CN219282697U - Hard type permeable pipe connection structure - Google Patents

Hard type permeable pipe connection structure Download PDF

Info

Publication number
CN219282697U
CN219282697U CN202320122014.5U CN202320122014U CN219282697U CN 219282697 U CN219282697 U CN 219282697U CN 202320122014 U CN202320122014 U CN 202320122014U CN 219282697 U CN219282697 U CN 219282697U
Authority
CN
China
Prior art keywords
arc
hard
water
permeable pipe
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320122014.5U
Other languages
Chinese (zh)
Inventor
王小霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Jinliyuan Environmental Protection Technology Co ltd
Original Assignee
Jinan Jinliyuan Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Jinliyuan Environmental Protection Technology Co ltd filed Critical Jinan Jinliyuan Environmental Protection Technology Co ltd
Priority to CN202320122014.5U priority Critical patent/CN219282697U/en
Application granted granted Critical
Publication of CN219282697U publication Critical patent/CN219282697U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model relates to a hard permeable pipe connecting structure, which comprises a fixed base, wherein a placing groove which extends along the length direction of the fixed base and is used for placing two hard permeable pipe overlapping parts is formed in the fixed base; this application is as the linking bridge who connects two hard type water permeable pipes through unable adjustment base, and unable adjustment base structural strength is high, can play the lift and strengthen the effect to the junction part, effectively promotes the structural strength at junction part, and junction part effectively avoids the circumstances that cause the disconnection because of reasons such as pressurized in the use.

Description

Hard type permeable pipe connection structure
Technical Field
The utility model relates to the technical field of permeable tube assembly, in particular to a hard permeable tube connecting structure.
Background
The hard water permeable pipe (also called as plastic blind ditch, hydrophobic pipe and curved net-shaped water permeable pipe) has small holes in the upper half 2/3 and no holes in the lower half 1/3, so that it can prevent secondary leakage of underground water and can drain the underground water quickly. The product is applied to large-scale dredging underground water-permeable projects such as railway construction, highway construction, airport runways, golf courses, football courses, large-scale lawns, landscaping, highways, refuse landfills, slope protection retaining walls, tunnels and the like.
The existing hard permeable pipe lap joint mode mainly depends on PVC two-way connection, two hard permeable pipes which need to be butted are respectively inserted into two connecting ports of the PVC two-way connection, and the following technical defects exist in the use process through the PVC two-way connection mode: the hard permeable pipe is only inserted into the connecting port, and the PVC two-way pipe lacks a structure for limiting the hard permeable pipe, so that the hard permeable pipe is separated from the connecting port in the use process; simultaneously, PVC two-way structural strength is low, can't effectively promote the structural strength at junction portion, and the condition of disconnection can appear in the junction portion because of reasons such as pressurized in the use.
The utility model provides a hard type permeable tube connection structure based on the defect that current hard type permeable tube overlap joint mode exists, can effectively avoid the situation such as junction portion breaks away from, disconnection, and simple structure easily processes, has certain marketing prospect.
Disclosure of Invention
The utility model provides a hard permeable pipe connecting structure aiming at the defects of the prior art.
The utility model is realized through the following technical scheme, the utility model provides a hard permeable pipe connecting structure, which comprises a fixed base, wherein a placing groove which extends along the length direction of the fixed base and is used for placing two hard permeable pipe lap joints is arranged on the fixed base, a connecting disc is arranged in the middle of the placing groove, a water guide through hole is arranged at the axle center of the connecting disc, elastic connecting plugs are respectively arranged at the left side and the right side of the connecting disc, the lap joints of the two hard permeable pipes are respectively positioned at the left side and the right side of the connecting disc, and each elastic connecting plug is spliced with the corresponding pipe cavity of the hard permeable pipe; each elastic connecting plug comprises an arc-shaped water guide plate and two arc-shaped elastic pieces, wherein each arc-shaped elastic piece is provided with an outwards-protruding barb, and the barb is used for being embedded into a water seepage hole of the hard water seepage pipe; the arc-shaped water guide plate and the two arc-shaped elastic pieces are circumferentially distributed on the periphery of the water guide through hole, a gap is reserved between the two arc-shaped elastic pieces, and a gap is reserved between each arc-shaped elastic piece and the arc-shaped water guide plate; the arc-shaped water guide plate corresponds to the drainage area of the hard water permeable pipe, and the two arc-shaped elastic sheets correspond to the water permeable area of the hard water permeable pipe.
Preferably, in order to enhance the fixing effect on the hard permeable pipes, fixing belts for fixing the lap joint parts of the two hard permeable pipes are respectively arranged on the left side and the right side of the connecting disc, and two ends of each fixing belt are connected with the fixing base through bolts. The hard permeable pipe can be bound through the fixing belt, so that the fixing effect is enhanced.
Preferably, the fixed base, the connecting disc and the elastic connecting plug are of an integrated structure.
Preferably, the arc-shaped water guide plate is attached to the inner wall of the hard water permeable pipe, and the arc length of the arc-shaped water guide plate is equal to the arc length of the water draining area of the hard water permeable pipe. The arc-shaped water guide plate corresponds to the water discharge area of the hard water permeable pipe and has the same arc length, and the arc-shaped water guide plate can play a role in guiding water to the hard water permeable pipe at the other side of the arc-shaped water guide plate.
Preferably, the placing groove is an arc groove, and the hard water permeable pipe is attached to the arc groove.
The beneficial effects of the utility model are as follows:
1. this application is as the linking bridge who connects two hard type water permeable pipes through unable adjustment base, and unable adjustment base structural strength is high, can play the lift and strengthen the effect to the junction part, effectively promotes the structural strength at junction part, and junction part effectively avoids the circumstances that cause the disconnection because of reasons such as pressurized in the use.
2. The elastic connecting plug and the hard permeable pipe adopt a spliced connection mode, so that the assembly is convenient and quick, and meanwhile, the elastic connecting plug can be in limit connection with the hard permeable pipe through the two arc-shaped elastic sheets on the basis of meeting the water guide requirement, and the hard permeable pipe and the elastic connecting plug cannot be separated in the use process.
Drawings
FIG. 1 is a schematic top view of the present utility model;
FIG. 2 is a side view of the connection between a stationary base and a rigid water permeable pipe according to the present utility model;
the figure shows:
1. unable adjustment base, 2, hard formula water permeability pipe, 3, fixed band, 4, connection pad, 5, elastic connection plug, 6, water guide through-hole, 7, arc shell fragment, 8, barb, 9, arc water guide plate, 10, standing groove.
Detailed Description
In order to clearly illustrate the technical characteristics of the scheme, the scheme is explained below through a specific embodiment.
As shown in fig. 1 and 2, the utility model comprises a fixed base 1, wherein a placing groove 10 which extends along the length direction of the fixed base 1 and is used for placing the lap joint parts of two hard water permeable pipes 2 is arranged on the fixed base, a connecting disc 4 is arranged in the middle of the placing groove 10, a water guide through hole 6 is arranged at the axle center of the connecting disc 4, elastic connecting plugs 5 are respectively arranged at the left side and the right side of the connecting disc 4, the lap joint parts of the two hard water permeable pipes 2 are respectively arranged at the left side and the right side of the connecting disc 4, and each elastic connecting plug 5 is spliced with the corresponding pipe cavity of the hard water permeable pipe 2. Each elastic connecting plug 5 comprises an arc-shaped water guide plate 9 and two arc-shaped elastic sheets 7, each arc-shaped elastic sheet 7 is provided with an outward protruding barb 8, and the barb 8 is used for being embedded into a water seepage hole of the hard water seepage pipe 2. The arc-shaped water guide plate 9 and the two arc-shaped elastic pieces 7 are circumferentially distributed on the periphery of the water guide through hole 6, a gap is reserved between the two arc-shaped elastic pieces 7, and a gap is reserved between each arc-shaped elastic piece 7 and the arc-shaped water guide plate 9. The arc-shaped water guide plate 9 corresponds to the water drainage area of the hard water permeable pipe 2, and the two arc-shaped elastic sheets 7 correspond to the water seepage area of the hard water permeable pipe 2.
In the present embodiment, the fixing base 1, the connection pad 4, and the elastic connection plug 5 are integrally structured.
In this embodiment, the arc-shaped water guide plate 9 is attached to the inner wall of the hard water permeable tube 2, and the arc length of the arc-shaped water guide plate 9 is equal to the arc length of the water drainage area of the hard water permeable tube 2. The arc-shaped water guide plate 9 corresponds to the water discharge area of the hard water permeable pipe 2 and has the same arc length, and the arc-shaped water guide plate 9 can play a role in guiding water in the water discharge area of the hard water permeable pipe 2 on one side to the hard water permeable pipe 2 on the other side.
In this embodiment, the placement groove 10 is an arc groove, and the hard water permeable pipe 2 is attached to the arc groove.
In this embodiment, in order to enhance the fixing effect on the hard water permeable tubes 2, fixing belts 3 for fixing overlapping parts of the two hard water permeable tubes 2 are respectively arranged on the left side and the right side of the connecting disc 4, and two ends of each fixing belt 3 are connected with the fixing base 1 through bolts. The hard permeable pipe 2 can be bound through the fixing belt 3, so that the fixing effect is enhanced.
When the adjacent hard water permeable pipes 2 are in lap joint connection, the lap joint parts of the two hard water permeable pipes 2 are placed in the placing groove 10, each elastic connecting plug 5 is inserted into the corresponding pipe cavity of the hard water permeable pipe 2, and the barbs 8 on the arc-shaped elastic sheets are embedded into the water seepage holes of the hard water permeable pipe 2. Finally, the two hard water permeable pipes 2 are further fixed by the fixing belt 3.
This application is through unable adjustment base 1 as the connection carrier of connecting two hard type water permeable pipes 2, and unable adjustment base 1 structural strength is high, can play to lift and strengthen the effect to the junction part, effectively promotes the structural strength at junction part, and junction part effectively avoids the circumstances that cause the disconnection because of reasons such as pressurized in the use. The elastic connecting plug 5 adopts the connected mode of pegging graft with the pipe 2 that permeates water of hard, equipment convenient and fast, and simultaneously elastic connecting plug 5 can realize spacing connection with the pipe 2 that permeates water of hard through two arc shell fragment 7 on the basis that satisfies the needs of leading water, and the circumstances that breaks away from can not appear with elastic connecting plug 5 in the use of pipe 2 that permeates water of hard.
Of course, the above description is not limited to the above examples, and the technical features of the present utility model that are not described may be implemented by or by using the prior art, which is not described herein again; the above examples and drawings are only for illustrating the technical scheme of the present utility model and not for limiting the same, and the present utility model has been described in detail with reference to the preferred embodiments, and it should be understood by those skilled in the art that changes, modifications, additions or substitutions made by those skilled in the art without departing from the spirit of the present utility model and the scope of the appended claims.

Claims (5)

1. A hard permeable pipe connection structure is characterized in that: the device comprises a fixed base, wherein a placing groove which extends along the length direction of the fixed base and is used for placing two overlapping parts of hard permeable pipes is formed in the fixed base, a connecting disc is arranged in the middle of the placing groove, a water guide through hole is formed in the axis of the connecting disc, elastic connecting plugs are respectively arranged on the left side and the right side of the connecting disc, the overlapping parts of the two hard permeable pipes are respectively arranged on the left side and the right side of the connecting disc, and each elastic connecting plug is spliced with the pipe cavity of the corresponding hard permeable pipe; each elastic connecting plug comprises an arc-shaped water guide plate and two arc-shaped elastic pieces, wherein each arc-shaped elastic piece is provided with an outwards-protruding barb, and the barb is used for being embedded into a water seepage hole of the hard water seepage pipe; the arc-shaped water guide plate and the two arc-shaped elastic pieces are circumferentially distributed on the periphery of the water guide through hole, a gap is reserved between the two arc-shaped elastic pieces, and a gap is reserved between each arc-shaped elastic piece and the arc-shaped water guide plate; the arc-shaped water guide plate corresponds to the drainage area of the hard water permeable pipe, and the two arc-shaped elastic sheets correspond to the water permeable area of the hard water permeable pipe.
2. The rigid water permeable pipe connection according to claim 1, wherein: fixing belts used for fixing the lap joint parts of the two hard permeable pipes are respectively arranged on the left side and the right side of the connecting disc, and two ends of each fixing belt are connected with the fixing base through bolts.
3. The rigid water permeable pipe connection according to claim 1, wherein: the fixed base, the connecting disc and the elastic connecting plug are of an integrated structure.
4. The rigid water permeable pipe connection according to claim 1, wherein: the arc-shaped water guide plate is attached to the inner wall of the hard water permeable pipe, and the arc length of the arc-shaped water guide plate is equal to that of the water draining area of the hard water permeable pipe.
5. A rigid water permeable pipe connection according to claim 2, wherein: the standing groove is an arc groove, and the hard permeable pipe is attached to the arc groove.
CN202320122014.5U 2023-01-16 2023-01-16 Hard type permeable pipe connection structure Active CN219282697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320122014.5U CN219282697U (en) 2023-01-16 2023-01-16 Hard type permeable pipe connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320122014.5U CN219282697U (en) 2023-01-16 2023-01-16 Hard type permeable pipe connection structure

Publications (1)

Publication Number Publication Date
CN219282697U true CN219282697U (en) 2023-06-30

Family

ID=86923875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320122014.5U Active CN219282697U (en) 2023-01-16 2023-01-16 Hard type permeable pipe connection structure

Country Status (1)

Country Link
CN (1) CN219282697U (en)

Similar Documents

Publication Publication Date Title
CN106149764A (en) A kind of precast assembly pipe gallery bell and spigot waterproof construction
CN207597428U (en) Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane
CN211343023U (en) A drainage structures for highway tunnel hoop construction joint
CN219282697U (en) Hard type permeable pipe connection structure
CN108590752B (en) Drainage repair system after lining of underdrain type tunnel and construction method thereof
CN208153035U (en) A kind of waterproof system for vcehicular tunnel corrugated steel preliminary bracing structure
CN108361050A (en) A kind of waterproof system for vcehicular tunnel corrugated steel preliminary bracing structure
CN215294013U (en) Connection structure of nodular cast iron pipe
CN215563142U (en) Water conservancy construction underground drainage pipeline
CN212839827U (en) Sectional type drainage pipe
CN207880196U (en) A kind of rectangular top pipe connector
CN211314278U (en) Waterproof drainage system in tunnel
CN211446883U (en) Underground continuous wall antiseep connection structure
CN211574446U (en) Pipeline buried under road
CN202206099U (en) Connecting and waterproofing structure for tunnel pipe joint in jacking pipe construction of cable tunnel
CN207880195U (en) A kind of rectangular top pipe connector of the longitudinally connected bolt of band
CN111088996A (en) A drainage structures for highway tunnel hoop construction joint
CN206706788U (en) Latch assembled steel cofferdam
CN212131640U (en) Pipe gallery
CN217683669U (en) Concrete pipe
CN217208223U (en) Pipeline for hydraulic engineering
CN210507547U (en) Water guide device for post-cast strip of underground chamber bottom plate
CN221276773U (en) Sewage draining system for life center construction project site
CN212250135U (en) Tunnel circumferential drainage device capable of collecting water and guiding flow
CN217234710U (en) Buried cement pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant