CN219157371U - Flattening construction equipment for road repair - Google Patents
Flattening construction equipment for road repair Download PDFInfo
- Publication number
- CN219157371U CN219157371U CN202320296204.9U CN202320296204U CN219157371U CN 219157371 U CN219157371 U CN 219157371U CN 202320296204 U CN202320296204 U CN 202320296204U CN 219157371 U CN219157371 U CN 219157371U
- Authority
- CN
- China
- Prior art keywords
- water
- lifting
- construction equipment
- flattening
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses flattening construction equipment for road repair, wherein limit holes are formed in four corners of the top of a lifting frame in a penetrating manner, lifting rods penetrate through the three limit holes, a screw rod is rotatably connected between the inside of one limit hole and a lifting groove, a telescopic sleeve is arranged in the lifting frame, a spray head is connected to the bottom of the telescopic sleeve, a telescopic spring is connected between the spray head and the telescopic sleeve, the bottom of the spray head is connected with a water suction head through threads, under the action of an air compressor, water is sprayed out through the spray head, sludge in a damaged pit is flushed, the screw rod is rotated, the water suction head touches the bottom of the damaged pit, the telescopic spring and the telescopic sleeve are matched, so that the water suction head can fully contact the bottom of the damaged pit, a water suction pump is started, the water in the damaged pit is drained, the prepared asphalt is filled in, and finally, the flattened asphalt is flattened by a flattening machine, so that the finally flattened asphalt is adhered to an old pavement better, and the flattening repair effect is better.
Description
Technical Field
The utility model relates to the technical field of road construction, in particular to flattening construction equipment for road repair.
Background
The road maintenance is to maintain and maintain the road, maintain the road and the structures and facilities on the road, keep the road service performance as much as possible, recover the damaged part in time, ensure the driving safety, comfort and smoothness, save the transportation cost and time, and need to repair the gap by using gap repair equipment when maintaining the road.
When the road is repaired, in order to ensure that the follow-up asphalt can be better adhered with the old road after being flattened, the sludge in the damaged pit needs to be removed during repairing, the sludge in the pit is removed by utilizing a shovel in the traditional removing mode, or the sludge in the pit is washed by utilizing a high-pressure water gun, but the two cleaning methods are not clean in the former method, and the follow-up asphalt is difficult to drain, so that the follow-up road is not beneficial to the repairing and flattening treatment of the follow-up road, and the finally flattened asphalt is difficult to be better adhered with the old road.
Disclosure of Invention
The utility model provides flattening construction equipment for road repair, which can effectively solve the problems that in the prior art, sludge in a pit is cleaned by a shovel or the sludge is flushed by a high-pressure water gun, but the two cleaning methods are not clean, and the water is difficult to drain, so that the subsequent road repair flattening treatment is not facilitated, and finally flattened asphalt is difficult to adhere to an old road surface.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction equipment flattens for road repair, includes the base, the lift groove has been seted up in the middle of the base top, lift groove bottom welding has the lifter, lift groove inside slidable mounting has the crane, the spacing hole has been seted up in the four corners of crane top, the lifter runs through inside three spacing hole, one it is connected with the lead screw to rotate between spacing hole inside and the lift groove, the inside telescopic tube that is provided with of crane, the telescopic tube bottom is connected with the shower nozzle, be connected with telescopic spring between shower nozzle and the telescopic tube, there is the suction head shower nozzle bottom through threaded connection, the suction head bottom surface bonds there is the rubber pad, the water absorption hole has evenly been seted up in suction head outside bottom, the inboard top joint of suction head has the filter screen, the support frame is installed at the base top, the transfer case is installed to the support frame bottom, the transfer case bottom surface trompil is connected in telescopic tube one end, the telescopic tube other end is connected in the telescopic tube top, the water tank is installed at the support frame top, be connected with communicating pipe between water tank and the transfer case, transfer case one side trompil is connected with suction pump top one side, suction head one side is connected with the water pump top one side of the output end of the air compressor.
Preferably, the outer surface of the lifting rod is a smooth curved surface, and the inner wall of the limiting hole is a smooth curved surface.
Preferably, the diameter of the cross section of the lifting rod is equal to the diameter of the limiting hole, and the telescopic sleeve is communicated with the spray head.
Preferably, the water pump input end is electrically connected with the external power supply output end, and the air compressor input end is electrically connected with the external power supply output end.
Preferably, the lifting frame is internally and parallelly welded with a sliding rod, sliding blocks are slidably arranged at the outer sides of two ends of the sliding rod, a moving rod is connected to one side of the top of the sliding blocks on two sides of the lifting frame, a positioning hole is formed in one end of the moving rod, fixing holes are uniformly formed in two ends of one side of the lifting frame, and pins are embedded in the positioning holes and one fixing hole.
Preferably, the outer surface of the sliding rod is a smooth curved surface, and the diameters of the positioning holes and the fixing holes are equal.
Compared with the prior art, the utility model has the beneficial effects that: the utility model has scientific and reasonable structure and safe and convenient use:
1. the hydraulic leveling device is provided with a lifting groove, a lifting rod, a lifting frame, a telescopic sleeve, a spray head, a telescopic spring, a water suction head, a rubber pad, a water suction hole, a filter screen, a supporting frame, a transfer box, a telescopic hose, a water tank, a communicating pipe, a water suction pump, a screw rod and an air compressor, under the action of the air compressor, water enters the telescopic sleeve through the telescopic hose and is sprayed out through the spray head, sludge in a damaged pit is flushed and cleaned, after the sludge is flushed, the lifting frame is controlled to descend by the rotary screw rod, the lifting frame descends in the lifting groove under the limiting action of the lifting rod and the limiting hole, the water suction head touches the bottom of the damaged pit, the telescopic spring and the telescopic sleeve are matched to enable the water suction head to fully contact the bottom of the damaged pit, the water suction pump is started, sewage in the damaged pit flows through the water suction hole and is drained through the water suction pump, a little water in the damaged pit is evaporated, prepared asphalt is filled in the damaged pit after the water is flattened, and finally, the leveling machine is used for repairing the asphalt, and the asphalt and the old road surface is better adhered.
2. Be provided with slide bar, slider, carriage release lever, locating hole, fixed orifices and pin, when the damage is less, shift out the pin from locating hole and fixed orifices in, remove the carriage release lever, with the shower nozzle at slide bar both ends to the crane intermediate movement, with the shower nozzle position adjustment back can, on the contrary, when the damage is great, repeat above step, with the shower nozzle outside remove can, make the device can be according to the position of broken hole size adjustment shower nozzle, prevent that spun water from spouting to the broken hole outside, make the waste of water.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model.
In the drawings:
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic view of the mounting structure of the lift frame of the present utility model;
FIG. 3 is a schematic view of the mounting structure of the suction head of the present utility model;
FIG. 4 is a schematic view of the structure of the lifting frame of the present utility model;
FIG. 5 is a side view of the present utility model;
reference numerals in the drawings: 1. a base; 2. a lifting groove; 3. a lifting rod; 4. a lifting frame; 5. a limiting hole; 6. a telescoping tube; 7. a spray head; 8. a telescopic spring; 9. a suction head; 10. a rubber pad; 11. a water suction hole; 12. a filter screen; 13. a support frame; 14. a transfer box; 15. a flexible hose; 16. a water tank; 17. a communicating pipe; 18. a water pump; 19. a screw rod; 20. an air compressor; 21. a slide bar; 22. a slide block; 23. a moving rod; 24. positioning holes; 25. a fixing hole; 26. a pin; 27. and (5) flattening the sheet.
Description of the embodiments
The preferred embodiments of the present utility model will be described below with reference to the accompanying drawings, it being understood that the preferred embodiments described herein are for illustration and explanation of the present utility model only, and are not intended to limit the present utility model.
Examples: as shown in figures 1-5, the utility model provides a technical scheme of flattening construction equipment for road repair, which comprises a base 1, wherein a lifting groove 2 is arranged in the middle of the top of the base 1, lifting rods 3 are welded at the bottom of the lifting groove 2, lifting frames 4 are slidably arranged in the lifting groove 2, limit holes 5 are formed in four corners of the top of the lifting frames 4 in a penetrating manner, the outer surfaces of the lifting rods 3 are smooth curved surfaces, the inner walls of the limit holes 5 are smooth curved surfaces, the relative friction force between the lifting rods 3 and the limit holes 5 is reduced, so that the lifting frames 4 are smoother when moving, the lifting rods 3 penetrate through the three limit holes 5, a screw rod 19 is rotationally connected between the inner part of one limit hole 5 and the lifting groove 2, the cross section diameter of each lifting rod 3 is equal to the diameter of the limit hole 5, the outer sides of the lifting rods 3 are more attached to the inner walls of the limit holes 5, the lifting frame 4 moves more stably, the telescopic tube 6 is arranged in the lifting frame 4, the bottom of the telescopic tube 6 is connected with the spray head 7, the telescopic tube 6 is communicated with the spray head 7, a telescopic spring 8 is connected between the spray head 7 and the telescopic tube 6, the bottom of the spray head 7 is connected with a water suction head 9 through threads, the bottom surface of the water suction head 9 is adhered with a rubber pad 10, water suction holes 11 are uniformly formed in the bottom outside the water suction head 9, a filter screen 12 is clamped at the top of the inner side of the water suction head 9, a support frame 13 is arranged at the top of the base 1, a transfer box 14 is arranged at the bottom of the support frame 13, an opening at the bottom of the transfer box 14 is connected with one end of a telescopic tube 15, the other end of the telescopic tube 15 is connected with the top of the telescopic tube 6, a water tank 16 is arranged at the top of the support frame 13, a communicating tube 17 is connected between the water tank 16 and the transfer box 14, an opening at one side of the transfer box 14 is connected with a water pumping end of a water pump 18, the input end of the water pump 18 is electrically connected with the output end of an external power supply, an opening is formed in the top of one side of the water tank 16 and is connected with the output end of the air compressor 20, the input end of the air compressor 20 is electrically connected with the output end of the external power supply, and a flattening machine 27 is arranged on one side of the base 1;
the inner side of the lifting frame 4 is welded with the sliding rods 21 in parallel, sliding blocks 22 are slidably arranged at the outer sides of two ends of the sliding rods 21, the outer surfaces of the sliding rods 21 are smooth curved surfaces, the relative friction force of contact surfaces between the sliding blocks 22 and the sliding rods 21 is reduced, when the sliding blocks 22 move on the sliding rods 21, the sliding blocks 22 are smoother, one side of the tops of the sliding blocks 22 positioned at two sides of the lifting frame 4 is connected with the moving rods 23, one end of each moving rod 23 is provided with a positioning hole 24, two ends of one side of the lifting frame 4 are uniformly provided with fixing holes 25, the positioning holes 24 and one fixing hole 25 are internally embedded with pins 26, and the diameters of the positioning holes 24 and the fixing holes 25 are equal, so that the fixing of the pins 26 is more stable.
The working principle and the using flow of the utility model are as follows: when the device is used, the water tank 16 is filled with clear water, the device is moved to a road to be repaired, the position of the spray head 7 is adjusted according to the size of a broken pavement, when the broken position is small, the spray heads 7 at two ends of the adjusting slide rod 21 move towards the middle of the lifting frame 4, the pins 26 are moved out of the positioning holes 24 and the fixing holes 25 during movement, the moving rod 23 is moved, the sliding block 22 slides on the slide rod 21, after the position of the spray head 7 is adjusted, the pins 26 are reinserted into the positioning holes 24 and the fixing holes 25, conversely, when the broken position is large, the steps are repeated, the spray head 7 moves outwards, after the spray head 7 is fixed, the air compressor 20 is started, the communicating pipe 17 is opened, water in the water tank 16 falls into the transit box 14, under the action of pressure, the water enters the telescopic sleeve 6 through the telescopic hose 15, finally is sprayed out through the spray head 7, the broken pits in the broken pavement are washed, after the sludge in the broken pits are washed, the lifting frame 4 is rotated, the lifting frame 4 is lowered, under the limit action of the lifting rod 3 and the limit holes 5, the lifting frame 2 is pressed down, the water pump 10 is fully contacts with the water pump 10, the water pump 10 is completely, the broken water pump holes are completely filled up, the water pump holes are completely and the water pump holes are completely filled up, and the water pump holes are completely broken, and the water pump holes are completely filled up, and the water pump holes are completely and the water is completely broken, and the water is completely and filled up, and the water is filled up and the water is filled.
Finally, it should be noted that: the foregoing is merely a preferred example of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Claims (6)
1. The utility model provides a construction equipment flattens for road repair, includes base (1), a serial communication port, lift groove (2) have been seted up in the middle of base (1) top, lift groove (2) bottom welding has lifter (3), lift groove (2) inside slidable mounting has lifter (4), spacing hole (5) have been seted up in the four corners of lifter (4) top, lifter (3) run through inside three spacing hole (5), one rotate between spacing hole (5) inside and lift groove (2) and be connected with lead screw (19), lifter (4) inside is provided with telescopic tube (6), telescopic tube (6) bottom is connected with shower nozzle (7), be connected with telescopic spring (8) between shower nozzle (7) and telescopic tube (6), shower nozzle (7) bottom has suction head (9) through threaded connection, suction head (9) bottom surface bonds and has rubber pad (10), suction head (9) outside bottom evenly has seted up water absorption hole (11), suction head (9) inboard top joint has (12), support frame (13) are installed to support frame (13) bottom, support frame (13), the utility model discloses a hydraulic control system for a hydraulic control system, including flexible hose (20), support frame (1), transfer case (14), air compressor machine (20), air compressor machine (27) are installed to support frame (1), transfer case (14) bottom surface trompil is connected in flexible hose (15) one end, flexible hose (15) other end is connected in flexible hose (6) top, water tank (16) are installed at support frame (13) top, be connected with communicating pipe (17) between water tank (16) and transfer case (14), transfer case (14) one side trompil is connected in suction pump (18) water pumping end, water tank (16) one side top trompil is connected in air compressor machine (20) output, flatting mill (27) are installed to base (1) one side.
2. The flattening construction equipment for road repair according to claim 1, wherein the outer surface of the lifting rod (3) is a smooth curved surface, and the inner wall of the limiting hole (5) is a smooth curved surface.
3. The flattening construction equipment for road repair according to claim 1, wherein the cross section diameter of the lifting rod (3) is equal to the diameter of the limiting hole (5), and the telescopic sleeve (6) is communicated with the spray head (7).
4. The flattening construction equipment for road repair according to claim 1, wherein the input end of the water pump (18) is electrically connected to an external power supply output end, and the input end of the air compressor (20) is electrically connected to the external power supply output end.
5. The flattening construction equipment for road repair according to claim 1, wherein sliding rods (21) are welded on the inner sides of the lifting frames (4) in parallel, sliding blocks (22) are slidably mounted on the outer sides of two ends of the sliding rods (21), moving rods (23) are connected to one sides of the tops of the sliding blocks (22) located on two sides of the lifting frames (4), positioning holes (24) are formed in one end of each moving rod (23), fixing holes (25) are uniformly formed in two ends of one side of each lifting frame (4), and pins (26) are embedded in the positioning holes (24) and one fixing hole (25).
6. The flattening construction equipment for road repair according to claim 5, wherein the outer surface of the sliding rod (21) is a smooth curved surface, and the diameter of the positioning hole (24) is equal to that of the fixing hole (25).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320296204.9U CN219157371U (en) | 2023-02-23 | 2023-02-23 | Flattening construction equipment for road repair |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320296204.9U CN219157371U (en) | 2023-02-23 | 2023-02-23 | Flattening construction equipment for road repair |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219157371U true CN219157371U (en) | 2023-06-09 |
Family
ID=86642226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320296204.9U Active CN219157371U (en) | 2023-02-23 | 2023-02-23 | Flattening construction equipment for road repair |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219157371U (en) |
-
2023
- 2023-02-23 CN CN202320296204.9U patent/CN219157371U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203314876U (en) | Automatic cleaning system for glass curtain wall of tall building | |
CN111335821A (en) | Oil extraction well head greasy dirt does not fall to ground sucker rod and oil pipe environmental protection cleaning device | |
CN112519976A (en) | Ship bottom cleaning robot | |
CN219157371U (en) | Flattening construction equipment for road repair | |
CN205413813U (en) | Oil well collateral line bye -pass surface device of decontaminating | |
CN212190289U (en) | Cleaning equipment for environment-friendly engineering equipment | |
CN111267782A (en) | Cleaning equipment for automobile beauty | |
CN109267454B (en) | Heavy road roller steel wheel cleaning device for road construction engineering machinery | |
CN213892839U (en) | Ship bottom cleaning robot | |
CN109047058A (en) | The cleaning equipment of numerical control processing | |
CN212200209U (en) | Guardrail belt cleaning device for road and bridge | |
CN215314231U (en) | Spray cleaning vehicle | |
CN109235238A (en) | A kind of overpass cleaning and maintenance device | |
CN215236635U (en) | Cleaning device for hydraulic dam gate | |
CN219137894U (en) | Repairing device for drainage pipeline detection well | |
CN217963722U (en) | Highway sign cleaning equipment | |
CN212999068U (en) | A dust collector for building engineering construction place | |
CN211275574U (en) | Photovoltaic module is from belt cleaning device suitable for many sand blown by wind area | |
CN219839919U (en) | Highway maintenance watering device | |
CN213571721U (en) | Road marking cleaner | |
CN220868417U (en) | Sewage pipe network dredging device | |
CN220518111U (en) | High-flow drainage emergency vehicle | |
CN217324918U (en) | Road maintenance is with road surface crack repair auxiliary device | |
CN219734633U (en) | Air bag plugging device for pipeline repair | |
CN215831407U (en) | Be used for prosthetic clearance prosthetic devices of drainage pipe non-excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |