CN218912190U - Pedal for dismantling combined overhanging I-steel - Google Patents
Pedal for dismantling combined overhanging I-steel Download PDFInfo
- Publication number
- CN218912190U CN218912190U CN202222981144.2U CN202222981144U CN218912190U CN 218912190 U CN218912190 U CN 218912190U CN 202222981144 U CN202222981144 U CN 202222981144U CN 218912190 U CN218912190 U CN 218912190U
- Authority
- CN
- China
- Prior art keywords
- pedal
- shaped
- supporting
- shaped frames
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 28
- 239000010959 steel Substances 0.000 title claims abstract description 28
- 238000000034 method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 229910000838 Al alloy Inorganic materials 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/56—Reuse, recycling or recovery technologies of vehicles
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑用具技术领域,更具体的说是涉及一种拆除组合式悬挑工字钢用的踏板。The utility model relates to the technical field of building appliances, in particular to a pedal used for dismantling a combined cantilevered I-beam.
背景技术Background technique
在构筑物建筑施工过程中,由于外围结构防护的必要性,往往在住宅类、写字楼类的建筑物施工过程中会采用悬挑式脚手架进行结构安全性的防护。同时悬挑式脚手架通常采用工字钢作为其支撑点进行搭设。In the process of building construction, due to the necessity of peripheral structure protection, cantilevered scaffolding is often used in the construction process of residential and office buildings for structural safety protection. At the same time, cantilevered scaffolding usually uses I-beam as its supporting point for erection.
现超高层建筑物越来越多,此类建筑的悬挑式脚手架往往分成若干悬挑段,第一悬挑层大多都会位于转换层或第一个标准层。同时伴随着住宅类销售展示的需要,悬挑式脚手架会根据实际需求在中间楼层进行拆除,而拆除的顶部楼层会利用重新悬挑工字钢的方法来满足施工要求。Nowadays, there are more and more super high-rise buildings. The cantilevered scaffolding of such buildings is often divided into several cantilevered sections, and the first cantilevered floor is mostly located on the transfer floor or the first standard floor. At the same time, to meet the needs of residential sales and display, the cantilevered scaffolding will be dismantled on the middle floor according to actual needs, and the top floor will be re-cantilevered to meet the construction requirements.
在这些悬挑工字钢的拆除过程中,因底部无操作平台而埋下了拆除的安全隐患。During the dismantling of these cantilevered I-beams, there was a potential safety hazard in dismantling because there was no operating platform at the bottom.
为拆除第一悬挑层及中间悬挑层的工字钢,现有技术中往往有如下做法:In order to remove the I-beams of the first overhanging layer and the middle overhanging layer, the following methods are often used in the prior art:
拆除第一悬挑层工字钢时,从地面搭设外架至悬挑层底部后进行工字钢的拆除;拆除中间悬挑层工字钢时,自下一楼板面进行悬挑外架搭设,悬挑出结构外作为操作平台。When removing the I-beam on the first cantilevered layer, remove the I-beam after erecting the outer frame from the ground to the bottom of the overhanging layer; , cantilevered out of the structure as an operating platform.
上述两种操作方法,均存在工程量大、人力物力消耗大、工期长的问题。Both of the above-mentioned operation methods have the problems of large engineering quantity, large consumption of manpower and material resources, and long construction period.
因此,为了解决上述问题,现有技术如CN207332281U,名称为一种用于悬挑工字钢拆除的移动式操作平台,包括支撑系统和与支撑系统相配合的至少四个工字钢紧固系统;支撑系统包括2根主梁、至少3根次梁、1块钢芭网;2根主梁之间呈平行状间隔分布,次梁之间亦呈平行状间隔分布,主梁与次梁之间相互垂直,主梁的一端固定设置有钢芭网,主梁的另一端上设置有工字钢紧固系统;工字钢紧固系统包括1根“L”型圆钢、1根“7”型圆钢,“L”型圆钢与“7”型圆对接成方框,固定螺帽的一端与“7”型圆钢焊接,中心穿过“L”型圆钢,紧固螺帽用于固定操作平台与工字钢。该操作平台降低了悬挑工字钢拆除的人力物力成本及安全风险,缩短了拆除工期。Therefore, in order to solve the above-mentioned problems, prior art such as CN207332281U, the name is a kind of mobile operating platform for the removal of cantilevered I-beams, including a support system and at least four I-beam fastening systems matched with the support system ;The support system includes 2 main beams, at least 3 secondary beams, and 1 piece of steel netting; the 2 main beams are distributed in parallel, and the secondary beams are also distributed in parallel. One end of the main girder is fixed with a steel net, and the other end of the main girder is equipped with an I-shaped steel fastening system; the I-shaped steel fastening system includes one "L"-shaped round steel, one "7" "Type round steel, "L" type round steel and "7" type round butt joint to form a square frame, one end of the fixed nut is welded with "7" type round steel, the center passes through the "L" type round steel, fasten the nut Used to fix the operating platform and I-beam. The operating platform reduces the manpower and material costs and safety risks of the cantilevered I-beam demolition, and shortens the demolition period.
但是,上述的移动式操作平台的支撑系统由主梁和次梁围合成一个矩形支撑框,仅仅在支撑系统的一侧设置有用作踏板的钢芭网,另一侧则为中空结构,使得工人站立面积小,行走空间小,存在踩空的危险;并且上述的工字钢紧固系统紧固工字钢时,需要用扳手转动紧固螺帽以便于将操作平台与工字钢紧固,操作比较繁琐;此外,该移动式操作平台没有设置供人工扶持的把手,不便于工人拆除作业,且存在一定的安全隐患。But the support system of above-mentioned mobile operation platform is surrounded by main girder and secondary girder and forms a rectangular support frame, and only a side of the support system is provided with a steel bar net used as a pedal, and the other side is a hollow structure, so that workers The standing area is small, the walking space is small, and there is a danger of stepping on the air; and when the above-mentioned I-beam fastening system fastens the I-beam, it is necessary to use a wrench to turn the fastening nut so as to fasten the operation platform to the I-beam. The operation is cumbersome; in addition, the mobile operating platform is not equipped with a handle for manual support, which is not convenient for workers to dismantle the operation, and there are certain safety hazards.
因此,如何提供一种使用安全性高,使用便捷的拆除组合式悬挑工字钢用的踏板是本领域技术人员亟需解决的问题。Therefore, how to provide a pedal with high safety in use and convenient use for dismantling the combined cantilevered I-beam is an urgent problem to be solved by those skilled in the art.
实用新型内容Utility model content
有鉴于此,本实用新型提供了一种使用安全性高,使用便捷的拆除组合式悬挑工字钢用的踏板。In view of this, the utility model provides a pedal for dismantling combined cantilevered I-beams with high safety and convenience.
为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种拆除组合式悬挑工字钢用的踏板,包括:A pedal for dismantling a combined cantilevered I-beam, comprising:
支撑踏板;support pedal;
支撑底梁,所述支撑底梁为平行间隔布置的两个,且分别固定在所述支撑踏板底端面的两侧;Supporting bottom beams, the supporting bottom beams are two arranged in parallel and spaced apart, and are respectively fixed on both sides of the bottom end surface of the supporting pedal;
第一L型架,所述第一L型架为两个,且两个所述第一L型架的竖向杆顶端分别与两个所述支撑底梁靠近其一端的位置固定连接;There are two first L-shaped frames, and the top ends of the vertical rods of the two first L-shaped frames are fixedly connected to the positions of the two supporting bottom beams near one end thereof;
第一U型限位插销,所述第一U型限位插销的两端分别穿过所述支撑踏板与两个所述第一L型架的横向杆对应插接,所述第一U型限位插销与所述第一L型架围合成第一限位空间,第一工字钢置于所述第一限位空间内;The first U-shaped limit pin, the two ends of the first U-shaped limit pin respectively pass through the support pedal and correspondingly plugged into the transverse bars of the two first L-shaped frames, the first U-shaped The limit bolt and the first L-shaped frame form a first limit space, and the first I-beam is placed in the first limit space;
第二L型架,所述第二L型架为两个,且两个所述第二L型架的竖向杆顶端分别与两个所述支撑底梁固定连接,所述第二L型架与所述第一L型架间隔布置;There are two second L-shaped frames, and the top ends of the vertical bars of the two second L-shaped frames are fixedly connected to the two supporting bottom beams respectively, and the second L-shaped frames The frame is spaced apart from the first L-shaped frame;
第二U型限位插销,所述第二U型限位插销的两端分别穿过所述支撑踏板与两个所述第二L型架的横向杆对应插接,所述第二U型限位插销与所述第二L型架围合成第二限位空间,第二工字钢置于所述第二限位空间内。The second U-shaped limit pin, the two ends of the second U-shaped limit pin respectively pass through the support pedal and correspondingly plugged into the transverse bars of the two second L-shaped frames, the second U-shaped The limit bolt and the second L-shaped frame form a second limit space, and the second I-beam is placed in the second limit space.
经由上述的技术方案可知,与现有技术相比,本实用新型公开提供了一种拆除组合式悬挑工字钢用的踏板,使用时,将踏板放置在工字钢上,此时需要将第一L型架的横向杆和第二L型架的横向杆位于相应的工字钢的底端,然后工人站立在支撑踏板上,将第一U型限位插销分别依次贯穿支撑踏板、第一L型架的横向杆,第二U型限位插销分别依次贯穿支撑踏板、第二L型架的横向杆,使对应的工字钢分别卡位在第一限位空间内和第二限位空间内,实现支撑踏板和工字钢之间的固定,防止支撑踏板发生侧翻,然后,工人在踏板上对需要拆除的工字钢进行拆除作业。当拆除完一个工字钢后,拔出第一U型限位插销和第二U型限位插销,将支撑踏板后移,并与后面的工字钢进行固定后,即可对另一个工字钢进行拆除作业。以此类推,即可完成多个工字钢的拆除作业。因此,该踏板中因支撑踏板为整个面板,可供工人踩踏的面积大,提高了工人行走、活动的空间,安全性高,并且采用第一U型限位插销和第二U型限位插销与支撑踏板、第一L型架、第二L型架插接的连接结构,不仅结构简单而且易操作,使用便捷,可快速实现支撑踏板与工字钢之间的固定,可避免现有的使用扳手多次旋转紧固螺帽实现踏板与工字钢的固定而造成操作繁琐的问题。It can be seen from the above-mentioned technical solutions that, compared with the prior art, the utility model discloses a pedal for dismantling the combined cantilevered I-beam. When in use, the pedal is placed on the I-beam. The transverse bar of the first L-shaped frame and the transverse bar of the second L-shaped frame are located at the bottom end of the corresponding I-beam, and then the worker stands on the support pedal, and the first U-shaped limit latch is sequentially passed through the support pedal, the second The transverse bar of the first L-shaped frame and the second U-shaped limit bolt respectively pass through the support pedal and the transverse bar of the second L-shaped frame in sequence, so that the corresponding I-beams are respectively clamped in the first limit space and the second limit space. In the space, realize the fixing between the support pedal and the I-beam, prevent the support pedal from turning over, and then, the workers will remove the I-beam to be removed on the pedal. After removing one I-beam, pull out the first U-shaped limit pin and the second U-shaped limit pin, move the support pedal backward, and after fixing it with the I-beam at the back, the other I-beam can be fixed. The beam is dismantled. By analogy, the dismantling operation of multiple I-beams can be completed. Therefore, because the supporting pedal is the entire panel in the pedal, the area for workers to step on is large, which improves the space for workers to walk and move, and has high safety, and adopts the first U-shaped limit pin and the second U-shaped limit pin The connection structure plugged with the support pedal, the first L-shaped frame, and the second L-shaped frame is not only simple in structure but also easy to operate and convenient to use. It can quickly realize the fixation between the support pedal and the I-beam, which can avoid the existing Using a wrench to rotate the fastening nut several times to realize the fixing of the pedal and the I-beam causes the problem of cumbersome operation.
进一步的,所述支撑踏板顶端面上安装有扶手。Further, a handrail is installed on the top surface of the support pedal.
采用上述技术方案产生的有益效果是,工人在进行拆除作业时,可以手扶扶手,提高工人作业的安全性。The beneficial effect of adopting the above-mentioned technical solution is that the worker can hold the handrail when performing the demolition operation, thereby improving the safety of the worker's operation.
进一步的,所述支撑踏板顶端面上远离所述第二U型限位插销的位置以及靠近所述第二U型限位插销的一侧位置上均安装有所述扶手。Further, the armrest is installed on the top surface of the support pedal at a position away from the second U-shaped limit pin and a position close to the second U-shaped limit pin.
采用上述技术方案产生的有益效果是,设置多个扶手,便于工人根据不同的作业位置可扶持不同位置上的扶手。The beneficial effect of adopting the above technical solution is that a plurality of handrails are provided, so that workers can support the handrails at different positions according to different working positions.
进一步的,所述扶手与所述支撑踏板可拆卸连接。Further, the armrest is detachably connected to the support pedal.
进一步的,所述扶手为U型钢筋,其两端具有螺纹段,两个所述螺纹段穿过所述支撑踏板通过锁紧螺帽与所述支撑踏板固定连接。Further, the handrail is a U-shaped steel bar with threaded sections at both ends, and the two threaded sections pass through the supporting pedal and are fixedly connected to the supporting pedal through lock nuts.
采用上述技术方案产生的有益效果是,便于扶手的拆装,使得将扶手拆下来后,支撑踏板上表面无其他零部件,便于两个支撑踏板叠置。The beneficial effect of adopting the above technical solution is that it facilitates the disassembly and assembly of the armrest, so that after the armrest is removed, there are no other parts on the upper surface of the support pedal, which facilitates the stacking of the two support pedals.
进一步的,所述支撑踏板顶端面为粗糙防滑面。Further, the top surface of the support pedal is a rough anti-skid surface.
采用上述技术方案产生的有益效果是,提高支撑踏板的防滑效果,提高使用安全性。The beneficial effect of adopting the above technical solution is to improve the anti-slip effect of the support pedal and improve the safety of use.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description It is only an embodiment of the utility model, and those skilled in the art can also obtain other drawings according to the provided drawings without creative work.
图1附图为本实用新型提供的一种拆除组合式悬挑工字钢用的踏板使用时的结构示意图。The accompanying drawing of Fig. 1 is a schematic diagram of the structure of a pedal used for dismantling the combined cantilevered I-beam provided by the utility model when it is in use.
图2附图为本实用新型提供的一种拆除组合式悬挑工字钢用的踏板的主视结构示意图。Figure 2 is a schematic diagram of the front structure of a pedal used for dismantling the combined cantilevered I-beam provided by the utility model.
图3附图为本实用新型提供的一种拆除组合式悬挑工字钢用的踏板的第一实施例的俯视结构示意图。Fig. 3 is a top view structural diagram of the first embodiment of the pedal used for dismantling the combined cantilevered I-beam provided by the utility model.
图4附图为本实用新型提供的一种拆除组合式悬挑工字钢用的踏板的二实施例的俯视结构示意图。Figure 4 is a top view structural diagram of a second embodiment of a pedal used for dismantling a combined cantilevered I-beam provided by the utility model.
图5附图为扶手和支撑踏板的连接结构示意图。Figure 5 is a schematic diagram of the connection structure of the handrail and the support pedal.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
参见图1-图5,本实用新型实施例公开了一种拆除组合式悬挑工字钢用的踏板,包括:Referring to Fig. 1-Fig. 5, the embodiment of the utility model discloses a pedal for dismantling a combined cantilevered I-beam, including:
支撑踏板1,支撑踏板1顶端面为粗糙防滑面101(粗糙防滑面上具体设有防滑纹),支撑踏板1可采用铝合金板;The
支撑底梁2,支撑底梁2为平行间隔布置的两个,且分别焊接或螺栓固定在支撑踏板1底端面的两侧,支撑底梁2可采用铝合金方管;Supporting
第一L型架3,第一L型架3为两个,且两个第一L型架3的竖向杆顶端分别与两个支撑底梁2靠近其一端的位置焊接或螺栓连接,第一L型架3可采用4#铝合金角钢;The first L-
第一U型限位插销4(强度等级M10),第一U型限位插销4的两端分别穿过支撑踏板1与两个第一L型架3的横向杆对应插接,第一U型限位插销4与第一L型架3围合成第一限位空间5,第一工字钢6置于第一限位空间5内;The first U-shaped limit pin 4 (strength grade M10), the two ends of the first
第二L型架7,第二L型架7为两个,且两个第二L型架7的竖向杆顶端分别与两个支撑底梁2焊接或螺栓连接,第二L型架7与第一L型架3间隔布置,第二L型架7可采用4#铝合金角钢;The second L-shaped
第二U型限位插销8(强度等级M10),第二U型限位插销8的两端分别穿过支撑踏板1与两个第二L型架7的横向杆对应插接,第二U型限位插销8与第二L型架7围合成第二限位空间9,第二工字钢10置于第二限位空间9内。The second U-shaped limit pin 8 (strength grade M10), the two ends of the second
为了便于工人作业,支撑踏板1顶端面上安装有扶手11。In order to facilitate workers' operations, a
支撑踏板1顶端面上远离第二U型限位插销8的位置以及靠近第二U型限位插销8的一侧位置上均安装有扶手11。
其中,在本方案中,支撑踏板1可以有两个,其中一个支撑踏板上位于第二U型限位插销8的位置上的扶手11位于踏板的一侧,该踏板上远离第二U型限位插销8的位置的扶手11在踏板的一侧(参见图3);另一个支撑踏板上位于第二U型限位插销8的位置上的扶手11位于踏板的另一侧,该踏板上远离第二U型限位插销8的位置的扶手11在踏板的另一侧(参见图4)。这样两个踏板可同时使用,便于两个工人同时站立在踏板上共同完成工字钢的拆除作业。其中,拆除过程采用两个踏板,随着工字钢逐个拆除,两个踏板交替后退,提供室外作业空间。Wherein, in this scheme, there can be two
为了便于扶手的拆装,扶手11与支撑踏板1可拆卸连接,具体的,扶手11为U型钢筋,其两端具有螺纹段111,两个螺纹段111穿过支撑踏板1通过锁紧螺帽12与支撑踏板1固定连接。In order to facilitate the disassembly and assembly of the handrail, the
使用时,将踏板放置在工字钢上,此时需要将第一L型架的横向杆和第二L型架的横向杆位于相应的工字钢的底端,然后工人站立在支撑踏板上,将第一U型限位插销分别依次贯穿支撑踏板、第一L型架的横向杆,第二U型限位插销分别依次贯穿支撑踏板、第二L型架的横向杆,使对应的工字钢分别卡位在第一限位空间内和第二限位空间内,实现支撑踏板和工字钢之间的固定,防止支撑踏板发生侧翻,然后,工人在踏板上对需要拆除的工字钢进行拆除作业。当拆除完一个工字钢后,拔出第一U型限位插销和第二U型限位插销,将支撑踏板后移,并与后面的工字钢进行固定后,即可对另一个工字钢进行拆除作业。以此类推,即可完成多个工字钢的拆除作业。因此,该踏板中因支撑踏板为整个面板,可供工人踩踏的面积大,提高了工人行走、活动的空间,安全性高,并且采用第一U型限位插销和第二U型限位插销与支撑踏板、第一L型架、第二L型架插接的连接结构,不仅结构简单而且易操作,使用便捷,可快速实现支撑踏板与工字钢之间的固定,可避免现有的使用扳手多次旋转紧固螺帽实现踏板与工字钢的固定而造成操作繁琐的问题。When in use, the pedal is placed on the I-beam, at this time, the horizontal bar of the first L-shaped frame and the horizontal bar of the second L-shaped frame need to be located at the bottom end of the corresponding I-beam, and then the worker stands on the support pedal , the first U-shaped limit pins are sequentially penetrated through the support pedal and the transverse bar of the first L-shaped frame, and the second U-shaped limit pins are respectively sequentially penetrated through the support pedal and the transverse bar of the second L-shaped frame, so that the corresponding working The beams are respectively clamped in the first space and the second space, so as to realize the fixing between the support pedal and the I-beam, and prevent the support pedal from turning over. The beam is dismantled. After removing one I-beam, pull out the first U-shaped limit pin and the second U-shaped limit pin, move the support pedal backward, and after fixing it with the I-beam at the back, the other I-beam can be fixed. The beam is dismantled. By analogy, the dismantling operation of multiple I-beams can be completed. Therefore, because the supporting pedal is the entire panel in the pedal, the area for workers to step on is large, which improves the space for workers to walk and move, and has high safety, and adopts the first U-shaped limit pin and the second U-shaped limit pin The connection structure plugged with the support pedal, the first L-shaped frame, and the second L-shaped frame is not only simple in structure but also easy to operate and convenient to use. It can quickly realize the fixation between the support pedal and the I-beam, which can avoid the existing Using a wrench to rotate the fastening nut several times to realize the fixing of the pedal and the I-beam causes the problem of cumbersome operation.
其中,在拆除时,将待拆工字钢用钢丝绳捆扎结实,对于重量较大的阳角工字钢可以直接固定在塔吊吊绳;对于重量较轻,附近有窗洞口的工字钢,也可以用捆扎后,将钢丝绳固定在室内,等待拆除完成后将工字钢拉入室内。这样防止拆除后的工字钢从高空中坠落发生危险。Among them, when dismantling, the I-beam to be dismantled is bound firmly with a steel wire rope. For the heavier male angle I-beam, it can be directly fixed on the tower crane lifting rope; After binding, fix the wire rope indoors, and pull the I-beam into the room after the removal is completed. This prevents the dismantled I-beam from falling from a high altitude to cause danger.
工字钢螺栓拆除分两种情况。一是螺母在室内,室外是螺栓头和垫片。拆除只需要在室内卸掉螺母,就可将工字钢吊运到地面或者拉至室内。另一种情况是螺母在室外,或采用了预埋形式的螺栓。拆除工作需要在室外,工人在本申请中的踏板上进行拆除工作。当室外不方便拆除螺母时,可先卸下锁母,之后用薄片扳手卡住紧固螺母,再从室内旋出螺栓。There are two situations for the removal of I-beam bolts. One is that the nuts are indoors, and the bolt heads and washers are outdoors. The removal only needs to remove the nuts indoors, and then the I-beam can be hoisted to the ground or pulled indoors. Another situation is that the nuts are outdoors, or pre-embedded bolts are used. The demolition work needs to be done outdoors and the workers are doing the demolition work on the treads in this application. When it is inconvenient to disassemble the nut outdoors, the lock nut can be removed first, and then the fastening nut can be clamped with a sheet wrench, and then the bolt can be unscrewed from the indoor.
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。对于实施例公开的装置而言,由于其与实施例公开的方法相对应,所以描述的比较简单,相关之处参见方法部分说明即可。Each embodiment in this specification is described in a progressive manner, each embodiment focuses on the difference from other embodiments, and the same and similar parts of each embodiment can be referred to each other. As for the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and for the related information, please refer to the description of the method part.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本实用新型。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本实用新型的精神或范围的情况下,在其它实施例中实现。因此,本实用新型将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables those skilled in the art to realize or use the utility model. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to these embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222981144.2U CN218912190U (en) | 2022-11-09 | 2022-11-09 | Pedal for dismantling combined overhanging I-steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222981144.2U CN218912190U (en) | 2022-11-09 | 2022-11-09 | Pedal for dismantling combined overhanging I-steel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218912190U true CN218912190U (en) | 2023-04-25 |
Family
ID=86041701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222981144.2U Expired - Fee Related CN218912190U (en) | 2022-11-09 | 2022-11-09 | Pedal for dismantling combined overhanging I-steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218912190U (en) |
-
2022
- 2022-11-09 CN CN202222981144.2U patent/CN218912190U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN202139833U (en) | Cantilever scaffold for building construction | |
CN112144854A (en) | Anchor pulling type section steel overhanging support operation scaffold combined system and construction method | |
CN110805257A (en) | Flower basket overhanging type section steel bearing beam structure and construction method | |
CN101775896B (en) | Rigid hanging scaffolding for installation of steel roof equipment piping | |
CN202451040U (en) | Perpendicular high-altitude crawling ladder | |
CN218912190U (en) | Pedal for dismantling combined overhanging I-steel | |
CN203307733U (en) | Construction platform system of concrete pier of viaduct | |
CN213268816U (en) | Assembled shaped steel horizontal protection platform of encorbelmenting | |
CN207999079U (en) | Overhang large form support device | |
CN113931354B (en) | Cantilever scaffold and curtain wall integrated structure and construction method | |
CN213597442U (en) | Elevator shaft template operation platform that encorbelments | |
CN214658693U (en) | A fixed chassis for outer wall construction goes up and down | |
CN213204913U (en) | Modular prefabricated staircase operation platform | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN111335609B (en) | Clamping type conversion unloading device for hanging scaffold | |
CN114541790A (en) | Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame | |
CN210685313U (en) | Safe convenient house steel connection structure | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble | |
CN208347279U (en) | A kind of building faces side structural column construction protecting rack | |
CN205955150U (en) | Instrument formula windrow operation integration platform | |
CN211923449U (en) | Tool type overhanging protective frame | |
CN214995797U (en) | Safety hanging basket for pipe truss overhead operation | |
CN216276830U (en) | Super high-rise core tube formwork lowering construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230425 |