CN214319566U - Dust collector is used in building engineering construction - Google Patents
Dust collector is used in building engineering construction Download PDFInfo
- Publication number
- CN214319566U CN214319566U CN202023031770.2U CN202023031770U CN214319566U CN 214319566 U CN214319566 U CN 214319566U CN 202023031770 U CN202023031770 U CN 202023031770U CN 214319566 U CN214319566 U CN 214319566U
- Authority
- CN
- China
- Prior art keywords
- fixed
- water
- frame
- pipe
- filter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000428 dust Substances 0.000 title claims abstract description 35
- 238000010276 construction Methods 0.000 title claims abstract description 20
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 105
- 238000001914 filtration Methods 0.000 abstract description 3
- 239000012535 impurity Substances 0.000 abstract description 3
- 230000029058 respiratory gaseous exchange Effects 0.000 abstract description 3
- 238000004140 cleaning Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 3
- 239000007921 spray Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 239000000779 smoke Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Landscapes
- Separation Of Particles Using Liquids (AREA)
Abstract
The utility model discloses a dust collector for building engineering construction, including the U template, the inboard upper end of U template is equipped with fixed frame, the one end inner wall of fixed frame is fixed with the outlet duct, the other end of outlet duct passes fixed frame and is connected with the air extractor, the lower extreme of air extractor is fixed with fixed supporting shoe, the lower extreme of fixed supporting shoe is located on the U template, the other end of air extractor is equipped with the breathing pipe, the other end of breathing pipe passes the U template, the inner wall of fixed frame is fixed with the fixed plate, the upper end of fixed plate is equipped with the water pump, the outside of water pump is equipped with the connecting pipe, the other end of connecting pipe is connected with the U template through the water passage, the other end of water passage is fixed with the suction pipe through the hose, the device can filter water, the water that will filter after filtering is used, high use efficiency, great water resource has been saved; can convenient and fast change water to the cleaning efficiency to impurity is higher.
Description
Technical Field
The utility model belongs to the technical field of building engineering, specifically be a dust collector for building engineering construction.
Background
The construction engineering major is mainly responsible for teaching and managing the construction engineering direction of the civil engineering major; basic theories and basic knowledge of engineering mechanics, soil mechanics, surveying, housing architecture and structural engineering subjects are mainly cultured and mastered; it is a general term for various buildings and engineering facilities providing material and technical foundation for human life and production.
The utility model discloses a building engineering construction dust collector of authorized bulletin number CN 211069532U, including dust removal case body and base, dust removal case body is located the top of base. This building engineering construction dust collector, through being provided with fan and filter screen, utilize the filter screen to filter the great dust of granule, and the fan goes out tuber pipe and dust removal case body and communicates mutually, make in a large amount of dust inhales dust collector through the fan operation, in water pump with the inside water pump delivery to the water pipe of water tank through the water pump, the use of cooperation installation pipe and atomising head, make water form an atomizing phenomenon, adhere to the dust, can effectively clear away the dust that produces when the construction, secondly be provided with boss and second filter screen in the containing box and make the dust can effectual layering, part dust and water smoke, reach solid-liquid separation's effect, effectively improve the utilization ratio of water resource, the waste of water resource has been avoided.
This patent is sent the inside water pump of water tank to the water pipe through the water pump in, the use of cooperation installation pipe and atomising head, make water form an atomizing phenomenon, adhere to the dust, the dust that produces when can effectively clear away the construction, secondly be provided with boss and second filter screen in the containing box and make the dust can effectual layering, part dust and water smoke, reach solid-liquid separation's effect, effectively improve the utilization ratio of water resource, the waste of water resource has been avoided, but can not carry out the recycle with the water resource, make the result of use of water resource relatively poor, make the availability factor of device relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a dust collector for building engineering construction to the problem that the solution device availability factor is low.
In order to achieve the above object, the utility model provides a following technical scheme: a dust removal device for building engineering construction comprises a U-shaped plate, wherein a fixing frame is arranged at the upper end of the inner side of the U-shaped plate and fixedly welded at the upper end of the left side of the U-shaped plate, an air outlet pipe is fixed on the inner wall of one end of the fixing frame and is led into the fixing frame, the other end of the air outlet pipe penetrates through the fixing frame to be connected with an air pump, a fixing support block is fixed at the lower end of the air pump, the lower end of the fixing support block is arranged on the U-shaped plate, an air suction pipe is arranged at the other end of the air pump, the air pump sucks gas needing dust removal operation into the fixing frame through the air suction pipe, the other end of the air suction pipe penetrates through the U-shaped plate, a fixing plate is fixed on the inner wall of the fixing frame, the outer side surface of the fixing plate is fixedly welded on the inner wall of the fixing frame, a water pump is arranged at the upper end center of the fixing plate, and is fixedly installed at the upper end center of the fixing plate, the outside of water pump is equipped with the connecting pipe, and the left end of water pump is fixed with the connecting pipe, the other end of connecting pipe passes through the water passage and is connected with the U template, and the other end of connecting pipe and the water passage of U template communicate each other, the other end of water passage is fixed with the pipe that absorbs water through the hose, and the pipe that absorbs water passes through hose and water passage intercommunication, guarantees the unobstructed of rivers to conveniently absorb water the activity of pipe, the lower extreme of water pump is equipped with the outlet pipe, and the outlet pipe setting is under the water pump, the lower extreme of outlet pipe passes the fixed plate and is connected with the frame that catchments, and the outlet pipe can be introduced water to the frame that catchments in, the lower extreme of frame that catchments is fixed with the shower nozzle, and the lower extreme at the frame that catchments is evenly laid to the shower nozzle.
Preferably, the lower end of the U-shaped plate is provided with a roller which is fixedly welded at the lower end of the U-shaped plate.
Preferably, the fixed frame is connected with a sliding connection water frame in a sliding manner, and the sliding connection water frame can be inserted into the fixed frame.
Preferably, the inner wall of the sliding connection water frame is provided with two connecting blocks, the two connecting blocks are positioned on the same horizontal line, and the two connecting blocks are welded on the inner walls of the two sides of the sliding connection water frame.
Preferably, the upper end contact of connecting block is connected with the filter, and the filter is placed in the upper end of connecting block to the surface of filter can slide at the inner wall of sliding connection water frame.
Preferably, the upper end of the filter plate is fixed with a lifting rod, and the lifting rod is fixedly welded at the central position of the upper end of the filter plate.
Preferably, set up the opening in the filter, the opening setting is at the left end of filter, the lower extreme surface that absorbs water the pipe slides and passes the opening, and the pipe that absorbs water can pass the filter through the opening, inserts the bottom of sliding connection water frame.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the device can filter water, and the water that will filter after filtering uses again, and the availability factor is higher, great saving the water resource.
2. The device can convenient and fast change water to the cleaning efficiency to impurity is higher.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a cross-sectional view of the present invention;
FIG. 3 is a partially enlarged top view of the water frame of the present invention;
fig. 4 is a schematic view of the water collecting frame according to the present invention.
In the figure: 1. a U-shaped plate; 11. a roller; 21. a fixing frame; 22. an air outlet pipe; 23. an air extractor; 24. fixing a supporting block; 25. an air intake duct; 31. a fixing plate; 32. a water pump; 33. a connecting pipe; 34. a water passage; 35. a suction pipe; 36. a water outlet pipe; 37. a water collecting frame; 38. a spray head; 41. the water frame is connected in a sliding way; 42. connecting blocks; 43. a filter plate; 44. lifting a rod; 45. and (6) a port.
Detailed Description
Referring to fig. 1-3, a dust removing device for construction engineering includes a U-shaped plate 1, a fixing frame 21 is disposed at the upper end of the inner side of the U-shaped plate 1, the fixing frame 21 is fixedly welded at the upper end of the left side of the U-shaped plate 1, an air outlet pipe 22 is fixed at the inner wall of one end of the fixing frame 21, the air outlet pipe 22 is introduced into the fixing frame 21, the other end of the air outlet pipe 22 passes through the fixing frame 21 and is connected with an air extractor 23, a fixing support block 24 is fixed at the lower end of the air extractor 23, the lower end of the fixing support block 24 is disposed on the U-shaped plate 1, an air suction pipe 25 is disposed at the other end of the air extractor 23, the air extractor 23 sucks gas to be subjected to dust removing operation into the fixing frame 21 through the air suction pipe 25, the other end of the air suction pipe 25 passes through the U-shaped plate 1, a fixing plate 31 is fixed at the inner wall of the fixing frame 21, the outer side surface of the fixing plate 31 is fixedly welded at the inner wall of the fixing plate 21, a water pump 32 is disposed at the upper end of the fixing plate 31, the water pump 32 is fixedly installed at the center of the upper end of the fixing plate 31, a connecting pipe 33 is arranged on the outer side of the water pump 32, the connecting pipe 33 is fixed at the left end of the water pump 32, the other end of the connecting pipe 33 is connected with the U-shaped plate 1 through a water passage 34, the other end of the connecting pipe 33 is mutually communicated with the water passage 34 of the U-shaped plate 1, a water suction pipe 35 is fixed at the other end of the water passage 34 through a hose, the water suction pipe 35 is communicated with the water passage 34 through a hose to ensure smooth water flow and facilitate the movement of the water suction pipe 35, a water outlet pipe 36 is arranged at the lower end of the water pump 32, the lower end of the water outlet pipe 36 penetrates through the fixing plate 31 to be connected with the water collecting frame 37, the water outlet pipe 36 can introduce water into the water collecting frame 37, a spray head 38 is fixed at the lower end of the water collecting frame 37, and the spray head 38 is uniformly distributed at the lower end of the water collecting frame 37.
Referring to fig. 1 and 2, a roller 11 is disposed at a lower end of the U-shaped plate 1, and the roller 11 is fixedly welded at the lower end of the U-shaped plate 1.
Referring to fig. 1 and 2, a sliding connection water frame 41 is slidably connected to the fixed frame 21, and the sliding connection water frame 41 can be inserted into the fixed frame 21.
Referring to fig. 1, 2 and 3, two connection blocks 42 are disposed on the inner wall of the sliding connection water frame 41, and the two connection blocks 42 are disposed on the same horizontal line and welded on the inner walls of the two sides of the sliding connection water frame 41.
Referring to fig. 1, 2 and 3, a filter plate 43 is contact-connected to an upper end of the connection block 42, the filter plate 43 is placed on the upper end of the connection block 42, and an outer surface of the filter plate 43 is slidable on an inner wall of the sliding-connection water frame 41.
Referring to fig. 2 and 3, a lifting bar 44 is fixed to the upper end of the filter plate 43, and the lifting bar 44 is fixedly welded to the center of the upper end of the filter plate 43.
Referring to fig. 2 and 3, a through hole 45 is formed in the filter plate 43, the through hole 45 is disposed at the left end of the filter plate 43, the outer surface of the lower end of the suction pipe 35 slidably penetrates through the through hole 45, and the suction pipe 35 can penetrate through the filter plate 43 through the through hole 45 and be inserted into the bottom of the sliding connection water frame 41.
The working principle of the scheme is as follows: during the use, remove the device to the position that needs to remove dust the operation, open air extractor 23, air extractor 23 spouts gas in fixed frame 21 through outlet duct 22 through breathing pipe 25, open the water pump 32 in the fixed frame 21 simultaneously, water pump 32 inhales water to water passage 34 through absorbing pipe 35, pass through connecting pipe 33 again, introduce the frame 37 that catchments from outlet pipe 36 of water pump 32 lower extreme, rethread shower nozzle 38 blowout, the gaseous dust fall operation that carries out to inhaling, dust and water pass through the filtration of filter 43, make the water that does not have impurity enter into sliding connection water frame 41, through filtered water can carry out the circulation use.
Claims (7)
1. The utility model provides a dust collector for building engineering construction, includes U template (1), its characterized in that: the air suction device is characterized in that a fixed frame (21) is arranged at the upper end of the inner side of the U-shaped plate (1), an air outlet pipe (22) is fixed to the inner wall of one end of the fixed frame (21), the other end of the air outlet pipe (22) penetrates through the fixed frame (21) to be connected with an air pump (23), a fixed supporting block (24) is fixed to the lower end of the air pump (23), the lower end of the fixed supporting block (24) is arranged on the U-shaped plate (1), an air suction pipe (25) is arranged at the other end of the air pump (23), the other end of the air suction pipe (25) penetrates through the U-shaped plate (1), a fixed plate (31) is fixed to the inner wall of the fixed frame (21), a water pump (32) is arranged at the upper end of the fixed plate (31), a connecting pipe (33) is arranged on the outer side of the water pump (32), the other end of the connecting pipe (33) is connected with the U-shaped plate (1) through a water passage (34), and a water suction pipe (35) is fixed to the other end of the water passage (34) through a hose, the lower extreme of water pump (32) is equipped with outlet pipe (36), the lower extreme of outlet pipe (36) passes fixed plate (31) and is connected with water collection frame (37), the lower extreme of water collection frame (37) is fixed with shower nozzle (38).
2. The dust removing device for constructional engineering construction as claimed in claim 1, wherein: the lower end of the U-shaped plate (1) is provided with a roller (11).
3. The dust removing device for constructional engineering construction as claimed in claim 1, wherein: the fixed frame (21) is connected with a water frame (41) in a sliding way.
4. The dust removing device for construction engineering according to claim 3, wherein: the inner wall of the sliding connection water frame (41) is provided with a connecting block (42).
5. The dust removing device for construction engineering according to claim 4, wherein: the upper end contact of connecting block (42) is connected with filter (43).
6. The dust removing device for construction engineering according to claim 5, wherein: and a lifting rod (44) is fixed at the upper end of the filter plate (43).
7. The dust removing device for construction engineering according to claim 5, wherein: opening (45) have been seted up in filter (43), the lower extreme surface of suction tube (35) slides and passes opening (45).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023031770.2U CN214319566U (en) | 2020-12-16 | 2020-12-16 | Dust collector is used in building engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023031770.2U CN214319566U (en) | 2020-12-16 | 2020-12-16 | Dust collector is used in building engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214319566U true CN214319566U (en) | 2021-10-01 |
Family
ID=77900101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023031770.2U Expired - Fee Related CN214319566U (en) | 2020-12-16 | 2020-12-16 | Dust collector is used in building engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214319566U (en) |
-
2020
- 2020-12-16 CN CN202023031770.2U patent/CN214319566U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214319566U (en) | Dust collector is used in building engineering construction | |
CN206045635U (en) | A kind of new dust collecting | |
CN215610241U (en) | Dust collector for building | |
CN212132808U (en) | Ventilated building structure | |
CN210079140U (en) | Building construction dust collector | |
CN211098415U (en) | Paint waste gas treatment system | |
CN208482195U (en) | A kind of interior decoration cleaner | |
CN207071287U (en) | A kind of straight-line mine dust arrester and its frame plate | |
CN217797642U (en) | Energy-conserving efficient fog leaching rooms | |
CN206911036U (en) | A kind of construction dust arrester | |
CN220696257U (en) | Filtering dust remover | |
CN216320803U (en) | Green building construction dust collector | |
CN210910641U (en) | Grooving device for pipeline installation engineering | |
CN212790305U (en) | Dust filter | |
CN211799677U (en) | Printing industry waste gas dust treatment device | |
CN217015957U (en) | Dust removal spray set for construction | |
CN217725044U (en) | Environment-friendly polishing dust collecting equipment | |
CN212999035U (en) | Dust collector for construction | |
CN210674653U (en) | Dust collector is used in building engineering processing | |
CN218166432U (en) | Dust collecting equipment based on program control software | |
CN115591346B (en) | Building construction ground dust collection and fall device | |
CN214486197U (en) | Dust collecting and processing device for ore crushing | |
CN213828558U (en) | High-efficient collection and processing metal exhaust-gas treatment equipment that polishes | |
CN217662302U (en) | Pipeline deodorizing device for ventilation | |
CN220656875U (en) | Spraying dust collecting equipment for cement production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211001 |