CN219118130U - Engineering pile of portable equipment - Google Patents

Engineering pile of portable equipment Download PDF

Info

Publication number
CN219118130U
CN219118130U CN202223561051.0U CN202223561051U CN219118130U CN 219118130 U CN219118130 U CN 219118130U CN 202223561051 U CN202223561051 U CN 202223561051U CN 219118130 U CN219118130 U CN 219118130U
Authority
CN
China
Prior art keywords
engineering pile
connecting frame
clamping
engineering
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223561051.0U
Other languages
Chinese (zh)
Inventor
陈格丛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223561051.0U priority Critical patent/CN219118130U/en
Application granted granted Critical
Publication of CN219118130U publication Critical patent/CN219118130U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a portable assembled engineering pile which comprises an engineering pile, a connecting frame and an extension plate, wherein the engineering pile comprises a pressure plate, a pile body, a drill bit and a clamping ring; the connecting frame consists of four frame bodies, clamping grooves are formed in the periphery of the inner wall of the connecting frame, the clamping grooves are connected with the clamping rings in a sliding manner, and a connecting port is fixedly connected to one side of the connecting frame; one side of the extension plate is sleeved with an adjusting plate in a sliding way. The utility model discloses a portable assembled engineering pile, which is characterized in that a connecting plate is replaced by a connecting frame, clamping rings and clamping grooves on the basis of the prior art, the connecting frame is composed of four frame bodies, the middle part is hollow, the periphery of the inner wall is provided with the clamping grooves, the surface of the engineering pile is fixedly connected with the clamping rings, the clamping rings are clamped in the clamping grooves, the engineering pile is enabled to move left and right in the connecting frame, screw holes are formed in the surface of the connecting frame, corresponding screw holes are formed in clamping adjustment, and when two corresponding screw holes are overlapped, the engineering pile is fixed at one position through limiting nuts.

Description

Engineering pile of portable equipment
Technical Field
The utility model relates to the field of construction, in particular to a portable assembled engineering pile.
Background
The existing combined engineering pile is mainly a pile which acts on stress in the building construction process, and the used combined engineering pile is formed by splicing a plurality of single engineering piles by adding connecting plates on the engineering piles.
The defects exist in the prior art:
after the engineering piles are added with the connecting plates, the engineering piles are fixed on one side of the connecting plates, and when the distance between the engineering piles needs to be changed, the engineering piles cannot move, so that the expected distance between the engineering piles cannot be reached after the engineering piles are assembled, and the engineering piles are not convenient to adjust.
Aiming at the defects of the prior art, the utility model discloses a portable assembled engineering pile for solving the problems.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model discloses a portable assembled engineering pile, which is characterized in that a connecting plate is replaced by a connecting frame, a clamping ring and a clamping groove on the basis of the prior art, the connecting frame is composed of four frame bodies, the middle part of the connecting frame is hollow, the left and right movement of the connecting frame is realized, screw holes are formed in the surface of the connecting frame, corresponding screw holes are formed in the clamping ring, and when two corresponding screw holes are overlapped, the engineering pile is fixed at one position through a limit nut; according to the portable assembled engineering pile, the adjusting plate is added on the original basis, and when the distance between the connecting frames is not long enough, two engineering piles are connected in a lengthening mode.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the portable assembled engineering pile comprises an engineering pile, a connecting frame and an extension plate, and is characterized by comprising a pressure plate, a pile body, a drill bit and a clamping ring;
the connecting frame consists of four frame bodies, clamping grooves are formed in the periphery of the inner wall of the connecting frame, the clamping grooves are connected with the clamping rings in a sliding manner, and a connecting port is fixedly connected to one side of the connecting frame;
one side of the extension plate is in sliding sleeve joint with an adjusting plate, and the other side of the adjusting plate is fixedly connected with a connecting block.
Preferably, the pressure plate is fixedly connected to the top of the pile body, the drill bit is fixedly connected to the bottom of the pile body, and the clamping ring is sleeved on the top of the pile body.
Preferably, a plurality of screw holes are formed in the tops of the front face and the back face of the connecting frame, two limit nuts a are arranged on the top of the connecting frame, and the limit nuts a are used for limiting the engineering piles.
Preferably, the top of the adjusting plate is provided with a plurality of limiting holes, the limiting holes are divided into two groups, the two groups of limiting holes are horizontally and centrally symmetrically arranged, and the top of the extending plate is provided with two limiting nuts b And the limit holes are connected with the corresponding limit nuts b in a threaded penetrating way.
Preferably, a plug is connected between one side and the other side of the inner wall of the connecting port in a penetrating way, a plug is fixedly connected to one side of the plug, and a limiting rod is connected to the other end of the plug in a penetrating way.
Preferably, a connecting hole is formed between one side and the other side of the connecting block, and the connecting block is connected with the bolt in a penetrating way through a connecting port.
The utility model has the technical effects and advantages that:
1. this engineering stake of portable equipment, change the link with the connecting plate into link, snap ring and draw-in groove on original basis, the link comprises four support bodies, the middle part is hollow, the draw-in groove has all been seted up around the inner wall, and engineering stake's fixed surface has the snap ring, the snap ring joint is in the draw-in groove, the engineering stake has been realized moving about the link is inside, the screw has been seted up on the surface of link, corresponding screw is seted up to the snap ring, when two corresponding screws overlap, realize fixing engineering stake in a position through stop nut.
2. This engineering stake of portable equipment increases the extension board on original basis, when the distance of link is not enough long, increases the extension board between two links, and one side of extension board is equipped with the regulating plate for adjust the length of extension board, utilize the nut to carry out spacingly after obtaining required length, realize two engineering stakes of extension connection.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic diagram of the front structure of the connection port of the present utility model;
fig. 3 is a schematic cross-sectional view illustrating the connection between the connection port and the connection block according to the present utility model.
In the figure:
1. engineering piles; 101. a pressure plate; 102. pile body; 103. a drill bit; 104. a clasp;
2. a connecting frame; 201. a clamping groove; 202. a screw hole; 203. a limit nut a;
3. an extension plate; 301. a limit nut b;
4. an adjusting plate; 401. a limiting hole;
5. a connection port; 501. a plug pin; 502. a plug; 503. a limit rod;
6. and (5) connecting a block.
Description of the embodiments
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides a portable assembled engineering pile as shown in fig. 1-3, which comprises an engineering pile 1, a connecting frame 2 and an extension plate 3, wherein the engineering pile 1 comprises a pressure plate 101, a pile body 102, a drill bit 103 and a clamping ring 104;
the connecting frame 2 consists of four frame bodies, clamping grooves 201 are formed in the periphery of the inner wall of the connecting frame 2, the clamping grooves 201 are connected with the clamping rings 104 in a sliding manner, a connecting port 5 is fixedly connected to one side of the connecting frame 2, the connecting frame 2 consists of four frame bodies, and the middle part of the connecting frame is hollow, so that the engineering pile 1 moves left and right in the connecting frame;
one side of the extension plate 3 is slidably sleeved with an adjusting plate 4, the other side of the adjusting plate 4 is fixedly connected with a connecting block 6, and the adjusting plate 4 is arranged to adjust the length of the extension plate 3.
The pressure disk 101 fixed connection is in the top of pile body 102, and drill bit 103 fixed connection is in the bottom of pile body 102, and snap ring 104 cover is established at the top of pile body 102, sets up snap ring 104 and realizes with snap ring 104 joint in draw-in groove 201 to realized that engineering pile 1 moves about in link 2 inside, prevented rocking from top to bottom.
The tops of the front and back surfaces of the connecting frame 2 are provided with a plurality of screw holes 202, the top of the connecting frame 2 is provided with two limit nuts a203, and the limit nuts a203 are used for limiting engineering piles.
A plurality of limiting holes 401 are formed in the top of the adjusting plate 4, the plurality of limiting holes 401 are divided into two groups, the two groups of limiting holes 401 are horizontally and centrally symmetrically arranged, and two limiting nuts b301 are arranged at the top end of the extension plate 3 And the limit holes 401 are connected with the corresponding limit nuts b301 in a threaded penetrating way.
The plug 501 is connected between one side and the other side of the inner wall of the connecting port 5 in a penetrating way, the plug 502 is fixedly connected to one side of the plug 501, the limit rod 503 is connected to the other end of the plug 501 in a penetrating way, the connecting port 5 and the connecting block 6 are connected with the two connecting frames 2 in a penetrating way, so that connection of the two engineering piles is achieved, after the connecting block 6 is inserted into the connecting port 5, the plug is inserted into openings of the two sides of the connecting port and the connecting block 6 in sequence, and then the limit rod 503 is used for insertion connection, so that the two connecting frames 2 are fixed.
A connecting hole is formed between one side and the other side of the connecting block 6, and the connecting block 6 is connected with the bolt 501 in a penetrating way through a connecting port.
The working principle of the utility model is as follows:
firstly, two connecting frames 2 are put together, a connecting block 6 of one connecting frame 2 is put into a connecting port 5 of the other connecting frame 2, after the connecting block 6 is inserted into the connecting port 5, bolts are inserted into two sides of the connecting port and an opening of the connecting block 6 to sequentially pass through, and then the two connecting frames 2 are inserted by using a limiting rod 503, so that the two connecting frames 2 are fixed;
next, the engineering pile 1 is moved inside the connecting frame 2 to a desired position, and is fixed by the stop nut a 203.
Finally, when the required distance between the two engineering posts 1 is too far, an extension plate 3 is added between the two connecting frames 2, the length of the extension plate 3 is adjusted by an adjusting plate 4 arranged on one side of the extension plate 3, and after the required length is obtained, limiting is performed by using a limiting nut b301, so that the length of connecting the two engineering posts 1 is achieved.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (6)

1. The portable assembled engineering pile comprises an engineering pile (1), a connecting frame (2) and an extension plate (3), and is characterized in that the engineering pile (1) comprises a pressure plate (101), a pile body (102), a drill bit (103) and a clamping ring (104);
the connecting frame (2) consists of four frame bodies, clamping grooves (201) are formed in the periphery of the inner wall of the connecting frame (2), the clamping grooves (201) are connected with the clamping rings (104) in a sliding mode, and a connecting port (5) is fixedly connected to one side of the connecting frame (2);
one side of the extension plate (3) is in sliding sleeve joint with an adjusting plate (4), and the other side of the adjusting plate (4) is fixedly connected with a connecting block (6).
2. The portable assembled engineering pile according to claim 1, wherein the pressure plate (101) is fixedly connected to the top of the pile body (102), the drill bit (103) is fixedly connected to the bottom of the pile body (102), and the clamping ring (104) is sleeved on the top of the pile body (102).
3. The portable assembled engineering pile according to claim 1, wherein the tops of the front and the back of the connecting frame (2) are provided with a plurality of screw holes (202), the top of the connecting frame (2) is provided with two limit nuts a (203), and the limit nuts a (203) are used for limiting the engineering pile.
4. The portable assembled engineering pile according to claim 1, wherein a plurality of limiting holes (401) are formed in the top of the adjusting plate (4), the limiting holes (401) are divided into two groups, the two groups of limiting holes (401) are horizontally and centrally symmetrically arranged, and two limiting nuts b (301) are arranged at the top end of the extending plate (3) And the limit holes (401) are connected with the corresponding limit nuts b (301) in a threaded penetrating way.
5. The engineering pile according to claim 1, wherein a plug pin (501) is connected between one side and the other side of the inner wall of the connecting port (5), a plug pin (502) is fixedly connected to one side of the plug pin (501), and a limit rod (503) is connected to the other end of the plug pin (501) in a penetrating manner.
6. The portable assembled engineering pile according to claim 1, wherein a connecting hole is formed between one side and the other side of the connecting block (6), and the connecting block (6) is connected with the bolt (501) in a penetrating manner through the connecting hole.
CN202223561051.0U 2022-12-30 2022-12-30 Engineering pile of portable equipment Active CN219118130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223561051.0U CN219118130U (en) 2022-12-30 2022-12-30 Engineering pile of portable equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223561051.0U CN219118130U (en) 2022-12-30 2022-12-30 Engineering pile of portable equipment

Publications (1)

Publication Number Publication Date
CN219118130U true CN219118130U (en) 2023-06-02

Family

ID=86534864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223561051.0U Active CN219118130U (en) 2022-12-30 2022-12-30 Engineering pile of portable equipment

Country Status (1)

Country Link
CN (1) CN219118130U (en)

Similar Documents

Publication Publication Date Title
CN110644674B (en) Concatenation formula steel construction truss
CN210507796U (en) Convenient connecting piece of beam body
CN219118130U (en) Engineering pile of portable equipment
CN210263386U (en) Assembled building beam column connection structure
CN206844715U (en) A kind of novel building ergonomic support device
CN110565812A (en) Steel structure building connecting assembly and connecting method
CN216948743U (en) Connecting piece of assembled steel construction building I-steel and side pipe
CN216740090U (en) Assembly type structure bottom coupling mechanism
CN219808737U (en) Butt joint device for assembled steel structure
CN217205298U (en) Civil engineering foundation mold fixing device for building engineering
CN219794662U (en) Template assembly capable of being flexibly assembled for bare concrete construction
CN201165636Y (en) Crawl type cable robot clamp device
CN220909709U (en) Assembled detachable construction trolley
CN219691065U (en) Scaffold diagonal bracing head
CN217760048U (en) Supporting device for pouring gate pier
CN216195430U (en) Steel house assembling connecting part
CN218952186U (en) Combined diagonal bracing supporting structure
CN221798721U (en) Connection structure
CN219343500U (en) Assembled steel construction docking mechanism
CN219315881U (en) Basement sump pit formwork structure
CN112878179B (en) Adjustable building truss structure for road bridge Liang Gongcheng
CN215223561U (en) Plant strutting arrangement is used in municipal garden
CN218952781U (en) Quick assembly disassembly formula template structure for construction
CN221322428U (en) In-tunnel big-arch shelter construction auxiliary device
CN220433911U (en) Assembled steel pipe concrete member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant