CN218933769U - Photovoltaic construction safety corridor for color steel tile roof - Google Patents

Photovoltaic construction safety corridor for color steel tile roof Download PDF

Info

Publication number
CN218933769U
CN218933769U CN202223407676.1U CN202223407676U CN218933769U CN 218933769 U CN218933769 U CN 218933769U CN 202223407676 U CN202223407676 U CN 202223407676U CN 218933769 U CN218933769 U CN 218933769U
Authority
CN
China
Prior art keywords
wall
fixed
plate
guide rail
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223407676.1U
Other languages
Chinese (zh)
Inventor
贾鹏
田永华
张力
张晓龙
刘建华
杨赛
杨轩
韩正术
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Xinhui Ruineng Electric Power Development Co ltd
Original Assignee
Ningxia Xinhui Ruineng Electric Power Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Xinhui Ruineng Electric Power Development Co ltd filed Critical Ningxia Xinhui Ruineng Electric Power Development Co ltd
Priority to CN202223407676.1U priority Critical patent/CN218933769U/en
Application granted granted Critical
Publication of CN218933769U publication Critical patent/CN218933769U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]

Abstract

The utility model discloses a photovoltaic construction safety corridor for a color steel tile roof, which belongs to the technical field of safety galleries and aims at solving the problem that the safety galleries are difficult to move and adjust according to construction positions, and the photovoltaic construction safety corridor comprises guide rail grooves, wherein the guide rail grooves are respectively arranged in the middle part of a side wall, which is close to two groups of support rods, of the two groups of support rods, and driving motors are respectively fixed on the inner sides of the left guide rail groove and the right guide rail groove of the top wall of a bottom plate; according to the utility model, the universal wheels are arranged at the bottom of the bottom plate, so that the safety corridor can be conveniently moved to a house position to be constructed, then the bottom plate is close to the wall body, the L-shaped clamping plates are respectively positioned at the left side and the right side of the wall body, and then the bolts are rotated, and the clamping blocks are driven to move towards the side close to the wall body in the rotation process of the bolts, so that the wall body is clamped, the bottom plate and the support rods at the upper side of the bottom plate are fixed, shaking in the construction process is avoided, the device can be conveniently moved, and meanwhile, the device has a stabilizing function, and the practicability is greatly improved.

Description

Photovoltaic construction safety corridor for color steel tile roof
Technical Field
The utility model belongs to the technical field of safety galleries, and particularly relates to a photovoltaic construction safety gallery for a color steel tile roof.
Background
Color steel tile, also called: the color profiling tile is made of color coated steel plate, and is rolled and cold bent into various wavy profiled plates, and is suitable for industrial and civil buildings, warehouses, special buildings, roofs, walls, decoration of inner and outer walls and the like of large-span steel structure houses.
The safety corridor for the photovoltaic construction of the color steel tile roof in the prior art is formed by combining a scaffold and a supporting plate, and the corridor can meet construction requirements, but is difficult to move and adjust according to construction positions because the corridor is fixed, so that the construction difficulty of workers is increased, and meanwhile, the construction efficiency of the workers is reduced.
Therefore, a photovoltaic construction safety corridor for the color steel tile roof is needed, and the problem that the safety corridor in the prior art is difficult to move and adjust according to the construction position is solved.
Disclosure of Invention
The utility model aims to provide a photovoltaic construction safety corridor for a color steel tile roof, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the photovoltaic construction safety corridor for the color steel tile roof comprises a bottom plate, wherein support rods are fixed on the left side and the right side of the top wall of the bottom plate, and a corridor position adjusting mechanism is arranged on the upper side of each support rod;
the gallery position adjusting mechanism comprises guide rail grooves, the guide rail grooves are formed in the middle of two groups of support rods close to one side wall, driving motors are fixed on the inner sides of the left guide rail groove and the right guide rail groove of the top wall of the bottom plate, an output shaft of each driving motor is fixedly provided with a screw, threaded blocks are connected with the middle of the periphery of each screw in a threaded mode, mounting plates are fixed in the middle of the two groups of threaded blocks, air cylinders are fixed at the left end and the right end of the top of the front wall of each mounting plate, and output ends of the air cylinders are fixed at the left end and the right end of the rear wall of each gallery plate respectively.
In the scheme, the protection plates are fixed on the left side, the right side and the rear side of the top wall of the gallery board, reinforcing rods are fixed on the lower sides of the left and the right cylinders of the front wall of the mounting plate, and one end, far away from the mounting plate, of each reinforcing rod is fixed on the front side of the bottom of each cylinder.
It is further worth to say that guide rail groove top all is fixed with the anticreep board, the screw rod top all rotates to be connected at the anticreep board middle part.
It should be further noted that the upper and lower ends of the rear side between the two groups of support rods are both fixed with connecting plates, and the top of the front wall between the two groups of support rods is fixed with a protection rod.
As a preferred implementation mode, two groups of support rods are mutually far away from the middle and lower two parts of one side wall and are respectively fixed with an L-shaped clamping plate, bolts are connected to the front side of the inner part of the L-shaped clamping plate in a threaded mode, and clamping blocks are respectively fixed at the positions, close to one end, of each of the left and right groups of bolts.
As a preferred implementation mode, the front side of the bottom plate is provided with a wall body, the top of the wall body is provided with a construction roof, the left side and the right side of the bottom plate bottom are provided with universal wheels, and the wall body is positioned between the clamping blocks at the left side and the right side.
Compared with the prior art, the photovoltaic construction safety corridor for the color steel tile roof provided by the utility model at least comprises the following beneficial effects:
(1) Through setting up the universal wheel in the bottom plate bottom and can be convenient for remove the safety corridor, make it reach the house position that needs the construction, afterwards make L type splint be in the wall body left and right sides back rotation bolt respectively through being close to the wall body with the bottom plate, the bolt rotates the in-process and drives the grip block and move to being close to wall body one side to carry out the centre gripping to the wall body so that realize fixed bottom plate rather than upside bracing piece, appear rocking in avoiding the work progress, have stable function again when making this device can be convenient for remove, improved its practicality greatly.
(2) Through starting driving motor, driving motor output shaft rotates and makes the screw rod rotate to make the screw thread piece reciprocate under the rotation of screw rod, send the corridor board to the high back start cylinder of position that needs construction on roof, the extension of cylinder output is with the corridor board to wait to construct the position front side, the constructor of being convenient for is under construction to roof different positions, thereby has improved roof efficiency of construction, has reduced the roof construction degree of difficulty.
Drawings
FIG. 1 is a schematic front perspective view of the present utility model;
FIG. 2 is a schematic side view of the present utility model;
fig. 3 is a schematic top perspective view of the present utility model.
In the figure: 1. a bottom plate; 2. a gallery position adjustment mechanism; 3. a support rod; 4. a guide rail groove; 5. a driving motor; 6. a screw; 7. a screw block; 8. a mounting plate; 9. a cylinder; 10. a reinforcing rod; 11. a gallery plate; 12. a protection plate; 13. an anti-drop plate; 14. a connecting plate; 15. a protective rod; 16. an L-shaped clamping plate; 17. a bolt; 18. a clamping block; 19. a wall body; 20. constructing a roof; 21. and a universal wheel.
Detailed Description
The utility model is further described below with reference to examples.
Referring to fig. 1-3, the utility model provides a photovoltaic construction safety corridor for a color steel tile roof, which comprises a bottom plate 1, wherein support rods 3 are fixed on the left side and the right side of the top wall of the bottom plate 1, the support rods 3 can support an upper corridor position adjusting mechanism 2, and the corridor position adjusting mechanism 2 is arranged on the upper side of the support rods 3;
the gallery position adjusting mechanism 2 comprises a guide rail groove 4, the guide rail groove 4 is not provided with a space by means of installation of a screw rod 6, and meanwhile, the screw rod 7 can be limited, the screw rod 7 can be prevented from rotating in the screw rod 6 rotating process, so that the screw rod 7 can ascend or descend, the guide rail groove 4 is arranged at the middle part of one side wall of the two groups of support rods 3, the inner sides of the left and right guide rail grooves 4 of the top wall of the bottom plate 1 are respectively fixed with a driving motor 5, the screw rod 6 can be driven to rotate during operation of the driving motor 5, so that the screw rod 7 ascends or descends, an output shaft of the driving motor 5 is fixed with the screw rod 6, the screw rod 6 is connected with the screw rod 7 by means of threads in the middle part, the screw rod 7 can drive a mounting plate 8 and an upper side component of the screw rod 7 to ascend or descend, the screw rod 7 is further, a function of adjusting the height of the gallery plate 11 is achieved, a mounting plate 8 is fixed between the two groups of the screw rod 7, the left and right ends of the top of the front wall of the mounting plate 8 are respectively fixed with a cylinder 9, the left and right ends of the back wall of the gallery plate 11 are respectively fixed, the left and right ends of the back wall of the gallery plate 11 are respectively fixed, the back wall of the gallery plate 11 can be accurately moved by the cylinder 9, and the gallery 11 can be accurately moved to the position of the worker to the position of the gallery 11 when the gallery is required to be processed.
Further, as shown in fig. 1, fig. 2 and fig. 3, it is worth specifically explaining that the protection plates 12 are fixed on the left side, the right side and the rear side of the top wall of the gallery board 11, the protection plates 12 can prevent the worker from falling from the left side, the right side and the rear side in the construction process, the front side is not provided with the protection plates 12 to provide space for the worker in the construction process, the lower sides of the left and right cylinders 9 of the front wall of the mounting board 8 are respectively fixed with the reinforcing rods 10, one end of each reinforcing rod 10, far away from the mounting board 8, is respectively fixed on the front side of the bottom of the cylinder 9, and the reinforcing rods 10 can play a role of connecting the mounting board 8 with the cylinder 9, so that the bearing capacity of the cylinder 9 is reinforced, and the bearing capacity of the gallery board 11 is improved.
Further, as shown in fig. 3, it is worth specifically explaining that the top ends of the guide rail grooves 4 are all fixed with the anti-falling plates 13, and the anti-falling plates 13 can prevent the thread blocks 7 from separating from the inside of the guide rail grooves 4 in the rotation process of the screw rods 6, and the top ends of the screw rods 6 are all rotationally connected to the middle parts of the anti-falling plates 13.
The scheme comprises the following working processes: when the color steel tile roof needs to be subjected to photovoltaic construction, firstly, the bottom plate 1 is pushed to move to the front side of the wall 19 through the universal wheels 21, then the bolts 17 are rotated, the clamping blocks 18 are driven to move to the side close to the wall 19 in the rotation process of the bolts 17, so that the wall 19 is clamped, the bottom plate 1 and the support rods 3 on the upper side of the wall are fixed, the construction device is connected with the wall 19 of a building, then the driving motor 5 is started, the output shaft of the driving motor 5 rotates to enable the screw rod 6 to rotate, so that the threaded block 7 moves up and down under the rotation of the screw rod 6, the mounting plate 8 is driven to move up and down with the gallery plate 11 on the front side of the mounting plate, the gallery plate 11 is driven to the height of the roof, then the cylinder 9 is started, the extension of the output end of the cylinder 9 is used for conveying the gallery plate 11 to the front side of the position to be constructed, construction workers can conveniently construct different positions of the roof, and after construction, the worker can safely land by starting the cylinder 9 and the driving motor 5 again.
The working process can be as follows: the flexibility of this construction equipment can be improved through the cooperation of bottom plate 1 and universal wheel 21, be convenient for remove it, can make this construction equipment be connected fixedly with wall 19 through the cooperation of L type splint 16, bolt 17 and grip block 18, avoid appearing rocking in the work progress, the security performance of installation corridor has been strengthened, finally through driving motor 5, screw rod 6, screw thread piece 7, mounting panel 8, cylinder 9 and corridor board 11's cooperation can be with corridor board 11 accurate delivery to wait the construction position, and can adjust according to the change of construction position, reduced workman's the construction degree of difficulty.
As further shown in fig. 1, 2 and 3, it should be specifically explained that connecting plates 14 are fixed at the upper and lower ends of the rear side between the two sets of support rods 3, a protection rod 15 is fixed at the top of the front wall between the two sets of support rods 3, and the connecting plates 14 play a role in reinforcing the connection of the support rods 3.
Further, as shown in fig. 1, it is worth specifically explaining that the middle and lower two parts of the two groups of support rods 3 far away from each other are all fixed with an L-shaped clamping plate 16, the front side inside the L-shaped clamping plate 16 is all in threaded connection with a bolt 17, one ends of the left and right groups of bolts 17 close to each other are all fixed with a clamping block 18, and the clamping blocks 18 can be mutually close to each other by rotating the bolt 17, so that the construction device is connected with a wall 19 of a construction house to improve the stability and safety of the construction device.
Further, as shown in fig. 1, it is worth specifically explaining that the front side of the base plate 1 is provided with a wall 19, the top of the wall 19 is provided with a construction roof 20, the left and right sides of the bottom of the base plate 1 are provided with universal wheels 21, the wall 19 is located between the left and right side clamping blocks 18, and the universal wheels 21 can facilitate the movement of the construction device.
To sum up: the cooperation of driving motor 5, screw rod 6, screw thread piece 7, mounting panel 8, cylinder 9 and corridor board 11 can be with the corridor board 11 accurate to wait to be under construction the position to can adjust according to the change of construction position, reduce workman's the construction degree of difficulty, connecting plate 14 plays the effect of strengthening bracing piece 3 connection, and the rotation bolt 17 can make grip block 18 be close to each other, thereby makes construction equipment and construction house's wall 19 connect in order to promote construction equipment's stability and security, and universal wheel 21 can be convenient for this construction equipment's removal.
The driving motor 5 can be purchased in the market, and the driving motor 5 is provided with a power supply, which belongs to the mature technology in the field and is fully disclosed, so that the description is not repeated.

Claims (6)

1. The utility model provides a various steel tile roof photovoltaic construction safety corridor, includes bottom plate (1), its characterized in that: support rods (3) are fixed on the left side and the right side of the top wall of the bottom plate (1), and gallery position adjusting mechanisms (2) are arranged on the upper sides of the support rods (3);
the gallery position adjusting mechanism (2) comprises guide rail grooves (4), the guide rail grooves (4) are formed in the middle of two groups of support rods (3) close to one side wall, driving motors (5) are fixedly arranged on the inner sides of the left and right guide rail grooves (4) of the top wall of the bottom plate (1), screw rods (6) are fixedly arranged on output shafts of the driving motors (5), threaded blocks (7) are fixedly connected to the middle of the periphery of the screw rods (6) in a threaded mode, mounting plates (8) are fixedly arranged between the two groups of threaded blocks (7), air cylinders (9) are fixedly arranged at the left and right ends of the top of the front wall of each mounting plate (8), and output ends of the air cylinders (9) are fixedly arranged at the left and right ends of the rear wall of the gallery plate (11).
2. The color steel tile roof photovoltaic construction safety corridor of claim 1, wherein: the protection plates (12) are fixed on the left side, the right side and the rear side of the top wall of the gallery plate (11), reinforcing rods (10) are fixed on the lower sides of the left and right air cylinders (9) of the front wall of the mounting plate (8), and one ends, far away from the mounting plate (8), of the reinforcing rods (10) are fixed on the front sides of the bottoms of the air cylinders (9).
3. The color steel tile roof photovoltaic construction safety corridor of claim 1, wherein: the top ends of the guide rail grooves (4) are respectively fixed with an anti-falling plate (13), and the top ends of the screws (6) are respectively connected to the middle parts of the anti-falling plates (13) in a rotating mode.
4. The color steel tile roof photovoltaic construction safety corridor of claim 1, wherein: connecting plates (14) are fixed at the upper end and the lower end of the rear side between the two groups of support rods (3), and a protective rod (15) is fixed at the top of the front wall between the two groups of support rods (3).
5. The color steel tile roof photovoltaic construction safety corridor of claim 1, wherein: the two groups of supporting rods (3) are far away from each other, the middle and lower two parts of one side wall are respectively fixed with an L-shaped clamping plate (16), bolts (17) are connected to the front side of the inner part of the L-shaped clamping plates (16) in a threaded mode, and clamping blocks (18) are respectively fixed at the positions, close to one end, of each bolt (17).
6. The color steel tile roof photovoltaic construction safety corridor of claim 1, wherein: the novel building foundation is characterized in that a wall body (19) is arranged on the front side of the base plate (1), a construction roof (20) is arranged at the top of the wall body (19), universal wheels (21) are arranged on the left side and the right side of the bottom of the base plate (1), and the wall body (19) is located between the left clamping blocks (18) and the right clamping blocks (18).
CN202223407676.1U 2022-12-20 2022-12-20 Photovoltaic construction safety corridor for color steel tile roof Active CN218933769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223407676.1U CN218933769U (en) 2022-12-20 2022-12-20 Photovoltaic construction safety corridor for color steel tile roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223407676.1U CN218933769U (en) 2022-12-20 2022-12-20 Photovoltaic construction safety corridor for color steel tile roof

Publications (1)

Publication Number Publication Date
CN218933769U true CN218933769U (en) 2023-04-28

Family

ID=86081900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223407676.1U Active CN218933769U (en) 2022-12-20 2022-12-20 Photovoltaic construction safety corridor for color steel tile roof

Country Status (1)

Country Link
CN (1) CN218933769U (en)

Similar Documents

Publication Publication Date Title
CN218933769U (en) Photovoltaic construction safety corridor for color steel tile roof
CN207272507U (en) A kind of batch production Prefabricated steel construction production system
CN218561044U (en) A operation platform for installing template
CN214272846U (en) Platform for interior decoration
CN112846996B (en) Building steel surface treatment system
CN214360123U (en) Small-size lift is used in engineering construction
CN212656583U (en) Wall building machine for wall body structure
CN212642054U (en) Building installation platform based on BIM technology
CN113735029A (en) Auxiliary lifting device for mounting multifunctional overhead pipeline
CN209891688U (en) High building quick-building safe construction foot rest
CN215107846U (en) Steel structure column installation device
CN112576048A (en) Assembly type building spandrel girder handling mounting system
CN213205003U (en) Building construction discharge apparatus
CN214275392U (en) A lighting device for construction
CN219190644U (en) Building brick body sprayer
CN220100569U (en) Building construction appurtenance
CN214575498U (en) Building construction platform convenient to remove
CN220758523U (en) Building construction dust device
CN218234271U (en) Bearing frame for building construction
CN219427033U (en) Glass fiber reinforced concrete guniting system
CN112096007B (en) Rib punching machine and rib punching method thereof
CN215484755U (en) Liftable support for construction engineering construction
CN220100668U (en) Template supporting device
CN216109608U (en) Supporting structure for building engineering construction
CN212314909U (en) Transfer device is used in steel structure preparation processing