CN210739574U - Secondary electrical equipment installation pipeline fixed knot constructs - Google Patents

Secondary electrical equipment installation pipeline fixed knot constructs Download PDF

Info

Publication number
CN210739574U
CN210739574U CN201921502412.XU CN201921502412U CN210739574U CN 210739574 U CN210739574 U CN 210739574U CN 201921502412 U CN201921502412 U CN 201921502412U CN 210739574 U CN210739574 U CN 210739574U
Authority
CN
China
Prior art keywords
solid fixed
fixing
fixed ring
ring
equipment installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921502412.XU
Other languages
Chinese (zh)
Inventor
李斌斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohhot Jinqiao thermal power plant of North United Electric Power Co., Ltd
Original Assignee
李斌斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李斌斌 filed Critical 李斌斌
Priority to CN201921502412.XU priority Critical patent/CN210739574U/en
Application granted granted Critical
Publication of CN210739574U publication Critical patent/CN210739574U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a secondary electrical equipment installation pipeline fixed knot constructs, including carrier lateral wall, fixed block and draw-in groove, the inside joint of draw-in groove has the cardboard, the first solid fixed ring of one side fixedly connected with of cardboard, first solid fixed ring is pegged graft through the dead lever and is had the solid fixed ring of second, the surface of dead lever is provided with the fixed silk, the inside of the solid fixed ring of first solid fixed ring and second is provided with electric pipeline. This secondary electrical equipment installation pipeline fixed knot constructs, through the carrier lateral wall, the setting of fixed block and cardboard, draw-in groove seted up through the fixed block upper surface, can the fixed cardboard of joint, make conveniently tear open when the maintenance and get, through first solid fixed ring, the solid fixed ring of second, the setting of dead lever and solid fixed wire, can fix the electrical pipeline through first solid fixed ring and the solid fixed ring of second, the solid fixed ring of first solid fixed ring and second can be fixed to dead lever and solid fixed wire, make the process of fixed pipeline simple, time is comparatively saved.

Description

Secondary electrical equipment installation pipeline fixed knot constructs
Technical Field
The utility model relates to a pipeline fixing technology field specifically is a secondary electrical equipment installation pipeline fixed knot constructs.
Background
The important role played by electric power in our life and production is not ignored, brings great convenience to our life, and becomes an important energy source in our production and life. The most critical factor that can let electric power normal operating and carry in the power plant is electrical equipment, and secondary electrical equipment installation pipeline fixed knot constructs is the device that an electrical equipment pipeline was fixed for fixed electrical equipment's pipeline, current pipeline process is comparatively troublesome when fixed, and it is comparatively inconvenient to tear open when needing the maintenance, consequently proposes a new pipeline fixing device to above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a secondary electrical equipment installs pipeline fixed knot and constructs has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a secondary electrical equipment installation pipeline fixed knot constructs, includes carrier lateral wall and fixed block, the side fixedly connected with pipe fixed block of carrier lateral wall, the draw-in groove has been seted up to the upper surface of fixed block, the inside joint of draw-in groove has the cardboard, the first solid fixed ring of one side fixedly connected with of cardboard, first solid fixed ring is pegged graft through the dead lever has the solid fixed ring of second, the surface of dead lever is provided with the fixed silk, the inside of the solid fixed ring of first solid fixed ring and second is provided with electric pipeline.
Optionally, the number of the fixing screws is four, and the fixing screws are all arranged on the side face of the fixing block.
Optionally, the number of the fixing screws is four, and the fixing screws are all arranged on the side face of the fixing block.
Optionally, the fixing rod is fixedly connected to the side surface of the first fixing ring.
Optionally, the fixing rod penetrates through the second fixing ring.
Optionally, the number of the fixing rods is two, and the two fixing rods are symmetrically arranged by taking the vertical central line of the second fixing ring as a symmetry axis.
(III) advantageous effects
The utility model provides a secondary electrical equipment installation pipeline fixed knot constructs possesses following beneficial effect:
this secondary electrical equipment installation pipeline fixed knot constructs, through the carrier lateral wall, the setting of fixed block and cardboard, draw-in groove seted up through the fixed block upper surface, can the fixed cardboard of joint, make conveniently tear open when the maintenance and get, through first solid fixed ring, the solid fixed ring of second, the setting of dead lever and solid fixed wire, can fix the electrical pipeline through first solid fixed ring and the solid fixed ring of second, the solid fixed ring of first solid fixed ring and second can be fixed to dead lever and solid fixed wire, make the process of fixed pipeline comparatively simple, comparatively save time.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic side view of the present invention.
In the figure: 1. a carrier sidewall; 2. a fixed block; 3. a card slot; 4. clamping a plate; 5. a first retaining ring; 6. A second retaining ring; 7. an electrical conduit; 8. fixing the rod; 9. fixing the wire; 10. and fixing the screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a secondary electrical equipment mounting pipeline fixing structure comprises a carrier side wall 1 and a fixing block 2, wherein a pipe fixing block 2 is fixedly connected to the side face of the carrier side wall 1, fixing screws 10 are fixedly connected to the side face of the fixing block 2, the number of the fixing screws 10 is four, the four fixing screws 10 are all arranged on the side face of the fixing block 2, a clamping groove 3 is formed in the upper surface of the fixing block 2, and a clamping plate 4 is clamped inside the clamping groove 3;
the clamping plate 4 can be clamped and fixed through the arrangement of the side wall 1 of the carrier, the fixing block 2 and the clamping plate 4 and the clamping groove 3 formed in the upper surface of the fixing block 2, so that the clamping plate 4 is convenient to detach and take during maintenance;
a first fixing ring 5 is fixedly connected to one side of the clamping plate 4, a second fixing ring 6 is inserted into the first fixing ring 5 through fixing rods 8, the fixing rods 8 are fixedly connected to the side face of the first fixing ring 5, the fixing rods 8 penetrate through the second fixing ring 6, the number of the fixing rods 8 is two, the two fixing rods 8 are symmetrically arranged by taking the vertical central line of the second fixing ring 6 as a symmetry axis, fixing wires 9 are arranged on the surfaces of the fixing rods 8, and electric pipelines 7 are arranged inside the first fixing ring 5 and the second fixing ring 6;
through the setting of the solid fixed ring of first solid fixed ring 5, the solid fixed ring of second 6, dead lever 8 and fixed wire 9, can fix electric pipeline 7 through the solid fixed ring of first solid fixed ring 5 and second 6, the solid fixed ring of first solid fixed ring 5 and the solid fixed ring of second 6 can be fixed to dead lever 8 and fixed wire 9 for the process of fixed pipeline is comparatively simple, comparatively saves time.
As an optimal technical solution of the utility model: the clamping groove 3 formed in the upper surface of the fixing block 2 can be used for clamping the fixing clamping plate 4, so that the fixing clamping plate is convenient to disassemble and take in maintenance.
This secondary electrical equipment installation pipeline fixed knot constructs's application method, in use, fixed block 2 is fixed in the side of carrier lateral wall 1 through the fixed screw 10 that the side set up, draw-in groove 3 seted up through the 2 upper surfaces of fixed block, can be the inside at draw-in groove 3 to 4 joints of cardboard, make and conveniently tear open when the maintenance and get, cardboard 4 one side fixed ring 5 of fixed connection, can connect the solid fixed ring 6 of second through dead lever 8, through the fixed wire 9 of 8 surface settings of dead lever, fix solid fixed ring 6 of second, make the process of fixed pipeline comparatively simple, comparatively save time.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a secondary electrical equipment installation pipeline fixed knot constructs, includes carrier lateral wall (1) and fixed block (2), its characterized in that: the utility model discloses a carrier, including carrier lateral wall (1), draw-in groove (3), cardboard (4) have been seted up to the side fixedly connected with pipe fixed block (2) of carrier lateral wall (1), draw-in groove (3) have been seted up to the upper surface of fixed block (2), the inside joint of draw-in groove (3) has cardboard (4), the first solid fixed ring (5) of one side fixedly connected with of cardboard (4), first solid fixed ring (5) are pegged graft through dead lever (8) and are had the solid fixed ring of second (6), the surface of dead lever (8) is provided with solid fixed silk (9), the inside of the solid fixed ring of first solid fixed ring.
2. The secondary electric equipment installation duct fixing structure according to claim 1, characterized in that: and the side surface of the fixed block (2) is fixedly connected with a fixed screw (10).
3. The secondary electric equipment installation duct fixing structure according to claim 2, characterized in that: the number of the fixing screws (10) is four, and the fixing screws (10) are all arranged on the side face of the fixing block (2).
4. The secondary electric equipment installation duct fixing structure according to claim 1, characterized in that: the fixing rod (8) is fixedly connected to the side face of the first fixing ring (5).
5. The secondary electric equipment installation duct fixing structure according to claim 1, characterized in that: the fixing rod (8) penetrates through the second fixing ring (6).
6. The secondary electric equipment installation duct fixing structure according to claim 1, characterized in that: the number of the fixing rods (8) is two, and the fixing rods (8) are symmetrically arranged by taking the vertical central line of the second fixing ring (6) as a symmetry axis.
CN201921502412.XU 2019-09-10 2019-09-10 Secondary electrical equipment installation pipeline fixed knot constructs Active CN210739574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921502412.XU CN210739574U (en) 2019-09-10 2019-09-10 Secondary electrical equipment installation pipeline fixed knot constructs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921502412.XU CN210739574U (en) 2019-09-10 2019-09-10 Secondary electrical equipment installation pipeline fixed knot constructs

Publications (1)

Publication Number Publication Date
CN210739574U true CN210739574U (en) 2020-06-12

Family

ID=70981946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921502412.XU Active CN210739574U (en) 2019-09-10 2019-09-10 Secondary electrical equipment installation pipeline fixed knot constructs

Country Status (1)

Country Link
CN (1) CN210739574U (en)

Similar Documents

Publication Publication Date Title
CN210739574U (en) Secondary electrical equipment installation pipeline fixed knot constructs
CN205398766U (en) A pin electrode preparation facilities for experiment of electric branch
CN204205415U (en) Fixture changed by a kind of conductor spacer
CN209150700U (en) A kind of insulation protection terminal for casing
CN207834980U (en) A kind of easy-to-mount line concentrator
CN215509889U (en) Automatic screw locking machine clamping jaw assembled by electricity consumption information acquisition terminal shell
CN209822580U (en) Circuit breaker convenient to installation
CN209434734U (en) A kind of cable keeper of power construction
CN208705364U (en) A kind of quick change test fixture of applicable multiple product
CN208142810U (en) A kind of modified outdoor cable branch box
CN206774814U (en) A kind of smart home socket
CN206017065U (en) A kind of inside shelf support of kuppe
CN214445817U (en) Clamping device is used in processing of wide sleeve pipe of adaptation scope
CN210923856U (en) Jig for electric detection
CN210835201U (en) Automatic pressure intensity magnet and magnet polarity detection equipment
CN208490059U (en) A kind of cable reel power pack suspension arrangement
CN215732279U (en) Electricity testing grounding ring for live working installation
CN206727953U (en) Photovoltaic junction box connector disconnects device
CN203641786U (en) Mounting structure for camera support and waterproof tank
CN212517817U (en) Domestic formula smart jack convenient to installation
CN220306833U (en) Sequential control device for gas-insulated substation
CN218976274U (en) Weak current well pipeline arrangement structure
CN209432860U (en) A kind of charge-discharge test machine battery parallel clamp tool
CN209190576U (en) It is counter to drag fixture
CN212459665U (en) Water quality analyzer casing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200925

Address after: 010000 No.20 Hanggai Road, Saihan District, Hohhot, Inner Mongolia Autonomous Region

Patentee after: Hohhot Jinqiao thermal power plant of North United Electric Power Co., Ltd

Address before: 010000 unit 3, building 3, Mengxin international, Genghis Khan street, Xincheng District, Hohhot City, Inner Mongolia Autonomous Region

Patentee before: Li Binbin