CN216508409U - Steel pipe travelling bogie for construction - Google Patents

Steel pipe travelling bogie for construction Download PDF

Info

Publication number
CN216508409U
CN216508409U CN202123319304.9U CN202123319304U CN216508409U CN 216508409 U CN216508409 U CN 216508409U CN 202123319304 U CN202123319304 U CN 202123319304U CN 216508409 U CN216508409 U CN 216508409U
Authority
CN
China
Prior art keywords
steel pipe
building construction
base
installation
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123319304.9U
Other languages
Chinese (zh)
Inventor
滕付旭
刘政位
肖建伟
蒋永辉
王雅
李旭昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment No9 Construction Co ltd
Original Assignee
Yunnan Construction Investment No9 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment No9 Construction Co ltd filed Critical Yunnan Construction Investment No9 Construction Co ltd
Priority to CN202123319304.9U priority Critical patent/CN216508409U/en
Application granted granted Critical
Publication of CN216508409U publication Critical patent/CN216508409U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to the field of building construction, and discloses a steel pipe transport trolley for building construction, which comprises a base, wherein a mounting frame is fixedly arranged at the middle position of the upper end of the base, a driving motor is fixedly arranged at the middle position of the upper end of the mounting frame, an output shaft of the driving motor penetrates through the mounting frame, a screw rod is fixedly arranged on the screw rod, the screw rod is rotatably connected with the bottom end in the mounting frame, a nut block is sleeved on the screw rod in a threaded manner, two driving rods are symmetrically and fixedly arranged at the left end and the right end of the nut block, the other ends of the two driving rods movably penetrate through the mounting frame and extend to the outside of the mounting frame, second connecting rods are fixedly arranged at the lower ends of the ends, far away from each other, of the two driving rods, a first connecting rod is fixedly arranged at the lower end of the second connecting rod, and a mounting rod is fixedly arranged at the upper end of the other end of the first connecting rod. The utility model has the advantages of convenient movement, high automation degree, convenient classification and storage, large storage space and high practicability.

Description

Steel pipe travelling bogie for construction
Technical Field
The utility model relates to the field of building construction, in particular to a steel pipe transportation trolley for building construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. When the building is used, the transport trolley is required to be used, the existing transport trolley is simple in structure, small in storage capacity, low in automation degree and inconvenient to unload. Further provides a steel pipe transport trolley for building construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a steel pipe transport trolley for building construction, which solves the problems in the background technology.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a steel pipe transportation trolley for building construction comprises a base, wherein a mounting frame is fixedly mounted at the middle position of the upper end of the base, a driving motor is fixedly mounted at the middle position of the upper end of the mounting frame, an output shaft of the driving motor penetrates through the mounting frame and is fixedly provided with a screw rod, the screw rod is rotatably connected with the bottom end in the mounting frame, a nut block is sleeved on the screw rod in a threaded manner, two driving rods are symmetrically and fixedly mounted at the left end and the right end of the nut block, the other ends of the two driving rods movably penetrate through the mounting frame and extend to the outside of the mounting frame, a second connecting rod is fixedly mounted at the lower end of one end, which is far away from each other, of the two driving rods, a first connecting rod is fixedly mounted at the lower end of the other end of the first connecting rod, a mounting rod is mounted at the bottom of a storage box, and one end, which is far away from each other, of the two storage boxes, and the parts of the storage box at the bottom of the storage box are respectively fixedly sleeved on the two pin shafts, the front end and the rear end of each pin shaft are respectively provided with an installation side plate in a rotating manner, the installation side plates are fixedly arranged at the upper end of the base, and the lower end of the base is fixedly provided with a universal wheel.
Preferably, first rectangle installation through-hole has been seted up to the mounting bracket front end, and the screw rod is located first rectangle installation through-hole rear side, two second rectangle installation through-holes have been seted up to mounting bracket left and right sides both ends symmetry, and two the actuating lever activity respectively runs through in two second rectangle installation through-holes to it is outside to extend to the mounting bracket, the actuating lever slides with second rectangle installation through-hole inside wall and laminates.
Preferably, a transparent observation window is fixedly arranged at the front end of the storage box.
Preferably, two deposit the case and keep away from one end each other and all seted up the mouth of depositing, and deposit mouthful articulated door plant of installing of department, fixed mounting has the handle on the door plant.
Preferably, the middle part of the lower end of the storage box is fixedly provided with a supporting leg, and the lower end of the supporting leg is attached to the upper end face of the base.
Preferably, the universal wheels are four, the four universal wheels are distributed at the lower end of the base in a rectangular array mode, and the universal wheels are braking universal wheels.
Preferably, the pushing handle is fixedly arranged at the upper end of the base and at the rear side of the storage box.
Preferably, the upper end of the mounting rod is hinged with a driving sliding block, and the driving sliding block is slidably mounted at the lower end of the storage box through a sliding rail.
The utility model has the beneficial effects that: the utility model can be moved conveniently by arranging the base, the push handle, the universal wheel and the like; through being provided with driving motor, screw rod, mounting bracket, nut piece, drive slider, installation pole, head rod and second connecting rod etc. can realize automatic discharge to deposit the case through being provided with two, can realize carrying out classified storage to the steel pipe, improve the storage space, and can unload in step automatically. The utility model has the advantages of convenient movement, high automation degree, convenient classification and storage, large storage space and high practicability.
Drawings
FIG. 1 is a front view of the steel pipe transportation trolley for building construction provided by the utility model.
Fig. 2 is a rear view of the steel pipe transportation trolley for building construction provided by the utility model.
Fig. 3 is an enlarged view of the structure at a in fig. 1.
FIG. 4 is a schematic view of a partial structure of the steel pipe transportation trolley for building construction provided by the utility model.
Reference numbers in the figures: the multifunctional door comprises a base 1, a side plate 2, a hinge pin 3, a handle 4, a door plate 5, a storage box 6, a driving motor 7, a push handle 8, a screw rod 9, a universal wheel 10, a transparent observation window 11, a mounting rack 12, a nut block 13, a supporting leg 14, a driving rod 15, a driving sliding block 16, a mounting rod 17, a first connecting rod 18, a second connecting rod 19, a first rectangular mounting through hole 121 and a second rectangular mounting through hole 122.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, a steel pipe transportation trolley for building construction comprises a base 1, a mounting frame 12 is fixedly installed at the middle position of the upper end of the base 1, a driving motor 7 is fixedly installed at the middle position of the upper end of the mounting frame 12, an output shaft of the driving motor 7 penetrates through the mounting frame 12, a screw 9 is fixedly installed, the screw 9 is rotatably connected with the bottom end inside the mounting frame 12, a nut block 13 is sleeved on the screw 9 in a threaded manner, two driving rods 15 are symmetrically and fixedly installed at the left end and the right end of the nut block 13, the other ends of the two driving rods 15 are movably penetrated through the mounting frame 12 and extend to the outside of the mounting frame 12, a second connecting rod 19 is fixedly installed at the lower end of one end part of the two driving rods 15, a first connecting rod 18 is fixedly installed at the lower end of the second connecting rod 19, an installation rod 17 is fixedly installed at the upper end of the other end of the first connecting rod 18, and an installation rod 17 is installed at the bottom of a storage box 6, two deposit case 6 and keep away from one end each other, and lie in and deposit 6 bottoms of case and fix the suit respectively on two round pin axles 3, both ends are all rotated around two round pin axles 3 and are installed installation curb plate 2, and installation curb plate 2 fixed mounting in base 1 upper end, and base 1 lower extreme fixed mounting has universal wheel 10.
In this embodiment, a first rectangular mounting through hole 121 is formed in the front end of the mounting frame 12, the screw 9 is located behind the first rectangular mounting through hole 121, two second rectangular mounting through holes 122 are symmetrically formed in the left and right ends of the mounting frame 12, the two driving rods 15 respectively penetrate through the two second rectangular mounting through holes 122 in a movable manner and extend to the outside of the mounting frame 12, and the driving rods 15 are slidably attached to the inner side walls of the second rectangular mounting through holes 122. Through being provided with first rectangle installation through-hole 121, can be convenient for observe the mounting bracket 12 is inside, through being provided with second rectangle through-hole, can be convenient for actuating lever 15 steady removal.
The front end of the storage box 6 is fixedly provided with a transparent observation window 11. Through the design, the interior of the storage box 6 can be checked conveniently.
Two deposit 6 one ends of keeping away from each other and all seted up the mouth of depositing, and deposit mouthful articulated door plant 5 of installing of department, fixed mounting has handle 4 on the door plant 5.
Deposit 6 lower extreme middle part positions fixed mounting of case have a supporting leg 14, and the laminating of 14 lower extremes of supporting legs sets up in base 1 up end.
Four universal wheels 10 are arranged, the four universal wheels 10 are distributed at the lower end of the base 1 in a rectangular array mode, and the universal wheels 10 are braking type universal wheels. The upper end of the base 1 is fixedly provided with a push handle 8 at the rear side of the storage box 6. Through the design, the utility model can be conveniently moved and fixed.
The upper end of the mounting rod 17 is hinged with a driving slide block 16, and the driving slide block 16 is slidably mounted at the lower end of the storage box 6 through a slide rail.
The working principle is as follows: the door plate 5 is opened by the handle 4, the steel pipe can be placed into the storage box 6 through the storage opening for storage, the door plate 5 can be opened during unloading, the driving motor 7 is started, the driving motor 7 works to drive the screw rod 9 to rotate so as to drive the nut block 13 to move upwards, the nut block 13 which moves upwards can drive the driving rod 15 to move upwards so as to drive the second connecting rod 19 to move upwards, further drive the first connecting rod 18 to move upwards, further drive the mounting rod 17 to move upwards, further drive the storage box 6 to incline, at the moment, the driving slide block 16 slides in the slide rail, further the steel pipe can be poured out of the storage box 6, and further automatic unloading is achieved. The utility model can be moved conveniently by arranging the base 1, the push handle 8, the universal wheel 10 and the like; through being provided with driving motor 7, screw rod 9, mounting bracket 12, nut piece 13, drive slider 16, installation pole 17, head rod 18 and second connecting rod 19 etc. can realize automatic discharge to deposit case 6 through being provided with two, can realize carrying out classified storage to the steel pipe, improve storage space, and can unload in step automatically. The utility model has the advantages of convenient movement, high automation degree, convenient classification and storage, large storage space and high practicability.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (8)

1. The steel pipe transportation trolley for building construction comprises a base (1) and is characterized in that a mounting rack (12) is fixedly mounted at the middle of the upper end of the base (1), a driving motor (7) is fixedly mounted at the middle of the upper end of the mounting rack (12), an output shaft of the driving motor (7) penetrates through the mounting rack (12), a screw rod (9) is fixedly mounted at the bottom inside the mounting rack (12), the screw rod (9) is rotatably connected with the bottom inside the mounting rack (12), a nut block (13) is sleeved on the screw rod (9) in a threaded manner, two driving rods (15) are symmetrically and fixedly mounted at the left end and the right end of the nut block (13), the other ends of the two driving rods (15) movably penetrate through the mounting rack (12) and extend to the outside of the mounting rack (12), and a second connecting rod (19) is fixedly mounted at the lower end of one end part, which is far away from the driving rods (15), wherein the second connecting rod (19) is fixedly mounted at the lower end part, second connecting rod (19) lower extreme fixed mounting has head rod (18), another tip upper end fixed mounting of head rod (18) has installation pole (17), install installation pole (17) upper end and install in depositing case (6) bottom, two deposit case (6) and keep away from one end each other, and lie in and deposit case (6) bottom fixed suit respectively on two round pin axles (3), two both ends are all rotated around round pin axle (3) and are installed installation curb plate (2), and install curb plate (2) fixed mounting in base (1) upper end, base (1) lower extreme fixed mounting has universal wheel (10).
2. The steel pipe transportation trolley for building construction as claimed in claim 1, wherein a first rectangular installation through hole (121) is formed in the front end of the installation frame (12), the screw (9) is located on the rear side of the first rectangular installation through hole (121), two second rectangular installation through holes (122) are symmetrically formed in the left end and the right end of the installation frame (12), the two driving rods (15) respectively and movably penetrate through the two second rectangular installation through holes (122) and extend to the outside of the installation frame (12), and the driving rods (15) are in sliding fit with the inner side walls of the second rectangular installation through holes (122).
3. The steel pipe transportation trolley for building construction as claimed in claim 1, wherein a transparent observation window (11) is fixedly installed at the front end of the storage box (6).
4. The steel pipe transportation trolley for building construction as claimed in claim 1, wherein one end of each of the two storage boxes (6) away from each other is provided with a storage opening, the storage openings are hinged with door plates (5), and the door plates (5) are fixedly provided with handles (4).
5. The steel pipe transport trolley for building construction as claimed in claim 1, wherein a support leg (14) is fixedly installed in the middle of the lower end of the storage box (6), and the lower end of the support leg (14) is attached to the upper end face of the base (1).
6. The steel pipe transportation trolley for building construction as claimed in claim 1, wherein four universal wheels (10) are provided, the four universal wheels (10) are distributed at the lower end of the base (1) in a rectangular array, and the universal wheels (10) are braking type universal wheels.
7. The steel pipe transport trolley for building construction as claimed in claim 1, wherein a push handle (8) is fixedly mounted at the upper end of the base (1) and at the rear side of the storage box (6).
8. The steel pipe transportation trolley for building construction as claimed in claim 1, wherein the upper end of the mounting rod (17) is hinged with a driving slider (16), and the driving slider (16) is slidably mounted at the lower end of the storage box (6) through a sliding rail.
CN202123319304.9U 2021-12-27 2021-12-27 Steel pipe travelling bogie for construction Active CN216508409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123319304.9U CN216508409U (en) 2021-12-27 2021-12-27 Steel pipe travelling bogie for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123319304.9U CN216508409U (en) 2021-12-27 2021-12-27 Steel pipe travelling bogie for construction

Publications (1)

Publication Number Publication Date
CN216508409U true CN216508409U (en) 2022-05-13

Family

ID=81506307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123319304.9U Active CN216508409U (en) 2021-12-27 2021-12-27 Steel pipe travelling bogie for construction

Country Status (1)

Country Link
CN (1) CN216508409U (en)

Similar Documents

Publication Publication Date Title
CN216508409U (en) Steel pipe travelling bogie for construction
CN111806652A (en) Ship equipment mounting tool
CN216616901U (en) Brick moving device for building construction
CN111519500A (en) Telescopic concrete road trowelling machine
CN211647206U (en) A remove handling frame for building engineering
CN217105763U (en) Quick adjustment type steel structure building ridge
CN212269356U (en) Lifting device for cable trough cover plate
CN210476899U (en) Instrument stores up and receives device for construction
CN215968677U (en) Material storage rack for building engineering management
CN208086833U (en) A kind of new type plastic pipe tilting trestle
CN215268965U (en) Operating mechanism for construction machinery
CN216399601U (en) Toolbox for building engineering cost
CN214279184U (en) Auxiliary teaching aid for history teaching
CN214554632U (en) Automatic spraying dull polish finish device in aluminum mould board surface
CN216076995U (en) Multifunctional rear bracket of sampling drilling machine
CN215398842U (en) Convenient pouring device for building materials
CN220463849U (en) Tool case
CN216512654U (en) Lifting machine for constructional engineering
CN218714870U (en) Translation type construction vehicle for construction of museum
CN220685780U (en) Combined bridge maintenance workbench
CN215554934U (en) Containing box for building engineering information management
CN213330550U (en) Sliding structure of electric retractable door
CN218208808U (en) Geographic information calibration measuring device
CN214870469U (en) Portable intelligent maintenance and overhaul tool box for Internet of things collection control platform system
CN217586397U (en) Highway engineering builds road soil sampling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant