetail block (9) is integrally arranged on one side, close to the upright post (3), of the top plate (7), and a second dovetail groove (10) for clamping the second dovetail block (9) is formed in the upright post (3).
5. A building board house according to claim 1, characterized in that: one side of the fixed block (11) close to the upright post (3) is integrally provided with an inserting post (12), a post groove (13) for inserting the inserting post (12) is formed in the upright post (3), and the fixed block (11) is used for limiting the first dovetail block (4) in the first dovetail groove (5).
6. A building board house according to claim 5, wherein: an extending plate (14) for pressing the top plate (7) is integrally arranged on one side, close to the top plate (7), of the fixed block (11), and an extending groove (15) for the extending plate (14) to enter is formed in the top plate (7).
7. A building board house according to claim 6, wherein: the fixed column (16) is integrally arranged on one side, close to the top plate (7), of the extension plate (14), a fixed hole (17) for the fixed column (16) to be inserted is formed in the top plate (7), and the fixed hole (17) is mutually communicated with the extension groove (15).
8. A building board house according to claim 5, wherein: one side of the fixed block (11) close to the first dovetail block (4) is integrally provided with a limiting column (18), and the first dovetail block (4) is provided with a limiting hole (19) for the insertion of the limiting column (18).
9. A building board house according to claim 1, characterized in that: sealing rings (20) are arranged between the wallboard (2) and the upright posts (3) and between the wallboard (2) and the top plate (7), sealing grooves (21) for installing the sealing rings (20) are formed in the wallboard (2), and the thickness of the sealing rings (20) is larger than the depth of the sealing grooves (21).
10. A building board house according to claim 1, characterized in that: one side of the upright post (3) close to the base (1) is integrally provided with a fixing plate (22) for fixing the upright post (3) and the base (1), the fixing plate (22) is fixed with the base (1) through bolts, and a yielding groove (23) for the fixing plate (22) to enter is formed in the wallboard (2).
CN202320492888.XU 2023-03-10 2023-03-10 Building board house Active CN219411253U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320492888.XU CN219411253U (en) 2023-03-10 2023-03-10 Building board house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320492888.XU CN219411253U (en) 2023-03-10 2023-03-10 Building board house

Publications (1)

Publication Number Publication Date
CN219411253U true CN219411253U (en) 2023-07-25

Family

ID=87206614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320492888.XU Active CN219411253U (en) 2023-03-10 2023-03-10 Building board house

Country Status (1)

Country Link
CN (1) CN219411253U (en)

Similar Documents

Publication Publication Date Title
CN219411253U (en) Building board house
CN219653923U (en) Detachable building heat preservation room
CN211396109U (en) Steel pipe column combination wall
CN217480405U (en) Assembled steel construction building
CN216690618U (en) Novel prefabricated enclosure
CN216516881U (en) Building plank sheathing wall post positive angle steel is stupefied and wall post plank sheathing braced system once
CN213897646U (en) Assembled building side fascia perps connected node
CN112878481A (en) Energy-conserving assembled building wall fixed knot constructs
CN210685597U (en) Novel buckle pressing type building enclosure
CN216664710U (en) Quick splicing structure of storehouse board
CN219386661U (en) Movable board house connection structure
CN211341307U (en) Assembled steel frame composite light wall body house building
CN220909336U (en) Assembled aluminum fence
CN217128545U (en) Building wallboard connection structure with locking function
CN210177865U (en) High-rise building external wall panel mounting structure with high safety
CN215926332U (en) Detachable wallboard connecting assembly and connecting system
CN216276678U (en) Frame panel type combined wood floor
CN211622076U (en) Assembled building shockproof structure
CN216196199U (en) Building sound insulation building panel convenient to equipment
CN210713181U (en) Modular assembly type building
CN215563306U (en) Cold-formed thin-wall environment-friendly steel structure house
CN215564978U (en) Transformer substation is with assembled enclosure
CN220848117U (en) Assembled acoustic celotex board
CN217554467U (en) Detachable stainless steel water tank
CN113494154B (en) Concrete beam and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant