CN105217152B - A kind of fort formula catching device scene fixation device - Google Patents

A kind of fort formula catching device scene fixation device Download PDF

Info

Publication number
CN105217152B
CN105217152B CN201510643067.1A CN201510643067A CN105217152B CN 105217152 B CN105217152 B CN 105217152B CN 201510643067 A CN201510643067 A CN 201510643067A CN 105217152 B CN105217152 B CN 105217152B
Authority
CN
China
Prior art keywords
catching device
pipe
supporting substrate
mobile jib
fort formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510643067.1A
Other languages
Chinese (zh)
Other versions
CN105217152A (en
Inventor
皮兆广
薛涛
齐少猛
刘勇
李志涛
孙伟
裘实
胡婧
宋达
高云生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510643067.1A priority Critical patent/CN105217152B/en
Publication of CN105217152A publication Critical patent/CN105217152A/en
Application granted granted Critical
Publication of CN105217152B publication Critical patent/CN105217152B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D71/00Bundles of articles held together by packaging elements for convenience of storage or transport, e.g. portable segregating carrier for plural receptacles such as beer cans or pop bottles; Bales of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The present invention provides a kind of fort formula catching device scene fixation device, including supporting substrate, for providing support;Mobile jib, it is fixedly mounted on the supporting substrate;Multiple installing pipes, uniformly on the mobile jib;Pipe is placed with multiple, one-to-one corresponding is placed in multiple installing pipes, for placing the catching device.Fort formula catching device scene provided by the invention fixation device can solve the Placement Problems of catching device, avoid the problem of catching device is nowhere put, storehouse catching device is had nowhere live in station;Simultaneously when being transported to catching device, it can also be easy to the placement of catching device, and in transportation, effectively catching device can be avoided to rock.The present invention is actually needed according to what live " 5S " was managed, there is provided it is a kind of be easy to carry, be easy to operate, reliable and practical special live fixation device.

Description

A kind of fort formula catching device scene fixation device
Technical field
The invention belongs to support technical field of tools, specifically, the present invention relates to a kind of fort formula catching device scene is fixed Device is put, the present invention is applied to the instrument in terms of field management, storehouse fixation and entrucking transport.
Background technology
By being put to the storehouse fixation of substation equipment maintenance and repair room once professional teams and groups, there is following problem in discovery:I.e. with Going deep into for management, it has been found that the development for still thering is the problem of many to influence and govern substation equipment maintenance and repair room once professional teams and groups: First, the Goods fixation of storehouse is influenceed by spatial area, Partial security Work tool is still within " having nowhere live " state, science Rational management mode also needs perfect;Second, way to manage method not yet adapts to job requirement completely, outstanding behaviours is scene " 5S " (i.e. five is small) managerial skills still need to be lifted;Third, there is Partial security Work tool in the entrucking work of each Large Field Put problem " feeling embarrassed ".These problems seriously constrain the security developments of substation equipment maintenance and repair room and teams and groups.Especially how is catching device It has been positioned to need to solve the problems, such as in time.
There are many kinds to the modes of emplacement of catching device currently on the market, if the applying date is December 3, Application No. in 2009 The patent document of the 200920270974.6th, entitled " falling protector fixing support for flower beam framework ", the fixed branch of the patent document Frame is on each clamping plate by two clamping plates with the spacing long ring group of concentric catching device that is fixed on each clamping plate base Multiple holes are provided with, two clamping plates are clipped on the angle bar of flower beam framework, and two clamping plates are fixedly clamped by stay bolt and nut.This is fixed Support can provide maintenance support for catching device, make to carry a hanging point for being higher than waist safely, ensure the safe operation of operating personnel Property.And it can be fixed on a variety of frameworks such as horizontal beam, triangular beam, four square beams, without the thing on steel tower in transformer station or shop Catching device card contact is first welded, significantly reduces the workload of operating personnel.Its is simple in construction, beneficial to installation, to staff It is low with environmental requirement, equipment power failure is not had to after safe distance is ensured, need to only be used in flower beam framework securing bracket bolt It is very convenient.It is known that the catching device when fixed support is suitable only for using, can not solve catching device when not in use Placement Problems, catching device puts problem when can not also solve entrucking.For another example the applying date is May 28, Application No. in 2014 201420277902.5th, the patent document of the entitled fixing device for being exclusively used in catching device, the fixing device include base, vertical Plate, the riser being arranged on link etc., the fixing device can play certain when catching device moment bearing enormous impact force Buffering so that device does not allow easy fracture or damage integrally, greatly improves the security performance of catching device.It is known that this is fixed Catching device when device is suitable only for using, can not solve the Placement Problems of catching device when not in use, can not also solve entrucking When catching device put problem.
By upper analysis, it is known that the fixing device (or fixed support) of the catching device of prior art has following characteristics and lacked Fall into:
1st, the Placement Problems of catching device when not in use can not be solved.In catching device temporarily when not in use, it is necessary to catching device Carry out arrangement placement, but the fixing device of prior art (or fixed support) and do not apply to;Certain conjunction of also just not knowing where to begin Manage Placement Problems.
Catching device puts problem when the 2nd, can not solve entrucking., it is necessary to consider how to put just when by catching device entrucking Placement Problems when after unloading or unloaded can be easy to, prior art can not solve the problem.
The content of the invention
It is an object of the invention to provide a kind of fort formula catching device scene fixation device, deposited with least solving prior art Catching device be inconvenient to the technical problem placed when not in use, while can solve the problem that in catching device entrucking existing for prior art When inconvenience place technical problem.
In order to solve the above problems, the present invention provides a kind of fort formula catching device scene fixation device, and its technical scheme is such as Under:
A kind of fort formula catching device scene fixation device, including supporting substrate, for providing support;Mobile jib, it is fixedly mounted On the supporting substrate;Multiple installing pipes, uniformly on the mobile jib;Pipe is placed with multiple, one-to-one corresponding is placed on In multiple installing pipes, for placing the catching device.
Fort formula catching device scene described above fixation device, more preferably:The supporting substrate is circular substrate.
Fort formula catching device scene described above fixation device, more preferably:The mobile jib is fixedly mounted on described The center of supporting substrate.
Fort formula catching device scene described above fixation device, more preferably:The area of the supporting substrate is more than The area that multiple installing pipes are formed.
Fort formula catching device scene described above fixation device, more preferably:The supporting substrate is support iron plate.
Fort formula catching device scene described above fixation device, more preferably:The installing pipe is pvc pipe.
Fort formula catching device scene described above fixation device, more preferably:Also include handle, be arranged on the master The upper end of bar, for providing mobile support.
Fort formula catching device scene described above fixation device, more preferably:The installing pipe is arranged on the master Bar middle and lower part position.
Fort formula catching device scene described above fixation device, more preferably:Also include placing branch pipe, the placement Branch pipe is arranged on the apical position of the placement pipe, for placing the catching device.
Fort formula catching device scene described above fixation device, more preferably:The placement, which is managed with the mobile jib, is It is arranged in parallel.
Fort formula catching device scene described above fixation device, more preferably:In the outer circumference surface of the mobile jib Multiple mount holes are laid with horizontal level, the installing pipe is provided with hitching frame, and the hitching frame is matched somebody with somebody with the mount hole The installation between the installing pipe and the mobile jib is realized in conjunction.
Fort formula catching device scene described above fixation device, more preferably:The hole that mounts is two rows, the peace The hitching frame in tubulature is two be vertically arranged.
Analysis understands that compared with prior art, the advantages of the present invention are:
First, fort formula catching device scene provided by the invention fixation device can solve the Placement Problems of catching device, avoid The problem of catching device is nowhere put, storehouse catching device is had nowhere live in station;Simultaneously when being transported to catching device, it can also be easy to The placement of catching device, and in transportation, effectively catching device can be avoided to rock.The present invention is managed according to live " 5S " Reason be actually needed, there is provided it is a kind of be easy to carry, be easy to operate, reliable and practical special live fixation device.
2nd, the supporting substrate is designed as circular substrate by the present invention so that whole fort formula catching device scene fixation dress The advantages of putting with space is saved, when multiple live fixation devices are placed simultaneously, it is possible to prevente effectively from adjacent live fixation Collision between device.
3rd, the area of the supporting substrate of the invention is more than the area that multiple installing pipes are formed, and is so placing During fort formula catching device scene fixation device, convenient the advantages of placing can be played.And put simultaneously in multiple live fixation devices When putting, it is only necessary to consider the area of the supporting substrate, ensure that whole scene fixation device area occupied.
4th, the supporting substrate is made the present invention of irony material, and center of gravity can be made to be located at bottom, effectively avoided Fort formula catching device scene fixation device is rocked into inclination when vehicle operation is rocked to skew.
5th, the placement branch pipe of the invention, can facilitate the placement of the catching device.
6th, the pipe of placing is provided parallel to set by the present invention with the mobile jib, can make whole fort formula catching device Live fixation device stress equalization.
Brief description of the drawings
Fig. 1 is the top view of the fort formula catching device scene fixation device of the preferred embodiment of the present invention.
Fig. 2 is the front view of the fort formula catching device scene fixation device of the preferred embodiment of the present invention.
Fig. 3 is the installing pipe of the preferred embodiment of the present invention and the mounting schematic diagram of mobile jib.
In figure, 1- supporting substrates;2- mobile jibs;3- installing pipes;31- hitching frames;4- places pipe;41- places branch pipe.
Embodiment
The present invention is described in further details with reference to the accompanying drawings and detailed description.
As shown in figure 1, the fort formula catching device scene fixation device of the preferred embodiment of the present invention mainly includes supporting substrate 1, for providing support;Mobile jib 2, it is fixedly mounted on supporting substrate 1;Multiple installing pipes 3, uniformly it is arranged on mobile jib 2;With it is more Individual placement pipe 4, one-to-one corresponding is placed in multiple installing pipes 3, for placing catching device.
Sum it up, live fixation device provided by the invention is into big gun mesa structure (i.e. supporting substrate 1, mobile jib 2 and multiple The profile of installing pipe 3 forms big gun mesa structure) fort formula catching device scene provided by the invention fixation device, it can be used for placing Catching device, fort formula catching device scene provided by the invention fixation device, it is by further investigation, on-the-spot investigation, by complete " five is small " summed up on the basis of teams and groups of surface analysis basic unit present situation is opened one's minds, and passes through the fort formula catching device scene of the present invention The implementation of fixation device, by the consistent favorable comment and affirmative for having field practice experience engineer for many years." appearance is ordinary, true material Real material;There is him everywhere, beautify everybody." efficiently solve station in catching device nowhere put, storehouse catching device " having nowhere live " it is awkward A word used for translation situation, we will handle and solve as teams and groups of basic unit catching device in station nowhere put, storehouse catching device " having nowhere live " Model is popularized;The invention of the device, the blank in the field is just filled up.
When carrying out entrucking to catching device, it is necessary to consider how that saving space and can is easy to the placement of catching device, based on this, As shown in figure 1, the supporting substrate 1 of the present invention is circular substrate, for circular substrate for other shapes substrate, it has section The characteristics of saving placement space, furthermore, if supporting substrate 1 is arranged into other shapes (such as rectangle, rectangle), supported placing When substrate 1, the mutual collision between adjacent supports substrate 1 can be caused;Supporting substrate 1 is arranged to circular substrate, due to The edge of supporting substrate 1 is circular arc, and this makes it possible to avoid colliding between adjacent supports substrate 1.Further preferably For:Mobile jib 2 is fixedly mounted on the center of circular substrate (i.e. supporting substrate 1).This set, it can make to be arranged on mobile jib 2 On the stress of multiple installing pipes 3 and the endurance of circular substrate reach balance set.
Carrying in order to facilitate staff and facilitate placement of the staff to catching device, as shown in Figure 1 and Figure 2, this The area of the supporting substrate 1 of invention is more than the area that multiple installing pipes 3 are formed.By supporting substrate 1 be circular substrate on the basis of count Calculate, i.e., the diameter of supporting substrate 1 is more than the diameter that multiple installing pipes 3 form circle.So can easily just can be by fort Formula catching device scene fixation device is placed on the ground (or on car), especially multiple fort formula catching device scene fixation devices When placed side by side, the circle diameter that multiple installing pipes 3 are formed directly is less than the diameter of circular substrate, can also be easy to the dress of catching device Unload.
When the fort formula catching device scene fixation device of the present invention is placed or during loading operation, especially entrucking is transported During row, rocking for fort formula catching device scene fixation device can be caused in the case where vehicle rocks, or even can prevent fort formula Pendant device scene fixation device, which tilts, to skew, and can not thus realize the function of placing catching device, based on this, branch support group of the invention Plate 1 is support iron plate, that is to say, that supporting substrate 1 of the invention is made up of irony material.Generally, branch support group of the invention Plate 1 can be round iron plate.
Asked when by the fort formula catching device scene fixation device loading operation of the present invention, it is necessary to consider to rock in operation Topic, is impacted, installing pipe 3 of the invention is in order to avoid rocking to installing pipe 3 (catching device i.e. in installing pipe 3) Pvc pipe (i.e. polyvinyl chloride pipe), pvc pipe has the characteristics of light material, good toughness, while pvc pipe has preferable mechanical performance, Tensile strength reaches 60MPa, and impact strength reaches 5~10kJ/ ㎡;And there are excellent dielectric properties.The institute of the present invention To select pvc pipe, exactly in order to the characteristic of pvc pipe is fully applied in the present invention.
In the present invention, it is exactly light the characteristics of a core, in order to realize the function, as shown in figure 1, the present invention also wraps Handle (not shown) is included, the upper end of mobile jib 2 is arranged on, for providing mobile support.So it can be achieved between handle and mobile jib 2 Firmly connection, and improves stability, while has the advantages of convenient and light, it is especially light the characteristics of.
Considered based on overall stress, as shown in Fig. 2 the installing pipe 3 of the present invention is arranged on the middle and lower part position of mobile jib 2;So The gravity of whole installing pipe 3 can be made on the lower, reduce it is integrally-built rocks inertia, play safe effect.
In order to facilitate the placement of catching device, as shown in Fig. 2 present invention additionally comprises branch pipe 41 is placed, place branch pipe 41 and set The apical position of pipe 4 is being placed, for placing catching device.Preferably:Two are symmetrical arranged in the apical position of each placement pipe 4 Place branch pipe 41.
In order that the fort formula catching device scene fixation device stress equalization of the present invention, as shown in figure 1, the placement of the present invention Pipe 4 is to be arranged in parallel with mobile jib 2, to meet gravity balance.For the ease of the fort formula catching device scene fixation device of the present invention Installation, as shown in Fig. 2 the height of the placement pipe 4 of the present invention is lower than the height of mobile jib 2, so in entrucking, it is only necessary to know that main The height of bar 2 just can learn whether whole fort formula catching device scene fixation device can put into in-car.
For the ease of the installation and removal of installing pipe 3, as shown in figure 3, outer circumference surface horizontal level of the present invention in mobile jib 2 On be laid with multiple mount holes (not shown), installing pipe 3 is provided with hitching frame 31, and hitching frame 31 coordinates with mount hole (to be hung Frame 31 is connect to be articulated on mount hole) realize installation between installing pipe 3 and mobile jib 2.In order that pacify between installing pipe 3 and mobile jib 2 Dress is firm, and the of the invention hole that mounts be two rows, and the hitching frame 31 in installing pipe 3 is be vertically arranged two.In some cases, Need to be considered as the installing pipe 3 of different size, while need to consider the damage of installing pipe 3, can be facilitated using mounting mode The replacing and handling of installing pipe 3.
Analysis understands that compared with prior art, the advantages of the present invention are:
First, fort formula catching device scene provided by the invention fixation device can solve the Placement Problems of catching device, avoid The problem of catching device is nowhere put, storehouse catching device is had nowhere live in station;Simultaneously when being transported to catching device, it can also be easy to The placement of catching device, and in transportation, effectively catching device can be avoided to rock.
2nd, supporting substrate 1 is designed as circular substrate by the present invention so that whole fort formula catching device scene fixation device tool Have save space the advantages of, multiple live fixation devices simultaneously place when, it is possible to prevente effectively from adjacent live fixation device it Between collision.
3rd, the area of supporting substrate 1 of the invention is more than the area that multiple installing pipes 3 are formed, and is so placing catching device During live fixation device, convenient the advantages of placing can be played.And when multiple live fixation devices are placed simultaneously, it is only necessary to consider The area of supporting substrate 1, ensure that whole scene fixation device area occupied.
4th, supporting substrate 1 is made the present invention of irony material, and center of gravity can be made to be located at bottom, effectively prevent Fort formula catching device scene fixation device is rocked into inclination when vehicle operation is rocked to skew.
5th, placement branch pipe 41 of the invention, can facilitate the placement of catching device.
6th, the present invention is provided parallel to set by pipe 4 is placed with mobile jib 2, and whole fort formula catching device scene can be made fixed Put device stress equalization.
As known by the technical knowledge, the present invention can pass through the embodiment party of other essence without departing from its spirit or essential feature Case is realized.Therefore, embodiment disclosed above, for each side, all it is merely illustrative, is not only.Institute Have within the scope of the present invention or be included in the invention in the change being equal in the scope of the present invention.

Claims (5)

  1. A kind of 1. fort formula catching device scene fixation device, it is characterised in that including:
    Supporting substrate, for providing support, the supporting substrate is support iron plate;
    Mobile jib, it is fixedly mounted on the supporting substrate;
    Multiple installing pipes, uniformly on the mobile jib, the installing pipe is arranged on mobile jib middle and lower part position;With
    Multiple to place pipe, one-to-one corresponding is placed in multiple installing pipes, for placing the catching device;
    Also include:Handle, it is arranged on the upper end of the mobile jib;
    Also include:Branch pipe is placed, the apical position placed branch pipe and be arranged on the placement pipe is described anti-fall for placing Device;
    The placement pipe is to be arranged in parallel with the mobile jib.
  2. 2. fort formula catching device scene according to claim 1 fixation device, it is characterised in that:
    The supporting substrate is circular substrate.
  3. 3. fort formula catching device scene according to claim 1 or 2 fixation device, it is characterised in that:
    The mobile jib is fixedly mounted on the center of the supporting substrate.
  4. 4. fort formula catching device scene according to claim 1 or 2 fixation device, it is characterised in that:
    The area of the supporting substrate is more than the area that multiple installing pipes are formed.
  5. 5. fort formula catching device scene according to claim 1 or 2 fixation device, it is characterised in that:
    The installing pipe is pvc pipe.
CN201510643067.1A 2015-09-30 2015-09-30 A kind of fort formula catching device scene fixation device Active CN105217152B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510643067.1A CN105217152B (en) 2015-09-30 2015-09-30 A kind of fort formula catching device scene fixation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510643067.1A CN105217152B (en) 2015-09-30 2015-09-30 A kind of fort formula catching device scene fixation device

Publications (2)

Publication Number Publication Date
CN105217152A CN105217152A (en) 2016-01-06
CN105217152B true CN105217152B (en) 2018-02-06

Family

ID=54986530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510643067.1A Active CN105217152B (en) 2015-09-30 2015-09-30 A kind of fort formula catching device scene fixation device

Country Status (1)

Country Link
CN (1) CN105217152B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025058B (en) * 2018-08-14 2020-12-15 苏州果汁网信息科技有限公司 Main beam frame for top of factory building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2748735A1 (en) * 1996-05-14 1997-11-21 Mauduit Daniel Holder for transporting, displaying and opening bi:valve shellfish e.g. oysters
CN102941973A (en) * 2012-11-20 2013-02-27 吴江市新丝源纺织有限公司 Spindle placing rack
CN103495445A (en) * 2013-09-30 2014-01-08 徐州工业园区投资发展有限公司 Test tube brush carrier
CN203958940U (en) * 2014-05-20 2014-11-26 特恩驰(南京)光纤有限公司 A kind of vertical optical wand storage shelf
CN204453297U (en) * 2014-12-31 2015-07-08 桐乡市新千禧时装有限公司 A kind of hanging apparatus
CN204979721U (en) * 2015-09-30 2016-01-20 国家电网公司 On --spot emplacement device of fort formula safety hook

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2748735A1 (en) * 1996-05-14 1997-11-21 Mauduit Daniel Holder for transporting, displaying and opening bi:valve shellfish e.g. oysters
CN102941973A (en) * 2012-11-20 2013-02-27 吴江市新丝源纺织有限公司 Spindle placing rack
CN103495445A (en) * 2013-09-30 2014-01-08 徐州工业园区投资发展有限公司 Test tube brush carrier
CN203958940U (en) * 2014-05-20 2014-11-26 特恩驰(南京)光纤有限公司 A kind of vertical optical wand storage shelf
CN204453297U (en) * 2014-12-31 2015-07-08 桐乡市新千禧时装有限公司 A kind of hanging apparatus
CN204979721U (en) * 2015-09-30 2016-01-20 国家电网公司 On --spot emplacement device of fort formula safety hook

Also Published As

Publication number Publication date
CN105217152A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN104276510A (en) Turnover lifting appliance for generator and use method of turnover lifting appliance
CN104266856A (en) Method for two-stage fairing-mounted rocket body free boundary implementation and fairing fixed-end boundary implementation in vibration tower
CN105217152B (en) A kind of fort formula catching device scene fixation device
CN105480002B (en) A kind of single-layer steel structure decoration tree and its installation method
CN204979721U (en) On --spot emplacement device of fort formula safety hook
CN201793330U (en) Gantry hanger frame device
CN203877739U (en) Bracket for integrally lifting air ducts
CN204979722U (en) On --spot emplacement ware of fort formula safety hook
CN105217153B (en) A kind of fort formula catching device scene fixation device
CN204642850U (en) A kind of wallboard piling bin
CN204588461U (en) Wind electricity blade handling unit block assembly rack
CN204663099U (en) Deck, Novel helicopter apron
CN104261283B (en) A kind of construction method of antenna hanging apparatus of wireless base station
CN203485813U (en) Auxiliary transportation device for engineering mechanical assembly
CN204152219U (en) Side fascia stone tongs
CN206034409U (en) A bearing frock for being directed at spud leg bears
CN109368479A (en) Fixed system and floor remove handling method
CN205275002U (en) Installation hoist of generator
CN204252022U (en) A kind of packaged type steel box-girder frange plate welding operation platform
CN105781431B (en) The multi-purpose rear portion drawing frame structure of integral drilling machine is repaired in a kind of soil sample
CN202830787U (en) Duplex beam for bridge construction
CN209210243U (en) The hanging apparatus of curtain wall lighting roof
CN202831668U (en) Combined type high attitude falling buffering and protective device
CN209210183U (en) Fixed system
CN206154097U (en) Foundation ring platform of polishing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant