CN219365339U - Scaffold for plastering house wall surfaces - Google Patents

Scaffold for plastering house wall surfaces Download PDF

Info

Publication number
CN219365339U
CN219365339U CN202320519172.4U CN202320519172U CN219365339U CN 219365339 U CN219365339 U CN 219365339U CN 202320519172 U CN202320519172 U CN 202320519172U CN 219365339 U CN219365339 U CN 219365339U
Authority
CN
China
Prior art keywords
sliding
scaffold
screw
plastering
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320519172.4U
Other languages
Chinese (zh)
Inventor
刘福建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Fuheng Construction Engineering Co ltd
Original Assignee
Anhui Fuheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Fuheng Construction Engineering Co ltd filed Critical Anhui Fuheng Construction Engineering Co ltd
Priority to CN202320519172.4U priority Critical patent/CN219365339U/en
Application granted granted Critical
Publication of CN219365339U publication Critical patent/CN219365339U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for plastering a house wall surface, which comprises a scaffold body and further comprises lifting pieces for lifting a dust bucket, wherein two sliding racks are vertically arranged in the lifting pieces, lifting pieces are vertically arranged between the two sliding racks in a lifting manner, sliding strips in the lifting pieces are horizontally and vertically arranged between the two sliding racks in a lifting manner, sliding plates are horizontally and movably arranged on the sliding strips, one side of one of the two sliding racks is vertically and rotatably connected with a screw rod, the top of the other sliding rack is provided with a motor with an output end connected with the end part of the screw rod, one end of the sliding strip is horizontally fixed with a screw hole block, and the screw hole block is in threaded penetrating connection with the screw rod.

Description

Scaffold for plastering house wall surfaces
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a scaffold for plastering a house wall surface.
Background
When the house is internally decorated, in order to repair the wall and keep the wall smooth, gypsum mud or cement mortar is required to be used for smearing the wall, the flatness of the surface of the wall is guaranteed, due to the fact that a certain height exists on an indoor wall, workers are supported in a traditional scaffold building mode, the wall is plastered to a proper height, then the stirred mortar is placed in a mortar barrel by ground workers, then the mortar barrel is lifted and placed on the scaffold, and members on the scaffold use tools to contain the mortar to smear the wall.
But above-mentioned adoption scaffold frame supports workman's mode of leveling the wall, but current scaffold frame lacks the structure of supporting ash bucket lift support, and the ash bucket needs the manual work to lift and places on the scaffold frame, and the workman need bow just can shovel the material on the scaffold frame simultaneously, and the process has increased workman's amount of labour, causes intensity of labour great, and the ash bucket needs the manual work to lift simultaneously to have certain potential safety hazard.
Disclosure of Invention
1. Technical problem to be solved
Aiming at the problems existing in the prior art, the utility model aims to provide a scaffold for plastering the wall surfaces of houses, which overcomes the technical defects.
2. Technical proposal
In order to solve the problems, the utility model adopts the following technical scheme.
The utility model provides a house wall is plastered and is used scaffold frame, including the scaffold frame body, still including the hoisting member that is used for promoting the ash bucket, the hoisting member includes the balladeur train, the hoisting member, wherein the balladeur train is vertical to be provided with two, and vertical liftable be provided with the hoisting member between two balladeur trains, the hoisting member includes draw runner and slide, wherein the vertical liftable slidable mounting of draw runner level is between two balladeur trains, and the level is movably provided with the slide on the draw runner, one side of two balladeur trains is vertical to be rotated and is connected with the lead screw, and one of them top of two balladeur trains is installed output and lead screw end connection's motor, the one end level of draw runner is fixed with the screw piece, and screw piece and lead screw threaded through connection.
Further, an insert block is horizontally fixed on the vertical end face of one side of the sliding frame, and a screw hole is formed in the insert block in a penetrating mode through horizontal threads.
Furthermore, an inserting frame is horizontally fixed on one side end face of the scaffold body, fixing screws are installed on the inserting frame in a penetrating mode through horizontal threads, and the fixing screws are assembled and inserted with screw hole threads on the inserting block.
Further, a sliding rod is horizontally fixed on the top surface of the sliding strip, a sliding cylinder is horizontally fixed at the bottom end of the sliding plate, and the sliding strip is connected with the sliding cylinder at the bottom end of the sliding plate in a sliding fit manner.
Further, one end of the sliding plate is vertically fixed with a charging barrel.
Further, the screw hole plates are vertically fixed downwards at the bottom ends of the two sliding frames, the screw rod is installed through the vertical downwards threads at the bottom of the screw hole plates, and the supporting wheels are connected to the bottom ends of the screw rod in a rotating mode.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that: when the automatic lifting device is used, the ash bucket containing ash is placed in the accommodating cylinder of the sliding plate, the motor is started to drive the screw rod to rotate, the vertical supporting sliding bar moves upwards between the two sliding frames, lifting and feeding of the ash bucket is completed, lifting height of the scaffold body is exceeded, the labor of workers is effectively reduced, the ash bucket is effectively prevented from being required to be lifted and placed on the scaffold, workers on the scaffold are required to be lifted and shoveled, labor intensity of the workers is increased, labor intensity is high, and meanwhile the ash bucket is required to be lifted manually, so that the labor intensity is reduced.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic diagram of the overall exploded structure of the present utility model;
FIG. 3 is a schematic view of an exploded construction of a lifter according to the present utility model;
FIG. 4 is a schematic view of an exploded structure of a lifter according to the present utility model;
fig. 5 is a schematic structural view of the scaffold body according to the present utility model.
The reference numerals in the figures illustrate:
1. a scaffold body; 11. inserting a frame; 12. a fixing screw; 2. a lifting member; 21. a carriage; 22. inserting blocks; 23. a lifting member; 24. a slide bar; 241. screw hole blocks; 242. a slide bar; 25. a slide plate; 251. a material containing cylinder; 26. a screw plate; 261. a screw; 262. and (5) supporting wheels.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model; it is apparent that the described embodiments are only some embodiments of the present utility model, not all embodiments, and that all other embodiments obtained by persons of ordinary skill in the art without making creative efforts based on the embodiments in the present utility model are within the protection scope of the present utility model.
Referring to fig. 1-5, a scaffold for plastering a house wall surface comprises a scaffold body 1, and further comprises a lifting member 2 for lifting a dust barrel, wherein the lifting member 2 comprises two sliding frames 21 and a lifting member 23, wherein the sliding frames 21 are vertically provided with two lifting members 23, the two sliding frames 21 are vertically and vertically provided with lifting members 23, the lifting member 23 comprises sliding bars 24 and sliding plates 25, the sliding bars 24 are horizontally and vertically arranged between the two sliding frames 21 in a sliding manner, the sliding plates 25 are horizontally and movably arranged on the sliding bars 24, one side of one of the two sliding frames 21 is vertically and rotatably connected with a screw rod 28, the top of one of the two sliding frames 21 is provided with a motor 27, the output end of which is connected with the end of the screw rod 28, one end of the sliding bar 24 is horizontally fixed with a screw hole block 241, the screw hole block 241 is in threaded penetrating connection with the screw rod 28, in use, one side of the assembled scaffold body 1 is provided with the lifting member 2, the plug 22 on two sliding frames 21 on the lifting piece 2 is plugged on the plug frame 11 of the scaffold body 1, the plug 22 and the plug frame 11 are assembled through the threads of the fixing screw 12, when the device is used, a dust barrel containing dust is placed in the containing barrel 251 of the sliding plate 25, then the motor 27 is started to drive the screw rod 28 to rotate, the vertical supporting sliding bar 24 moves upwards between the two sliding frames 21, lifting and feeding of the dust barrel are completed, meanwhile, the lifting height of the scaffold body 1 is exceeded, workers are effectively reduced to bend down and shoveling, accordingly, the problem that the dust barrel needs to be manually lifted and placed on the scaffold, workers need to bend down and shoveling can be effectively avoided, labor capacity of workers is increased, labor intensity is high, meanwhile, the dust barrel needs to be manually lifted and has a certain potential safety hazard is solved, and labor intensity is reduced.
Referring to fig. 2, 3 and 4, an insert 22 is horizontally fixed on a vertical end surface on one side of a carriage 21, a screw hole is formed in the insert 22 by penetrating through horizontal threads, an insert frame 11 is horizontally fixed on an end surface on one side of a scaffold body 1, a fixing screw 12 is installed on the insert frame 11 by penetrating through horizontal threads, the fixing screw 12 is assembled and spliced with the screw hole on the insert 22 by using the insert 22 on two carriages 21 to be spliced on the insert frame 11 of the scaffold body 1, and the insert 22 and the insert frame 11 are assembled and connected by penetrating through the screw 12 by penetrating through threads of the fixing screw 12.
Referring to fig. 4, a sliding rod 242 is horizontally fixed on the top surface of the sliding strip 24, a sliding cylinder is horizontally fixed at the bottom end of the sliding strip 25, the sliding strip 24 is connected with the sliding cylinder at the bottom end of the sliding strip 25 in a sliding fit manner, a material containing cylinder 251 is vertically fixed at one end of the sliding strip 25, and after loading, the sliding strip 25 is pulled to slide on the sliding strip 24 towards the scaffold according to the needs of constructors on the scaffold, so that the constructors on the later-stage scaffold can conveniently shovel materials.
Referring to fig. 3, screw holes 26 are vertically fixed downward at the bottom ends of the two carriages 21, and screws 261 are vertically installed to penetrate the bottom of the screw holes 26, and the bottom ends of the screws 261 are rotatably connected with supporting wheels 262, and according to the height of the scaffold body 1, the screws 261 on the screw holes 26 are rotated to vertically change the supporting height upward.
When the lifting device is used, a dust barrel containing dust is placed in the material containing barrel 251 of the sliding plate 25, then the motor 27 is started to drive the screw rod 28 to rotate, the vertical supporting sliding strip 24 moves upwards between the two sliding frames 21, lifting and feeding of the dust barrel are completed, and meanwhile, the lifting height of the lifting device exceeds the lifting height of the scaffold body 1, so that the bending and shoveling of workers is effectively reduced.
The above description is only of the preferred embodiments of the present utility model; the scope of the utility model is not limited in this respect. Any person skilled in the art, within the technical scope of the present disclosure, may apply to the present utility model, and the technical solution and the improvement thereof are all covered by the protection scope of the present utility model.

Claims (6)

1. Scaffold frame for house wall plastering, including scaffold frame body (1), its characterized in that: still including being used for promoting lifting element (2) of ash storage bucket, lifting element (2) include balladeur train (21), lifter (23), wherein balladeur train (21) are vertical to be provided with two, and two vertical liftable between balladeur train (21) are provided with lifter (23), lifter (23) are including draw runner (24) and slide (25), wherein draw runner (24) horizontal vertical liftable slidable mounting is between two balladeur trains (21), and draw runner (24) go up horizontal movable and be provided with slide (25), two one side vertical rotation of balladeur train (21) is connected with lead screw (28), and two output and lead screw (28) end connection's motor (27) are installed at the top of one of them of balladeur train (21), the one end level of draw runner (24) is fixed with screw piece (241), and screw piece (241) and lead screw (28) screw thread through connection.
2. A scaffold for plastering a wall of a house according to claim 1, wherein: an inserting block (22) is horizontally fixed on the vertical end face of one side of the sliding frame (21), and a screw hole is formed in the inserting block (22) in a penetrating mode through horizontal threads.
3. A scaffold for plastering a wall of a house according to claim 2, wherein: the scaffold is characterized in that an inserting frame (11) is horizontally fixed on one side end face of the scaffold body (1), fixing screws (12) are installed on the inserting frame (11) in a penetrating mode through horizontal threads, and the fixing screws (12) are assembled and inserted with screw hole threads on the inserting block (22).
4. A scaffold for plastering a wall of a house according to claim 1, wherein: the top surface of the sliding strip (24) is horizontally fixed with a sliding rod (242), the bottom end of the sliding plate (25) is horizontally fixed with a sliding cylinder, and the sliding strip (24) is connected with the sliding cylinder at the bottom end of the sliding plate (25) in a sliding fit manner.
5. A scaffold for plastering a wall of a house according to claim 4, wherein: one end of the sliding plate (25) is vertically fixed with a charging barrel (251).
6. A scaffold for plastering a wall of a house according to claim 1, wherein: screw hole plates (26) are vertically fixed downwards at the bottom ends of the two sliding frames (21), screw rods (261) are vertically and downwards threaded at the bottoms of the screw hole plates (26) in a penetrating mode, and supporting wheels (262) are rotatably connected to the bottom ends of the screw rods (261).
CN202320519172.4U 2023-03-14 2023-03-14 Scaffold for plastering house wall surfaces Active CN219365339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320519172.4U CN219365339U (en) 2023-03-14 2023-03-14 Scaffold for plastering house wall surfaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320519172.4U CN219365339U (en) 2023-03-14 2023-03-14 Scaffold for plastering house wall surfaces

Publications (1)

Publication Number Publication Date
CN219365339U true CN219365339U (en) 2023-07-18

Family

ID=87145653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320519172.4U Active CN219365339U (en) 2023-03-14 2023-03-14 Scaffold for plastering house wall surfaces

Country Status (1)

Country Link
CN (1) CN219365339U (en)

Similar Documents

Publication Publication Date Title
CN210598071U (en) Lifting platform for interior decoration
CN219365339U (en) Scaffold for plastering house wall surfaces
CN210459899U (en) Plastering device for building construction
CN217998834U (en) Construction that can carry out altitude mixture control bears frame
CN216810817U (en) Plastering device for fiber anti-crack mortar
CN215179372U (en) Ceramic tile water absorption rate detection device
CN215858898U (en) Wall plastering device for indoor construction
CN212053828U (en) Steel construction engineering component rotating device
CN213329907U (en) Thin plastering construction tool
CN211691334U (en) Mortar trowelling equipment
CN212359033U (en) Reentrant corner plastering unit
CN219526146U (en) Loader for constructional engineering
CN112177297A (en) Vertical automatic wall tile sticking device for building construction and tile sticking method
CN112177295A (en) Wall scraping device for building construction
CN112282316A (en) A machine of plastering a wall for building interior decoration usefulness
CN215978508U (en) Construction is with device of smoothing that has multi-angle regulatory function
CN216810976U (en) Reinforced structure of unilateral template
CN219241251U (en) Temporary support frame for building construction
CN218894024U (en) Movable water retaining wall structure
CN219710926U (en) Construction frame for building construction
CN217600290U (en) Clear water concrete apparent quality inspection device
CN219548294U (en) Impact assembly for firm tile
CN215368555U (en) Wall surface strickle equipment for engineering
CN220226117U (en) Wall surface pointing device for building construction
CN218091947U (en) Suspension type hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant