CN215111557U - Surveying instrument supporting device for construction - Google Patents
Surveying instrument supporting device for construction Download PDFInfo
- Publication number
- CN215111557U CN215111557U CN202121221542.3U CN202121221542U CN215111557U CN 215111557 U CN215111557 U CN 215111557U CN 202121221542 U CN202121221542 U CN 202121221542U CN 215111557 U CN215111557 U CN 215111557U
- Authority
- CN
- China
- Prior art keywords
- surveying
- supporting device
- box
- movably connected
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a surveying instrument supporting device for construction, including box, surveying instrument, the inside movable mounting of box has supporting platform, and the last fixed slide of having seted up of supporting platform, the slide has three groups, and the inside fixed scale that is provided with of every group slide, the activity sets up on every group slide and removes the frame, removes a bottom of the body fixed connection movable block, removes movable mounting equipment platform on the frame, and the fixed screw that is provided with on the equipment platform, swing joint bolt on the screw, bolt swing joint surveying instrument, the utility model discloses have the survey and drawing and accomodate structure integration, make the simple facility more of working process, and improve survey and drawing precision and work efficiency.
Description
Technical Field
The utility model relates to a supporting device technical field particularly, relates to a surveying instrument supporting device for construction.
Background
Surveying instruments, which are simply instruments and devices for data acquisition, processing, output and the like designed and manufactured for surveying and mapping operation, and are used for various aspects of orientation, distance measurement, angle measurement, height measurement, mapping, photogrammetry and the like required by measurement work in the planning, design, construction and operation management stages in engineering construction;
traditional surveying instrument uses traditional tripod to pass through three telescopic link height-adjusting, and the job site height is uneven, it is comparatively troublesome to make highly unable accurate control and adjustment process, finally can produce certain influence to the survey and drawing precision, after the work, constructor must dismantle surveying instrument from the support frame and get off and put into dedicated instrument shelter storage, and use at every turn and all need make a round trip to carry to the storage box, not only waste time and energy but also can cause these precision instruments to take place the damage in handling.
SUMMERY OF THE UTILITY MODEL
In order to compensate above not enough, the utility model discloses a main aim at provides a surveying instrument supporting device for construction, can effectively solve the problem in the background art.
The utility model discloses a realize like this: the utility model provides a surveying instrument supporting device for construction, includes box, surveying instrument, the inside movable mounting of box has supporting platform, the last fixed slide of having seted up of supporting platform, the slide has three groups, every group the inside fixed scale that is provided with of slide, every group the activity sets up on the slide and removes the frame, remove a bottom fixed connection movable block, movable mounting equipment platform is gone up to the removal frame, the fixed screw that is provided with on the equipment platform, swing joint bolt on the screw, bolt swing joint surveying instrument.
Preferably, the bottom of the assembling platform is provided with grooves, the grooves are provided with three groups, each group of grooves is movably connected with a roller inside, the roller is movably connected with a moving frame, and the moving frame is movably provided with a telescopic rod.
Preferably, supporting platform below swing joint elevating system, elevating system includes slide bar, spout and lifter, the fixed spout that sets up of box inner wall, swing joint slider in the spout, slider fixed connection the slide bar, fixed mounting on the slide bar the lifter.
Preferably, a storage box is fixedly installed on the slide bar, the first foam cotton is fixedly installed in the storage box, a storage cover is movably arranged above the storage box, and the storage cover is fixedly arranged at the bottom of the supporting platform.
Preferably, the storage cover is provided with second foam cotton, and the second foam cotton is matched with the first foam cotton.
Preferably, bottom half movable mounting moving mechanism, moving mechanism includes base, hydraulic stem and universal wheel, base fixed mounting be in the bottom half, the base has four groups to encircle the symmetry installation, base bottom swing joint has the hydraulic stem, the hydraulic stem encircles the installation spring, hydraulic stem below fixed mounting connecting block, connecting block bottom movable mounting universal wheel.
Preferably, the box top symmetry installation is two to open the door, two open door one side swing joint hinges, hinge opposite side swing joint box, two fixed mounting handles on the door, box body side swing joint push rod, swing joint flexible piece on the push rod.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses a can raise surveying instrument's receiver and operation platform simultaneously through elevating system, raise the back, spout and scale on the supporting platform can raise the height that just can accurate unified three groups of removal frame of assembling the platform, can follow the receiver after that and take out required surveying instrument and assemble, accomplish to dismantle simple convenient, the better protection surveying instrument of receiver simultaneously, reduce the damage that causes these precision instruments to take place among the constructor round trip handling.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a schematic perspective view of a supporting device of a surveying and mapping instrument for building construction according to the present invention;
FIG. 2 is a schematic perspective view of a supporting device of a surveying and mapping instrument for building construction according to the present invention;
FIG. 3 is a schematic perspective view of the support device of the surveying and mapping instrument for building construction;
FIG. 4 is an enlarged schematic view of the support device A of the surveying and mapping instrument for building construction of the present invention;
fig. 5 is the utility model relates to an enlarged schematic diagram of surveying instrument supporting device B department for construction.
In the figure: 100. a box body; 110. a support platform; 120. a slideway; 121. a graduated scale; 130. a movable frame; 131. a moving block; 132. an electric telescopic rod; 140. assembling the platform; 141. a screw hole; 142. a groove; 143. a roller; 150. a lifting mechanism; 151. a slide bar; 152. a chute; 153. a lifting rod; 154. a slider; 160. a storage box; 161. a first foam; 162. a sealing groove; 170. a storage cover; 171. a second foam; 172. a sealing strip; 200. a surveying instrument; 210. a bolt; 300. a moving mechanism; 310. a base; 320. a hydraulic lever; 321. a spring; 330. a universal wheel; 340. connecting blocks; 400. double doors are opened; 410. a hinge; 420. a handle; 500. a push rod; 510. a telescopic block.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
Examples
As shown in fig. 1, 3, 4, a surveying instrument supporting device for construction, including box 100, surveying instrument 200, the inside movable mounting of box 100 has supporting platform 110, supporting platform 110 is last to fix and has been seted up slide 120, slide 120 has three groups, the inside fixed scale 121 that is provided with of every group slide 120, the activity sets up on every group slide 120 removes frame 130, remove frame 130 bottom fixed connection movable block 131, remove movable mounting equipment platform 140 on the frame 130, the fixed screw 141 that is provided with on the equipment platform 140, swing joint bolt 210 on the screw 141, bolt 210 swing joint surveying instrument 200, in this setting: the lifting mechanism 150 can lift the storage box 160 and the supporting platform 110 of the surveying instrument 200 at the same time, after the lifting, the slide 120 and the graduated scale 121 on the supporting platform 110 can lift the assembling platform 140 and can precisely unify the heights of the three groups of moving frames 130, then the required surveying instrument 200 can be taken out from the storage box 160 and assembled through the screw hole 141 and the bolt 210 of the assembling platform 140, the mounting and use of the screw hole 141 and the bolt 210 can realize the simple and convenient dismounting of the surveying instrument 200, the time is saved, the working efficiency is improved, and meanwhile the storage box 160 can better protect the surveying instrument 200 from damage.
Referring to fig. 1 and 2, the bottom of the assembly platform 140 is provided with three sets of grooves 142, each set of grooves 142 is movably connected with a roller 143, the roller 143 is movably connected with the movable frame 130, the movable frame 130 is movably provided with an electric telescopic rod 132, in the present arrangement: can drive through roller 143 and remove frame 130 and remove, after work, can be more convenient accomodate and remove frame 130 and return to in the slide 120.
Referring to fig. 1 and 2, a lifting mechanism 150 is movably connected below the supporting platform 110, the lifting mechanism 150 includes a sliding rod 151, a sliding groove 152 and a lifting rod 153, the sliding groove 152 is fixedly disposed on the inner wall of the box body 100, a sliding block 154 is movably connected in the sliding groove 152, the sliding block 154 is fixedly connected to the sliding rod 151, and the lifting rod 153 is fixedly mounted on the sliding rod 151, in this arrangement: the slider 154 drives the slide bar 151 to go up and down in the sliding groove 152 of the inner wall of the box 100, when surveying and mapping are needed, the slider 154 drives the slide bar 151 to go up and down out of the box 100 to go up and down to survey and map, and the lifting rod 153 lifts the supporting platform 110, so that the needed surveying and mapping instrument 200 in the storage box 160 can be taken conveniently.
Please refer to fig. 1 and 2, a storage box 160 is fixedly installed on the sliding rod 151, a first foam 161 is fixedly installed inside the storage box 160, a storage cover 170 is movably disposed above the storage box 160, the storage cover 170 is fixedly disposed at the bottom of the supporting platform 110, a second foam 171 is installed on the storage cover 170, the second foam 171 is adapted to the first foam 161, a sealing groove 162 is fixedly disposed on the storage box 160, a sealing strip 172 is fixedly disposed on the storage cover 170, the sealing groove 162 is adapted to the sealing strip 172, and the storage box is disposed in the storage box: receiver 160 is installed in box 100, reduce constructor's the surveying instrument 200 of taking that makes a round trip, improve work efficiency and receiver 160 inside first foam 161 be the honeycomb, can be better around protection surveying instrument 200, under accomodating lid 170 closed condition, second foam 171 combines together with first foam 161, prevent that surveying instrument 200 from rolling in receiver 160 when moving box 100, sealing strip 172 makes its receiver 160 inseparabler under closed condition with seal groove 162 simultaneously, should not become flexible.
Referring to fig. 2 and 5, the moving mechanism 300 is movably mounted at the bottom of the box 100, the moving mechanism 300 includes a base 310, a hydraulic rod 320 and a universal wheel 330, the base 310 is fixedly mounted at the bottom of the box 100, the base 310 is symmetrically mounted in four groups, the hydraulic rod 320 is movably connected at the bottom of the base 310, the hydraulic rod 320 is mounted around a spring 321, a connecting block 340 is fixedly mounted below the hydraulic rod 320, and the universal wheel 330 is movably mounted at the bottom of the connecting block 340, in the present arrangement: when the universal wheel 330 moves on uneven construction site, the hydraulic rod 320 can cooperate with the spring 321 to reduce the overall vibration of the box 100 when the box is bumpy, so that the damage of the surveying instrument 200 in the storage box 160 caused by excessive vibration can be effectively controlled, and the surface of the universal wheel 330 is provided with anti-skid lines.
Referring to fig. 1, the top of the box 100 is symmetrically provided with a double door 400, one side of the double door 400 is movably connected with a hinge 410, the other side of the hinge 410 is movably connected with the box 100, the double door 400 is fixedly provided with a handle 420, the side of the box 100 is movably connected with a push rod 500, the push rod 500 is movably connected with a telescopic block 510, and in the arrangement: hinge 410 can let two flexible switches of door 400, and handle 420 makes things convenient for the constructor to have the stress point to go to open two door 400, and at the in-process of advancing, snatching when the convenient walking of push rod 500 is carried out, and under idle state, flexible piece 510 can flexible push rod 500, makes it not hinder the job site.
The working principle is as follows: when the surveying and mapping work is started, firstly, a constructor pulls a handle 420 of the double door 400 to open the double door 400, after the double door 400 is opened, the supporting platform 110 and the storage box 160 in the box 100 are lifted out of the box 100 through the lifting mechanism 150, then the constructor moves the moving frame 130 out of the slide way 120 and performs high uniformity according to the graduated scale 121, so that the surveying and mapping accuracy is higher, then the required surveying and mapping instrument 200 is taken out of the storage box 160, the surveying and mapping instrument 200 is placed in the screw hole 141 through the bolt 210 and rotates rightwards to be firmer, the next step of work can be performed with confidence, after the surveying and mapping is finished, the bolt 210 is rotated leftwards to disassemble the surveying and mapping instrument 200 and place in the storage box 160, the lifting mechanism 150 is lowered into the box 100, the constructor pulls the push rod 500 to move the box 100 to the next construction point, when the universal wheel 330 moves on an uneven construction site, the hydraulic rod 320 can be matched with the spring 321 to reduce the whole vibration of the box 100 when the box passes through a bumpy road surface, the damage that the surveying instrument 200 in the effective control receiver 160 took place because of excessive vibrations, this utility model survey and drawing accomodates structure integration, makes the simple facility more of working process, and improves survey and drawing precision and work efficiency.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (8)
1. The utility model provides a surveying instrument supporting device for construction, includes box (100), surveying instrument (200), its characterized in that, box (100) inside movable mounting has supporting platform (110), slide (120) have been seted up to the last fixed slide (110), slide (120) have three groups, every group slide (120) inside fixed scale (121) that are provided with, every group the activity sets up on slide (120) removes frame (130), remove frame (130) bottom fixed connection movable block (131), movable mounting equipment platform (140) on removing frame (130), the fixed screw hole (141) that are provided with on equipment platform (140), swing joint bolt (210) on screw hole (141), bolt (210) swing joint surveying instrument (200).
2. The supporting device for the surveying and mapping instrument used in building construction according to claim 1, wherein the bottom of the assembling platform (140) is provided with three grooves (142), the grooves (142) are provided with three groups, each group of the grooves (142) is movably connected with a roller (143), the roller (143) is movably connected with the moving frame (130), and the moving frame (130) is movably provided with an electric telescopic rod (132).
3. The supporting device of the surveying and mapping instrument for building construction according to claim 1, wherein an elevating mechanism (150) is movably connected below the supporting platform (110), the elevating mechanism (150) comprises a sliding rod (151), a sliding groove (152) and an elevating rod (153), the sliding groove (152) is fixedly arranged on the inner wall of the box body (100), a sliding block (154) is movably connected in the sliding groove (152), the sliding block (154) is fixedly connected with the sliding rod (151), and the elevating rod (153) is fixedly installed on the sliding rod (151).
4. The supporting device of the surveying and mapping instrument for building construction according to claim 3, wherein a storage box (160) is fixedly installed on the sliding rod (151), first foam (161) is fixedly installed inside the storage box (160), a storage cover (170) is movably arranged above the storage box (160), and the storage cover (170) is fixedly arranged at the bottom of the supporting platform (110).
5. The supporting device of the surveying and mapping instrument for building construction according to claim 4, wherein a second foam (171) is installed on the receiving cover (170), and the second foam (171) is matched with the first foam (161).
6. The supporting device for the surveying and mapping instrument for building construction according to claim 4, wherein a sealing groove (162) is fixedly formed in the storage box (160), a sealing strip (172) is fixedly formed in the storage cover (170), and the sealing groove (162) is matched with the sealing strip (172).
7. The supporting device for the surveying and mapping instrument for building construction according to claim 1, wherein a moving mechanism (300) is movably installed at the bottom of the box body (100), the moving mechanism (300) comprises a base (310), a hydraulic rod (320) and universal wheels (330), the base (310) is fixedly installed at the bottom of the box body (100), the base (310) has four groups of circular symmetrical installation, the hydraulic rod (320) is movably connected to the bottom of the base (310), the hydraulic rod (320) is circularly installed with a spring (321), a connecting block (340) is fixedly installed below the hydraulic rod (320), and the universal wheels (330) are movably installed at the bottom of the connecting block (340).
8. The surveying instrument supporting device for building construction according to claim 1, wherein the box body (100) is symmetrically provided with two open doors (400) at the top, one side of each open door (400) is movably connected with a hinge (410), the other side of each hinge (410) is movably connected with the box body (100), each open door (400) is fixedly provided with a handle (420), the side of each box body (100) is movably connected with a push rod (500), and each push rod (500) is movably connected with a telescopic block (510).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121221542.3U CN215111557U (en) | 2021-06-02 | 2021-06-02 | Surveying instrument supporting device for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121221542.3U CN215111557U (en) | 2021-06-02 | 2021-06-02 | Surveying instrument supporting device for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215111557U true CN215111557U (en) | 2021-12-10 |
Family
ID=79302698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121221542.3U Expired - Fee Related CN215111557U (en) | 2021-06-02 | 2021-06-02 | Surveying instrument supporting device for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215111557U (en) |
-
2021
- 2021-06-02 CN CN202121221542.3U patent/CN215111557U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211371800U (en) | Adjustable supporting device for building measurement | |
CN215111557U (en) | Surveying instrument supporting device for construction | |
CN217878446U (en) | Sewage sampling device for ecological environment detection | |
CN111348078B (en) | Surveying and mapping device | |
CN212076308U (en) | Multifunctional surveying and mapping trolley | |
CN208765717U (en) | A kind of novel civil engineering measuring instrument fixed support device | |
CN213946416U (en) | Portable land mapping device | |
CN214333785U (en) | Portable survey and drawing sighting rod | |
CN210440913U (en) | Surveying and mapping device for constructional engineering | |
CN210441859U (en) | Measuring device is used in civil engineering construction | |
CN209911339U (en) | Movable crop high-temperature test device | |
CN114088876A (en) | Satellite-based remote sensing gas quality monitoring device | |
CN214931761U (en) | Distance measuring device for geographical information surveying and mapping with good protection performance | |
CN216479864U (en) | Portable hydraulic engineering mapping device | |
CN215148831U (en) | Differential mechanism assembling table | |
CN214643502U (en) | Lifting tool case convenient to installation of fire engineering | |
CN217022869U (en) | Cadastral survey and drawing unmanned aerial vehicle | |
CN217006439U (en) | Sampling instrument based on geotechnical investigation sample | |
CN214096058U (en) | Equipment box for engineering surveying and mapping | |
CN220745259U (en) | Multifunctional supporting frame | |
CN213859196U (en) | Portable toolbox for land exploration | |
CN213569367U (en) | Lifting platform for waterproof, anti-corrosion and heat-preservation engineering | |
CN219204968U (en) | Building engineering survey and drawing auxiliary device | |
CN220453183U (en) | Mapping instrument positioning device for mapping | |
CN214008611U (en) | Portable atmosphere detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211210 |