CN219410567U - Pier stud template adjusting device - Google Patents

Pier stud template adjusting device Download PDF

Info

Publication number
CN219410567U
CN219410567U CN202320589071.4U CN202320589071U CN219410567U CN 219410567 U CN219410567 U CN 219410567U CN 202320589071 U CN202320589071 U CN 202320589071U CN 219410567 U CN219410567 U CN 219410567U
Authority
CN
China
Prior art keywords
template
groove
pier column
pier
fit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320589071.4U
Other languages
Chinese (zh)
Inventor
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Tianwei Hengchuang Intelligent Technology Co.,Ltd.
Original Assignee
Chengdu Tianwei Template Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Tianwei Template Co ltd filed Critical Chengdu Tianwei Template Co ltd
Priority to CN202320589071.4U priority Critical patent/CN219410567U/en
Application granted granted Critical
Publication of CN219410567U publication Critical patent/CN219410567U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an adjusting device for a pier column template, which belongs to the technical field of cement construction and comprises a pier column template, an inner movable groove and an inner guide groove, wherein the inner movable groove is arranged in the pier column template, the inner guide groove is arranged in the inner movable groove, and an adjusting mechanism capable of adjusting the cement pouring height in the pier column template and a fixing mechanism capable of fixedly supporting two connected pier column templates are arranged in the pier column template. According to the utility model, the adjusting mechanism is arranged, the extending template, the guide edge and the handles are matched for use, the handles are pushed to move in the sliding grooves to drive the extending template to move in the inner movable grooves, the extending template is fixed by screwing in the bolts, the overall cement pouring height of the pier column template can be increased, meanwhile, the pouring height can be further increased by superposing the pier column template, and pier columns with different heights can be poured according to requirements.

Description

Pier stud template adjusting device
Technical Field
The utility model belongs to the technical field of cement construction, and particularly relates to an adjusting device for a pier column template.
Background
The pier is an important component in the engineering of highway bridges, railway bridges, overpasses, ramp bridges, overpasses and the like, and when the pier is constructed, the reinforcement cage needs to be paved firstly, then a pouring area is surrounded by using the pier template, and finally the concrete pouring is completed.
According to the search, the application number CN202222464974.8 pier column template verticality adjusting device comprises a level bar assembly, a fixing structure, a dial and a line drop, wherein the level bar assembly is connected with the fixing structure and is connected with an external pier column template through the fixing structure; the disadvantages are as follows:
through research analysis, the device can judge the pier column template verticality, but because the superposition between a plurality of pier column templates leads to each pier column template junction unstable, and need consume more manpower to install and fix a plurality of pier column templates, have the space between two superimposed pier column templates simultaneously, and directly run through fixedly through the bolt, consequently lead to the pier column template after connecting wholly unstable easily, lead to the verticality to have the skew.
Disclosure of Invention
The utility model aims at: in order to solve the problem that the pier column templates cannot be adjusted, so that a plurality of pier column templates are required to be used for completing work and connection between the pier column templates is unstable, the pier column template adjusting device is provided.
The technical scheme adopted by the utility model is as follows: the utility model provides an pier stud template adjusting device, includes pier stud template, interior movable groove, interior guide way, the inside interior movable groove that is provided with of pier stud template, interior movable groove inside is provided with interior guide way, the inside adjustment mechanism that can adjust the cement pouring height of pier stud template and the fixed establishment who can carry out fixed bolster between two connected pier stud templates that is provided with of pier stud template.
Wherein, adjustment mechanism is including extending template, direction along, handle, wherein, interior movable groove inside activity is provided with the extension template, and is connected with the elastic sealing face between extension template bottom and the interior movable groove, and runs through fixedly through the bolt between extension template and the pier stud template, the extension template outside is provided with the direction along, and the direction along including the inside activity of guide groove, extension template both sides outer wall is close to the direction along the top and all is provided with the handle, and the handle is along to the pier stud template outside, and pier stud template surface is provided with the spout, and the handle can be at spout internal motion.
The fixing mechanism comprises a fit top edge, a support edge, a sliding fit groove, a fool-proof top edge, a sliding fit block, a movable groove, a movable support column, a fit bottom groove and a fool-proof bottom groove.
Wherein the top of the extension template is provided with a fitting top edge, the outer wall of the top of the pier column template and the outer wall close to the lower part of the handle are provided with supporting edges, both sides of the supporting edges of the outer wall of the top of the pier column template are provided with sliding fitting grooves, both sides of the supporting edges of the outer wall of the pier column template close to the lower part of the handle are provided with sliding fitting grooves, the top of the pier column template is provided with a foolproof top edge, the outer part of the pier column template is provided with a movable groove, movable struts are movably arranged in the movable groove, the movable grooves and the movable struts are fixed through bolts, the movable support column top and the movable groove bottom are both provided with sliding fit blocks, the sliding fit grooves and the sliding fit blocks are in fit arrangement, the sliding fit grooves and the sliding fit blocks are fixed through bolts, the pier column template bottom is provided with fit bottom grooves, the cross section of the fit top edge is semicircular, the fit top edge and the fit bottom grooves are in fit arrangement, the pier column template bottom pipe edge is provided with foolproof bottom grooves, the cross section of the foolproof top edge is isosceles trapezoid, the foolproof top edge and the foolproof bottom grooves are in fit arrangement, and the pier column template bottom pipe edge and the foolproof bottom grooves are fixed through bolts.
In summary, due to the adoption of the technical scheme, the beneficial effects of the utility model are as follows:
1. according to the utility model, the adjusting mechanism is arranged, the extending template, the guide edge and the handle are matched for use, the handle is pushed to move in the sliding groove to drive the extending template to move in the inner movable groove, the extending template is fixed by screwing in the bolt, the overall cement pouring height of the pier column template can be increased, meanwhile, the pouring height can be further increased by superposing the pier column template, and pier columns with different heights can be poured according to requirements.
2. According to the utility model, the fixing mechanism is arranged, and the sliding fit blocks can be slid into the sliding fit grooves by matching the fit top edge, the support edge, the sliding fit grooves, the foolproof top edge, the sliding fit blocks, the movable grooves, the movable support posts, the fit bottom grooves and the foolproof bottom grooves, and the movable support posts can move in the movable grooves to support and fix the connected pier column templates by the movable support posts, so that the connection firmness of the two pier column templates can be further improved by the fit of all the components.
Drawings
FIG. 1 is a schematic diagram of the overall three-dimensional structure of the present utility model;
FIG. 2 is a schematic diagram of the overall structure of the present utility model;
FIG. 3 is a schematic diagram of the enlarged construction of FIG. 2A according to the present utility model;
fig. 4 is a schematic diagram of a partial three-dimensional explosion structure of the present utility model.
The marks in the figure: 1. pier column templates; 101. an inner movable groove; 102. an inner guide groove; 2. extending the template; 201. a guide edge; 202. fitting the top edge; 203. a handle; 3. a support edge; 301. a sliding engagement groove; 4. fool-proof top edge; 5. a sliding engagement block; 501. a movable groove; 502. a movable support; 6. fitting the bottom groove; 7. a fool-proof bottom groove.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
referring to fig. 1-4, an adjusting device for a pier column template comprises a pier column template 1, an inner movable groove 101 and an inner guide groove 102, wherein the inner movable groove 101 is arranged in the pier column template 1, the inner guide groove 102 is arranged in the inner movable groove 101, and an adjusting mechanism capable of adjusting the pouring height of cement in the pier column template 1 and a fixing mechanism capable of fixedly supporting two connected pier column templates 1 are arranged in the pier column template 1.
Referring to fig. 1-4, in this embodiment, the adjusting mechanism includes an extension template 2, a guiding edge 201, and a handle 203, wherein the extension template 2 is movably disposed in the inner movable groove 101, and an elastic sealing surface is connected between the bottom of the extension template 2 and the inner movable groove 101, and the extension template 2 and the pier column template 1 are fixed by bolts, the guiding edge 201 is disposed on the outer side of the extension template 2, and the guiding edge 201 moves in the inner guide groove 102, the handles 203 are disposed on the outer walls of the two sides of the extension template 2 near the upper side of the guiding edge 201, and the handles 203 are disposed on the outer side of the pier column template 1, and the surface of the pier column template 1 is provided with a chute, and the handles 203 can move in the chute, the worker sleeves the pier column template 1 with the corresponding size on the outer side of the pier column reinforcement frame laid in advance, then, the handles 203 are pushed to move the extension template 2 in the inner movable groove 101, so that the extension template 2 moves upward, the whole internal cement pouring amount of the pier column template 1 is increased, and finally the bolts are screwed into the pier column template 1 and the extension template 2 to fix the pier column template 2 at a plurality of different heights, and then another pier column template 1 needs to be sleeved on the top of the pier column template 1.
Referring to fig. 1 to 4, in this embodiment, the fixing mechanism includes a top engagement edge 202, a support edge 3, a sliding engagement groove 301, a fool-proof top edge 4, a sliding engagement block 5, a movable groove 501, a movable pillar 502, a bottom engagement groove 6, and a fool-proof bottom groove 7.
Referring to fig. 1-4, in this embodiment, the top of the extension form 2 is provided with a engaging top edge 202, the top outer wall of the pier column form 1 and the outer wall close to the lower part of the handle 203 are both provided with a supporting edge 3, both sides of the supporting edge 3 of the top outer wall of the pier column form 1 are both provided with sliding engaging grooves 301, both sides of the bottom of the supporting edge 3 of the pier column form 1 close to the outer wall of the lower part of the handle 203 are both provided with sliding engaging grooves 301, the top of the pier column form 1 is provided with a foolproof top edge 4, the outside of the pier column form 1 is provided with a movable groove 501, the inside of the movable groove 501 is movably provided with a movable pillar 502, the movable groove 501 and the movable pillar 502 are fixed by bolts, the top of the movable pillar 502 and the bottom of the movable groove 501 are both provided with sliding engaging blocks 5, the sliding engaging grooves 301 and the sliding engaging blocks 5 are engaged by bolts, the bottom of the pier column template 1 is provided with a fitting bottom groove 6, the cross section of a fitting top edge 202 is semicircular, the fitting top edge 202 and the fitting bottom groove 6 are in fitting arrangement, the bottom pipe edge of the pier column template 1 is provided with a foolproof bottom groove 7, the cross section of a foolproof top edge 4 is isosceles trapezoid, the foolproof top edge 4 and the foolproof bottom groove 7 are in fitting arrangement, the foolproof top edge 4 and the foolproof bottom groove 7 are fixed through bolts, the new fitting bottom groove 6 and the foolproof bottom groove 7 at the bottom of the pier column template 1 are respectively matched with the fitting top edge 202 and the foolproof top edge 4 at the top of the last pier column template 1, finally, the joint of the two pier column templates 1 is fixedly penetrated by the screwing bolts through the foolproof top edge 4 and the fitting top edge 202, the movable support column 502 in the movable groove 501 with the corresponding length is adjusted to the required length, then the bolts are screwed for fixing, finally, and finally, screwing bolts into the sliding fit grooves 301 corresponding to the support edges 3 to penetrate through the sliding fit blocks 5 and the sliding fit grooves 301 to fix the movable grooves 501, so that the pier column template 1 is supported and fixed.
Working principle: firstly, a worker is sleeved with a pier column template 1 with a corresponding size on the outer side of a pier column reinforcement frame paved in advance, then, the extension template 2 is moved in an inner movable groove 101 through pushing a handle 203, so that the extension template 2 moves upwards, the integral cement pouring amount of the pier column template 1 is improved, finally, a movable support column 502 in the movable groove 501 with a corresponding length is adjusted to a required length, a plurality of heights are insufficient, another pier column template 1 is sleeved on the top of the upper pier column template 1, a fit bottom groove 6 and a foolproof bottom groove 7 at the bottom of the new pier column template 1 are respectively matched with a fit top edge 202 and a foolproof top edge 4 at the top of the upper pier column template 1, finally, the movable support column 502 in the movable groove 501 with a corresponding length is adjusted to a required length through the screw bolts, finally, the sliding blocks 5 at the bottom of the movable groove and the top of the movable support column template are correspondingly matched with the sliding blocks 301 in the corresponding support grooves 3, and the sliding blocks 301 are screwed into the corresponding support grooves 301, and finally, the sliding blocks 301 are matched with the sliding blocks 301 are screwed into the movable groove 5, and the sliding blocks are matched with the sliding blocks, and the sliding blocks are matched with the sliding blocks.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (7)

1. The utility model provides a pier stud template adjusting device, includes pier stud template (1), interior movable groove (101), interior guide way (102), pier stud template (1) inside is provided with interior movable groove (101), interior movable groove (101) inside is provided with interior guide way (102), its characterized in that: the pier column template (1) is internally provided with an adjusting mechanism capable of adjusting the cement pouring height inside the pier column template (1) and a fixing mechanism capable of fixedly supporting two connected pier column templates (1).
2. The pier stud template adjusting device of claim 1, wherein: the adjusting mechanism comprises an extending template (2), a guiding edge (201) and a handle (203), wherein the extending template (2) is movably arranged in the inner movable groove (101), the guiding edge (201) is arranged on the outer side of the extending template (2), and the handles (203) are arranged on the outer walls of the two sides of the extending template (2) close to the upper portion of the guiding edge (201).
3. The pier stud template adjusting device of claim 1, wherein: the fixing mechanism comprises a fit top edge (202), a support edge (3), a sliding fit groove (301), a fool-proof top edge (4), a sliding fit block (5), a movable groove (501), a movable support (502), a fit bottom groove (6) and a fool-proof bottom groove (7).
4. The pier stud template adjusting device of claim 2, wherein: the utility model provides a pier column template, including pier column template (1), pier column template (1) top outer wall and be close to outer wall department of handle (203) below and all be provided with support edge (3), support edge (3) top both sides of pier column template (1) top outer wall all are provided with slip fit groove (301), support edge (3) bottom both sides that pier column template (1) is close to outer wall department of handle (203) below all are provided with slip fit groove (301), pier column template (1) top is provided with prevents slow-witted top edge (4), pier column template (1) outside has movable groove (501), movable groove (501) internal activity is provided with movable pillar (502), movable pillar (502) top and movable groove (501) bottom all are provided with slip fit piece (5), pier column template (1) bottom is provided with fit groove (6), pier column template (1) bottom pipe edge department is provided with prevents slow-witted bottom groove (7).
5. The pier stud template adjusting device of claim 2, wherein: the handle (203) is arranged on the outer side of the pier column template (1), a sliding groove is formed in the surface of the pier column template (1), the handle (203) can move in the sliding groove, the guiding edge (201) moves in the inner guiding groove (102), an elastic sealing surface is connected between the bottom of the extension template (2) and the inner moving groove (101), and the extension template (2) and the pier column template (1) are fixedly penetrated through by bolts.
6. The pier stud template adjusting device of claim 4, wherein: the cross section of fool-proof top edge (4) is isosceles trapezoid, and is in fit arrangement between fool-proof top edge (4) and fool-proof bottom groove (7), and is fixed through bolts between the fool-proof top edge and fool-proof bottom groove (7), and the cross section of fit top edge (202) is in semicircular arrangement, and is in fit arrangement between fit top edge (202) and fit bottom groove (6).
7. The pier stud template adjusting device of claim 4, wherein: the sliding engagement groove (301) and the sliding engagement block (5) are arranged in an engaged mode, the movable groove (501) and the movable support column (502) are fixed through bolts, and the sliding engagement groove (301) and the sliding engagement block (5) are fixed through bolts.
CN202320589071.4U 2023-03-23 2023-03-23 Pier stud template adjusting device Active CN219410567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320589071.4U CN219410567U (en) 2023-03-23 2023-03-23 Pier stud template adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320589071.4U CN219410567U (en) 2023-03-23 2023-03-23 Pier stud template adjusting device

Publications (1)

Publication Number Publication Date
CN219410567U true CN219410567U (en) 2023-07-25

Family

ID=87232034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320589071.4U Active CN219410567U (en) 2023-03-23 2023-03-23 Pier stud template adjusting device

Country Status (1)

Country Link
CN (1) CN219410567U (en)

Similar Documents

Publication Publication Date Title
CN103967050B (en) Construction system of subway station
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN106194216A (en) A kind of Rectangular Box Culvert and constructing tunnel chassis
CN204457807U (en) A kind of tunnel ditch cable channel hydraulic formwork trolley
CN112065454A (en) Inverted arch formwork and construction method thereof
CN202194071U (en) Adjustable inner die
CN219410567U (en) Pier stud template adjusting device
CN205936645U (en) A full liquid die plate system for culvert is pour
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN112302259A (en) Floor thickness and floor double-layer steel bar protection layer thickness control device and manufacturing method
CN211006318U (en) Assembled pier
CN112228109A (en) Inverted arch formwork and construction method thereof
CN210066503U (en) Thin-wall hollow pier die of sliding frame lifting die
CN208996446U (en) A kind of column mould strengthening frame structure
CN209851191U (en) Single track PC roof beam template of high accuracy
CN203514740U (en) Rib filling device
CN207144456U (en) Builder's jack I-steel built-in fitting
CN206736636U (en) The moveable overall transfering type straddle-type monorail PC track beam forms of bed die
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN212335790U (en) Large cantilever bent cap construction trolley
CN210552225U (en) Anti-settling mechanism of cutting machine for aerated concrete block
CN204000626U (en) A kind of guiding ruler for bridge web template construct, installation
CN209082555U (en) A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form open
CN208857691U (en) A kind of slide platform of recycling
CN203559909U (en) Height-adjustable lining trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.188, Section 2, East Third Ring Road, Tianpeng Town, Pengzhou City, Chengdu City, Sichuan Province

Patentee after: Chengdu Tianwei Hengchuang Intelligent Technology Co.,Ltd.

Country or region after: China

Address before: No. 188, Section 2, East Third Ring Road, Tianpeng Town, Pengzhou City, Chengdu, Sichuan 610000

Patentee before: Chengdu Tianwei template Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address