CN219281174U - Equipment is cleared to building rubbish in high-rise building construction floor - Google Patents
Equipment is cleared to building rubbish in high-rise building construction floor Download PDFInfo
- Publication number
- CN219281174U CN219281174U CN202320106969.1U CN202320106969U CN219281174U CN 219281174 U CN219281174 U CN 219281174U CN 202320106969 U CN202320106969 U CN 202320106969U CN 219281174 U CN219281174 U CN 219281174U
- Authority
- CN
- China
- Prior art keywords
- conveying pipeline
- construction waste
- box body
- sides
- rise building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/58—Construction or demolition [C&D] waste
Landscapes
- Refuse Collection And Transfer (AREA)
Abstract
The utility model relates to the technical field of construction waste clearing equipment, and discloses construction waste clearing equipment in a high-rise building construction floor, which comprises a material conveying pipeline and a box body connected with the material conveying pipeline, and further comprises: the connecting part is arranged on the material conveying pipeline; the buffer mechanism is arranged in the material conveying pipeline; dust removing mechanisms arranged at two sides in the box body; the stirring mechanism is arranged in the middle of the box body; according to the utility model, the plurality of conveying pipelines can be erected together through the connecting frame, so that construction waste in different layers can be put into the conveying pipelines, the impact force of the falling construction waste on the ground can be slowed down through the buffer mechanism, the dust emission is further reduced, the construction waste falling to the bottom of the box body can be pushed to two sides through the material stirring mechanism, the accumulated construction waste is prevented from blocking the bottom port of the conveying pipelines, and the dust collection mechanism can be used for spraying and removing dust, so that the use effect is better.
Description
Technical Field
The utility model relates to the technical field of construction waste clearing equipment, in particular to equipment for clearing construction waste in a high-rise building construction floor.
Background
When constructing high-rise building, can remain a large amount of building rubbish in the floor, need transport rubbish through rubbish clearance equipment, traditional collect rubbish through the shallow is concentrated, and the rubbish is transported to the rethread companion ladder, but this kind of mode wastes time and energy, and clearance efficiency is lower, has consequently produced the building rubbish conveying channel to high-rise building construction rubbish transportation.
Among the prior art, chinese patent CN217975217U discloses a rubbish is cleared and is put for high-rise building construction, relate to rubbish and clear device technical field, including connecting pipe and inlet pipe, the top and the bottom of inlet pipe all are connected with the one end of connecting pipe, the bottom of one of them connecting pipe is connected with the chassis, the stand is all installed in the bottom four corners of chassis, first mounting panel is installed to the bottom of stand, the feeder hopper is installed to one side of inlet pipe, first movable seat is all installed to the both sides of inlet pipe, the one end of first movable seat is connected with the threaded rod, threaded rod and inlet pipe are articulated through first movable seat, the one end cover of threaded rod is equipped with the sleeve, telescopic one end is connected with the second movable seat, the one end of second movable seat is connected with the second mounting panel. The utility model can effectively improve the stability, avoid the pipeline from being broken during the garbage conveying, effectively inhibit dust, avoid environmental pollution and have higher practical value, but in the prior art, garbage continuously falls to the bottom and is easy to stack together, so that the port at the bottom of a garbage conveying channel is blocked, and therefore, workers are required to continuously remove the fallen garbage, the process is more laborious and dangerous.
For this purpose, a person skilled in the art proposes a device for cleaning and transporting construction waste in the floors of high-rise buildings, so as to solve the problems presented in the background.
Disclosure of Invention
The utility model aims to provide a device for clearing and transporting building rubbish in a high-rise building construction floor, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a building rubbish clearance equipment in high-rise building construction floor, includes the conveying pipeline and the box of being connected with the conveying pipeline, still includes:
the connecting component is arranged on the material conveying pipeline and is used for connecting the material conveying pipeline with a floor wall;
the buffer mechanism is arranged in the material conveying pipeline and is used for relieving the impact force of falling construction waste on the ground so as to reduce dust;
dust removing mechanisms arranged at two sides in the box body and used for removing dust;
the stirring mechanism is arranged in the middle of the box body and is used for pushing the falling construction waste to two sides, so that the accumulated construction waste is prevented from blocking the bottom port of the material conveying pipeline.
As a further scheme of the utility model: the material stirring mechanism comprises a rotating shaft rotatably arranged in the middle of the box body, a material stirring plate is fixedly arranged on the rotating shaft, and the rotating shaft is connected with a reciprocating part.
As still further aspects of the utility model: the reciprocating part comprises a power box arranged outside the box body, a reciprocating gear is arranged at one end of the rotating shaft penetrating into the power box, motors are arranged at two sides of the outer wall of the power box, one end of an output shaft of each motor penetrates into the power box and is fixedly connected with the incomplete gear, and the incomplete gear is meshed with the reciprocating gear intermittently.
As still further aspects of the utility model: the dust removing mechanism comprises water pumps arranged on two sides of the box body, the water pumps are fixedly connected with a water tank arranged on the side wall of the box body through a perfusion tube, the water pumps are connected with a liquid spraying disc through connecting pipes, and atomizing spray heads which are regularly arranged are arranged on the liquid spraying disc.
As still further aspects of the utility model: the buffer mechanism comprises a rotating seat arranged on the inner walls of two sides of the conveying pipeline, a buffer plate is rotatably arranged on the rotating seat, a fixing seat is arranged on the inner walls of two sides of the conveying pipeline and is hinged with the buffer plate through a telescopic rod, a buffer spring is sleeved on the telescopic rod, and two ends of the buffer spring are respectively connected with the buffer plate and the inner walls of the conveying pipeline.
As still further aspects of the utility model: the connecting part comprises fixing frames arranged on two sides of the conveying pipeline, the fixing frames are fixedly connected with the mounting frames, and bolt holes are formed in the mounting frames.
As still further aspects of the utility model: connecting frames are arranged at two ends of the conveying pipeline, bolt holes are formed in the connecting frames, and a feed hopper is arranged on one side of the conveying pipeline.
Compared with the prior art, the utility model has the beneficial effects that: according to the utility model, the plurality of conveying pipelines can be erected together through the connecting frame, so that construction waste in different layers can be put into the conveying pipelines, the impact force of the falling construction waste on the ground can be slowed down through the buffer mechanism, the dust emission is further reduced, the construction waste falling to the bottom of the box body can be pushed to two sides through the material stirring mechanism, the accumulated construction waste is prevented from blocking the bottom port of the conveying pipelines, and the dust collection mechanism can be used for spraying and removing dust, so that the use effect is better.
Drawings
Fig. 1 is a schematic structural view of a construction waste clearing device in a high-rise building construction floor.
Fig. 2 is a schematic structural view of the inside of a conveying pipeline in a construction waste clearing device in a high-rise building construction floor.
Fig. 3 is a schematic diagram of the structure of the inside of a box in a construction waste clearing device in a high-rise building construction floor.
Fig. 4 is a schematic diagram of the structure of the interior of the power box in the construction waste clearing device in the high-rise building construction floor.
Fig. 5 is a schematic structural view of a three-dimensional conveying pipeline in the construction waste clearing equipment in the high-rise building construction floor.
In the figure: 1. a material conveying pipeline; 2. a connecting frame; 3. a fixing frame; 4. a mounting frame; 5. a feed hopper; 6. a rotating seat; 7. a buffer plate; 8. a fixing seat; 9. a telescopic rod; 10. a buffer spring; 11. a case; 12. a water pump; 13. an infusion tube; 14. a water tank; 15. a connecting pipe; 16. a liquid spraying disc; 17. an atomizing nozzle; 18. a rotating shaft; 19. a kick-out plate; 20. an incomplete gear; 21. a motor; 22. a power box; 23. a discharge port; 24. a reciprocating gear.
Detailed Description
The technical scheme of the patent is further described in detail below with reference to the specific embodiments.
Examples
Referring to fig. 1-5, a building rubbish clearing device in high-rise building construction floor includes a material conveying pipeline 1 and a box 11 connected with the material conveying pipeline 1, two sides of the box 11 are provided with a discharge hole 23, and further includes:
the connecting component is arranged on the conveying pipeline 1 and is used for connecting the conveying pipeline 1 with a floor wall;
the buffer mechanism is arranged in the conveying pipeline 1 and is used for relieving the impact force of falling construction waste on the ground so as to reduce dust;
dust removing mechanisms arranged at two sides in the box body 11 for removing dust;
the stirring mechanism is arranged in the middle of the box body 11 and is used for pushing the falling construction waste to two sides, so that the accumulated construction waste is prevented from blocking the bottom port of the material conveying pipeline 1.
The connecting part comprises fixing frames 3 arranged on two sides of the material conveying pipeline 1, the fixing frames 3 are fixedly connected with mounting frames 4, and bolt holes are formed in the mounting frames 4.
The connecting frames 2 are arranged at two ends of the material conveying pipeline 1, bolt holes are formed in the connecting frames 2, and a feed hopper 5 is arranged on one side of the material conveying pipeline 1.
The theory of operation, when setting up this device, with the box 11 fixed mounting of this device bottom at the high-rise side to link together a plurality of conveying pipeline 1 through bolt and nut and link 2, make the every floor of the conveying pipeline 1 of setting up all have, and make the conveying pipeline 1 can be in the same place with the firm connection of floor wall through bolt and nut and mounting bracket 4, and then accomplish the setting up of this device.
The material stirring mechanism comprises a rotating shaft 18 rotatably arranged in the middle of a box body 11, a material stirring plate 19 is fixedly arranged on the rotating shaft 18, the rotating shaft 18 is connected with a reciprocating component, the reciprocating component comprises a power box 22 arranged outside the box body 11, a reciprocating gear 24 is arranged at one end of the rotating shaft 18 penetrating into the power box 22, motors 21 are arranged at two sides of the outer wall of the power box 22, an output shaft of each motor 21 penetrates into one end of the power box 22 and is fixedly connected with an incomplete gear 20, and the incomplete gear 20 is intermittently meshed with the reciprocating gear 24.
Specifically, after building construction waste is thrown into the conveying pipeline 1 from the feed hopper 5, the building construction waste can fall down until falling to the bottom of the box 11, in the process, the motor 21 is started, the two motors 21 can respectively drive the incomplete gear 20 connected with the motor to rotate, so that the incomplete gear 20 can drive the reciprocating gear 24 to continuously reciprocate, and further drive the stirring plate 19 to continuously reciprocate, and in the reciprocating swinging process, the building construction waste falling under the conveying pipeline 1 in the box 11 is pushed to two sides of the box 11 until being pushed out from the discharge hole 23, and further, the situation that the continuously piled building construction waste blocks the bottom port of the conveying pipeline 1 can be avoided, and the waste transferring effect of the device is ensured.
The dust removing mechanism comprises water pumps 12 arranged on two sides of a box body 11, the water pumps 12 are fixedly connected with a water tank 14 arranged on the side wall of the box body 11 through a liquid conveying pipe 13, the water pumps 12 are connected with a liquid spraying disc 16 through a connecting pipe 15, and atomizing nozzles 17 which are regularly arranged are arranged on the liquid spraying disc 16.
Specifically, when construction waste falls into the bottom of the box 11 from the conveying pipeline 1, dust is generated, and under the action of the water pump 12, water in the water tank 14 is conveyed into the liquid spraying disc 16 through the conveying pipe 13 and the connecting pipe 15, and is sprayed out through the atomizing nozzle 17, so that dust is removed.
The buffer mechanism comprises a rotating seat 6 arranged on the inner walls of two sides of the conveying pipeline 1, a buffer plate 7 is rotatably arranged on the rotating seat 6, a fixing seat 8 is arranged on the inner walls of two sides of the conveying pipeline 1, the fixing seat 8 is hinged with the buffer plate 7 through a telescopic rod 9, a buffer spring 10 is sleeved on the telescopic rod 9, and two ends of the buffer spring 10 are respectively connected with the buffer plate 7 and the inner wall of the conveying pipeline 1.
Specifically, after building construction waste is thrown into the material conveying pipeline 1 from a higher floor, the falling building construction waste has larger impact force to the bottom of the box 11, and then has a large amount of dust, and the huge impact force can damage the material conveying pipeline 1 when striking the material conveying pipeline 1, so that the building construction waste falls onto the buffer plate 7 through the telescopic rod 9 and the buffer spring 10, the buffer effect can be provided, and the impact force of the falling building construction waste can be reduced.
According to the utility model, the plurality of conveying pipelines 1 can be erected together through the connecting frame 2, so that construction waste in different layers can be put into the conveying pipelines 1, the impact force of the falling construction waste on the ground can be slowed down through the buffer mechanism, dust emission is further reduced, the construction waste falling to the bottom of the box 11 can be pushed to two sides through the material stirring mechanism, the accumulated construction waste is prevented from blocking the bottom port of the conveying pipelines 1, spraying dust removal can be performed through the dust removing mechanism, and the use effect is better.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.
Claims (5)
1. The utility model provides a building rubbish clearance equipment in high-rise building construction floor, includes conveying pipeline and the box of being connected with conveying pipeline, its characterized in that still includes:
the connecting component is arranged on the material conveying pipeline and is used for connecting the material conveying pipeline with a floor wall;
the buffer mechanism is arranged in the material conveying pipeline and is used for relieving the impact force of falling construction waste on the ground so as to reduce dust;
dust removing mechanisms arranged at two sides in the box body and used for removing dust;
the stirring mechanism is arranged in the middle of the box body and used for pushing the falling construction waste to two sides, so that the accumulated construction waste is prevented from blocking the bottom port of the material conveying pipeline;
the material stirring mechanism comprises a rotating shaft rotatably arranged in the middle of the box body, a material stirring plate is fixedly arranged on the rotating shaft, and the rotating shaft is connected with a reciprocating part;
the reciprocating part comprises a power box arranged outside the box body, a reciprocating gear is arranged at one end of the rotating shaft penetrating into the power box, motors are arranged at two sides of the outer wall of the power box, one end of an output shaft of each motor penetrates into the power box and is fixedly connected with the incomplete gear, and the incomplete gear is meshed with the reciprocating gear intermittently.
2. The device for cleaning and transporting construction waste in high-rise building construction floors according to claim 1, wherein the dust removing mechanism comprises water pumps arranged on two sides of the box body, the water pumps are fixedly connected with a water tank arranged on the side wall of the box body through a liquid conveying pipe, the water pumps are connected with a liquid spraying disc through connecting pipes, and atomizing spray heads which are regularly arranged are arranged on the liquid spraying disc.
3. The device for cleaning and transporting construction waste in high-rise building construction floors according to claim 1, wherein the buffer mechanism comprises a rotating seat arranged on the inner walls of two sides of the conveying pipeline, a buffer plate is rotatably arranged on the rotating seat, a fixing seat is arranged on the inner walls of two sides of the conveying pipeline and is hinged with the buffer plate through a telescopic rod, a buffer spring is sleeved on the telescopic rod, and two ends of the buffer spring are respectively connected with the buffer plate and the inner walls of the conveying pipeline.
4. A high-rise building construction intra-floor construction waste clearing device according to claim 3, wherein the connecting component comprises fixing frames arranged on two sides of the conveying pipeline, the fixing frames are fixedly connected with the mounting frames, and the mounting frames are provided with bolt holes.
5. The device for cleaning and transporting construction waste in high-rise building construction floors of claim 4, wherein connecting frames are arranged at two ends of the conveying pipeline, bolt holes are formed in the connecting frames, and a feeding hopper is arranged on one side of the conveying pipeline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320106969.1U CN219281174U (en) | 2023-02-03 | 2023-02-03 | Equipment is cleared to building rubbish in high-rise building construction floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320106969.1U CN219281174U (en) | 2023-02-03 | 2023-02-03 | Equipment is cleared to building rubbish in high-rise building construction floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219281174U true CN219281174U (en) | 2023-06-30 |
Family
ID=86929767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320106969.1U Active CN219281174U (en) | 2023-02-03 | 2023-02-03 | Equipment is cleared to building rubbish in high-rise building construction floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219281174U (en) |
-
2023
- 2023-02-03 CN CN202320106969.1U patent/CN219281174U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235348B (en) | Road cleaning dust-removing vehicle with spiral conveying mechanism | |
CN214863927U (en) | Building rubbish circulation reducing mechanism | |
CN219281174U (en) | Equipment is cleared to building rubbish in high-rise building construction floor | |
CN113733318B (en) | Integrated equipment for cleaning and spraying release agent on precast concrete member platform | |
CN110961228A (en) | Building rubbish reducing mechanism for environmental protection | |
CN214051783U (en) | Novel environmental protection building rubbish treatment facility | |
CN212595943U (en) | Breaker for construction | |
CN211027400U (en) | Steel sandblast rust cleaning room system convenient to it is clean | |
CN211359016U (en) | Building rubbish reducing mechanism | |
CN209932583U (en) | Environment-friendly dust remover | |
CN218049058U (en) | Intelligent warehousing logistics sorting equipment with dust suppression mechanism | |
CN215352656U (en) | Efficient energy-saving dust-raising-preventing device for building construction | |
CN215029331U (en) | Roller chain conveying combined crusher | |
CN107758276A (en) | A kind of mining haul band cleaning plant | |
CN108341207A (en) | A kind of feature of environmental protection building waste conveying device | |
CN214487080U (en) | A garbage collection device for green building construction | |
CN108824313B (en) | High-efficient road cleans dust collector | |
CN211247712U (en) | Energy-saving environment-friendly in-situ advanced treatment equipment for building wastes | |
CN113041754A (en) | A house is torn open and is taken place atomizing raise dust and administer device for immigration engineering construction | |
CN113172018A (en) | Bridge inhaul cable cleaning device | |
CN219849798U (en) | Environmental protection crushing apparatus of building rubbish | |
CN221439264U (en) | Garbage recycling tricycle with dust fall function | |
CN218260973U (en) | Indoor decoration garbage transferring and treating machine | |
CN221252812U (en) | Multifunctional coal mine electromechanical transportation transmission device | |
CN220599020U (en) | Building rubbish transportation system attached to building body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |