CN218794969U - Tail gas absorption tower for chemical production - Google Patents

Tail gas absorption tower for chemical production Download PDF

Info

Publication number
CN218794969U
CN218794969U CN202222401562.XU CN202222401562U CN218794969U CN 218794969 U CN218794969 U CN 218794969U CN 202222401562 U CN202222401562 U CN 202222401562U CN 218794969 U CN218794969 U CN 218794969U
Authority
CN
China
Prior art keywords
absorption tower
wall
tail gas
tower main
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222401562.XU
Other languages
Chinese (zh)
Inventor
孙春娣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Zhongtai Group Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222401562.XU priority Critical patent/CN218794969U/en
Application granted granted Critical
Publication of CN218794969U publication Critical patent/CN218794969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
    • Y02A50/20Air quality improvement or preservation, e.g. vehicle emission control or emission reduction by using catalytic converters

Landscapes

  • Gas Separation By Absorption (AREA)

Abstract

The utility model discloses a tail gas absorption tower for chemical production, including treatment tank, tail gas connecting pipe and absorption tower main part, tail gas connecting pipe both sides top is all installed with treatment tank and absorption tower main part outer wall through dismouting mechanism, the screen cloth has been installed through stop gear in absorption tower main part left side middle part, the water pipe is installed to the inboard middle part upper end of absorption tower main part, and the outer wall that the water pipe right side runs through the absorption tower main part places at the water tank inboardly, the water pump is installed to the middle part upper end on water pipe right side. The utility model discloses make comparatively convenient installation between the tail gas connecting pipe and the butt joint mouth of pipe under the effect of dismouting mechanism, simultaneously can be under the sealed effect of sealed cushion, guarantee device is at the gas tightness of butt joint in-process, has improved the availability factor of device in the use, can comparatively convenient relatively dismantle the tail gas connecting pipe and maintain, improved the practicality of device in the use.

Description

Tail gas absorption tower for chemical production
Technical Field
The utility model relates to an absorption tower technical field especially relates to a tail gas absorption tower for chemical production.
Background
The waste gas that produces in the chemical industry raw materials production process, it is harmful mostly, enter into external environment, not only can cause the pollution of environment, still can cause harm to the human body, the security is low, consequently absorb and purify tail gas and just seem very necessary, and current tail gas absorption tower, tail gas absorption tower for the chemical industry production in the society at present can satisfy people's needs basically, but still has some problems.
The patent for CN211216041U discloses a production tail gas absorption tower for industrial chemicals, compact structure, and reasonable design, through absorbing and purifying tail gas, can avoid the human body to inhale harmful gas effectively, the security is high, therefore, the clothes hanger is strong in practicability, and is suitable for popularization, but the condition that is connected easy gas leakage between tail gas-supply pipe and the trachea adapter can not be solved to current patent No. CN211216041U patent, influence the device work efficiency in the use, consequently, need a tail gas absorption tower for chemical production to solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an: in order to solve the problems, the tail gas absorption tower for chemical production is provided.
In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a tail gas absorption tower for chemical production, is including handling jar, tail gas connecting pipe and absorption tower main part, tail gas connecting pipe both sides top is all installed with handling jar and absorption tower main part outer wall through dismouting mechanism, the screen cloth has been installed through stop gear in absorption tower main part left side middle part, the water pipe is installed to the inboard middle part upper end of absorption tower main part, and the water pipe right side runs through the outer wall of absorption tower main part and places in the water tank inboardly, the water pump is installed to the middle part upper end on water pipe right side.
As a further description of the above technical solution: dismouting mechanism includes installation curb plate, first spacing groove, first spring, activity interior pole, slider, slide bar, second spacing groove, dragging plate, draws handle, spacing inserted block, sealed cushion, inserts and establishes inner tube and butt joint mouth of pipe, the equal fixed mounting in tail gas connecting pipe both sides top is at installation curb plate inner wall middle part, installation curb plate outer wall middle part all fixed mounting insert establish the inner tube, and insert and establish inner tube outside top and all insert and establish and dock the mouth of pipe inboard, the all fixed mounting in the butt joint mouth of pipe outside is on the outer wall of treatment tank and absorption tower main part, first spacing groove has all been seted up at the middle part at both ends about the installation curb plate, first spacing inslot wall middle part all welds first spring, and first spring outside top all welds in the inboard outer wall middle part of activity interior pole, the all fixed mounting in the outer pole top of activity is in dragging plate inner wall bottom, the all fixed mounting in the dragging plate inner wall outside has spacing inserted block, and the inboard bottom of spacing inserted block all inserts and establish on the butt joint mouth of pipe outer wall.
As a further description of the above technical solution: the movable inner rod is characterized in that sliding blocks are fixedly mounted on two sides of the bottom end of the movable inner rod, the sliding blocks are connected to the outer wall of the sliding rod in a sliding mode, the upper end and the lower end of the sliding rod are fixedly mounted on the inner side of the second limiting groove, and the second limiting groove is symmetrically formed in the middle of the inner wall of the first limiting groove.
As a further description of the above technical solution: the middle part of the outer wall of the pulling plate is fixedly provided with a pulling handle, and the middle part of the inner side of the pulling handle is provided with anti-skid grains.
As a further description of the above technical solution: the outer walls of the installation side plates inserted into the inner side of the inner pipe are all glued with sealing cushions, and the top ends of the outer sides of the sealing cushions are all abutted against the outer walls of the inner sides of the butted pipe openings.
As a further description of the above technical solution: the outer wall of water pipe middle part lower extreme all the joint in joint piece inboard, joint piece left side top all fixed mounting is in the middle part upper end of water tank inner wall.
As a further description of the above technical solution: stop gear includes drainage piece, spacing curb plate, fixed lug, collecting vat, ball and loading board, sieve screen right side bottom butt is on three group's ball outer wall tops, the ball outer wall all rolls the embedding and installs on the loading board top, the equal fixed mounting in the middle part of absorption tower main part inner wall on loading board right side top, sieve screen left side top is run through absorption tower main part outer wall and is installed at spacing curb plate right side middle part, the upper and lower both ends on spacing curb plate right side all fixed mounting have two sets of fixed lugs, fixed lug right side top is all inserted and is established at absorption tower main part left side outer wall, the drainage piece is installed to the absorption tower main part inner wall symmetry of crossing the screen cloth bottom, absorption tower main part inner wall bottom is placed and is installed the collecting vat.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, make under the effect of dismouting mechanism can be relatively more convenient install between tail gas connecting pipe and the butt joint mouth of pipe, simultaneously can be under the sealed effect of sealed cushion, ensure the gas tightness of device in the butt joint process, improved the availability factor of device in the use, can relatively more convenient dismantle the maintenance to tail gas connecting pipe, improved the practicality of device in the use;
2. the utility model discloses in, make tail gas get into absorption tower main part inboard under the effect of dust fall mechanism, carry out dust removal work under the sieving action of cross screen cloth again, can also absorb and purify smell and harmful gas in the tail gas simultaneously, purifying effect is good.
Drawings
Fig. 1 shows a schematic perspective view of a structure provided according to an embodiment of the present invention;
fig. 2 is a schematic front view of a cross-sectional structure provided according to an embodiment of the present invention;
fig. 3 is a schematic diagram illustrating an enlarged structure at a in fig. 2 according to an embodiment of the present invention;
fig. 4 shows an enlarged schematic structural diagram at B in fig. 2 according to an embodiment of the present invention.
Illustration of the drawings:
1. a first treatment tank; 2. a tail gas connecting pipe; 3. installing a side plate; 4. a first limit groove; 5. a first spring; 6. a movable inner rod; 7. a slider; 8. a slide bar; 9. a second limit groove; 10. pulling the movable plate; 11. pulling a handle; 12. limiting the inserting block; 13. sealing the soft cushion; 14. inserting the inner pipe; 15. butting pipe orifices; 16. an absorption tower main body; 17. a water pipe; 18. a water pump; 19. a clamping block; 20. a water tank; 21. a flow guide block; 22. sieving by using a sieve; 23. a limiting side plate; 24. fixing the bump; 25. collecting tank; 26. ball, 27, loading board.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without making creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a tail gas absorption tower for chemical production, including handling jar 1, tail gas connecting pipe 2 and absorption tower main part 16, 2 both sides tops of tail gas connecting pipe are all installed with handling jar 1 and the 16 outer walls of absorption tower main part through dismouting mechanism, 16 left sides middle parts of absorption tower main part install screen cloth 22 through stop gear, water pipe 17 is installed to the inboard middle part upper end of absorption tower main part 16, and the outer wall that water pipe 17 right side runs through absorption tower main part 16 is placed at 20 inboards of water tank, water pump 18 is installed to the middle part upper end on water pipe 17 right side.
The dismounting mechanism comprises a mounting side plate 3, a first limit groove 4, a first spring 5, a movable inner rod 6, a slide block 7, a slide rod 8, a second limit groove 9, a pulling plate 10, a pulling handle 11, a limit insert block 12, a sealing cushion 13, an inserted inner pipe 14 and a butt joint pipe orifice 15, the top ends of two sides of a tail gas connecting pipe 2 are fixedly arranged in the middle of the inner wall of the mounting side plate 3, the middle of the outer wall of the mounting side plate 3 is fixedly provided with the inserted inner pipe 14, the top ends of the outer sides of the inserted inner pipes 14 are inserted in the inner side of the butt joint pipe orifice 15, the outer sides of the butt joint pipe orifice 15 are fixedly arranged on the outer walls of a treatment tank 1 and an absorption tower main body 16, the middle parts of the upper end and the lower end of the mounting side plate 3 are provided with the first limit groove 4, first spring 5 has all been welded at 4 inner wall middle parts in first spacing groove, and first spring 5 outside top all welds at the inboard outer wall middle part of pole 6 in the activity, the equal fixed mounting in the pole 10 inner wall bottom in the pole 6 outside top in the activity, the equal fixed mounting in the pole 10 inner wall outside has spacing inserted block 12, and the inboard bottom of spacing inserted block 12 all inserts and establish on the 15 outer walls of butt joint mouth of pipe, its effect lies in making can be comparatively convenient installation between exhaust gas connecting pipe 2 and the butt joint mouth of pipe 15, can comparatively convenient dismantle the exhaust gas connecting pipe 2 and maintain, the practicality of device in the use has been improved.
The both sides of the bottom end of the movable inner rod 6 are fixedly provided with the sliding blocks 7, the sliding blocks 7 are connected to the outer wall of the sliding rod 8 in a sliding mode, the upper end and the lower end of the sliding rod 8 are fixedly arranged on the inner side of the second limiting groove 9, the second limiting groove 9 is symmetrically arranged in the middle of the inner wall of the first limiting groove 4, the movable inner rod 6 can be relatively stable and can move up and down on the inner side of the first limiting groove 4, and the lifting efficiency of the device in the using process is guaranteed.
Pulling plate 10 outer wall middle part is all fixed mounting has the handle 11 of pulling, and pulls 11 inboard middle parts and all be provided with anti-skidding line, and its effect lies in can be relatively comparatively convenient pulling plate 10 under the effect of pulling 11, can increase staff's hand and pull the frictional force between the 11 simultaneously under the effect of anti-skidding line, has improved the stable efficiency of device in the use.
The outer walls of the installation side plates 3 inserted into the inner side of the inner pipe 14 are all glued with the sealing cushions 13, the top ends of the outer sides of the sealing cushions 13 are abutted against the outer walls of the inner sides of the butt joint pipe openings 15, the sealing device has the advantages that the air tightness of the device in the butt joint process can be guaranteed under the sealing effect of the sealing cushions 13, and the using efficiency of the device in the using process is improved.
The outer wall of water pipe 17 middle part lower extreme all the joint 19 inboards at joint piece, and joint piece 19 left side top is all fixed mounting in the middle part upper end of water tank 20 inner wall, and its effect lies in can relatively stable make to the stabilizing efficiency of installation between water pipe 17 outer wall and the water tank 20, has ensured the firm efficiency of device in the use.
Limiting mechanism includes drainage piece 21, spacing curb plate 23, fixed lug 24, collecting vat 25, ball 26 and loading board 27, sieve 22 right side bottom butt at three 26 outer wall tops of group's ball, ball 26 outer wall all rolls the embedding and installs on loading board 27 top, the equal fixed mounting in the middle part of absorption tower main part 16 inner wall in loading board 27 right side top, cross sieve 22 left side top and run through absorption tower main part 16 outer wall and install at 23 right side middle parts of spacing curb plate, the upper and lower both ends on spacing curb plate 23 right side all fixed mounting have two sets of fixed lug 24, fixed lug 24 right side top all inserts and establishes at 16 left side outer walls of absorption tower main part, drainage piece 21 is installed to the 16 inner wall symmetry of absorption tower main part of sieve 22 bottom, collecting vat 25 is installed to 16 inner wall bottom of absorption tower main part, its effect lies in can carry out dust removal work under the sieving effect of sieve 22, simultaneously can also absorb and purify smell and harmful gas in the tail gas, purifying effect is good.
The working principle is as follows: firstly, the pull handle 11 is pulled under the sliding action of the sliding block 7 and the sliding rod 8 from the upper end to the lower end, the top end of the inner side of the limit insert block 12 is driven to move outwards, the inserted inner pipe 14 is inserted into the middle part of the inner side of the butt joint pipe orifice 15, the pull handle 11 is loosened, so that the installation work among the tail gas connecting pipe 2, the treatment tank 1 and the absorption tower main body 16 is completed under the action of the elastic potential energy of the first spring 5, the water pump 18 is started at the moment, the liquid in the water tank 20 is sprinkled on the inner side of the absorption tower main body 16, the dust fall work on the tail gas in the absorption tower main body 16 is completed, and the liquid wraps dust and moves to the inner side of the collecting tank 25 under the drainage action of the drainage block 21;
when crossing screen cloth 22 in the installation, it is inboard to insert into absorption tower main part 16 with screen cloth 22 simultaneously, places on loading board 27 top until crossing screen cloth 22 right side bottom for after screening screen cloth 22 right side bottom and ball 26 top outer wall carry out the butt, insert fixed lug 24 this moment and establish into absorption tower main part 16 left side outer wall and can accomplish the installation dismantlement work to screen cloth 22.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a tail gas absorption tower for chemical production, includes treatment tank (1), tail gas connecting pipe (2) and absorption tower main part (16), its characterized in that: tail gas connecting pipe (2) both sides top is all installed through dismouting mechanism and treatment tank (1) and absorption tower main part (16) outer wall, screen cloth (22) have been installed through stop gear in the middle part of absorption tower main part (16) left side, water pipe (17) are installed to the middle part upper end of absorption tower main part (16) inboard, and water pipe (17) right side runs through the outer wall of absorption tower main part (16) and places in water tank (20) inboardly, water pump (18) are installed to the middle part upper end on water pipe (17) right side.
2. The tail gas absorption tower for the chemical production according to claim 1, wherein the disassembly and assembly mechanism comprises an installation side plate (3) and a butt joint pipe orifice (15), the top ends of both sides of the tail gas connecting pipe (2) are fixedly installed in the middle of the inner wall of the installation side plate (3), the middle of the outer wall of the installation side plate (3) is fixedly installed with an insertion inner pipe (14), and the top ends of the outer side of the insertion inner pipe (14) are inserted in the inner side of the butt joint pipe orifice (15), the top ends of the outer side of the butt joint pipe orifice (15) are fixedly installed on the outer wall of the treatment tank (1) and the absorption tower main body (16), the middle parts of the upper end and the lower end of the installation side plate (3) are provided with a first limiting groove (4), the middle parts of the inner wall of the first limiting groove (4) are welded with a first spring (5), the top ends of the outer side of the first spring (5) are welded in the middle of the inner wall of the movable inner rod (6), the top ends of the outer side of the movable rod (6) are fixedly installed at the bottom end of the inner wall of the pull plate (10), and the outer wall of the pull plate (10) is fixedly installed with a limiting insertion block (12) in the butt joint pipe orifice (15).
3. The tail gas absorption tower for the chemical production according to claim 2, wherein the sliding blocks (7) are fixedly mounted on both sides of the bottom end of the movable inner rod (6), the sliding blocks (7) are slidably connected to the outer wall of the sliding rod (8), the upper end and the lower end of the sliding rod (8) are fixedly mounted on the inner side of the second limiting groove (9), and the second limiting groove (9) is symmetrically formed in the middle of the inner wall of the first limiting groove (4).
4. The tail gas absorption tower for chemical production according to claim 2, wherein the pull plate (10) is fixedly provided with a pull handle (11) at the middle part of the outer wall, and the pull handle (11) is provided with anti-skid lines at the middle part of the inner side.
5. The tail gas absorption tower for chemical production according to claim 2, wherein the outer walls of the installation side plates (3) inserted inside the inner pipe (14) are glued with sealing cushions (13), and the top ends of the outer sides of the sealing cushions (13) are abutted against the outer walls of the inner sides of the butt pipe openings (15).
6. The tail gas absorption tower for the chemical production according to claim 1, wherein the outer walls of the middle lower end of the water pipe (17) are all clamped inside the clamping blocks (19), and the top ends of the left sides of the clamping blocks (19) are all fixedly installed at the upper end of the middle of the inner wall of the water tank (20).
7. The tail gas absorption tower for chemical production according to claim 1, wherein the limiting mechanism comprises a diversion block (21) and a bearing plate (27), the bottom end of the right side of the screen (22) abuts against the top ends of the outer walls of the three groups of balls (26), the outer walls of the balls (26) are all installed on the top end of the bearing plate (27) in a rolling and embedding manner, the top ends of the right side of the top end of the right side of the bearing plate (27) are all fixedly installed in the middle of the inner wall of the absorption tower main body (16), the top end of the left side of the screen (22) penetrates through the outer wall of the absorption tower main body (16) and is installed in the middle of the right side of the limiting side plate (23), two groups of fixing lugs (24) are fixedly installed at the upper end and the lower end of the right side of the limiting side plate (23), the top ends of the right side of the fixing lugs (24) are all inserted in the outer wall of the left side of the absorption tower main body (16), the diversion block (21) is symmetrically installed on the inner wall of the absorption tower main body (16), and a collecting groove (25) is installed at the bottom end of the inner wall of the absorption tower main body (16).
CN202222401562.XU 2022-09-09 2022-09-09 Tail gas absorption tower for chemical production Active CN218794969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222401562.XU CN218794969U (en) 2022-09-09 2022-09-09 Tail gas absorption tower for chemical production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222401562.XU CN218794969U (en) 2022-09-09 2022-09-09 Tail gas absorption tower for chemical production

Publications (1)

Publication Number Publication Date
CN218794969U true CN218794969U (en) 2023-04-07

Family

ID=87042157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222401562.XU Active CN218794969U (en) 2022-09-09 2022-09-09 Tail gas absorption tower for chemical production

Country Status (1)

Country Link
CN (1) CN218794969U (en)

Similar Documents

Publication Publication Date Title
CN205019865U (en) Energy -concerving and environment -protective dust collector based on remote control
CN207655316U (en) A kind of electrostatic precipitation system conducive to electric field maintenance
CN218794969U (en) Tail gas absorption tower for chemical production
CN207076224U (en) A kind of environment-friendly type gardens sewage-treatment plant
CN216342293U (en) Tunnel engineering ventilator convenient to automatic dust removal
CN113480127B (en) A concentrated dehydration filter-pressing device for solidifying mud
CN215233079U (en) High-efficient flue gas dust collector of sustainable work
CN208594990U (en) A kind of vehicle exhaust filtration treatment device
CN208090907U (en) A kind of fan wind inleting tube with anti-blockage function
CN208243502U (en) A kind of dust removal machine of the subway station with cleaning function
CN214261061U (en) Dust collector in FRP section bar pultrusion production cutting process
CN217961916U (en) Road dust absorbing device
CN206168072U (en) Sewage filtering device
CN216063752U (en) A dust recovery device for building energy-saving material production
CN112495095B (en) Waste gas high-efficiency treatment mechanism for preparing iron oxide red inorganic pigment
CN218188752U (en) A dust removal filtration equipment for VOC gas absorption spray column
CN216513020U (en) Chain type sewage treatment magnetic separator
CN213270195U (en) Gas compressor with air filtering structure
CN219233462U (en) Floating dust collecting and absorbing device for cleaning chassis of reduction furnace
CN214319566U (en) Dust collector is used in building engineering construction
CN219333387U (en) Filtering device of heat exchange station
CN214261149U (en) Graphite roasting device convenient for gas purification
CN220589393U (en) Residual gas and residual liquid recovery device
CN217431359U (en) Miniaturized high-efficiency deodorization equipment
CN220204974U (en) Pipeline butt joint device for drainage pipeline construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230627

Address after: 830000 No. 39 Yangchenghu Road, Urumqi Economic and Technological Development Zone, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee after: Xinjiang Zhongtai Group Engineering Co.,Ltd.

Address before: Xu Zhen Wenge Village, Nanling County, Wuhu City, Anhui Province, 242400

Patentee before: Sun Chundi

TR01 Transfer of patent right