CN219410893U - Foundation pit supporting structure for foundation pit excavation - Google Patents
Foundation pit supporting structure for foundation pit excavation Download PDFInfo
- Publication number
- CN219410893U CN219410893U CN202320747460.5U CN202320747460U CN219410893U CN 219410893 U CN219410893 U CN 219410893U CN 202320747460 U CN202320747460 U CN 202320747460U CN 219410893 U CN219410893 U CN 219410893U
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- support
- excavation
- assembly
- support structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
技术领域technical field
本申请涉及建筑工程技术的领域,尤其是涉及一种基坑开挖用的基坑支护结构。The present application relates to the field of construction engineering technology, in particular to a foundation pit support structure for foundation pit excavation.
背景技术Background technique
在建筑施工中,为确保基坑开挖和基础结构施工安全,在基坑挖坑施工中会设置基坑支护结构,使基坑侧壁能够得到加固和保护。In building construction, in order to ensure the safety of foundation pit excavation and foundation structure construction, a foundation pit support structure will be set up during foundation pit excavation construction, so that the side walls of the foundation pit can be reinforced and protected.
相关技术中,申请号为201520617626.7公开了一种基坑支护,坑由上部放坡基坑、下部垂直基坑构成,上部放坡基坑是自基坑表面起以设定的坡度形成的放坡面,下部垂直基坑以位于基坑周边的若干个按照一定间距排列的水泥搅拌桩为支撑,水泥搅拌桩内设有工字钢,上部放坡基坑和下部垂直基坑的外表面均设有挂网区域,对基坑进行支护时,在刚加工好的水泥搅拌桩还未凝固将工字钢放入水泥搅拌桩内,在下部垂直基坑的边坡表面铺设钢筋网,在喷射一层混凝土进行支护。In the related technology, the application number is 201520617626.7 which discloses a foundation pit support. The pit is composed of an upper sloping foundation pit and a lower vertical foundation pit. The upper sloping foundation pit is a slope surface formed with a set slope from the surface of the foundation pit. The lower vertical foundation pit is supported by several cement mixing piles arranged at a certain distance around the foundation pit. The cement mixing piles are equipped with I-beams. , when supporting the foundation pit, put the I-beam into the cement mixing pile before the cement mixing pile has just been solidified, lay steel mesh on the slope surface of the vertical foundation pit at the lower part, and spray a layer of concrete for support.
针对上述中的相关技术,在水泥搅拌桩内放入工字钢,之后,在下部垂直基坑的边坡表面铺设钢筋网,再喷射一层混凝土进行支护,但当基坑支护完成后,需要取出支护结构时,不易将支护结构取出,会对基坑造成损坏。In view of the above-mentioned related technologies, I-beams are put into the cement mixing pile, and then steel mesh is laid on the slope surface of the lower vertical foundation pit, and then a layer of concrete is sprayed for support. However, when the support structure needs to be taken out after the foundation pit support is completed, it is not easy to take out the support structure, which will cause damage to the foundation pit.
实用新型内容Utility model content
为了改善会对基坑造成损坏的问题,本申请提供一种基坑开挖用的基坑支护结构。In order to improve the problem of damage to the foundation pit, the present application provides a foundation pit support structure for foundation pit excavation.
本申请提供的一种基坑开挖用的基坑支护结构采用如下的技术方案:A foundation pit support structure for foundation pit excavation provided by the application adopts the following technical scheme:
一种基坑开挖用的基坑支护结构,包括多个支护挡板,多个所述支护挡板拼接成矩形框;A foundation pit support structure for foundation pit excavation, comprising a plurality of support baffles, the plurality of support baffles spliced into a rectangular frame;
所述支护挡板包括多个插板和四个连接座,所述插板与基坑的一个内侧壁贴合,所述插板一侧开设有插接槽,另一侧固定有插接条,一个所述插板的所述插接条插接于另一个所述插板的所述插接槽,四个所述连接座各位于基坑相邻两侧壁的拐角处,所述连接座能够将基坑相邻两侧壁的拐角处相邻两个所述插板固定。The support baffle includes a plurality of inserting plates and four connecting seats, the inserting plates are attached to an inner side wall of the foundation pit, one side of the inserting plate is provided with an insertion slot, and the other side is fixed with an inserting bar, the inserting bar of one of the inserting plates is inserted into the insertion slot of the other inserting plate, and the four connecting seats are respectively located at the corners of the adjacent side walls of the foundation pit, and the connecting seats can fix the corners of the adjacent two sides of the foundation pit adjacent to the two inserting plates.
通过采用上述技术方案,当需要对基坑进行支护时,首先,人员取出多个插板,随后,将多个插板分别插入基坑中,并且使每一个插板各与基坑的一个内侧壁贴合,此时,一个插板的插接条能够插入另一个插板的插接槽,位于基坑一个内侧壁上的插板通过相邻两个插板插接,之后,取出连接座,将连接座放置于基坑相邻两侧壁的拐角处,通过连接座和插板组成支护挡板,能够拼接成矩形框,便可对基坑进行支护;需要对支护挡板进行拆除时,将插板和连接座依次取出基坑即可,与相关技术相比,本申请将插板和连接座依次取出基坑,能够拆除支护挡板,有利于降低对基坑损坏的情况。By adopting the above technical solution, when it is necessary to support the foundation pit, first, the personnel take out a plurality of plugboards, and then insert the multiple plugboards into the foundation pit respectively, and make each plugboard stick to one inner wall of the foundation pit. At this time, the plug strip of one plugboard can be inserted into the insertion groove of the other plugboard, and the plugboard located on one inner sidewall of the foundation pit is connected by two adjacent plugboards. After that, the connecting seat is taken out, and the connecting seat is placed at the corner of the adjacent two side walls of the foundation pit, and the support baffle is formed by the connecting seat and the plugboard , can be spliced into a rectangular frame, and the foundation pit can be supported; when the support baffle needs to be removed, the inserting plate and the connecting seat can be taken out of the foundation pit in sequence. Compared with the related technology, the present application takes the inserting plate and the connecting seat out of the foundation pit in sequence, and the support baffle can be removed, which is beneficial to reduce the damage to the foundation pit.
可选的,所述插板底壁固定有至少一个插入桩,所述插入桩远离所述插板一侧为尖头设置。Optionally, at least one insertion pile is fixed on the bottom wall of the insertion board, and the insertion pile is provided with a pointed end on a side away from the insertion board.
通过采用上述技术方案,插板底壁设有尖形的插入桩,当插板插入基坑后,插入桩能够插入基坑侧壁,通过设置插入桩,一方面便于将插板插入基坑内,另一方面也可对插板进行支撑。By adopting the above-mentioned technical scheme, the bottom wall of the inserting plate is provided with pointed insertion piles. When the inserting plate is inserted into the foundation pit, the inserting piles can be inserted into the side wall of the foundation pit. By setting the inserting piles, on the one hand, it is convenient to insert the inserting plate into the foundation pit, and on the other hand, it can also support the inserting plate.
可选的,两个正对的所述插板相互靠近一侧开设有滑槽,所述滑槽的设置方向由基坑开口朝向基坑底壁,所述插板于所述滑槽内设有滑块,所述滑块能够在所述滑槽内沿所述滑槽的长度方向滑动;Optionally, two opposing inserting plates are provided with chute on one side close to each other, and the setting direction of the chute is from the opening of the foundation pit to the bottom wall of the foundation pit, and the inserting plate is provided with a slider in the chute, and the slider can slide along the length direction of the chute in the chute;
基坑开挖用的基坑支护结构还包括插入组件,所述插入组件包括伸缩件和固定底座,所述伸缩件倾斜设置,所述伸缩件位于矩形框内,所述伸缩件较高一端铰接于所述滑块,所述伸缩件较低一端与所述固定底座铰接,所述固定底座水平设置,所述固定底座安装于基坑底壁,所述伸缩件能够支撑所述插板。The foundation pit support structure for foundation pit excavation also includes an insertion assembly, the insertion assembly includes a telescopic piece and a fixed base, the telescopic piece is arranged obliquely, the telescopic piece is located in a rectangular frame, the higher end of the telescopic piece is hinged to the slider, the lower end of the telescopic piece is hinged to the fixed base, the fixed base is horizontally arranged, the fixed base is installed on the bottom wall of the foundation pit, and the telescopic piece can support the inserting plate.
通过采用上述技术方案,当插板插入基坑后,首先将伸缩件根据人员需要调整至合适位置,在伸缩件调整的过程中,滑块能够沿滑槽滑动,随后,将固定底座安装于基坑底壁,通过设置插入组件,有利于对插板进行固定。By adopting the above-mentioned technical solution, when the inserting plate is inserted into the foundation pit, the telescopic member is first adjusted to a suitable position according to the needs of the personnel. During the adjustment process of the expanding member, the slider can slide along the chute, and then the fixed base is installed on the bottom wall of the foundation pit. By setting the inserting component, it is beneficial to fix the inserting plate.
可选的,所述插入组件还包括插销,所述插销位于所述固定底座远离所述伸缩件一侧,所述插销的设置方向与所述插入桩的设置方向一致,所述插销固定于所述固定底座,所述插销远离所述固定底座一端为尖头,所述插销能够插入基坑底壁。Optionally, the insertion assembly further includes a pin, the pin is located on the side of the fixed base away from the telescopic element, the installation direction of the pin is consistent with the installation direction of the insertion pile, the pin is fixed on the fixed base, the end of the pin away from the fixed base is pointed, and the pin can be inserted into the bottom wall of the foundation pit.
通过采用上述技术方案,当伸缩件调整至合适位置,此时,将插销插入基坑侧壁,能够将固定底座安装于基坑底壁,通过设置插销,有利于对固定底座固定。By adopting the above technical solution, when the telescopic element is adjusted to a proper position, the bolt is inserted into the side wall of the foundation pit, and the fixed base can be installed on the bottom wall of the foundation pit. By setting the bolt, it is beneficial to fix the fixed base.
可选的,还包括多个支撑装置,所述支撑装置用于支撑正对的两个所述支护挡板,所述支撑装置与所述支护挡板可拆卸连接。Optionally, a plurality of support devices are also included, the support devices are used to support the two facing support baffles, and the support devices are detachably connected to the support baffles.
通过采用上述技术方案,通过设置支撑装置,一方面可以对正对的两个支护挡板进行支撑,增强支护的稳固性,通过支撑装置与支护挡板可拆卸连接,便于将支撑装置从支护挡板间取出。By adopting the above-mentioned technical scheme and setting the support device, on the one hand, the two facing support baffles can be supported to enhance the stability of the support, and the support device can be detachably connected to the support baffle, so that the support device can be easily taken out from between the support baffles.
可选的,所述支撑装置包括连接组件和支撑组件,所述连接组件包括连接板和连接杆,所述连接板各位于正对两个所述插板相互靠近一侧,所述连接板可拆卸连接于所述插板,所述连接杆位于所述连接板远离所述插板一侧,所述连接杆安装于所述连接板;Optionally, the supporting device includes a connecting assembly and a supporting assembly, the connecting assembly includes a connecting plate and a connecting rod, the connecting plates are respectively located on the side facing each other of the two inserting plates, the connecting plates are detachably connected to the inserting plates, the connecting rods are located on the side of the connecting plate away from the inserting plates, and the connecting rods are installed on the connecting plates;
所述支撑组件包括多个支撑杆,所述支撑杆水平设置,所述连接杆插接于所述支撑杆一端,所述连接杆螺纹连接于所述连接杆。The supporting assembly includes a plurality of supporting rods, the supporting rods are arranged horizontally, the connecting rods are inserted into one end of the supporting rods, and the connecting rods are screwed to the connecting rods.
通过采用上述技术方案,需要安装支撑装置时,首先,将连接板与连接杆安装,之后,将连接板与插板可拆卸连接,随后,将支撑杆靠近于位于正对两个插板上的连接杆,使连接杆插入支撑杆,旋拧支撑杆,能够将支撑杆和连接杆固定,通过设置支撑杆和连接杆,能够对支护挡板支撑,支撑杆和连接杆螺纹连接,便于支撑杆和连接杆的拆卸和安装。By adopting the above-mentioned technical solution, when the supporting device needs to be installed, firstly, install the connecting plate and the connecting rod, then detachably connect the connecting plate and the inserting plate, and then place the supporting rod close to the connecting rod on the two inserting plates facing each other, insert the connecting rod into the supporting rod, and screw the supporting rod to fix the supporting rod and the connecting rod.
可选的,所述支撑装置还包括调节组件,所述调节组件包括调节件,所述调节件位于两个所述支撑杆之间,所述调节件与所述支撑杆可拆卸连接。Optionally, the support device further includes an adjustment assembly, the adjustment assembly includes an adjustment member, the adjustment member is located between the two support rods, and the adjustment member is detachably connected to the support rods.
通过采用上述技术方案,需要增加支撑杆长度时,将支撑杆一端与连接杆连接,另一端与调节件连接,之后,取出另一支撑杆,并且将其与调节件另一端固定,通过设置调节件,便于增加支撑杆长度。By adopting the above-mentioned technical solution, when it is necessary to increase the length of the support rod, one end of the support rod is connected to the connecting rod, and the other end is connected to the adjustment member. After that, another support rod is taken out and fixed to the other end of the adjustment member. By setting the adjustment member, it is convenient to increase the length of the support rod.
可选的,所述连接杆铰接于所述连接板。Optionally, the connecting rod is hinged to the connecting plate.
通过采用上述技术方案,通过连接杆和连接板铰接,需要将支撑杆和连接杆螺纹连接时,能够将连接杆转动不同角度,有利于支撑杆和连接杆连接。By adopting the above technical scheme, through the hinged connection of the connecting rod and the connecting plate, when the supporting rod and the connecting rod need to be threaded, the connecting rod can be rotated at different angles, which is beneficial to the connection of the supporting rod and the connecting rod.
综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:
1.需要对支护挡板进行拆除时,将插板和连接座依次取出基坑即可,与相关技术相比,本申请将插板和连接座依次取出基坑,能够拆除支护挡板,有利于降低对基坑损坏的情况;1. When it is necessary to remove the support baffle, it is enough to take the inserting plate and the connecting seat out of the foundation pit in sequence. Compared with the related technology, in this application, the inserting plate and the connecting seat are taken out of the foundation pit in sequence, so that the supporting baffle can be removed, which is beneficial to reduce the damage to the foundation pit;
2.通过设置插入桩,一方面便于将插板插入基坑内,另一方面也可对插板进行支撑;2. By setting the insertion pile, on the one hand, it is convenient to insert the inserting plate into the foundation pit, and on the other hand, it can also support the inserting plate;
3.通过设置支撑杆和连接杆,能够对支护挡板支撑,支撑杆和连接杆螺纹连接,便于支撑杆和连接杆的拆卸和安装。3. By setting the support rod and the connecting rod, the support baffle can be supported, and the support rod and the connecting rod are threaded, which facilitates the disassembly and installation of the support rod and the connecting rod.
附图说明Description of drawings
图1是本实施例中的整体结构示意图;Fig. 1 is the overall structure schematic diagram among the present embodiment;
图2是本实施例中插入组件的结构示意图;Fig. 2 is the structural representation of inserting assembly in the present embodiment;
图3是图2中A的放大图;Fig. 3 is an enlarged view of A in Fig. 2;
图4是图2中B的放大图;Figure 4 is an enlarged view of B in Figure 2;
图5是本实施例中支护挡板和支撑装置的结构示意图;Fig. 5 is the structural representation of support baffle plate and supporting device in the present embodiment;
图6是图5中C的放大图;Figure 6 is an enlarged view of C in Figure 5;
图7是图5中D的放大图。FIG. 7 is an enlarged view of D in FIG. 5 .
附图标记说明:1、支护挡板;11、插板;111、插接槽;112、插接条;113、插入桩;114、插入孔;115、滑槽;116、滑块;12、连接座;121、插槽;122、插条;2、插入组件;21、伸缩件;211、第一插杆;2111、连接孔;212、第二插杆;2121、螺钉;22、固定底座;23、插销;3、支撑装置;31、连接组件;311、连接板;3111、第一紧固件;312、连接杆;32、支撑组件;321、支撑杆;3211、插接孔;33、调节组件;331、调节件;3311、插孔;3312、第二紧固件。Explanation of reference numerals: 1, support baffle; 11, inserting plate; 111, socket slot; 112, inserting strip; 113, inserting pile; 114, inserting hole; 115, chute; 116, sliding block; 12, connecting seat; ; 22, fixed base; 23, latch; 3, support device; 31, connecting component; 311, connecting plate; 3111, the first fastener; 312, connecting rod; 32, supporting component; 321, supporting rod;
具体实施方式Detailed ways
以下结合附图1-7对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-7.
本申请实施例公开一种基坑开挖用的基坑支护结构。参照图1和图2,一种基坑开挖用的基坑支护结构包括多个支护挡板1、多个插入组件2和多个支撑装置3,在本实施例中,支护挡板1的个数为八个,八个支护挡板1分为两组,两组中的四个支护挡板1各拼接成一个矩形框式的结构,其中一个矩形框位于另一个矩形框上方,正对的支护挡板1由至少一个支撑装置3进行支撑,在本实施例中,正对的支护挡板1由一个支撑装置3支撑。The embodiment of the present application discloses a foundation pit support structure for foundation pit excavation. Referring to Fig. 1 and Fig. 2, a foundation pit support structure for foundation pit excavation includes a plurality of support baffles 1, a plurality of insert assemblies 2 and a plurality of support devices 3. In this embodiment, the number of support baffles 1 is eight, and the eight support baffles 1 are divided into two groups. The support baffle 1 is supported by a support device 3 .
参照图1和图2,支护挡板1包括多个插板11和四个连接座12,插板11与基坑的一个内侧壁贴合,在本实施例中,一个支护挡板1由三个插板11拼接而成,插板11为竖直放置的矩形板,插板11一侧开设有插接槽111,另一侧设有一个插接条112,且插接条112焊接于插板11,相邻两个插板11拼接时,其中一个插板11上的插接条112插入另一个插板11上的插接槽111内,四个连接座12各位于基坑相邻两侧壁的拐角处,在本实施例中,连接座12呈L形,连接座12一端开设有供插板11上插接条112插接的插槽121,另一端设有插条122,且插条122能够插入插板11上的插接槽111,插条122焊接于连接座12;插板11底壁焊接有至少一个插入桩113,在本实施例中,每一插板11底壁焊接有一个插入桩113,插入桩113的底端为尖头,插板11远离插入桩113一侧开设有供另一个插板11的插入桩113插入的插入孔114。Referring to Figures 1 and 2, the support baffle 1 includes a plurality of inserts 11 and four connecting seats 12. The inserts 11 are attached to an inner side wall of the foundation pit. In this embodiment, a support baffle 1 is formed by splicing three inserts 11. The inserts 11 are rectangular plates placed vertically. One side of the insert 11 is provided with an insert slot 111, and the other side is provided with an insert strip 112, and the insert strip 112 is welded to the insert 11. When two adjacent inserts 11 are spliced together , the plug strip 112 on one of the plugboards 11 is inserted into the slot 111 on the other plugboard 11, and the four connection seats 12 are respectively located at the corners of the adjacent side walls of the foundation pit. In this embodiment, the connection seats 12 are L-shaped. 22 is welded to the connection seat 12; the bottom wall of the flashboard 11 is welded with at least one insertion pile 113, in the present embodiment, the bottom wall of each flashboard 11 is welded with an insertion pile 113, the bottom end of the insertion pile 113 is a pointed tip, and the side of the flashboard 11 away from the insertion pile 113 is provided with an insertion hole 114 for the insertion of the insertion pile 113 of another flashboard 11.
参照图1、图2和图3,两个正对的插板11相互靠近一侧开设有滑槽115,且滑槽115的设置方向由基坑开口朝向基坑底壁,位于上方插板11的滑槽115与位于下方插板11的滑槽115连通,在本实施例中,滑槽115的纵截面呈T形,插板11于滑槽115内设有滑块116,在本实施例中,滑块116的纵截面呈T形,且滑块116能够与滑槽115的槽壁贴合,滑块116能够在滑槽115内沿滑槽115的长度方向滑动,在滑块116滑动至合适位置时,滑块116通过螺丝连接于插板11,插入组件2包括伸缩件21、固定底座22和插销23,伸缩件21倾斜设置,且伸缩件21位于矩形框内,伸缩件21较高一端铰接于滑块116,伸缩件21较低一端与固定底座22铰接,在本实施例中,伸缩件21包括第一插杆211和第二插杆212,第一插杆211一端与滑块116铰接,另一端插接于第二插杆212,第一插杆211靠近第二插杆212一端设有连接孔2111,且多个连接孔2111沿第一插杆211的长度方向排列,第二插杆212设有螺钉2121,螺钉2121穿设于第二插杆212后伸入连接孔2111内,螺钉2121能够将第二插杆212和第一插杆211固定,固定底座22水平设置,插销23位于固定底座22远离第二插杆212一侧,插销23的设置方向与插入桩113的设置方向一致,插销23焊接于固定底座22,插销23远离固定底座22一端为尖头。Referring to Fig. 1, Fig. 2 and Fig. 3, two facing boards 11 are provided with chute 115 on one side close to each other, and the setting direction of chute 115 is from the opening of the foundation pit toward the bottom wall of the foundation pit, and the chute 115 positioned at the upper board 11 communicates with the chute 115 located at the lower board 11. The longitudinal section of 6 is T-shaped, and the slider 116 can fit the groove wall of the chute 115. The slider 116 can slide in the chute 115 along the length direction of the chute 115. When the slider 116 slides to a suitable position, the slider 116 is connected to the inserting plate 11 by screws. The insertion assembly 2 includes a telescopic piece 21, a fixed base 22 and a latch 23. The lower end of the telescopic member 21 is hinged to the fixed base 22. In this embodiment, the telescopic member 21 includes a first insertion rod 211 and a second insertion rod 212. One end of the first insertion rod 211 is hinged to the slider 116, and the other end is inserted into the second insertion rod 212. The first insertion rod 211 is provided with a connecting hole 2111 near the end of the second insertion rod 212, and a plurality of connection holes 2111 are arranged along the length direction of the first insertion rod 211. The second insertion rod 211 2. A screw 2121 is provided. The screw 2121 penetrates the second insertion rod 212 and then extends into the connection hole 2111. The screw 2121 can fix the second insertion rod 212 and the first insertion rod 211. The fixed base 22 is arranged horizontally. The bolt 23 is located on the side of the fixed base 22 away from the second insertion rod 212. The installation direction of the latch 23 is consistent with the installation direction of the insertion pile 113. .
参照图4,支撑装置3包括连接组件31、支撑组件32和调节组件33,调节组件33设于支撑组件32上。Referring to FIG. 4 , the supporting device 3 includes a connecting component 31 , a supporting component 32 and an adjusting component 33 , and the adjusting component 33 is arranged on the supporting component 32 .
参照图5和图6,在本实施例中,两个正对的插板11相互靠近一侧均与一个连接组件31连接,连接组件31包括连接板311和连接杆312,连接板311上设有第一紧固件3111,第一紧固件3111穿设于连接板311后与插板11螺纹连接,第一紧固件3111螺纹连接于连接板311,连接杆312位于连接板311远离插板11一侧,连接杆312铰接于连接板311,连接杆312远离铰接端与支撑组件32固定。Referring to Fig. 5 and Fig. 6, in the present embodiment, two facing inserting boards 11 are connected to a connecting assembly 31 on one side close to each other. The connecting assembly 31 includes a connecting plate 311 and a connecting rod 312. The connecting plate 311 is provided with a first fastener 3111. On one side, the connecting rod 312 is hinged to the connecting plate 311 , and the connecting rod 312 is fixed to the support assembly 32 away from the hinged end.
参照图5和图7,支撑组件32包括多个支撑杆321,支撑杆321位于两个正对的插板11之间,且支撑杆321水平设置,连接杆312远离铰接端的一端插入支撑杆321一端,且连接杆312螺纹连接于支撑杆321,支撑杆321远离连接座12一端与调节组件33可拆卸连接,支撑杆321靠近调节组件33一端开设有多个插接孔3211,且多个插接孔3211且支撑杆321的长度方向设置。5 and 7, the support assembly 32 includes a plurality of support rods 321, the support rods 321 are located between the two facing plates 11, and the support rods 321 are arranged horizontally, the end of the connecting rod 312 away from the hinged end is inserted into the end of the support rod 321, and the connecting rod 312 is threadedly connected to the support rod 321, the end of the support rod 321 away from the connecting seat 12 is detachably connected to the adjustment assembly 33, and the end of the support rod 321 near the adjustment assembly 33 is provided with a plurality of insertion holes 32 11, and a plurality of insertion holes 3211 and the length direction of the support rod 321 are set.
参照图5和图7,调节组件33包括调节件331,在本实施例中,调节件331的纵截面为矩形,调节件331两端开设有供支撑杆321插入的插孔3311,调节件331于插孔3311处设有第二紧固件3312,第二紧固件3312依次穿设于调节件331和支撑杆321,第二紧固件3312能够伸入插接孔3211中,在本实施例中,第二紧固件3312为螺栓,第二紧固件3312能够将调节件331和支撑杆321固定。5 and 7, the adjustment assembly 33 includes an adjustment member 331. In this embodiment, the longitudinal section of the adjustment member 331 is rectangular. The two ends of the adjustment member 331 are provided with sockets 3311 for the support rod 321 to be inserted into. , in this embodiment, the second fastener 3312 is a bolt, and the second fastener 3312 can fix the adjustment member 331 and the support rod 321 .
本申请实施例一种基坑开挖用的基坑支护结构的实施原理为:当需要对基坑进行支护时,首先,将插板11拼接固定成支护挡板1,随后,将支护挡板1插入基坑内,使支护挡板1与基坑的侧壁贴合,插入桩113能够插入基坑底部,再通过连接座12将位于基坑拐角处相邻的两个插板11连接,再根据基坑的大小将支撑组件32固定在正对的两个插板11之间。The implementation principle of a foundation pit support structure for foundation pit excavation in the embodiment of the present application is as follows: when the foundation pit needs to be supported, first, the inserting plate 11 is spliced and fixed into a support baffle 1, and then the support baffle 1 is inserted into the foundation pit, so that the support baffle 1 fits with the side wall of the foundation pit, the insertion pile 113 can be inserted into the bottom of the foundation pit, and then the two adjacent inserts 11 located at the corner of the foundation pit are connected through the connecting seat 12, and then the support assembly 32 is fixed on the base according to the size of the foundation pit between the two facing boards 11.
需要安装支撑装置3时,取出两个连接板311,将两个连接板311各固定在正对的两个插板11相互靠近一侧,旋拧第一紧固件3111,第一紧固件3111能够将连接板311和插板11固定,随后,取出支撑杆321,使连接杆312插入支撑杆321一端,且旋拧支撑杆321,能够将支撑杆321和连接杆312固定,将支撑杆321远离连接杆312一端靠近调节件331一侧,使支撑杆321插入插孔3311内,将第二紧固件3312依次穿设于调节件331和支撑杆321,使第二紧固件3312将调节件331与支撑杆321固定;之后,按照上述步骤,将另一支撑杆321固定在调节件331另一侧,按照上述操作,将其余支撑杆321固定于正对的两个插板11之间。When the support device 3 needs to be installed, take out the two connecting plates 311, fix the two connecting plates 311 on the opposite side of the two inserting plates 11 close to each other, screw the first fastener 3111, the first fastener 3111 can fix the connecting plate 311 and the inserting plate 11, then take out the supporting rod 321, insert the connecting rod 312 into one end of the supporting rod 321, and screw the supporting rod 321, the supporting rod 321 and the connecting rod 312 can be fixed, and the supporting rod 321 can be fixed. 1. The end far away from the connecting rod 312 is close to the side of the adjustment piece 331, insert the support rod 321 into the socket 3311, and pass the second fastener 3312 through the adjustment piece 331 and the support rod 321 in turn, so that the second fastener 3312 fixes the adjustment piece 331 and the support rod 321; then, according to the above steps, fix the other support rod 321 on the other side of the adjustment piece 331, and according to the above operation, fix the remaining support rods 321 between the two facing plates 11 .
需要增加支护挡板1高度时,取出其余的支护挡板1,人员使用吊车将支护挡板1吊动至基坑上方,使位于上方支护挡板1的插入桩113能够插入位于下方支护挡板1对应的插入孔114内。When the height of the support baffle 1 needs to be increased, the rest of the support baffle 1 is taken out, and the personnel use a crane to lift the support baffle 1 above the foundation pit, so that the insertion pile 113 on the upper support baffle 1 can be inserted into the corresponding insertion hole 114 on the lower support baffle 1 .
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made according to the structure, shape, and principle of the present application should be covered within the protection scope of the present application.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320747460.5U CN219410893U (en) | 2023-04-06 | 2023-04-06 | Foundation pit supporting structure for foundation pit excavation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320747460.5U CN219410893U (en) | 2023-04-06 | 2023-04-06 | Foundation pit supporting structure for foundation pit excavation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219410893U true CN219410893U (en) | 2023-07-25 |
Family
ID=87241657
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320747460.5U Active CN219410893U (en) | 2023-04-06 | 2023-04-06 | Foundation pit supporting structure for foundation pit excavation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219410893U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119711509A (en) * | 2025-01-08 | 2025-03-28 | 中交上海航道局有限公司 | Pump station foundation pit support structure |
-
2023
- 2023-04-06 CN CN202320747460.5U patent/CN219410893U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119711509A (en) * | 2025-01-08 | 2025-03-28 | 中交上海航道局有限公司 | Pump station foundation pit support structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN219410893U (en) | Foundation pit supporting structure for foundation pit excavation | |
| CN104563172B (en) | A kind of steel construction room sinking resetting structure and repositioning method thereof | |
| CN103698219B (en) | Self-equilibrating door frame anti-earth's surface deformation experiment device | |
| CN214272134U (en) | Basement unilateral side formwork system | |
| CN211597144U (en) | A noise reduction device for environmental protection and energy saving in building construction management | |
| CN209941962U (en) | Vertical connection structure of a prefabricated shear wall | |
| CN217500248U (en) | Foundation pit supporting structure | |
| CN110185074B (en) | Inclined pile model test device and test method | |
| CN214754986U (en) | Install swift type box-type substation basis | |
| CN207469275U (en) | A kind of slope rock river bed steel cofferdam | |
| CN209194588U (en) | A steel formwork for the side wall of a subway station | |
| CN111042519B (en) | An early dismantling system for floor formwork containing beam and slab structure buildings | |
| CN219175551U (en) | New Wall to Old Wall Connectors | |
| CN222667591U (en) | Template supporting structure | |
| CN219471520U (en) | concrete building formwork | |
| CN219157734U (en) | Assembled building foundation structure | |
| CN223662770U (en) | Pipeline fixing device | |
| CN219196697U (en) | A lightweight foam concrete filling construction equipment | |
| CN219808242U (en) | Trestle for foundation pit | |
| CN206681491U (en) | The detachable assembled enclosure wall in building site | |
| CN219097514U (en) | A stacking device for prefabricated building exterior wall panels | |
| CN219711182U (en) | Gravity combined fencing | |
| CN222436084U (en) | Embedded prefabricated wall structure | |
| CN219386661U (en) | Movable board house connection structure | |
| CN218241182U (en) | Anchor net cable analogue simulation test supporting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250616 Address after: 610000 Sichuan Province, Chengdu City, Jinniu District, Rongbei Commercial Avenue Second Section No. 293, Building 15, Unit 1, 16th Floor, Room 1601 Patentee after: Longheyuan Technology (Sichuan) Co.,Ltd. Country or region after: China Address before: 710000 Shaanxi Province, Xi'an City, Changan Ecological Zone, East Third Ring Road No. 7188, Star Union Exhibition Building 901 Patentee before: Shaanxi Guoyang Construction Engineering Co.,Ltd. Country or region before: China |