CN218887995U - Temporary bracket for construction cable - Google Patents

Temporary bracket for construction cable Download PDF

Info

Publication number
CN218887995U
CN218887995U CN202222607340.3U CN202222607340U CN218887995U CN 218887995 U CN218887995 U CN 218887995U CN 202222607340 U CN202222607340 U CN 202222607340U CN 218887995 U CN218887995 U CN 218887995U
Authority
CN
China
Prior art keywords
cable
support frame
construction
temporary bracket
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222607340.3U
Other languages
Chinese (zh)
Inventor
许清波
王树腾
李红波
郭备战
王彦红
杜永利
郭勇彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Hebei Engineering Corp Ltd
Original Assignee
PowerChina Hebei Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Hebei Engineering Corp Ltd filed Critical PowerChina Hebei Engineering Corp Ltd
Priority to CN202222607340.3U priority Critical patent/CN218887995U/en
Application granted granted Critical
Publication of CN218887995U publication Critical patent/CN218887995U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses a temporary cable bracket for construction, which comprises a stand column, a suspension hook arranged at the top of the stand column and used for suspending on an external mechanism, and a support frame arranged on the stand column and used for supporting a cable; the support frame is provided with at least one. The utility model belongs to the technical field of the cable bracket, adopt the utility model discloses can deposit the cable layering for the construction in order, convenient to use has effectively avoided the damage that constructor and construction machinery equipment caused the cable simultaneously.

Description

Temporary bracket for construction cable
Technical Field
The utility model belongs to the technical field of the cable bracket, a interim bracket of cable is related to, concretely relates to interim bracket of cable is used in construction.
Background
The power utilization is an indispensable part in building construction, and cables in construction sites play a significant role in site power supply systems. Cables used in the prior construction are usually randomly placed on the ground, and various cables are stacked on the ground in disorder, so that the problem of inconvenience in taking the cables is caused when the cables are used, and inconvenience is brought to workers; simultaneously, if the cable that uses is air supply pipe or cable, stack and suffer trampling and rolling of constructor and construction machinery equipment very easily subaerial, cause the cable to damage, not only can have very big potential safety hazard, also can bring economic loss for the enterprise. Therefore, it is highly desirable to develop a temporary cable tray capable of orderly arranging cables in layers.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an interim bracket of cable for construction to reach and deposit the cable layering for the construction in order, convenient to use effectively avoids constructor and construction machinery equipment to cause the purpose of damage to the cable simultaneously.
In order to achieve the above object, the utility model adopts the following technical scheme:
a temporary bracket for a construction cable comprises a vertical column, a suspension hook arranged at the top of the vertical column and used for suspending on an external mechanism, and a support frame arranged on the vertical column and used for supporting the cable;
the support frame is provided with at least one.
As a limitation, the support frame is an arc-shaped support frame with an upward opening.
As a second definition, the cage is a semi-circular ring cage.
As a third limitation, the supports are arranged in series in the vertical direction on the upright.
As a fourth limitation, the number of the supporting frames is three.
As a fifth limitation, the construction cable temporary bracket further comprises a support block provided on the pillar and located below the opening of the suspension hook.
And as a sixth limitation, the upright post, the hanging hook and the support frame are all coated with insulating layers.
Since the technical scheme is adopted, compared with the prior art, the utility model, the beneficial effect who gains is:
(1) The utility model discloses can deposit the construction cable in layers orderly, convenient to use has effectively avoided constructor and construction machinery equipment to the damage that the cable caused simultaneously;
(2) The utility model can ensure that the cable can not easily fall off the supporting frame when the cable is arranged on the supporting frame by arranging the supporting frame into an arc shape;
(3) The utility model has the advantages that the supporting frames are sequentially arranged on the upright posts along the vertical direction, so that the cables can be layered and placed in a classified manner, and the cables are convenient for construction workers to take;
(4) The utility model is provided with three support frames, which can realize the layered and classified placement of the cables;
(5) The utility model can ensure the utility model to be in a more stable state when in use by adding the supporting block on the upright post;
(6) The utility model discloses all the cladding has the insulating layer on stand, suspension hook, support frame, has reduced the wearing and tearing of each part when insulating.
To sum up, the utility model discloses deposit the cable layering for the construction in order, convenient to use has effectively avoided constructor and construction machinery equipment to the damage that the cable caused simultaneously.
The utility model belongs to the technical field of the cable bracket for temporary storage of cable for the construction.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
in the figure: 1. the device comprises a hanging hook, 2, a stand column, 3, a support frame, 4, an insulating layer, 5, an external mechanism, 6 and a support block.
Detailed Description
For the purpose of better explaining the present invention, in order to facilitate understanding, preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
Example temporary Cable bracket for construction
For the sake of convenience of description, the present embodiment shows an external mechanism 5 from which the suspension hook 1 is suspended in the drawings. Wherein, the external mechanism 5 can be steel pipes, hooks and the like arranged at two sides of the construction channel. As shown in fig. 1, the external mechanism 5 is a steel pipe fixed to the construction passage.
As shown in fig. 1, the present embodiment includes a column 2, a hanging hook 1 provided on the top of the column 2 for hanging on an external mechanism 5, a support frame 3 provided on the column 2 for supporting a cable, and the hanging hook 1 and the column 2 may be integrally provided.
In this embodiment, the hanging hook 1 is in the shape of a semicircular ring, and in order to ensure that the hanging hook 1 is hung on the external mechanism 5, that is, on the steel pipe fixed on the construction passage, the diameter of the hanging hook 1 is larger than that of the steel pipe.
Support frame 3 is opening arc support frame 3 up, and the quantity of support frame 3 is equipped with threely and arranges in proper order along vertical direction on stand 2. In this embodiment, the support frame 3 is a semi-circular support frame 3. One end of the support frame 3 is connected with the upright post 2, and the cable can be effectively prevented from falling off from the support frame 3 when the cable is placed on the inner arc surface of the support frame.
This embodiment still includes supporting shoe 6, and supporting shoe 6 is established on stand 2 and is located 1 opening below of suspension hook, and when hanging this embodiment on external mechanism 5, supporting shoe 6 can play the effect of support between the wall body of stand 2 and construction passageway, makes stand 2 keep vertical state, has guaranteed to place the cable on support frame 3 more stable.
In this embodiment, all the cladding has insulating layer 4 on hanging hook 1, support frame 3, stand 2, and insulating layer 4 adopts insulating tape. The wear of the components can be reduced and the service life can be prolonged by providing the insulating layer 4.
In order to improve the bearing capacity, in the embodiment, the suspension hook 1, the support frame 3 and the upright post 2 are all made of high-strength steel, so that the structure is stable and the bearing capacity is high.
In this embodiment, only the number of the support frames 3 is three for illustration, in practice, the number of the support frames 3 can be changed as required, at least one support frame 3 needs to be arranged, the number and the types of the cables which can be placed increase with the increase of the number of the support frames 3, but the load-bearing capacity of the external mechanism 5 and the suspension hook 1 needs to be considered when the support frame 3 is additionally arranged.
The utility model discloses a theory of operation does: when in use, an external mechanism 5 suitable for hanging the hanging hook 1 is found, and the hanging hook 1 is hung on the external mechanism 5; then, classifying cables for construction, and placing cables of different types on the support frames 3 of different layers; the cable can be easily obtained according to the position where the cable is placed when the cable is used.
When the use of one construction site on the construction site is finished, if the next use site needs to be replaced, the suspension hook 1 is taken down from the external mechanism 5 and is suspended on the external mechanism 5 of the next construction site for use.
It should be noted that the above-mentioned embodiments are only preferred embodiments of the present invention, and the present invention is not limited thereto, and although the present invention has been described in detail with reference to the above-mentioned embodiments, it will be apparent to those skilled in the art that modifications can be made to the technical solutions described in the above-mentioned embodiments, or some technical features can be replaced with equivalents. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A temporary bracket for a cable for construction is characterized by comprising a stand column, a suspension hook arranged at the top of the stand column and used for suspending an external mechanism, and a support frame arranged on the stand column and used for supporting the cable;
the support frame is provided with at least one.
2. The construction cable temporary bracket according to claim 1, wherein the support frame is an arc-shaped support frame having an opening facing upward.
3. A construction cable temporary bracket according to claim 2, wherein the support frame is a semi-circular ring-shaped support frame.
4. A construction cable temporary bracket according to claim 3, wherein the supports are arranged in order in a vertical direction on the post.
5. The construction cable temporary bracket according to claim 4, wherein the number of the support brackets is three.
6. The construction cable temporary bracket according to claim 1, further comprising a support block provided on the pillar below the opening of the suspension hook.
7. A construction cable temporary bracket according to any of claim 1~6, wherein said post, said hanging hook and said support frame are coated with an insulating layer.
CN202222607340.3U 2022-09-30 2022-09-30 Temporary bracket for construction cable Active CN218887995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222607340.3U CN218887995U (en) 2022-09-30 2022-09-30 Temporary bracket for construction cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222607340.3U CN218887995U (en) 2022-09-30 2022-09-30 Temporary bracket for construction cable

Publications (1)

Publication Number Publication Date
CN218887995U true CN218887995U (en) 2023-04-18

Family

ID=85939686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222607340.3U Active CN218887995U (en) 2022-09-30 2022-09-30 Temporary bracket for construction cable

Country Status (1)

Country Link
CN (1) CN218887995U (en)

Similar Documents

Publication Publication Date Title
CN203845712U (en) Heavy-duty equipment hoisting device
CN218887995U (en) Temporary bracket for construction cable
CN206538126U (en) The large-scale overweight equipment handling constructing device of Super High
CN207596336U (en) A kind of device for installing mixing machine
CN204642850U (en) A kind of wallboard piling bin
CN218091936U (en) Ladder hanging device for construction of external insulation board of large-scale steel structure building
CN109372274A (en) A kind of high-altitude wire frame installation system and its construction method
CN219489339U (en) Transformer substation steel frame anti-deformation sliding hoisting device and system
CN206034409U (en) A bearing frock for being directed at spud leg bears
CN104078893B (en) Vertical well cable construction device used for high-rise building
CN203820360U (en) Lifting appliance for installing existing railway sound barrier plate
CN101845914B (en) Installation method of three-tube steel chimney
CN205015532U (en) Novel optical cable stores up line device
CN213846154U (en) Wiring device for machine room
CN103121629B (en) Hoisting method of large support equipment for basement
CN206156063U (en) Civil engineering pipe fitting placing rack
CN206244260U (en) A kind of hoisting balance beam
CN203406561U (en) Cable-placing device
CN113264281B (en) Storage device for steel wire mesh composite pipe
CN205708565U (en) A kind of firm cable transmission device
CN213326561U (en) Hydraulic lifting device for cable reel
CN105217152B (en) A kind of fort formula catching device scene fixation device
CN219654234U (en) Front support device for hanging basket installation
CN221500386U (en) Anti-swing device for steel wire rope
CN210669291U (en) Cable support for construction site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant