CN218759925U - Secondary grouting hole structure - Google Patents
Secondary grouting hole structure Download PDFInfo
- Publication number
- CN218759925U CN218759925U CN202222442967.8U CN202222442967U CN218759925U CN 218759925 U CN218759925 U CN 218759925U CN 202222442967 U CN202222442967 U CN 202222442967U CN 218759925 U CN218759925 U CN 218759925U
- Authority
- CN
- China
- Prior art keywords
- pipe
- grouting
- slip casting
- buried
- check valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a secondary slip casting pore structure, pre-buried screwed pipe (4) top install stopper (3), slip casting spiral pipe (5) are installed to the bottom, pre-buried screwed pipe (4) one end install check valve (1), check valve (1) be located between pre-buried screwed pipe (4) and slip casting spiral pipe (5), pre-buried screwed pipe (4) in perfuse slurry coagulation piece (8), slip casting spiral pipe (5) bottom install sealing washer (6) and slip casting stopcock (7). The anti-seepage water-stop plastic cover overcomes the defects that the adhesive property of a grout block and the wall of a concrete pipe is weakened along with the increase of the operating years of a tunnel, the plastic cover can be corroded and fall off after being used for a long time, high external water pressure is difficult to bear, finally disasters such as water leakage and sand gushing of a secondary grouting hole can occur, and the anti-seepage water-stop plastic cover has the advantages that the secondary grouting hole can provide seepage prevention and water stop by virtue of the adhesive friction between the grout condensation block 8 and the embedded threaded pipe 4.
Description
Technical Field
The utility model relates to civil engineering shield tunnel's technical field, concretely relates to secondary slip casting pore structure.
Background
In the shield tunnel tunneling construction process, the gaps between shield segments and surrounding rocks are generally filled with slurry in a synchronous grouting mode, when the synchronous grouting has poor effect of plugging the gaps around the segments, so that the stratum is too large in sedimentation or the water seepage of the segments is serious, secondary grouting is carried out through reserved grouting holes in the segments to fill the gaps, and the purposes of controlling the stratum sedimentation and plugging seepage are achieved.
After the secondary grouting is finished, the secondary grouting holes in the segments need to be plugged, so that the phenomenon that the secondary grouting holes leak water in the construction period and the operation period to influence the normal use of the shield tunnel is avoided. At present, the conventional plugging of the secondary grouting hole depends on the friction between a slurry block condensed in a straight pipe in the hole and a pipe wall, and the end part of the secondary grouting hole is plugged by a plastic blank cap. However, as the number of years of tunnel operation increases, the adhesion between the grout blocks and the concrete pipe wall is weakened, and the plastic blank cap is corroded and falls off even after being used for a long time, so that the plastic blank cap is difficult to bear high external water pressure, and finally disasters such as water leakage and sand gushing of a secondary grouting hole can occur.
A structure is therefore required to solve the above problems.
Disclosure of Invention
The utility model aims to overcome the defects of the background art and provides a secondary grouting hole structure.
The utility model aims at being implemented through the following technical scheme: a secondary grouting hole structure comprises a grouting spiral pipe, an embedded spiral pipe and a plug which are sequentially arranged from the right bottom to the top of a secondary grouting filling opening;
the top of the pre-buried screwed pipe is provided with a plug, the bottom of the pre-buried screwed pipe is provided with a grouting spiral pipe, one end of the pre-buried screwed pipe is provided with a check valve, the check valve is positioned between the pre-buried screwed pipe and the grouting spiral pipe,
slurry coagulator is poured into the pre-buried threaded pipe, and a sealing ring and a grouting pipe plug are installed at the bottom of the grouting spiral pipe.
In the above technical scheme: and a grouting pipe sealing ring is arranged between the check valve and the grouting spiral pipe.
In the above technical scheme: the inner wall of the embedded threaded pipe is threaded, and the pipe diameter of the embedded threaded pipe is larger than that of the grouting spiral pipe.
The utility model has the advantages of as follows: 1. the utility model discloses improve secondary slip casting pore structure, increase one section pre-buried screwed pipe in section of jurisdiction thickness direction slip casting section to prefabricate into the wedge with the screwed pipe. Like this, after the secondary slip casting, the bonding that the thick liquid can be fine with pre-buried screwed pipe, area of contact increases, and the thick liquid condenses into the thick liquid behind the thick liquid piece with the frictional force increase of screwed pipe.
2. The utility model provides a thick liquid coagulation piece finally becomes the wedge, can form the bayonet socket in the section of jurisdiction, should not become flexible and drop. This has greatly increased the stagnant water performance of construction period and operation period secondary slip casting hole.
3. The utility model discloses overall structure is simple, and the construction is convenient, need not do any change to current template, and the expense of increase is very little, and the real-time is extremely strong.
Drawings
FIG. 1 is a view showing a state of a grouting hole before secondary grouting.
Fig. 2 is a diagram of a grouting hole after secondary grouting.
Wherein: the grouting device comprises a check valve 1, a grouting pipe sealing ring 2, a plug 3, a pre-buried threaded pipe 4, a grouting spiral pipe 5, a sealing ring 6, a grouting pipe plug 7, a slurry condensation block 8 and a secondary grouting filling opening 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to FIGS. 1-2: a secondary grouting hole structure comprises a grouting spiral pipe 5, an embedded threaded pipe 4 and a plug 3 which are sequentially arranged from the right lower part to the upper part of a secondary grouting filling opening 9; the top of the pre-buried threaded pipe 4 is provided with a plug 3, the bottom of the pre-buried threaded pipe is provided with a grouting spiral pipe 5, one end of the pre-buried threaded pipe 4 is provided with a check valve 1, the check valve 1 is positioned between the pre-buried threaded pipe 4 and the grouting spiral pipe 5,
and after the secondary lining grouting is finished, a slurry coagulation block 8 is poured into the embedded threaded pipe 4, and a sealing ring 6 and a grouting pipe plug 7 are installed at the bottom of the grouting spiral pipe 5.
And a grouting pipe sealing ring 2 is arranged between the check valve 1 and the grouting spiral pipe 5. The inner wall of the pre-buried screwed pipe 4 is in a thread shape, and the pipe diameter of the pre-buried screwed pipe is larger than that of the grouting spiral pipe 5.
The utility model discloses still include as follows implementation engineering: the grouting spiral pipe 5 is screwed in the grouting head in advance, firstly, a drill rod extends into a secondary grouting hole 9, a concrete structure at the upper end of the plug 3 is drilled, meanwhile, the other end of the grouting head is connected with a ball valve, grouting is started after a grouting pipeline is connected, grout enters the outer side of a concrete pipe piece through the secondary grouting filling hole 9, a water stop valve 1 and an embedded threaded pipe 4, a gap between the pipe piece and the ground is filled, and meanwhile, the grout is prevented from flowing back through a check valve 1 arranged at the tail part of the embedded threaded pipe 4.
After the secondary grouting is finished, the grouting head is screwed out of the grouting spiral pipe 5, the position of the original grouting spiral pipe 5 is free to form a cavity, and the end part of the grouting spiral pipe 5 is stuffed with a grouting pipe plug 7 and a grouting pipe plug sealing ring 6.
Along with the operation of the tunnel, the grouting pipe plug 7 is easy to corrode and fall off, and a good anti-seepage effect is difficult to achieve. But the secondary grouting hole provides seepage prevention and water stop by means of the bonding friction between the grout congealing block 8 and the embedded threaded pipe 4.
The above-mentioned parts not described in detail are prior art.
Claims (3)
1. A secondary grouting hole structure comprises a grouting spiral pipe (5), an embedded threaded pipe (4) and a plug (3) which are sequentially arranged from bottom to top from a secondary grouting filling opening (9); the method is characterized in that: the top of the pre-buried threaded pipe (4) is provided with a plug (3), the bottom of the pre-buried threaded pipe (4) is provided with a grouting spiral pipe (5), one end of the pre-buried threaded pipe (4) is provided with a check valve (1), the check valve (1) is positioned between the pre-buried threaded pipe (4) and the grouting spiral pipe (5),
slurry coagulator (8) is poured into the embedded threaded pipe (4), and a sealing ring (6) and a grouting pipe plug (7) are installed at the bottom of the grouting spiral pipe (5).
2. The secondary grouting hole structure of claim 1, wherein: and a grouting pipe sealing ring (2) is arranged between the check valve (1) and the grouting spiral pipe (5).
3. The secondary grouting hole structure of claim 1, wherein: the inner wall of the embedded threaded pipe (4) is threaded, and the pipe diameter of the embedded threaded pipe (4) is larger than that of the grouting spiral pipe (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222442967.8U CN218759925U (en) | 2022-09-15 | 2022-09-15 | Secondary grouting hole structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222442967.8U CN218759925U (en) | 2022-09-15 | 2022-09-15 | Secondary grouting hole structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218759925U true CN218759925U (en) | 2023-03-28 |
Family
ID=85693850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222442967.8U Active CN218759925U (en) | 2022-09-15 | 2022-09-15 | Secondary grouting hole structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218759925U (en) |
-
2022
- 2022-09-15 CN CN202222442967.8U patent/CN218759925U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104389623B (en) | Shield tunnel prefabricated tunnel segment lining back stratum grouting device | |
CN103669346B (en) | A kind of tuck inside the sleeve raft pipe and the application in landslide control | |
CN209637774U (en) | A kind of duct pieces of shield tunnel grouting device | |
CN105697034B (en) | Backfill the grouting system and grouting method of slip casting behind for composite lining structure | |
CN109026068A (en) | Shield tunnel grouting behind shaft or drift lining auxiliary body and grouting method | |
CN201129184Y (en) | Tubule external valve one-way type subsection back grouting apparatus | |
CN104948133A (en) | Grouting plugging device suitable for high-pressure mass-flow gushing water and technology thereof | |
CN106894414A (en) | Biliquid deep hole bottom pinpoints accurate mixed construction technique and slip casting structure | |
CN218759925U (en) | Secondary grouting hole structure | |
CN208219682U (en) | A kind of ultra-deep foundation pit decompression of confined water well shut-in well structure | |
CN206646495U (en) | Biliquid deep hole bottom fixed point precisely mixes slip casting structure | |
CN210370586U (en) | Water outlet elevation drilling and grouting water stopping device | |
CN106640159A (en) | Connecting sleeve sealing structure for self-drilling type hollow grouting anchors | |
CN207436079U (en) | A kind of drainage for foundation pit construction only gushes device | |
CN206785350U (en) | A kind of water burst drilling holes plugging device | |
CN110777860A (en) | Method for grouting and plugging back of side wall leakage water of subway station | |
CN206233204U (en) | Buried pressure steel pipe contact grouting hole sealing structure | |
CN215566027U (en) | Novel anchor rod full-length anchoring device | |
CN212154855U (en) | Disposable simple grout stop plug for goaf grouting filling | |
CN111156033B (en) | Tunnel inverted arch structure repairing method | |
CN211448734U (en) | Slip casting steel floral tube | |
CN210289836U (en) | Advanced drainage structure of rich water tunnel construction | |
CN102182480A (en) | Mortar anchor constructing method | |
CN204491618U (en) | Self-plugging infiltration type slurry casting machine | |
CN202039360U (en) | Grout-stopping plug for anchorage cables |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |