CN218779338U - High mound pier stud reinforcing bar mounting platform - Google Patents

High mound pier stud reinforcing bar mounting platform Download PDF

Info

Publication number
CN218779338U
CN218779338U CN202223305450.0U CN202223305450U CN218779338U CN 218779338 U CN218779338 U CN 218779338U CN 202223305450 U CN202223305450 U CN 202223305450U CN 218779338 U CN218779338 U CN 218779338U
Authority
CN
China
Prior art keywords
plate
fixedly connected
bolt
rail
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223305450.0U
Other languages
Chinese (zh)
Inventor
蒯强
欧广州
柴印杰
马威武
单武林
杨瑞芬
欧露威
谢培娟
李霖
刘斯宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Civil Engineering Group Co Ltd
Original Assignee
China Construction Second Engineering Bureau Civil Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Civil Engineering Group Co Ltd filed Critical China Construction Second Engineering Bureau Civil Engineering Group Co Ltd
Priority to CN202223305450.0U priority Critical patent/CN218779338U/en
Application granted granted Critical
Publication of CN218779338U publication Critical patent/CN218779338U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a high mound pier stud steel bar installation platform relates to bridge construction technical field, including the mount table main part, the bottom of mount table main part is provided with first plate, top one side cover of first plate is equipped with the rail, the middle part fixedly connected with protection network of rail, top one side fixedly connected with connecting rod of rail, one side of first plate is provided with the opening connecting plate, one side of opening connecting plate is provided with connects the passageway. The utility model discloses a rail, protection network, connecting rod, opening connecting plate and the cooperation of being connected the passageway reach and prevent that the rail from appearing the slope, ensure the security that improves the device, and the people installation of being convenient for, through the cooperation of first plate, second plate, fixture block, draw-in groove, dead lever and second bolt, reach the installation of being convenient for and dismantle, greatly reduced the mount table main part demolish the in-process condition of damage appearing, improved the availability factor of mount table main part.

Description

High mound pier stud reinforcing bar mounting platform
Technical Field
The utility model relates to a bridge construction technical field, concretely relates to high mound pier stud steel bar mounting platform.
Background
In the process of rapid development of the transportation industry, modern coastal urban highways are limited by urban construction, and conflict between highway city penetration and urban planning is avoided, so that the highways are planned and arranged along the periphery of a city in the line selection process and are provided with a plurality of high pier stud bridges. The following problems exist in the prior art:
most of the existing high pier column reinforcing steel bar mounting platforms are assembled together in a welding mode, and the high pier column reinforcing steel bar mounting platforms are inconvenient to disassemble after the pier columns are constructed; and the equipment can be scrapped in the dismantling process, and the secondary use problem of the high pier column steel bar mounting platform is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a high mound pier stud reinforcing bar mounting platform can effectively solve the problem that proposes in the above-mentioned background.
In order to achieve the above object, the utility model adopts the following technical scheme:
the utility model provides a high mound pier stud reinforcing bar mounting platform, includes the mount table main part, the bottom of mount table main part is provided with first plate, top one side cover of first plate is equipped with the rail, the middle part fixedly connected with protection network of rail, top one side fixedly connected with connecting rod of rail, one side of first plate is provided with the opening connecting plate, one side of opening connecting plate is provided with connects the passageway.
The utility model discloses technical scheme's further improvement lies in: the bottom fixedly connected with connecting block of rail, the middle part threaded connection of connecting block has first screw, the both ends outer wall of first screw all with the lateral wall threaded connection of first plate.
Adopt above-mentioned technical scheme, the cooperation of rail, connecting block, first screw and protection network in this scheme prevents through the protection network that constructor from appearing the condition that the instrument dropped in the course of the work, inserts the inside back of first plate through the connecting block, through rotating the stability of first screw guarantee rail, and then ensures workman's personal safety.
The utility model discloses technical scheme's further improvement lies in: threaded holes are formed in the two ends of the connecting rod, a first bolt is connected to the inner threads of the threaded holes, a nut is connected to the other end of the first bolt in a threaded mode, and the outer side wall of the nut is fixedly connected with the inner wall of the first bolt.
Adopt above-mentioned technical scheme, the cooperation of connecting rod, first bolt, nut and screw hole in this scheme penetrates the inside back of first bolt through the nut, through the internal connection who rotates first bolt and screw hole, ensures the stability of connecting between the connecting rod, prevents that the rail from appearing the slope, and the guarantee improves the security of stake, and the people's installation of being convenient for.
The utility model discloses technical scheme's further improvement lies in: the connecting passageway is characterized in that rails are fixedly connected to two sides of the top of the connecting passageway, rectangular grooves are formed in two sides of the top of the connecting passageway, a rectangular rod is sleeved inside each rectangular groove, a second screw is connected to the middle of each rectangular rod in a threaded mode, two ends of each second screw are connected with the inner wall of the connecting passageway in a threaded mode, the other end of each rectangular rod is fixedly connected with one side wall of the opening connecting plate, and a clamping block is fixedly connected to two ends of the other side of the opening connecting plate.
Adopt above-mentioned technical scheme, the opening connecting plate in this scheme, the second plate, the second screw, connect the cooperation of passageway and rectangular channel, after the inside of rectangular channel is gone into through the rectangular rod card, through the stability of second screw guarantee structure, be connected with climbing frame through connecting the passageway, the rail through connecting the passageway both sides has improved the safety efficiency of structure greatly, and through the connection of connecting passageway and opening connecting plate, the people of being convenient for get into mounting platform, mounting platform's availability factor has been improved greatly.
The utility model discloses technical scheme's further improvement lies in: one end of each clamping block is fixedly connected with one side wall of each first plate, each second plate is arranged on one side of each first plate, clamping grooves are formed in two sides of each second plate, and the inner walls of the clamping grooves are connected with the outer side wall of each clamping block in a clamping mode.
Adopt above-mentioned technical scheme, the cooperation of first plate, second plate, fixture block and draw-in groove in this scheme is gone into the inside of draw-in groove through the fixture block card for the joint is in the same place between first plate, the second plate, and the equilibrium of guarantee mount table main part is convenient for install and dismantle, improves the availability factor of structure.
The utility model discloses technical scheme's further improvement lies in: the bottom of the first plate is provided with a fixed rod, the inner thread of the fixed rod is connected with a second bolt, one end of the second bolt is in threaded connection with the inner wall of the first plate, the two ends of the second bolt are connected with the inner wall of the second plate in threaded connection, and one side wall of the second plate and one side wall of the clamping block are fixedly connected through the fixed rod.
Adopt above-mentioned technical scheme, first plate in this scheme, the second plate, the cooperation of dead lever and second bolt, make the dead lever fix at first plate through the second bolt, the bottom of second plate, ensure first plate through the dead lever, the stability of connecting between the second plate, be connected with external steel pipe through the dead lever, make the mount table main part can be fixed on the pier stud, and can not damage the structure of mount table main part, greatly reduced the mount table main part the condition that damages appears demolising the in-process, the availability factor of mount table main part has been improved.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a high mound pier stud reinforcing bar mounting platform, adopt the rail, the protection network, the connecting rod, the cooperation in opening connecting plate and connection passageway, prevent the condition that the instrument dropped from appearing in the work process of constructor through the protection network, insert the inside back of first plate through the connecting block, guarantee the stability of rail through rotating first screw, and then ensure workman's personal safety, penetrate the inside back of first bolt through the nut, through the internal connection of rotating first bolt and screw hole, the stability of connecting between the guarantee connecting rod, prevent that the rail from appearing inclining, guarantee the security of improving device, and be convenient for people to install, after the inside of rectangular channel is gone into through the rectangular bar card, through the stability of second screw guarantee structure, through connecting passageway and climbing frame joint, the security efficiency of structure has been improved greatly through the rail of connecting the passageway both sides, and through connecting passageway and opening connecting plate's connection, the people of being convenient for get into mounting platform, the availability factor of mounting platform has been improved greatly.
2. The utility model provides a high mound pier stud rebar installation platform, adopt first plate, the second plate, the fixture block, the draw-in groove, the cooperation of dead lever and second bolt, go into the inside of draw-in groove through the fixture block card, make first plate, the joint is in the same place between the second plate, the equilibrium of guarantee mount table main part, be convenient for install and dismantle, the availability factor of structure is improved, make the dead lever fix at first plate through the second bolt, the bottom of second plate, ensure first plate through the dead lever, the stability of connecting between the second plate, be connected with external steel pipe through the dead lever, make the mount table main part can be fixed on the pier stud, and can not damage the structure of mount table main part, be convenient for install and dismantle, greatly reduced the mount table main part demolish the circumstances that the in-process appears damaging, the availability factor of mount table main part has been improved.
Drawings
Fig. 1 is a schematic perspective view of a main body of a structural mounting table of the present invention;
FIG. 2 is a schematic side sectional view of the structural mounting platform main body of the present invention;
FIG. 3 is another schematic cross-sectional view of the structural mounting platform body of the present invention;
fig. 4 is a schematic cross-sectional view of the structurally connected aisle according to the present invention.
In the figure: 1. a mounting table main body; 2. a first plate; 21. a second plate; 22. a clamping block; 23. a card slot; 3. a fence; 31. connecting blocks; 32. a first screw; 4. a connecting rod; 41. a first bolt; 42. a nut; 43. a threaded hole; 5. an open connecting plate; 51. a rectangular bar; 52. a second screw; 6. connecting the aisle; 61. a rectangular groove; 7. a protective net; 8. fixing the rod; 9. and a second bolt.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the utility model provides a high mound pier stud reinforcing bar mounting platform, including mount table main part 1, the bottom of mount table main part 1 is provided with first plate 2, and top one side cover of first plate 2 is equipped with rail 3, and rail 3's middle part fixedly connected with protection network 7, rail 3's top one side fixedly connected with connecting rod 4, one side of first plate 2 are provided with opening connecting plate 5, and one side of opening connecting plate 5 is provided with connects passageway 6.
The bottom fixedly connected with connecting block 31 of rail 3, the middle part threaded connection of connecting block 31 has first screw 32, the both ends outer wall of first screw 32 all with the lateral wall threaded connection of first plate 2.
In this embodiment, prevent through protection network 7 that the instrument of constructor from dropping the condition in the course of the work, insert the inside back of first plate 2 through connecting block 31, ensure the stability of rail 3 through rotating first screw 32, and then ensure workman's personal safety.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, threaded hole 43 is all seted up at the both ends of connecting rod 4, the inside threaded connection of threaded hole 43 has first bolt 41, the other end threaded connection of first bolt 41 has nut 42, the lateral wall of nut 42 and first bolt 41's inner wall fixed connection, connect the top both sides fixedly connected with rail 3 of crossing 6, rectangular channel 61 has all been seted up to the top both sides of connecting crossing 6, the inside cover of rectangular channel 61 is equipped with rectangular rod 51, rectangular rod 51's middle part threaded connection has second screw 52, the both ends of second screw 52 all with the inner wall threaded connection who is connected crossing 6, rectangular rod 51's the other end and a lateral wall fixed connection of opening connecting plate 5, the equal fixedly connected with fixture block 22 in opposite side both ends of opening connecting plate 5.
In this embodiment, penetrate first bolt 41's inside back through nut 42, through the internal connection of rotating first bolt 41 and screw hole 43, the stability of connecting between the guarantee connecting rod 4, prevent that slope from appearing in rail 3, the guarantee improves the security of stake, and the people's installation of being convenient for, go into the inside back of rectangular channel 61 through rectangular rod 51 card, guarantee the stability of structure through second screw 52, be connected with climbing frame through connecting passageway 6, rail 3 through connecting passageway 6 both sides has improved the safety efficiency of structure greatly, and through being connected passageway 6 and opening connecting plate 5, the people of being convenient for get into mounting platform, mounting platform's availability factor has been improved greatly.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, fixture block 22's one end all with a lateral wall fixed connection of first plate 2, one side of every first plate 2 all is provided with second plate 21, draw-in groove 23 has all been seted up to the both sides of second plate 21, the inner wall of draw-in groove 23 is connected with fixture block 22's lateral wall block, the bottom of first plate 2 is provided with dead lever 8, the internal thread of dead lever 8 is connected with second bolt 9, the one end of middle part second bolt 9 and first plate 2's inner wall threaded connection, both ends second bolt 9's one end all with second plate 21's inner wall threaded connection, second plate 21, a lateral wall of fixture block 22 all is through dead lever 8 fixed connection.
In this embodiment, go into the inside of draw-in groove 23 through fixture block 22 card, make first plate 2, the joint is in the same place between the second plate 21, ensure the equilibrium of mount table main part 1, be convenient for installation and dismantlement, improve the availability factor of structure, make dead lever 8 fix at first plate 2 through second bolt 9, the bottom of second plate 21, ensure first plate 2 through dead lever 8, the stability of connecting between the second plate 21, be connected with external steel pipe through dead lever 8, make mount table main part 1 can be fixed on the pier stud, and can not damage the structure of mount table main part 1, greatly reduced mount table main part 1 the condition that damages appears dismantling the in-process, the availability factor of mount table main part 1 has been improved.
The working principle of the high pier column reinforcing steel bar mounting platform is described in detail below.
As shown in fig. 1-4, when in use, the first plate 2 and the second plate 21 are connected together in a clamping manner by a clamping block 22, the base part of the installation platform main body 1 is assembled, the fixing rod 8 is fixed on the first plate 2 by a second bolt 9, the bottom of the second plate 21 is fixed by the fixing rod 8, the first plate 2 is ensured by the fixing rod 8, the connection stability between the second plate 21 is ensured by the fixing rod 8, the installation platform main body 1 is connected with an external steel pipe by the fixing rod 8, the installation platform main body 1 can be fixed on a pier stud, after the first plate 2 is inserted into the first plate 2 through a connecting block 31, the stability of the fence 3 is ensured by rotating a first screw 32, the condition that a tool drops during the working process is prevented by a protective net 7, after the nut 42 penetrates into the inside of a first bolt 41, the connection between the first bolt 41 and a threaded hole 43 is rotated, the connection stability between the connecting rods 4 is ensured, the fence 3 is prevented from inclining, after the first plate is clamped into the inside of a rectangular rod 51, the structure is stabilized by a second screw 52, the climbing frame is connected with a climbing frame 6, the passageway 6, and the connection efficiency of the platform is greatly improved by the connecting plate 5.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (6)

1. The utility model provides a high mound pier stud reinforcing bar mounting platform, includes mount table main part (1), the bottom of mount table main part (1) is provided with first plate (2), its characterized in that: one side of the top of the first plate (2) is sleeved with a fence (3), the middle of the fence (3) is fixedly connected with a protective net (7), one side of the top of the fence (3) is fixedly connected with a connecting rod (4), one side of the first plate (2) is provided with an opening connecting plate (5), and one side of the opening connecting plate (5) is provided with a connecting passageway (6).
2. The high pier column steel bar installation platform of claim 1, wherein: the bottom fixedly connected with connecting block (31) of rail (3), the middle part threaded connection of connecting block (31) has first screw (32), the both ends outer wall of first screw (32) all with the lateral wall threaded connection of first plate (2).
3. The high pier column steel bar installation platform of claim 1, wherein: threaded holes (43) are formed in two ends of the connecting rod (4), a first bolt (41) is connected to the inner threads of the threaded holes (43), a nut (42) is connected to the other end of the first bolt (41) in a threaded mode, and the outer side wall of the nut (42) is fixedly connected with the inner wall of the first bolt (41).
4. The high pier column steel bar installation platform of claim 1, wherein: connect top both sides fixedly connected with rail (3) in passageway (6), rectangular channel (61) have all been seted up to the top both sides of connecting passageway (6), the inside cover of rectangular channel (61) is equipped with rectangular pole (51), the middle part threaded connection of rectangular pole (51) has second screw (52), the both ends of second screw (52) all with the inner wall threaded connection who is connected passageway (6), a lateral wall fixed connection of the other end and opening connecting plate (5) of rectangular pole (51), the equal fixedly connected with fixture block (22) in opposite side both ends of opening connecting plate (5).
5. The high pier column rebar installation platform of claim 4, wherein: one end of each clamping block (22) is fixedly connected with one side wall of each first plate (2), each second plate (21) is arranged on one side of each first plate (2), clamping grooves (23) are formed in the two sides of each second plate (21), and the inner walls of the clamping grooves (23) are clamped and connected with the outer side walls of the clamping blocks (22).
6. The high pier column steel bar installation platform of claim 1, wherein: the bottom of the first plate (2) is provided with a fixing rod (8), the inner thread of the fixing rod (8) is connected with a second bolt (9), the middle part of the fixing rod is connected with one end of the second bolt (9) and the inner wall of the first plate (2) in a threaded mode, the two ends of the fixing rod are connected with one end of the second bolt (9) and the inner wall of the second plate (21) in a threaded mode, and the side walls of the second plate (21) and the clamping block (22) are fixedly connected through the fixing rod (8).
CN202223305450.0U 2022-12-06 2022-12-06 High mound pier stud reinforcing bar mounting platform Active CN218779338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223305450.0U CN218779338U (en) 2022-12-06 2022-12-06 High mound pier stud reinforcing bar mounting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223305450.0U CN218779338U (en) 2022-12-06 2022-12-06 High mound pier stud reinforcing bar mounting platform

Publications (1)

Publication Number Publication Date
CN218779338U true CN218779338U (en) 2023-03-31

Family

ID=85710972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223305450.0U Active CN218779338U (en) 2022-12-06 2022-12-06 High mound pier stud reinforcing bar mounting platform

Country Status (1)

Country Link
CN (1) CN218779338U (en)

Similar Documents

Publication Publication Date Title
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
CN218779338U (en) High mound pier stud reinforcing bar mounting platform
CN109779247A (en) The formwork erection device and construction method of steel column cornerite
CN209855375U (en) Building construction rail guard convenient to dismouting and angularly adjustable
CN209817385U (en) Cantilever beam for cantilever scaffold
CN210342602U (en) Scaffold frame convenient to adjust for building engineering
CN111424827A (en) Column-beam connecting device
CN214615043U (en) Prefabricated component reserved steel bar positioning and correcting device
CN111677321B (en) Assembled building reinforced structure
CN211286584U (en) Construction protection system of attached scaffold
CN210597127U (en) Be applicable to rural highway guardrail device of low grade
CN212406336U (en) Bridge construction guardrail device
CN110206306B (en) Integrated transverse assembling method for reinforcement cage and steel formwork
CN210529574U (en) Municipal administration rail guard
CN219365025U (en) PCT shear wall structure suitable for assembly type building construction
CN215717448U (en) Top connection type building inner edge opening protective fence
CN211714638U (en) Face limit protector
CN217840991U (en) A can have enough to meet need formula and enclose fender device for protection of floor adjacent side
CN213709616U (en) Contact net basis rag bolt positioner
CN212801990U (en) Column-beam connecting device
CN213449189U (en) Parapet construction tool
CN211691303U (en) Civil air defense door frame supporting structure
CN220928828U (en) Existing crossbeam normal position cast-in-situ reinforcement structure
CN210217115U (en) Template for constructional engineering
CN220746603U (en) Simple platform for installing high pier turnover formwork construction steel bars

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant