CN219311246U CN202320247715.1U CN202320247715U CN219311246U CN 219311246 U CN219311246 U CN 219311246U CN 202320247715 U CN202320247715 U CN 202320247715U CN 219311246 U CN219311246 U CN 219311246U
Authority
CN
China
Prior art keywords
storage box
tool storage
bottom plate
tool
engineering management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320247715.1U
Other languages
Chinese (zh)
Inventor
时健
徐兴红
张世会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aurige Technology Co ltd
Original Assignee
Aurige Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aurige Technology Co ltd filed Critical Aurige Technology Co ltd
Priority to CN202320247715.1U priority Critical patent/CN219311246U/en
Application granted granted Critical
Publication of CN219311246U publication Critical patent/CN219311246U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The utility model discloses a combined tool box for building engineering management, which belongs to the technical field of tool boxes, and aims at solving the problems that the tool box is unfavorable for people to use when carrying various tools, and the precision is easily affected by damage to precision tools; according to the utility model, the precise tool storage box is moved to the right side by poking the precise tool storage box to the right side, the hydraulic cylinder is started in the right movement process of the precise tool storage box, the output end of the hydraulic cylinder extends to enable the supporting plate and the large tool storage box on the supporting plate to move upwards, so that the precise tool storage box and the large tool storage box are positioned at the same height, the tools in the tool storage box can be conveniently taken and used by workers, and the practicability of the tool storage box is improved.

Description

Combined tool box for building engineering management
Technical Field
The utility model belongs to the technical field of tool boxes, and particularly relates to a combined tool box for building engineering management.
Background
The building engineering is the engineering entity which performs planning, investigation, design and construction, completion and other technical works for building, rebuilding or expanding house buildings and affiliated structure facilities, and the installation engineering of lines, pipelines and equipment matched with the engineering entity, also refers to the building engineering of various houses and buildings, also called building workload, and the investment amount must be realized through construction activities, wherein the building engineering of the house building comprises factory buildings, theatres, hotels, shops, schools, hospitals, houses and the like, and the building, rebuilding or expanding must be realized through construction activities; the term "auxiliary structure facilities" refers to water towers, bicycle sheds, water pools and the like matched with the house building, and the term "installation of lines, pipelines and equipment" refers to the installation activities of the lines, pipelines and equipment matched with the house building and the auxiliary facilities thereof, such as water supply and drainage, heating ventilation, communication, intellectualization, elevators and the like.
In the prior art, planning, investigation, design and construction steps during construction of a building project all need to use corresponding required tools, and the tools contain precise tools such as planning, investigation and design tools, and large tools such as a sledge hammer and a spade which are provided with construction steps, and the tools are uniformly arranged on the inner side of a tool box so as to be unfavorable for the use, and meanwhile, the precise tools are extremely easy to damage, so that a combined tool box for management of the building project is urgently needed.
Therefore, a combined tool box for building engineering management is needed, and the problems that the tool box in the prior art is unfavorable for people to use when carrying various tools, and damage to precision tools is easy to cause and influence the precision of the tools are solved.
Disclosure of Invention
The utility model aims to provide a combined tool box for building engineering management, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the combined tool box for the construction engineering management comprises a bottom plate, wherein a containing mechanism is arranged on the upper side of the bottom plate;
the storage mechanism comprises a first connecting rod, the first connecting rod is fixed on the front and back sides of the right end of the top wall of the bottom plate respectively, second connecting rods are fixed on the front and back sides of the left end of the top wall of the bottom plate respectively, mounting rods are fixed on the upper sides between the first connecting rod and the second connecting rods, sliding grooves are formed in the middle of the top wall of the mounting rods, rollers are connected to the left and right parts of the inner sides of the sliding grooves in a rotating mode, the rollers are arranged on the left and right ends of the bottom of the front and back side wall of the precision tool storage box respectively, large tool storage boxes are arranged on the left side of the top wall of the bottom plate, and a plurality of groups of evenly distributed positioning rings are fixed on the upper and lower parts of the left and right walls of the inner side of each large tool storage box.
In the scheme, the front and rear parts of the bottom wall of the large-sized tool storage box are respectively fixed with a supporting plate, the bottoms of the supporting plates are respectively fixed with a hydraulic cylinder, the supporting plates are respectively and slidably connected to the inner sides of the openings, and the openings are respectively formed in the front and rear parts of the left side of the bottom plate.
It is further worth to say that the pneumatic cylinder is kept away from backup pad one end and is fixed respectively in two parts around the diapire left side in the base, the base is fixed in the bottom plate bottom.
The vehicle seat is characterized in that through holes are formed in the left side and the right side of the bottom wall of the base, axles are connected to the inner sides of the through holes in a rotating mode, and wheels are fixed to the front end and the rear end of each axle
As a preferred embodiment, a push rod is fixed at the upper side between the second connecting rods, and the large tool storage box and the precise tool storage box are the same in size.
As a preferred embodiment, the top of the precision tool storage box is provided with a box cover, the box cover is connected with the precision tool storage box through a buckle, and the middle part of the rear wall of the base is provided with an access door.
Compared with the prior art, the combined tool box for building engineering management provided by the utility model at least comprises the following beneficial effects:
(1) The precise tool storage box is moved to the right side by shifting the precise tool storage box to the right side through the rolling of the roller wheel on the inner side of the sliding groove, the hydraulic cylinder is started in the right movement process of the precise tool storage box, the output end of the hydraulic cylinder extends to enable the supporting plate and the large tool storage box on the upper side of the supporting plate to move upwards, so that the precise tool storage box and the large tool storage box are located at the same height, workers can conveniently take tools in the tool box, and the practicability of the tool box is improved.
(2) Through respectively storing accurate instrument and construction tool inside two sets of storage casees, use the holding ring to fix large-scale instrument simultaneously, make its neatly arranged inside large-scale instrument storage casees, avoid the messy condition of instrument to appear, reduced the degree of difficulty of looking for when workman uses the instrument.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic side view of the present utility model;
fig. 3 is a schematic cross-sectional perspective view of the present utility model.
In the figure: 1. a bottom plate; 2. a storage mechanism; 3. large tool storage box; 4. a first connecting rod; 5. a second connecting rod; 6. a precision tool storage case; 7. a mounting rod; 8. a chute; 9. a roller; 10. a case cover; 11. a buckle; 12. a base; 13. a through hole; 14. an axle; 15. a wheel; 16. a hydraulic cylinder; 17. an opening; 18. a support plate; 19. an access door; 20. a positioning ring; 21. a push rod.
Detailed Description
The utility model is further described below with reference to examples.
Referring to fig. 1-3, the utility model provides a combined tool box for building engineering management, which comprises a bottom plate 1, wherein a containing mechanism 2 is arranged on the upper side of the bottom plate 1;
the receiving mechanism 2 includes head rod 4, head rod 4 is fixed both sides around bottom plate 1 roof right-hand member respectively, both sides all are fixed with second connecting rod 5 around bottom plate 1 roof left end, head rod 4 and the cooperation of second connecting rod 5 can support fixedly to installation pole 7, can avoid gyro wheel 9 to appear the condition that drops in the inside roll in-process of spout 8 simultaneously, the upside all is fixed with installation pole 7 between head rod 4 and the second connecting rod 5, installation pole 7 roof middle part is provided with spout 8, both sides all rotate about spout 8 are connected with gyro wheel 9, gyro wheel 9 rolls at spout 8 inside and can drive precision tool storage box 6 and control the removal, gyro wheel 9 sets up both ends about precision tool storage box 6 front and back lateral wall bottom respectively, bottom plate 1 roof left side is provided with large-scale tool storage box 3, both sides all are fixed with multiunit evenly distributed's holding ring 20 about the inside wall of large-scale tool storage box 3, holding ring 20 can avoid too big tool's handle, if fix in the too disorder in the storage.
Further, as shown in fig. 1, 2 and 3, it should be specifically explained that the front and rear parts of the bottom wall of the large tool storage box 3 are both fixed with a support plate 18, the support plate 18 is used for connecting the hydraulic cylinder 16 with the large tool storage box 3, the bottom of the support plate 18 is fixed with the hydraulic cylinder 16, the support plate 18 is both slidably connected inside the opening 17, the opening 17 is respectively arranged at the front and rear parts of the left side of the bottom plate 1, and the output end of the hydraulic cylinder 16 extends to enable the large tool storage box 3 to move upwards.
Further, as shown in fig. 3, it is worth specifically explaining that one end of the hydraulic cylinder 16 far away from the supporting plate 18 is respectively fixed at the front and rear parts of the left side of the inner bottom wall of the base 12, the base 12 is fixed at the bottom of the bottom plate 1, the base 12 provides space for installing the hydraulic cylinder 16, and the wheels 15 can also act, so that the tool box can be moved conveniently.
The scheme comprises the following working processes: when the tool box is used for construction, the precise tool storage box 6 can be moved to the right by pulling the precise tool storage box 6 to the right through the rolling wheel 9 to roll on the inner side of the sliding groove 8, the hydraulic cylinder 16 is started in the right moving process of the precise tool storage box 6, the output end of the hydraulic cylinder 16 extends to enable the supporting plate 18 and the large tool storage box 3 on the upper side of the supporting plate to move upwards, so that the precise tool storage box 6 and the large tool storage box 3 are located at the same height, workers can conveniently take tools in the tool box for use, and meanwhile, after the tools are used, the positions of the tools can be determined through the locating ring 20, so that the tools can be neatly placed on the inner side of the tool box, and the condition that the tools are difficult to find when in mess use is avoided.
The working process can be as follows: the accurate tool storage box 6 is stirred to enable the accurate tool storage box 6 to roll on the inner side of the sliding groove 8 to move to the right side, the hydraulic cylinder 16 is started in the right moving process of the accurate tool storage box 6, the output end of the hydraulic cylinder 16 extends to enable the supporting plate 18 and the large tool storage box 3 on the upper side of the supporting plate to move upwards, the two tool boxes are located at the same height and are closer to hands of workers, the workers can conveniently select and take the tools, the practicability of the tool boxes is improved, meanwhile, the positioning rings 20 are utilized to inductive the positions of all tools, disorder inside is avoided, and the space of the tool boxes and the time required for searching tools are saved.
Further, as shown in fig. 1, 2 and 3, it is worth specifically explaining that through holes 13 are formed in the left side and the right side of the bottom wall of the base 12, the inner sides of the through holes 13 are rotationally connected with an axle 14, wheels 15 are fixed at the front end and the rear end of the axle 14, and the through holes 13 can enable the axle 14 to drive the wheels 15 to rotate, so that the tool box is moved.
Further, as shown in fig. 1, it is worth specifically explaining that a push rod 21 is fixed on the upper side between the second connecting rods 5, the large tool storage box 3 and the precise tool storage box 6 are the same in size, and the push rod 21 and the wheels 15 cooperate to facilitate pushing of the tool storage box by workers.
Further, as shown in fig. 1, it is worth specifically describing that the top of the precision tool storage box 6 is provided with a box cover 10, the box cover 10 is connected with the precision tool storage box 6 through a buckle 11, an access door 19 is arranged in the middle of the rear wall of the base 12, and the box cover 10 is provided and connected by using the buckle 11, so that external sundries and dust can be prevented from entering the precision tool storage box 6.
To sum up: the through hole 13 can let the axletree 14 drive wheel 15 and rotate to remove the toolbox, push rod 21 and wheel 15 cooperation can be convenient for the workman promote the toolbox, set up case lid 10 and use buckle 11 to connect can avoid external debris and dust to get into accurate instrument storage case 6.
Hydraulic cylinder 16 is commercially available and well known in the art and will not be repeated herein.

Claims (6)

1. The utility model provides a building engineering management is with combination toolbox, includes bottom plate (1), its characterized in that: a containing mechanism (2) is arranged on the upper side of the bottom plate (1);
the storage mechanism (2) comprises a first connecting rod (4), the first connecting rod (4) is respectively fixed on the front side and the rear side of the right end of the top wall of the bottom plate (1), the front side and the rear side of the left end of the top wall of the bottom plate (1) are respectively fixed with a second connecting rod (5), the upper side of each of the first connecting rod (4) and the second connecting rod (5) is fixedly provided with a mounting rod (7), the middle part of the top wall of the mounting rod (7) is provided with a sliding groove (8), the left and right parts of the inner side of the sliding groove (8) are respectively rotationally connected with a roller (9), the rollers (9) are respectively arranged on the left and the right sides of the bottom wall of the front and the rear side wall of the precision tool storage box (6), and the left side of the top wall of the bottom plate (1) is provided with a large tool storage box (3), and the left and right sides of the inner side of the large tool storage box (3) are respectively fixedly provided with a plurality of groups of evenly distributed positioning rings (20).
2. The combination tool kit for construction engineering management according to claim 1, wherein: the large tool storage box is characterized in that support plates (18) are fixed at the front and rear parts of the bottom wall of the large tool storage box (3), hydraulic cylinders (16) are fixed at the bottoms of the support plates (18), the support plates (18) are connected to the inner sides of openings (17) in a sliding mode, and the openings (17) are respectively arranged at the front and rear parts of the left side of the bottom plate (1).
3. A combination tool kit for construction engineering management according to claim 2, wherein: one end of the hydraulic cylinder (16) far away from the supporting plate (18) is respectively fixed at the front and rear parts of the left side of the inner bottom wall of the base (12), and the base (12) is fixed at the bottom of the bottom plate (1).
4. A combination tool kit for construction engineering management according to claim 3, wherein: the left side and the right side of the bottom wall of the base (12) are respectively provided with a through hole (13), the inner sides of the through holes (13) are respectively connected with an axle (14) in a rotating mode, and wheels (15) are respectively fixed at the front end and the rear end of the axle (14).
5. The combination tool kit for construction engineering management according to claim 4, wherein: the upper side between the second connecting rods (5) is fixedly provided with a push rod (21), and the sizes of the large tool storage box (3) and the precise tool storage box (6) are the same.
6. The combination tool kit for construction engineering management according to claim 5, wherein: the precision tool storage box (6) top is provided with case lid (10), precision tool storage box (6) are connected through buckle (11) to case lid (10), base (12) back wall middle part is provided with access door (19).
CN202320247715.1U 2023-02-18 2023-02-18 Combined tool box for building engineering management Active CN219311246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320247715.1U CN219311246U (en) 2023-02-18 2023-02-18 Combined tool box for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320247715.1U CN219311246U (en) 2023-02-18 2023-02-18 Combined tool box for building engineering management

Publications (1)

Publication Number Publication Date
CN219311246U true CN219311246U (en) 2023-07-07

Family

ID=87029326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320247715.1U Active CN219311246U (en) 2023-02-18 2023-02-18 Combined tool box for building engineering management

Country Status (1)

Country Link
CN (1) CN219311246U (en)

Similar Documents

Publication Publication Date Title
CN219311246U (en) Combined tool box for building engineering management
CN211439907U (en) Tool box for maintaining electromechanical equipment
CN211499909U (en) Support bracket for constructional engineering
CN211647206U (en) A remove handling frame for building engineering
CN210790945U (en) Anti-drop pipe fitting support frame for civil engineering
CN209912342U (en) Simulation live-action sand table used in building planning management construction
CN210887989U (en) Architectural decoration auxiliary supporting device for building construction
CN211391324U (en) Anti-falling mechanism of transportation device for building construction
CN210476899U (en) Instrument stores up and receives device for construction
CN219255534U (en) Tool box for house building construction
CN215749085U (en) Combined tool case for engineering management
CN216634312U (en) Portable gardens construction tool case
CN216508409U (en) Steel pipe travelling bogie for construction
CN214980943U (en) Water conservancy construction maintenance equipment
CN216399601U (en) Toolbox for building engineering cost
CN215111557U (en) Surveying instrument supporting device for construction
CN218226587U (en) Maintenance auxiliary device for numerical control lathe
CN213307922U (en) Building engineering management measuring device
CN209877974U (en) Supplementary mapping device of three-dimensional topography in city
CN216454102U (en) Industry space planning layout equipment based on unification of rule more
CN210909922U (en) Dedicated movable tool bogie in numerical control machining workshop
CN211682072U (en) Novel convenient tool bogie
CN214724066U (en) Portable machine tool toolbox
CN213154523U (en) Engineering cost calculation learning box
CN221211650U (en) Tool box for land investigation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant