CN219279334U - Movable tower crane construction channel structure - Google Patents

Movable tower crane construction channel structure Download PDF

Info

Publication number
CN219279334U
CN219279334U CN202320560821.5U CN202320560821U CN219279334U CN 219279334 U CN219279334 U CN 219279334U CN 202320560821 U CN202320560821 U CN 202320560821U CN 219279334 U CN219279334 U CN 219279334U
Authority
CN
China
Prior art keywords
tower crane
channel
girder
displacement
cushion block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320560821.5U
Other languages
Chinese (zh)
Inventor
魏新山
龙子江
刘哲睿
田钦先
田伟
徐磊
李櫪
谢博章
郑钰昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group filed Critical No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority to CN202320560821.5U priority Critical patent/CN219279334U/en
Application granted granted Critical
Publication of CN219279334U publication Critical patent/CN219279334U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

The application discloses portable tower crane construction passageway structure includes: the displacement buffer cushion block is installed at the bottom of one end of the channel girder, and the end part of the channel girder provided with the displacement buffer cushion block is tightly pressed and fixed on the cross beam of the tower crane through the U-shaped limiting snap ring. The telescopic link that goes up and down is fixed to passageway girder other end, and the universal wheel is installed to telescopic link bottom, and the passageway girder other end extends to the floor of building body on, makes the universal wheel contact on the floor of building body. Vibration transmission buffering reduction between tower crane and the building body is realized through the combination of rolling displacement of a steering wheel, lifting displacement of a telescopic rod and elastic displacement of a displacement buffering cushion block, so that the abrasion loss of local motion is reduced, two ends of a channel girder are correspondingly lapped on a building surface of the building body and a beam of the tower crane, and the problem that the abrasion of a hinge point is increased and the safety is reduced due to excessive overturning of a front channel is solved.

Description

Movable tower crane construction channel structure
Technical Field
The utility model relates to a movable tower crane construction channel structure, and belongs to the technical field of building construction.
Background
When building a high-rise building, in order to facilitate the operation staff to walk between the tower crane and the building, a channel structure is required to be constructed between the tower crane and the building. In order to protect the stability of the tower crane, the two ends of the channel are correspondingly connected to the tower crane and the building body, and flexible connection is needed, so that vibration waves are prevented from being transmitted between the tower crane and the building body.
The prior art is a multistage turning tower crane channel of a mould frame platform with a Chinese patent publication number of CN207142695U, and the disclosed technology is as follows: the rear section channel and the front section channel are turned over; although the front section channel and the rear section channel can be hinged and rotated to be opened and installed, the vibration wave can be generated to carry out displacement supplement to reduce vibration transmission, the problem that the abrasion of the hinge point is increased and the safety is reduced due to the fact that the hinge point of the front section channel and the rear section channel is located in a suspension distance space and the front section channel is excessively overturned.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a movable tower crane construction channel structure.
The utility model is realized by the following technical scheme.
The utility model provides a movable tower crane construction channel structure, which comprises the following components:
the displacement buffer cushion block is installed at the bottom of one end of the channel girder, and the end part of the channel girder provided with the displacement buffer cushion block is tightly pressed and fixed on the cross beam of the tower crane through the U-shaped limiting snap ring.
The telescopic link that goes up and down is fixed to passageway girder other end, and the universal wheel is installed to telescopic link bottom, and the passageway girder other end extends to the floor of building body on, makes the universal wheel contact on the floor of building body.
And the U-shaped limiting snap ring is fixed with the side edge of the channel girder.
The U-shaped limiting clamp ring and the cross beam clamp sleeve are pressed on the cross beam by a displacement buffer cushion block at the bottom surface of the main beam of the channel under the pressing force of the U-shaped limiting clamp ring.
The displacement buffer cushion block is elastic rubber.
And a limiting body is fixedly arranged on the floor surface at the side edge of the universal wheel.
And the main channel beam is provided with a pedal through a secondary beam formed by square steel.
The number of the secondary beams is multiple and the secondary beams are fixed on the channel main beams at intervals in a welding mode.
And the side edge of the channel girder is fixedly provided with a grid type guard rail.
The utility model has the beneficial effects that: vibration transmission buffering reduction between tower crane and the building body is realized through the combination of rolling displacement of a steering wheel, lifting displacement of a telescopic rod and elastic displacement of a displacement buffering cushion block, so that the abrasion loss of local motion is reduced, two ends of a channel girder are correspondingly lapped on a building surface of the building body and a beam of the tower crane, and the problem that the abrasion of a hinge point is increased and the safety is reduced due to excessive overturning of a front channel is solved.
Drawings
FIG. 1 is a schematic diagram of the structure of the front view of the present utility model;
FIG. 2 is a schematic rear view of the present utility model;
in the figure: 1-a channel girder; 11-displacement buffer cushion blocks; 12-U-shaped limiting snap ring; 13-a telescopic rod; 2-tower crane; 21-a cross beam; 3-universal wheels; 4-building body; 41-floor level; 42-limiting body; 5-secondary beams; 51-pedal; 52-grid type guard rail.
Detailed Description
The technical solution of the present utility model is further described below, but the scope of the claimed utility model is not limited to the above.
As shown in fig. 1-2.
The utility model provides a portable tower crane construction passageway structure, include:
the channel girder 1 is formed by channel steel, the displacement buffer cushion block 11 made of elastic rubber is installed at the bottom of one end of the channel girder 1, the end part of the channel girder 1 provided with the displacement buffer cushion block 11 is tightly pressed and fixed on the cross beam 21 of the tower crane 2 through the U-shaped limiting snap ring 12, after the U-shaped limiting snap ring 12 welded and fixed with the side edge of the channel girder 1 is clamped with the cross beam 21, the displacement buffer cushion block 11 at the bottom surface of the channel girder 1 is tightly pressed on the cross beam 21 under the pressing force of the U-shaped limiting snap ring 12.
The telescopic link 13 that goes up and down is fixed to passageway girder 1 other end, and universal wheel 3 is installed to telescopic link 13 bottom, and passageway girder 1 other end extends to on the floor 41 of building body 4, makes universal wheel 3 contact on the floor 41 of building body 4, and the vibration transmission between tower crane 2 and the building body 4 is reduced in the buffering of the combination of the three of rolling displacement of universal wheel 3 itself, telescopic link 13 lift displacement and displacement buffer pad 11 elastic displacement.
The vibration transmission buffer reduction between the tower crane 2 and the tower crane 4 is realized by combining the rolling displacement of the steering wheel 3, the lifting displacement of the telescopic rod 13 and the elastic displacement of the displacement buffer cushion block 11, so that the abrasion loss of local motion is reduced, and the two ends of the channel main beam 1 are correspondingly lapped on the floor surface 41 of the tower crane 4 and the cross beam 21 of the tower crane 2, thereby solving the problem that the abrasion of a hinge point is increased and the safety is reduced due to excessive overturning of a front channel.
And a limiting body 42 is fixedly arranged on the floor surface 41 positioned on the side edge of the universal wheel 3, and the limiting body 42 limits the maximum rolling displacement of the universal wheel 3.
The secondary beam 5 formed by square steel is arranged on the channel main beam 1, and the pedal 51 is formed by a protective steel plate. The number of the secondary beams 5 is two, the secondary beams are fixedly welded on the channel main beams 1 at intervals, and the grid type guard rails 52 are fixedly arranged on the side edges of the channel main beams 1.

Claims (8)

1. The utility model provides a portable tower crane construction passageway structure which characterized in that includes:
the bottom of one end of the channel girder (1) is provided with a displacement buffer cushion block (11), the end part of the channel girder (1) provided with the displacement buffer cushion block (11) is tightly pressed and fixed on a cross beam (21) of the tower crane (2) through a U-shaped limit clamping ring (12),
the telescopic link (13) that goes up and down is fixed to passageway girder (1) other end, and universal wheel (3) are installed to telescopic link (13) bottom, and passageway girder (1) other end extends to on floor (41) of building body (4), makes universal wheel (3) contact on floor (41) of building body (4).
2. The movable tower crane construction tunnel structure of claim 1, wherein: the U-shaped limiting snap ring (12) is fixed with the side edge of the channel girder (1).
3. The movable tower crane construction tunnel structure of claim 1, wherein: the U-shaped limiting clamp ring (12) and the cross beam (21) are clamped, and the displacement buffer cushion block (11) on the bottom surface of the channel main beam (1) is tightly pressed on the cross beam (21) under the pressing force of the U-shaped limiting clamp ring (12).
4. The movable tower crane construction tunnel structure of claim 1, wherein: the displacement buffer cushion block (11) is elastic rubber.
5. The movable tower crane construction tunnel structure of claim 1, wherein: and a limiting body (42) is fixedly arranged on the floor surface (41) positioned on the side edge of the universal wheel (3).
6. The movable tower crane construction tunnel structure of claim 1, wherein: a pedal (51) is arranged on the channel main beam (1) through a secondary beam (5) formed by square steel.
7. The movable tower crane construction tunnel structure of claim 6, wherein: the number of the channel main beams (1) is two, the number of the secondary beams (5) is multiple, and the secondary beams are fixed on the channel main beams (1) at intervals in a welding mode.
8. The mobile tower crane construction tunnel structure of claim 7, wherein: the side of the channel girder (1) is fixedly provided with a grid type guard rail (52).
CN202320560821.5U 2023-03-21 2023-03-21 Movable tower crane construction channel structure Active CN219279334U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320560821.5U CN219279334U (en) 2023-03-21 2023-03-21 Movable tower crane construction channel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320560821.5U CN219279334U (en) 2023-03-21 2023-03-21 Movable tower crane construction channel structure

Publications (1)

Publication Number Publication Date
CN219279334U true CN219279334U (en) 2023-06-30

Family

ID=86920471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320560821.5U Active CN219279334U (en) 2023-03-21 2023-03-21 Movable tower crane construction channel structure

Country Status (1)

Country Link
CN (1) CN219279334U (en)

Similar Documents

Publication Publication Date Title
CN219279334U (en) Movable tower crane construction channel structure
CN105421224A (en) Intelligent supporting base
CN210598240U (en) Strutting arrangement for building
CN210563610U (en) Welding application multifunctional integrated mobile workshop
CN211226233U (en) A multi-functional companion ladder for bent cap construction
CN101768918A (en) Ferry board device and boarding bridge thereof
CN214874824U (en) Asymmetric sleeper beam
CN204917674U (en) Hoist girder
CN213862190U (en) Aerial ladder vehicle with X-shaped hydraulic support legs
CN212354902U (en) Bottom steel structure for supporting cargo platform
CN211895724U (en) Steel shotcrete ground is assembled and is disintegrated support
CN212126288U (en) Supporting type steel coal bucket energy consumption shaking stopping point
CN113756853A (en) Deep well soft rock stratum rock burst protector
CN214693190U (en) Contact net installation operation car
CN102491195A (en) Reinforcing jib frame structure of truss-jib crane and crane comprising reinforcing jib frame structure
CN211397574U (en) Auxiliary wheel disc system for shield trolley turning and translating
CN217323239U (en) Height safety limiting device of lifting machine
CN215755917U (en) Exempt from to open hole girder steel hoisting device
CN208279221U (en) A kind of shipbuilding gantry crane
CN219361176U (en) Bearing structure of electric truck
CN211644384U (en) Damping device for cab of gantry crane
CN221521807U (en) Plain concrete roof beam hoist and mount appurtenance
CN210985599U (en) Auxiliary device for crawler-type maintenance operation vehicle to pass through cable trench obstacle
CN213925900U (en) Movable light rail overhead protective shed
CN219826892U (en) Movable support reinforcing device for shield connection channel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant