CN218976274U - Weak current well pipeline arrangement structure - Google Patents
Weak current well pipeline arrangement structure Download PDFInfo
- Publication number
- CN218976274U CN218976274U CN202223382463.8U CN202223382463U CN218976274U CN 218976274 U CN218976274 U CN 218976274U CN 202223382463 U CN202223382463 U CN 202223382463U CN 218976274 U CN218976274 U CN 218976274U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixing
- arrangement structure
- pipeline arrangement
- sleeves
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a weak electric well pipeline arrangement structure, which comprises a mounting plate and two fixing plates, wherein the two fixing plates are respectively arranged at the front end and the rear end of the mounting plate, the upper end of the mounting plate is provided with an adjusting and fixing structure, and the adjusting and fixing structure comprises: the device comprises two threaded connecting columns, a fixing plate, a fixing groove, four first sleeves, a replacement fixing assembly, a connecting plate, four second sleeves and four connecting bolts; the two threaded connecting columns are respectively arranged at the two side wall surfaces of the mounting plate, and the adjusting and fixing structure adopted in the scheme relates to the technical field of pipeline structures.
Description
Technical Field
The utility model relates to the technical field of pipeline structures, in particular to a weak electric well pipeline arrangement structure.
Background
The electric well is a channel for laying weak electric lines, an inspection port is formed in a specified floor of the weak electric well, so that the weak electric line is conveniently inspected for professional staff, and the lines run by the weak electric well mainly comprise network lines, telephone lines, monitoring lines, radio frequency cables, TV (television) and the like, and the common weak electric well runs by signal lines.
The existing pipeline arrangement structure is generally in a fixed mode, cables with different specifications cannot be fixed, therefore, when the cables with different specifications are fixed, the pipeline arrangement structure needs to be integrally replaced, the operation is complex, and when the traditional pipeline arrangement structure is arranged, a shell defining a connecting line is not easy to open, so that time is wasted when overhauling is conducted, the labor intensity is increased, and the scheme is generated for the scheme for deeply researching the problems.
Disclosure of Invention
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a weak current well pipeline arrangement structure, includes mounting panel and two stationary blades, two the stationary blade install respectively in mounting panel front end and rear end, the mounting panel upper end is equipped with adjusts fixed knot and constructs, adjust fixed knot and construct and include: the device comprises two threaded connecting columns, a fixing plate, a fixing groove, four first sleeves, a replacement fixing assembly, a connecting plate, four second sleeves and four connecting bolts; the two threaded connection columns are respectively installed at two side wall surfaces of the mounting plate, the fixing plate is installed at the center of the upper end of the mounting plate, the fixing groove is formed in the upper wall surface of the fixing plate, the four first sleeves are respectively installed at two sides of the upper end of the fixing plate, the replacement fixing assembly is movably placed in the fixing groove, the connecting plate is placed at the upper end of the replacement fixing assembly, the four second sleeves are respectively installed at two sides of the lower end of the connecting plate, and the four connecting bolts respectively penetrate through the two side wall surfaces of the connecting plate and are respectively embedded in the upper wall surfaces of the two threaded connection columns.
Preferably, three fixing holes are formed in the upper ends of the two fixing pieces.
Preferably, a connecting piece is arranged at the joint of the threaded connecting column and the mounting plate.
Preferably, the replacement fixture assembly includes: the device comprises a supporting plate, a separation plate, eight limiting rods and a buckling plate;
the backup pad activity place in the fixed slot, the division board place in backup pad upper end, eight the gag lever post install respectively in division board upper end and lower extreme both sides, and inlay respectively in four in first sleeve and the second sleeve, the lock board place in division board upper end.
Preferably, the upper end of the supporting plate and the lower end of the buckling plate are provided with a plurality of first grooves.
Preferably, the upper end and the lower end of the partition plate are provided with a plurality of second grooves.
Advantageous effects
The utility model provides a weak electric well pipeline arrangement structure which has the beneficial effects that the adopted adjusting and fixing structure can be used for replacing the replacement and fixing components in the weak electric well pipeline arrangement structure according to cables of different specifications, is simple to operate, can be used for fixing cables of various specifications, and is convenient to detach and overhaul in the later period, the connecting plate is connected with two threaded connecting columns through four connecting bolts, so that the fixing effect of the replacement and fixing components on the cables is ensured.
Drawings
Fig. 1 is a schematic perspective view of a weak electric well pipeline arrangement structure according to the present utility model.
Fig. 2 is a schematic diagram of a front view of a weak electric well pipeline arrangement structure according to the present utility model.
In the figure: 1. mounting panel, 2, stationary blade, 3, threaded connection post, 4, fixed plate, 5, fixed slot, 6, first sleeve, 7, connecting plate, 8, second sleeve, 9, connecting bolt, 10, fixed orifices, 11, the connection piece, 12, backup pad, 13, division board, 14, gag lever post, 15, lock board.
Detailed Description
All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples: referring to fig. 1-2, the main components of the present case are: the utility model provides a weak current well pipeline arrangement structure, includes mounting panel 1 and two stationary blades 2, and two stationary blades 2 are installed respectively in mounting panel 1 front end and rear end, and mounting panel 1 upper end is equipped with adjusts fixed knot and constructs, adjusts fixed knot and constructs and include: two threaded connection posts 3, a fixing plate 4, a fixing groove 5, four first sleeves 6, a replacement fixing assembly, a connecting plate 7, four second sleeves 8 and four connecting bolts 9; two threaded connection posts 3 are installed in mounting panel 1 both sides wall face department respectively, fixed plate 4 is installed in mounting panel 1 upper end center department, fixed slot 5 is seted up in fixed plate 4 upper wall face department, four first sleeves 6 are installed in fixed plate 4 upper end both sides respectively, change fixed subassembly activity and place in fixed slot 5, connecting plate 7 is placed in change fixed subassembly upper end, four second sleeves 8 are installed in connecting plate 7 lower extreme both sides respectively, four connecting bolt 9 run through respectively in connecting plate 7 both sides wall face department, and inlay respectively in two threaded connection post 3 upper wall faces.
It should be noted that, when in use, the staff first fixes the mounting plate 1 at a designated position through the two fixing plates 2, then selects the adaptive replacement fixing assembly according to cables with different specifications, places the replacement fixing assembly in the fixing groove 5 at the upper end of the fixing plate 4, fixes the cables through the replacement fixing assembly, places the connecting plate 7 at the upper end of the replacement fixing assembly, embeds the four connecting bolts 9 in the connecting plate 7 and the two threaded connecting columns 3, fixes the connecting plate 7, and fixes the replacement fixing assembly through the connecting plate 7.
In the specific implementation process, three fixing holes 10 are formed in the upper ends of the two fixing pieces 2.
In the concrete implementation process, a connecting sheet 11 is arranged at the joint of the threaded connecting column 3 and the mounting plate 1.
In a specific implementation, replacing the securing assembly includes: a supporting plate 12, a partition plate 13, eight limiting rods 14 and a buckling plate 15;
the backup pad 12 activity is placed in fixed slot 5, and backup pad 12 upper end is placed in to backup pad 13, and eight gag lever posts 14 are installed respectively in backup pad 13 upper end and lower extreme both sides, and inlay respectively in four first sleeve 6 and second sleeve 8, and snap plate 15 is placed in backup pad 13 upper end.
Before fixing the cables, the staff changes the sizes of the support plate 12, the partition plate 13 and the buckling plate 15 according to different cable specifications, when in use, the staff firstly puts the support plate 12 into the fixing groove 5, puts a part of cables into the upper end of the support plate 12, then places the partition plate 13 at the upper end of the support plate 12, embeds four limit rods 14 into four first sleeves 6, fixes the cables at the upper end of the support plate 12, places the other part of cables at the upper end of the partition plate 13, places the buckling plate 15 at the upper end of the partition plate 13, fixes the cables at the upper end of the partition plate 13, and performs limit connection between the connecting plate 7 and the partition plate 13 by matching four limit rods 14 at the upper end of the partition plate 13 with four second sleeves 8.
In a specific implementation process, the upper end of the supporting plate 12 and the lower end of the buckling plate 15 are provided with a plurality of first slots.
In a specific implementation process, the upper end and the lower end of the partition plate 13 are provided with a plurality of second grooves.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a weak current well pipeline arrangement structure, includes mounting panel and two stationary blades, two the stationary blade install respectively in mounting panel front end and rear end, the mounting panel upper end is equipped with adjusts fixed knot and constructs, adjust fixed knot and construct and include: the device comprises two threaded connecting columns, a fixing plate, a fixing groove, four first sleeves, a replacement fixing assembly, a connecting plate, four second sleeves and four connecting bolts; the connecting plate is characterized in that two threaded connecting columns are respectively arranged at two side wall surfaces of the mounting plate, the fixing plate is arranged at the center of the upper end of the mounting plate, the fixing groove is formed in the upper wall surface of the fixing plate, four first sleeves are respectively arranged at two sides of the upper end of the fixing plate, a replacement fixing assembly is movably arranged in the fixing groove, the connecting plate is arranged at the upper end of the replacement fixing assembly, four second sleeves are respectively arranged at two sides of the lower end of the connecting plate, and four connecting bolts respectively penetrate through the two side wall surfaces of the connecting plate and are respectively embedded in the two upper wall surfaces of the threaded connecting columns.
2. The weak electric well pipeline arrangement structure as claimed in claim 1, wherein three fixing holes are formed in the upper ends of the fixing plates.
3. The weak electric well pipeline arrangement structure as claimed in claim 1, wherein connecting pieces are arranged at the connection positions of the threaded connecting columns and the mounting plate.
4. A weak current well line layout structure according to claim 1, wherein said replacement fixture assembly comprises: the device comprises a supporting plate, a separation plate, eight limiting rods and a buckling plate;
the backup pad activity place in the fixed slot, the division board place in backup pad upper end, eight the gag lever post install respectively in division board upper end and lower extreme both sides, and inlay respectively in four in first sleeve and the second sleeve, the lock board place in division board upper end.
5. The weak electric well pipeline arrangement structure of claim 4, wherein the upper end of the supporting plate and the lower end of the buckling plate are provided with a plurality of first grooves.
6. The weak electric well pipeline arrangement structure as claimed in claim 4, wherein the upper end and the lower end of the partition plate are provided with a plurality of second grooves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223382463.8U CN218976274U (en) | 2022-12-16 | 2022-12-16 | Weak current well pipeline arrangement structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223382463.8U CN218976274U (en) | 2022-12-16 | 2022-12-16 | Weak current well pipeline arrangement structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218976274U true CN218976274U (en) | 2023-05-05 |
Family
ID=86167668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223382463.8U Active CN218976274U (en) | 2022-12-16 | 2022-12-16 | Weak current well pipeline arrangement structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218976274U (en) |
-
2022
- 2022-12-16 CN CN202223382463.8U patent/CN218976274U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216354678U (en) | Waveguide butt joint clamp | |
CN218976274U (en) | Weak current well pipeline arrangement structure | |
CN212063365U (en) | Bottom box connecting structure | |
CN220896286U (en) | Wiring device for water and electricity construction of assembled house | |
CN211351677U (en) | Plug and play device based on standard interface board | |
CN219154275U (en) | Charging pile of power cord of removable specification | |
CN201787198U (en) | Adjustable aluminum alloy cable tray | |
CN212784692U (en) | Cable support capable of being lengthened | |
CN217956360U (en) | Environmental protection electric power meter box easy to assemble | |
CN216625187U (en) | Combined cable bridge | |
CN219420232U (en) | Butt joint structure for intelligent bus duct | |
CN213027265U (en) | Quick connection structure of network bridge | |
CN221058194U (en) | Photovoltaic inverter bracket | |
CN210182997U (en) | Combined cable support | |
CN216617080U (en) | Concrete pole of easily installing cable | |
CN219762746U (en) | Motor installation structure of electric lifting table | |
CN211629761U (en) | Fixing frame for communication cable | |
CN221102952U (en) | Ladder type aluminum alloy bridge | |
CN220325220U (en) | Wiring groove structure of photovoltaic cable | |
CN213151501U (en) | Trolley type charged insulation stripping tool | |
CN210739574U (en) | Secondary electrical equipment installation pipeline fixed knot constructs | |
CN212935396U (en) | Installing support is used in electric power engineering construction | |
CN210725451U (en) | Electrostatic grounding device | |
CN216693735U (en) | Air conditioner | |
CN217924182U (en) | Building heat insulating board convenient to installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |