CN102182480A - Mortar anchor constructing method - Google Patents

Mortar anchor constructing method Download PDF

Info

Publication number
CN102182480A
CN102182480A CN2011101140744A CN201110114074A CN102182480A CN 102182480 A CN102182480 A CN 102182480A CN 2011101140744 A CN2011101140744 A CN 2011101140744A CN 201110114074 A CN201110114074 A CN 201110114074A CN 102182480 A CN102182480 A CN 102182480A
Authority
CN
China
Prior art keywords
limit plug
hole
slip casting
mortar
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101140744A
Other languages
Chinese (zh)
Other versions
CN102182480B (en
Inventor
辛振省
郑保才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN 201110114074 priority Critical patent/CN102182480B/en
Publication of CN102182480A publication Critical patent/CN102182480A/en
Application granted granted Critical
Publication of CN102182480B publication Critical patent/CN102182480B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention belongs to the technical field of mortar anchor construction in tunnel and underground engineering and side slope engineering, in particular to a mortar anchor constructing method. By the method, the problem that the mortar anchor constructing method has difficulty in ensuring engineering quality in the prior art is solved. The method accomplishes mortar anchor construction by using a frustum-shaped location plug consisting of an upper part and a lower part; the upper part of the location plug has a hard wedge structure; the lower part of the location plug is made of elastic material; and a through hole is formed in the lower part of the location plug along the mortar-injecting direction. The method disclosed by the invention is low in cost, simple and easy in operation and easy in popularization; the economic benefit and social benefit of the method are outstanding in the current large-scale tunnel and underground engineering and side slope engineering; and the popularization value of the method is very high.

Description

A kind of grouting rock bolt job practices
Technical field
The invention belongs to the technical field of tunnel and underground construction and slope project grouting rock bolt construction, be specifically related to a kind of grouting rock bolt job practices.
Background technology
Along with the day of land resources is becoming tight, the planning of increasing traffic route can not occupy cultivated land in a large number again, so traffic engineering often need be built in the mountain region, inevitably need in the engineering construction to adopt the mode of tunnel or side slope to carry out design and construction, in the engineering construction field, the proportion that tunnel and underground construction and slope project account for is increasing.In numerous tunnels and side slope construction project, all need to adopt grouting rock bolt to realize the stable of country rock, so grouting rock bolt support at present is the support system of widespread usage in tunnel or the slope project as support system.
The grouting rock bolt system main construction method of using is at present: arrange the position, hole of anchor pole earlier, and according to position of designing and angle boring, the grouting pump pipeline is connected again that the wetting pipeline of water and thin pulp is inserted to Grouting Pipe at the bottom of the square more then.Slowly open valve and begin slip casting.Under pressure promoted, water was preceding, mortar after, the moistening pump housing of water and pipeline, the guiding mortar enters in the anchor hole, along with mortar constantly is pressed into the eyeground, Grouting Pipe and then slowly withdraws from eyelet, after mortar is filled with eyelet.Immediately anchor pole is inserted eyelet, then, anchor pole is inserted to the eyeground with the method that pushes away, thumps.Stop up the aperture with timber wedge then, prevent that mortar runs off.
But in the site operation process, anchor pole needs hammering in the location, and the hammering vibrations cause the mortar segregation and the mortar outflow of anchor pole easily, and locate failure under a lot of situation, the secondary location makes the mortar of initial set and the bond stress of anchor pole lose efficacy, and makes the support system of whole grouting rock bolt lose efficacy; Moreover hammering is bigger to original unsettled country rock disturbance, causes that easily country rock caves in; In addition it is lack of standardization to stop up the employed timber wedge size in aperture, can not play due effect.The lighter need do over again, and weight person causes engineering accident.
Summary of the invention
There are the problems referred to above in the present invention in order to solve existing grouting rock bolt job practices, be difficult to guarantee workmanship, a kind of grouting rock bolt job practices is provided, with easy method anchor pole is accurately located during insertion, the seal anchors aperture prevents the slurries outflow simultaneously, reaches the purpose of construction safely and fast when guaranteeing workmanship.
The present invention adopts following technical scheme to realize:
The grouting rock bolt job practices, step is as follows:
1), arrange the position, hole of anchor pole, and form anchor hole according to the position and the angle boring of design;
2), slip casting in anchor hole;
3), prepare limit plug, limit plug is made of the upper and lower two parts that can form the frustum shape, limit plug top is divided into the wedge structure of hard, the limit plug lower part is made by elastomeric material, the limit plug lower part is along having through hole on the slip casting direction;
4), slip casting is about to extract Grouting Pipe when full out, Grouting Pipe filled in the through hole of limit plug lower part, then the anchor hole mouth is filled in the limit plug lower part, and compresses;
5), continue slip casting, treat that slurries flow out from the wedge shape space of top, limit plug lower part, Grouting Pipe is extracted on the limit plug top of wedge structure beyond the Great Wall, inserts anchor pole simultaneously;
6), treat that slurries solidify the construction of then finishing grouting rock bolt.
The present invention has following beneficial effect: it is set to two parts up and down to the positioner that seals that the present invention adopts dexterously, and top is divided into hard, the bottom is divided into elastic body, so in the work progress that it is finished, when being about to the nature outflow, mortar fills in the fullness degree that the bottom elastic part has in time guaranteed slurries, guaranteed the construction quality of grouting rock bolt, the top wedge structure further guarantees mortar construction enforcement as interim exhaust plant simultaneously; Simultaneously a whole set of closure system can be so that anchor bolt construction be just can be in design attitude through the external force vibrations, and is in the slurries centre position, the common fault of avoiding disturbance that the hammering in the conventional method brings to country rock and stopper to be difficult to the jam-pack aperture; So the present invention guarantees construction quality to greatest extent from construction technology or from the construction angle of mechanics.This method is cheap, and is simple to operation, very easily promotes, and its economic benefit and social benefit are particularly outstanding, of far-reaching significance in current extensive tunnel and underground construction and slope project, and high promotional value is arranged.
Description of drawings
Fig. 1 is the schematic diagram that becomes anchor hole according to the bolthole position
Fig. 2 is the schematic diagram of slip casting in anchor hole
Fig. 3 is the structural representation of limit plug
Fig. 4 fills in the schematic diagram that continues slip casting behind the limit plug
Fig. 5 is sealing anchor hole aperture and the schematic diagram that inserts anchor pole
Among the figure: 1-country rock, 2-anchor hole, 3-Grouting Pipe, 4-slurries, 5-limit plug top, 6-limit plug lower part, 7-through hole, 8-anchor pole.
The specific embodiment
The specific embodiment to invention is described further in conjunction with the accompanying drawings.
The grouting rock bolt job practices, step is as follows:
1, arranges the position, hole of anchor pole 8 earlier, and hole, as shown in Figure 1 according to the position and the angle of design.
2, the grouting pump pipeline is connected, the wetting pipeline of water and thin pulp then is inserted to Grouting Pipe 3 the anchor hole bottom more again, slowly open valve and begin slip casting, on one side slip casting slowly extract Grouting Pipe 3 out according to the slurries amount on one side, full until slurries.
3, prepare limit plug, limit plug is made of the upper and lower two parts that can form the frustum shape, and limit plug top 5 is the wedge structure of hard, and limit plug lower part 6 is made by elastomeric material, limit plug lower part 6 is along having through hole 7, as shown in Figure 3 on the slip casting direction.Whole limit plug rear portion diameter is more bigger than anchor hole mouth.
4, slip casting is about to extract out when full Grouting Pipe 3, Grouting Pipe 3 is filled in the through hole 7 of limit plug lower part 6, the anchor hole mouth is filled in limit plug lower part 6 and compress, limit plug top 5 is not filled in earlier, continue slip casting then, the gas that slip casting is got rid of is discharged from the wedge shape space of 5 tops, limit plug lower part, as shown in Figure 4.
5, treat that slurries 4 flow out from the top wedge shape space, illustrate that slurries are full, beyond the Great Wall the limit plug top 5 of hard wedge structure, insert ready anchor pole 8 when extracting Grouting Pipe 4, then anchor pole is positioned and fills in the location, as shown in Figure 5, treats that slurries solidify the construction of then finishing grouting rock bolt.

Claims (1)

1. grouting rock bolt job practices is characterized in that step is as follows:
1), arrange the position, hole of anchor pole (8), and form anchor hole (2) according to the position and the angle boring of design;
2), slip casting in anchor hole (2);
3), prepare limit plug, limit plug is made of the upper and lower two parts that can form the frustum shape, limit plug top (5) is the wedge structure of hard, and limit plug lower part (6) are made by elastomeric material, and limit plug lower part (6) are along having through hole (7) on the slip casting direction;
4), slip casting is about to extract Grouting Pipe (3) when full out, Grouting Pipe (3) filled in the through hole (7) of limit plug lower part (6), then limit plug lower part (6) are filled in the anchor hole mouth, and compress;
5), continue slip casting, treat that slurries (4) flow out from the wedge shape space of limit plug lower part (6) top, Grouting Pipe (3) is extracted on the limit plug top (5) of wedge structure beyond the Great Wall, inserts anchor pole (8) simultaneously;
6), treat that slurries (4) solidify the construction of then finishing grouting rock bolt.
CN 201110114074 2011-05-04 2011-05-04 Mortar anchor constructing method Active CN102182480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110114074 CN102182480B (en) 2011-05-04 2011-05-04 Mortar anchor constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110114074 CN102182480B (en) 2011-05-04 2011-05-04 Mortar anchor constructing method

Publications (2)

Publication Number Publication Date
CN102182480A true CN102182480A (en) 2011-09-14
CN102182480B CN102182480B (en) 2013-03-13

Family

ID=44568758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110114074 Active CN102182480B (en) 2011-05-04 2011-05-04 Mortar anchor constructing method

Country Status (1)

Country Link
CN (1) CN102182480B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797491A (en) * 2012-08-04 2012-11-28 河南理工大学 System and method for monitoring dynamic disaster of coal mine with fiber bragg gratings
CN105201513A (en) * 2015-09-11 2015-12-30 重庆工程职业技术学院 Shaft construction method for rail transit
CN107119682A (en) * 2017-04-25 2017-09-01 温州鸿越建设工程有限公司 A kind of soil nail wall and its construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2290119A (en) * 1994-06-07 1995-12-13 Jennmar Corp Flexible rock bolt
WO2007015614A1 (en) * 2005-08-03 2007-02-08 Jong Duck Shin Preceding tension type lock bolt and construction method using the same
CN1982651A (en) * 2005-12-14 2007-06-20 招金矿业股份有限公司大尹格庄金矿 Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
KR20070087945A (en) * 2006-02-17 2007-08-29 원연호 Cement mortar type rock bolt
CN201137141Y (en) * 2007-12-26 2008-10-22 成都现代万通锚固技术有限公司 Hollow grouting anchoring-bolt capable of measuring length and discharging gas
CN201377333Y (en) * 2009-04-02 2010-01-06 唐忠明 Expansion type recyclable rock bolt
CN201412173Y (en) * 2009-06-25 2010-02-24 中冶集团华冶资源开发有限责任公司 Grouting device for anchor rod hole
CN101768960A (en) * 2008-12-31 2010-07-07 新疆维吾尔自治区送变电工程公司 Bored concrete pile construction method of permafrost layer
CN201539270U (en) * 2009-08-20 2010-08-04 陕西省公路勘察设计院 Novel prestressed supporting device
KR20100130768A (en) * 2009-06-04 2010-12-14 주식회사 비젼테크 Cap for preventing mortar from leaking

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2290119A (en) * 1994-06-07 1995-12-13 Jennmar Corp Flexible rock bolt
WO2007015614A1 (en) * 2005-08-03 2007-02-08 Jong Duck Shin Preceding tension type lock bolt and construction method using the same
CN1982651A (en) * 2005-12-14 2007-06-20 招金矿业股份有限公司大尹格庄金矿 Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
KR20070087945A (en) * 2006-02-17 2007-08-29 원연호 Cement mortar type rock bolt
CN201137141Y (en) * 2007-12-26 2008-10-22 成都现代万通锚固技术有限公司 Hollow grouting anchoring-bolt capable of measuring length and discharging gas
CN101768960A (en) * 2008-12-31 2010-07-07 新疆维吾尔自治区送变电工程公司 Bored concrete pile construction method of permafrost layer
CN201377333Y (en) * 2009-04-02 2010-01-06 唐忠明 Expansion type recyclable rock bolt
KR20100130768A (en) * 2009-06-04 2010-12-14 주식회사 비젼테크 Cap for preventing mortar from leaking
CN201412173Y (en) * 2009-06-25 2010-02-24 中冶集团华冶资源开发有限责任公司 Grouting device for anchor rod hole
CN201539270U (en) * 2009-08-20 2010-08-04 陕西省公路勘察设计院 Novel prestressed supporting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王瑞萍: "拱部超长径向系统砂浆锚杆施工技术", 《西部探矿工程》, no. 05, 25 May 2005 (2005-05-25) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797491A (en) * 2012-08-04 2012-11-28 河南理工大学 System and method for monitoring dynamic disaster of coal mine with fiber bragg gratings
CN105201513A (en) * 2015-09-11 2015-12-30 重庆工程职业技术学院 Shaft construction method for rail transit
CN107119682A (en) * 2017-04-25 2017-09-01 温州鸿越建设工程有限公司 A kind of soil nail wall and its construction method
CN107119682B (en) * 2017-04-25 2019-03-12 温州鸿越建设工程有限公司 A kind of soil nail wall and its construction method

Also Published As

Publication number Publication date
CN102182480B (en) 2013-03-13

Similar Documents

Publication Publication Date Title
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN206319886U (en) Tunnel lining structure
CN102182480B (en) Mortar anchor constructing method
CN106968140B (en) The construction method of structure is repaired in a kind of non-fragment orbit railway tunnel arch
CN103774649B (en) Anti-mouth prevents the prestressed anchor extracted from anchor hole
CN201771514U (en) Concealed tunneling structure with pile foundation
CN207567738U (en) Diversion tunnel plugging structure
WO2020006870A1 (en) Gas extraction hole drilling and hole sealing method for building anti-seepage barrier based on grooving-backfilling method
CN204921007U (en) Process systems is strutted in stock slip casting
CN203307776U (en) Concrete face rock fill dam toe board structure
CN204436425U (en) A kind of two fluid grouting mixing arrangement
CN101864990A (en) Water intercepting and conducting device for shaft of vertical well
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN202039879U (en) Combined type mortar bolt sealing locating plug
CN206916543U (en) Structure is repaired in a kind of non-fragment orbit railway tunnel arch
CN105089687B (en) Bolt grouting support process system
CN103966981B (en) Force transferring structure and the construction method thereof of arch dam is built on weathering rock mass
CN202851052U (en) A delay self-expanding capsule and paste body combination hole sealing device for drilled holes of gas extraction
CN201865118U (en) Grouting spiral anchor base
CN205475098U (en) Panel rock -fill dam seepage prevention structure
CN104389609A (en) No-blasting mechanical digging method
CN104141286A (en) Construction adit blocking structure
CN204899958U (en) Antiskid anchor rope
CN210975737U (en) Reservoir dam body culvert pipe transformation structure
CN204570705U (en) Three-dimensional post jacking structure is held in a kind of artificial grouting layer method stake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant