CN219385971U - Scribing construction trolley for road marking - Google Patents

Scribing construction trolley for road marking Download PDF

Info

Publication number
CN219385971U
CN219385971U CN202320154124.XU CN202320154124U CN219385971U CN 219385971 U CN219385971 U CN 219385971U CN 202320154124 U CN202320154124 U CN 202320154124U CN 219385971 U CN219385971 U CN 219385971U
Authority
CN
China
Prior art keywords
fixedly connected
construction trolley
construction
storage box
paint storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320154124.XU
Other languages
Chinese (zh)
Inventor
张朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Yate Construction Engineering Co ltd
Original Assignee
Tianjin Yate Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Yate Construction Engineering Co ltd filed Critical Tianjin Yate Construction Engineering Co ltd
Priority to CN202320154124.XU priority Critical patent/CN219385971U/en
Application granted granted Critical
Publication of CN219385971U publication Critical patent/CN219385971U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)

Abstract

The utility model discloses a scribing construction trolley for road marking, which comprises a construction trolley, wherein the rear side of the lower end of the construction trolley is fixedly connected with a paint storage box, the front part of the lower end of the construction trolley is fixedly connected with a second motor, the lower end transmission shaft part of the second motor is fixedly connected with a pinion, the side end of the pinion is in meshed connection with a large gear, the lower end of the large gear is rotationally connected with a mounting bracket, the side edge of the upper end face of the large gear is rotationally connected with a push rod, the front top end of the push rod is rotationally connected with a connecting block, the side end of the connecting block is fixedly connected with a swinging rod, and the lower bottom surface of the front end of the swinging rod is fixedly connected with a cleaning brush. When the cleaning brush swings, the cleaning brush can play a role in swinging and cleaning dust or broken stone on the road surface, so that the problem that the marking paint can be blocked by the dust or the broken stone on the road surface and cannot be effectively covered on the road surface is avoided, and the working efficiency of road marking construction is reduced.

Description

Scribing construction trolley for road marking
Technical Field
The utility model relates to the technical field of road marking, in particular to a marking construction trolley for road marking.
Background
The road marking is mainly marked on the road surface and used for construction projects such as road marking, factory parking lot, underground garage marking, school road marking, living district marking and the like, is subjected to sun and rain, wind and snow freezing and is subjected to impact abrasion of vehicles, so that the road marking has strict requirements on the performance, and is generally divided into hot melt marking, normal-temperature cold paint marking, color anti-skid marking, oscillation anti-skid reflective marking and preformed marking, wherein the hot melt marking is the most widely applied marking on the road marking in China at present, and can be used for road marking construction carts when road marking construction is carried out;
the utility model discloses a "marking construction shallow for road marking" wherein is 202122111135.3, including the bottom plate, the top fixedly connected with lacquer storage box of bottom plate, the left side fixedly connected with handle at bottom plate top, the bottom fixedly connected with gyro wheel of bottom plate, the right side fixedly connected with electric telescopic handle of handle, electric telescopic handle's right side articulates there is the transfer line, the bottom of transfer line articulates there is the rolling disc. According to the utility model, through the mutual matching of the bottom plate, the paint storage box, the handle, the idler wheels, the electric telescopic rod, the transmission rod, the rotating disc, the stirring rod, the feeding port, the water storage tank, the first water pipe, the second water pipe, the spray head, the electromagnetic heater and the heat conducting metal, the problems that the activity of the marking paint cannot be ensured, the marking of the marking construction trolley is uneven, the marking paint needs to be replaced frequently, the paint waste is increased and the marking paint activity is ensured are solved;
but when using, in road marking construction process, can't clean the operation to ground dust or rubble, when can't clean the operation to ground dust or rubble, the shower nozzle appears when carrying out marking paint spraying easily, can spray the condition on ground dust or rubble, when marking paint spraying on ground dust or rubble, marking paint can be blocked by ground dust or rubble and can't effectively cover the problem on road ground to road marking construction's work efficiency has been reduced.
Disclosure of Invention
The utility model aims to provide a scribing construction trolley for road marking, which solves the problems that in the background technology, in the scribing construction process of the road marking, ground dust or broken stone cannot be cleaned, when the cleaning operation of the ground dust or the broken stone cannot be performed, a nozzle is easy to spray on the ground dust or the broken stone when the marking paint is sprayed on the ground dust or the broken stone, and when the marking paint is sprayed on the ground dust or the broken stone, the marking paint can be blocked by the ground dust or the broken stone and cannot be effectively covered on the road ground, so that the working efficiency of the scribing construction of the road marking is reduced.
In order to achieve the above purpose, the present utility model provides the following technical solutions: including construction shallow, construction shallow lower extreme rear side fixedly connected with lacquer case, bottom fixedly connected with heating base under the lacquer case, bottom fixedly connected with electric heating pipe in the heating base, the first motor of lacquer case up end middle part fixedly connected with, first motor lower extreme transmission shaft part is passed and is stored up lacquer case up end middle part fixedly connected with (mixing) shaft, bottom surface fixedly connected with booster pump in the lacquer case, booster pump side exit lower extreme threaded connection has the shower nozzle, construction shallow lower extreme middle part fixedly connected with power control cabinet, construction shallow lower extreme front portion fixedly connected with second motor, second motor lower extreme transmission shaft part fixedly connected with pinion, pinion side meshing is connected with the gear wheel, gear wheel lower extreme rotation is connected with installing support, gear wheel up end side rotation is connected with the push rod, top rotation is connected with the connecting block before the push rod, connecting block side end fixedly connected with sways the pole, bottom surface fixedly connected with cleaning brush under the push rod front end.
Preferably, a feed inlet is formed in the side edge of the upper end face of the paint storage box, and stirring rods are fixedly connected to the outer curved surface of the stirring shaft from top to bottom in sequence.
Preferably, the outlet pipe at the side end of the booster pump penetrates through the lower end face of the outer side of the paint storage box to the bottom end of the outer side of the paint storage box.
Preferably, a storage battery pack is arranged in the power control cabinet.
Preferably, the top fixed connection is in construction shallow lower extreme front portion on the installing support side, the push rod front end is the arc.
Preferably, the lower top end of the swinging rod is rotatably connected to the front side of the bottom surface of the mounting bracket.
Preferably, the brush part at the lower end of the cleaning brush is attached to the road surface in a movable connection manner.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, when the electric heating pipe is started, heat is generated to heat the interior of the paint storage tank, when the electric heating pipe is started, the first motor welded in the middle of the upper end face of the paint storage tank is started, when the first motor is started, the transmission shaft part at the lower end of the first motor is driven to rotate through the stirring shaft welded in the middle of the upper end face of the paint storage tank, when the stirring shaft rotates, the stirring rod sequentially welded from top to bottom on the outer curved surface of the stirring shaft is driven to rotate, and when the stirring rod rotates, the marking paint in the paint storage tank is rotated and stirred, so that the problems of poor using effect caused by solidification of the marking paint in the use process are solved, and meanwhile, the marking paint in the paint storage tank is pressurized and conveyed to the spray heads in threaded connection with the lower ends of outlets at the side ends of the booster pumps, so that the marking operation on the road downwards is realized, and the marking operation on the road in different sizes can be realized by replacing spray heads with different sizes;
the utility model also starts the second motor welded at the front part of the lower end of the construction trolley, when the second motor is started, the pinion which is welded at the transmission shaft part of the lower end of the second motor is driven to rotate, when the pinion rotates, the big gear which is meshed and connected with the side end of the pinion is driven to rotate, when the big gear rotates, the side edge of the upper end face of the big gear is driven to rotationally swing through the rear end of the push rod which is rotationally connected with the pin shaft, when the rear end of the push rod rotationally swings, the front top end of the push rod is driven to rotationally swing through the pin shaft, when the connecting block swings, the swing rod welded at the side end of the connecting block can be driven to swing, when the swing rod swings, the cleaning brush adhered to the lower bottom surface of the front end of the swing rod can be driven to swing, when the cleaning brush swings, the cleaning brush can play a role in swinging and cleaning dust or broken stone on the road surface, so that the problem that marking paint can be blocked by the dust or broken stone on the ground and cannot be effectively covered on the road surface is avoided, and the working efficiency problem of road marking scribing construction is reduced.
Drawings
FIG. 1 is a schematic diagram of the whole structure of a scribing construction trolley for road marking;
FIG. 2 is a schematic diagram II of the whole structure of the scribing construction trolley for the road marking;
FIG. 3 is a schematic view of a partial structure of a scribing construction cart for road marking according to the present utility model;
fig. 4 is a cross-sectional view of the whole structure of the scribing construction trolley for the road marking.
In the figure: 1. a construction trolley; 2. a paint storage box; 3. heating the base; 4. an electric heating tube; 5. a first motor; 6. a stirring shaft; 7. a booster pump; 8. a spray head; 9. a power supply control cabinet; 10. a second motor; 11. a pinion gear; 12. a large gear; 13. a mounting bracket; 14. a push rod; 15. a connecting block; 16. swinging the rod; 17. a cleaning brush.
Description of the embodiments
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: comprises a construction trolley 1, a paint storage tank 2 is welded at the rear side of the lower end of the construction trolley 1, a feed inlet is formed on the side edge of the upper end face of the paint storage tank 2, a heating base 3 is welded at the lower end of the paint storage tank 2, an electric heating pipe 4 is welded at the inner bottom of the heating base 3, a first motor 5 is welded at the middle part of the upper end face of the paint storage tank 2, a stirring shaft 6 is welded at the middle part of the upper end face of the paint storage tank 2 through which a transmission shaft part of the lower end of the first motor 5 penetrates, stirring rods are welded on the outer curved face of the stirring shaft 6 from top to bottom in sequence, a booster pump 7 is welded at the inner bottom face of the paint storage tank 2, a side outlet pipe of the booster pump 7 penetrates through the lower end face of the outer side of the paint storage tank 2 to the outer bottom of the paint storage tank 2, a spray head 8 is connected at the lower end screw thread of the side outlet of the booster pump 7, a power control cabinet 9 is welded at the middle part of the lower end of the construction trolley 1, a storage battery pack is arranged in the power control cabinet 9, the front portion welding of construction shallow 1 lower extreme has second motor 10, the partial welding of second motor 10 lower extreme transmission shaft has pinion 11, pinion 11 side end meshing is connected with gear wheel 12, gear wheel 12 lower extreme is connected with installing support 13 through the pivot rotation, and the top welding is in construction shallow 1 lower extreme front portion on the installing support 13 side, gear wheel 12 up end side is connected with push rod 14 through the round pin axle rotation, and push rod 14 front end is arc, the top is connected with connecting block 15 through the round pin axle rotation before the push rod 14, connecting block 15 side end welding has rocking rod 16, and rocking rod 16 lower top is rotated the front side at installing support 13 bottom surface through the pivot, the bottom surface bonds under rocking rod 16 front end has cleaning brush 17, and cleaning brush 17 lower extreme brush part laminating swing joint is on road ground.
Working principle: when the paint storage box is used, the required marking paint is added into the paint storage box 2 through the feed inlet formed in the side edge of the upper end face of the paint storage box 2, when the marking paint is added into the paint storage box 2, the electric heating pipe 4 welded in the bottom of the heating base 3 is opened, when the electric heating pipe 4 is opened, heat can be generated to heat the interior of the paint storage box 2, when the electric heating pipe 4 heats the interior of the paint storage box 2, the first motor 5 welded in the middle of the upper end face of the paint storage box 2 is opened, when the first motor 5 is opened, the stirring shaft 6 welded in the middle of the upper end face of the paint storage box 2 is driven to rotate, when the stirring shaft 6 rotates, the stirring rod welded in sequence from top to bottom is driven to rotate, and when the stirring rod rotates, the marking paint in the interior of the paint storage box 2 is rotated, so that the marking paint can be mixed and stirred while being heated, the problem of poor use effect is avoided, meanwhile, the marking paint can be sprayed to a spray head 8 with different sizes from the bottom face of the paint storage box 2 is connected to a spray head 8 in a large scale from the bottom face of the side of the paint storage box 2, and the spray head 8 can be replaced by different sizes, and the spray heads can be connected to the spray heads 8 in different sizes from the bottom face of the spray heads of the paint storage box 8;
when pushing the construction trolley 1 to carry out spraying marking operation, through opening construction trolley 1 lower extreme front portion welded second motor 10, when second motor 10 opens, can drive the pinion 11 of second motor 10 lower extreme transmission shaft part welded and rotate, when pinion 11 rotates, can drive pinion 11 side meshing connection's gear wheel 12 and rotate, when gear wheel 12 rotates, can drive gear wheel 12 up end side through the rotatory swing of round pin axle pivoted connection's push rod 14 rear end, when push rod 14 rear end rotatory swing, can drive push rod 14 front end through the swing of round pin axle pivoted connection's connecting block 15, when connecting block 15 swings, can drive connecting block 15 side welded swinging rod 16 and swing, when swinging rod 16 swings, can drive swinging rod 16 front end lower bottom surface bonded cleaning brush 17 and swing, can play the effect of swing cleaning road ground dust or rubble, thereby avoid the marking paint can be blocked by ground or rubble and can not effectively cover the problem on the road marking dust, thereby the work efficiency problem of road marking construction has been reduced.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a marking construction shallow for road marking, includes construction shallow (1), its characterized in that: the utility model discloses a construction trolley, which is characterized in that a paint storage box (2) is fixedly connected to the rear side of the lower end of the construction trolley (1), a heating base (3) is fixedly connected to the lower bottom end of the paint storage box (2), an electric heating pipe (4) is fixedly connected to the inner bottom of the heating base (3), a first motor (5) is fixedly connected to the middle part of the upper end surface of the paint storage box (2), a stirring shaft (6) is fixedly connected to the middle part of the upper end surface of the paint storage box (2) through which a transmission shaft part of the lower end of the first motor (5) penetrates, a booster pump (7) is fixedly connected to the inner bottom surface of the paint storage box (2), a spray head (8) is connected to the lower end of an outlet at the side end of the booster pump (7), the middle part of the lower end of the construction trolley (1) is fixedly connected with a power supply control cabinet (9), the front part of the lower end of the construction trolley (1) is fixedly connected with a second motor (10), the transmission shaft part of the lower end of the second motor (10) is fixedly connected with a pinion (11), the side end of the pinion (11) is in meshed connection with a large gear (12), the lower end of the large gear (12) is rotationally connected with a mounting bracket (13), the side edge of the upper end face of the large gear (12) is rotationally connected with a push rod (14), the front top end of the push rod (14) is rotationally connected with a connecting block (15), the side end of the connecting block (15) is fixedly connected with a swinging rod (16), the lower bottom surface of the front end of the swinging rod (16) is fixedly connected with a cleaning brush (17).
2. The scribing construction trolley for road marking according to claim 1, wherein: the side edge of the upper end face of the paint storage box (2) is provided with a feed inlet, and the outer curved surface of the stirring shaft (6) is fixedly connected with a stirring rod from top to bottom.
3. The scribing construction trolley for road marking according to claim 1, wherein: the outlet pipe at the side end of the booster pump (7) penetrates through the lower end face of the outer side of the paint storage box (2) to the bottom end of the outer side of the paint storage box (2).
4. The scribing construction trolley for road marking according to claim 1, wherein: the power supply control cabinet (9) is internally provided with a storage battery pack.
5. The scribing construction trolley for road marking according to claim 1, wherein: the upper top end of the side edge of the mounting bracket (13) is fixedly connected to the front part of the lower end of the construction trolley (1), and the front end of the push rod (14) is arc-shaped.
6. The scribing construction trolley for road marking according to claim 1, wherein: the lower top end of the swinging rod (16) is rotatably connected to the front side of the bottom surface of the mounting bracket (13).
7. The scribing construction trolley for road marking according to claim 1, wherein: the brush part at the lower end of the cleaning brush (17) is attached to the road surface in a movable connection manner.
CN202320154124.XU 2023-02-08 2023-02-08 Scribing construction trolley for road marking Active CN219385971U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320154124.XU CN219385971U (en) 2023-02-08 2023-02-08 Scribing construction trolley for road marking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320154124.XU CN219385971U (en) 2023-02-08 2023-02-08 Scribing construction trolley for road marking

Publications (1)

Publication Number Publication Date
CN219385971U true CN219385971U (en) 2023-07-21

Family

ID=87170667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320154124.XU Active CN219385971U (en) 2023-02-08 2023-02-08 Scribing construction trolley for road marking

Country Status (1)

Country Link
CN (1) CN219385971U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117758590A (en) * 2024-02-22 2024-03-26 华源伟业建设集团有限公司 Bridge construction marking device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117758590A (en) * 2024-02-22 2024-03-26 华源伟业建设集团有限公司 Bridge construction marking device
CN117758590B (en) * 2024-02-22 2024-05-07 华源伟业建设集团有限公司 Bridge construction marking device

Similar Documents

Publication Publication Date Title
CN206297542U (en) Vertical drum-type public transport cleaning dolly
CN219385971U (en) Scribing construction trolley for road marking
CN212925718U (en) Construction marking device
CN210058717U (en) Overhead line coating device for electric power construction
CN111749110A (en) Town road marking device
CN111424519B (en) Unmanned car of line is mended in engineering road marking washing
CN221523277U (en) Municipal administration is with interval adjustable road marking device
CN210886875U (en) Novel crack repair is used in pitch highway construction device
CN221371810U (en) Marking vehicle for road marking
CN208325154U (en) A kind of electric wiper with music playback function
CN219187399U (en) Spraying device
CN111889221A (en) High-efficient log washer of tire transmission
CN216631340U (en) Road traffic marking spraying device
CN215629235U (en) Damaged pavement cleaning equipment for highway maintenance
CN214783151U (en) Municipal works road maintenance device
CN221965699U (en) Energy-saving sprinkler for building construction
CN210315183U (en) Manual heating device of asphalt concrete road surface hot melt type marking
CN215405808U (en) Washing and sweeping vehicle applying joint one-way valve technology
CN215366715U (en) Multifunctional highway maintenance engineering truck
CN221142398U (en) Road and bridge maintenance machine
CN213719286U (en) Livestock-raising excrement and urine cleaning device
CN218203826U (en) Multi-functional highway maintenance highway construction car
CN221094796U (en) Auxiliary seam filling device
CN221181603U (en) Stadium scribing machine
CN217419254U (en) Quick patching device of crack for road engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant