CN102182480B - Mortar anchor constructing method - Google Patents

Mortar anchor constructing method Download PDF

Info

Publication number
CN102182480B
CN102182480B CN 201110114074 CN201110114074A CN102182480B CN 102182480 B CN102182480 B CN 102182480B CN 201110114074 CN201110114074 CN 201110114074 CN 201110114074 A CN201110114074 A CN 201110114074A CN 102182480 B CN102182480 B CN 102182480B
Authority
CN
China
Prior art keywords
limit plug
hole
anchor
mortar
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110114074
Other languages
Chinese (zh)
Other versions
CN102182480A (en
Inventor
辛振省
郑保才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN 201110114074 priority Critical patent/CN102182480B/en
Publication of CN102182480A publication Critical patent/CN102182480A/en
Application granted granted Critical
Publication of CN102182480B publication Critical patent/CN102182480B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention belongs to the technical field of mortar anchor construction in tunnel and underground engineering and side slope engineering, in particular to a mortar anchor constructing method. By the method, the problem that the mortar anchor constructing method has difficulty in ensuring engineering quality in the prior art is solved. The method accomplishes mortar anchor construction by using a frustum-shaped location plug consisting of an upper part and a lower part; the upper part of the location plug has a hard wedge structure; the lower part of the location plug is made of elastic material; and a through hole is formed in the lower part of the location plug along the mortar-injecting direction. The method disclosed by the invention is low in cost, simple and easy in operation and easy in popularization; the economic benefit and social benefit of the method are outstanding in the current large-scale tunnel and underground engineering and side slope engineering; and the popularization value of the method is very high.

Description

A kind of mortar anchor constructing method
Technical field
The invention belongs to the technical field of tunnel and underground construction and slope project grouting rock bolt construction, be specifically related to a kind of mortar anchor constructing method.
Background technology
Along with the day of land resources is becoming tight, increasing traffic lines planning can not occupy cultivated land in a large number again, so traffic engineering often need to be built in the mountain region, inevitably need in the engineering construction to adopt the mode of tunnel or side slope to carry out design and construction, in the engineering construction field, the proportion that tunnel and underground construction and slope project account for is increasing.In numerous tunnels and Slope Construction engineering, all need to adopt grouting rock bolt to realize the stable of country rock as support system, so at present grouting rock bolt support is the support system of generally using in tunnel or the slope project.
The grouting rock bolt system main construction method of using at present is: arrange first the position, hole of anchor pole, and according to the position and the angular hole-boring that design, the grouting pump pipeline is connected again that then the wetting pipeline of water and thin pulp is inserted to Grouting Pipe at the bottom of the square again.Slowly open valve and begin slip casting.Under pressure promoted, water was front, and mortar is rear, the moistening pump housing of water and pipeline, and the guiding mortar enters in the anchor hole, and along with mortar constantly is pressed into the eyeground, Grouting Pipe and then slowly withdraws from eyelet, until after mortar fills with eyelet.Immediately anchor pole is inserted eyelet, then with the method that pushes away, thumps, anchor pole is inserted to the eyeground.Then stop up the aperture with timber wedge, prevent that mortar runs off.
But in the site operation process, anchor pole needs hammering in the location, and the hammering vibrations cause mortar segregation and the mortar outflow of anchor pole easily, and locate failure in a lot of situation, secondary is located so that the bond stress of the mortar of initial set and anchor pole lost efficacy, so that the support system of whole grouting rock bolt lost efficacy; Moreover hammering is larger to original unsettled country rock disturbance, causes that easily country rock caves in; In addition it is lack of standardization to stop up the employed timber wedge size in aperture, can not play due effect.The lighter need to do over again, and severe one causes engineering accident.
Summary of the invention
There are the problems referred to above in the present invention in order to solve existing mortar anchor constructing method, be difficult to guarantee workmanship, a kind of mortar anchor constructing method is provided, with easy method anchor pole is accurately located during insertion, the seal anchors aperture prevents the slurries outflow simultaneously, reaches the safely and fast purpose of construction when guaranteeing workmanship.
The present invention adopts following technical scheme to realize:
Mortar anchor constructing method, step is as follows:
1), arrange the position, hole of anchor pole, and form anchor hole according to position and the angular hole-boring of design;
2), slip casting in the anchor hole;
3), prepare limit plug, limit plug is made of the upper and lower two parts that can form the frustum shape, limit plug top is divided into the wedge structure of hard, part is made by elastomeric material under the limit plug, part is along having through hole on the slip casting direction under the limit plug;
4), slip casting is about to extract Grouting Pipe when full out, Grouting Pipe filled in the through hole of part under the limit plug, then part under the limit plug is filled in the anchor hole mouth, and compresses;
5), continue slip casting, treat that slurries wedge shape space of part top under the limit plug flows out, part on the limit plug of wedge structure is extracted Grouting Pipe beyond the Great Wall, inserts simultaneously anchor pole;
6), treat that slurries solidify the construction of then finishing grouting rock bolt.
The present invention has following beneficial effect: it is set to up and down two parts to the sealing positioner that the present invention adopts dexterously, and top is divided into hard, the bottom is divided into elastic body, so in the work progress that it is finished, when being about to the nature outflow, mortar fills in the fullness degree that the bottom elastic part has in time guaranteed slurries, guaranteed the construction quality of grouting rock bolt, go up simultaneously the part wedge structure as interim exhaust plant, further guarantee mortar construction enforcement; Simultaneously a whole set of closure system can be so that anchor bolt construction be just can be in design attitude through the external force vibrations, and is in the slurries centre position, the common fault of avoiding disturbance that the hammering in the conventional method brings to country rock and stopper to be difficult to the jam-pack aperture; So the present invention guarantees construction quality to greatest extent from construction technology or from the angle of construction mechanics.This method is cheap, and is simple to operation, very easily promotes, and its economic benefit and social benefit are particularly outstanding, of far-reaching significance in current extensive tunnel and underground construction and slope project, and high promotional value is arranged.
Description of drawings
Fig. 1 is the schematic diagram that becomes anchor hole according to the bolthole position
Fig. 2 is the schematic diagram of slip casting in the anchor hole
Fig. 3 is the structural representation of limit plug
Fig. 4 fills in the schematic diagram that continues slip casting behind the limit plug
Fig. 5 is sealing anchor hole aperture and the schematic diagram that inserts anchor pole
Among the figure: 1-country rock, 2-anchor hole, 3-Grouting Pipe, 4-slurries, part on the 5-limit plug, part under the 6-limit plug, 7-through hole, 8-anchor pole.
The specific embodiment
By reference to the accompanying drawings the specific embodiment of invention is described further.
Mortar anchor constructing method, step is as follows:
1, arrange first the position, hole of anchor pole 8, and according to the position and the angular hole-boring that design, as shown in Figure 1.
2, the grouting pump pipeline is connected, the wetting pipeline of water and thin pulp then is inserted to Grouting Pipe 3 the anchor hole bottom more again, slowly open valve and begin slip casting, on one side slip casting slowly extract Grouting Pipe 3 out according to the slurries amount on one side, until slurries are full.
3, prepare limit plug, limit plug is made of the upper and lower two parts that can form the frustum shape, and part 5 is the wedge structure of hard on the limit plug, and part 6 is made by elastomeric material under the limit plug, part 6 is along having through hole 7, as shown in Figure 3 under the limit plug on the slip casting direction.Whole limit plug rear portion diameter is more bigger than anchor hole mouth.
4, slip casting is about to extract out when full Grouting Pipe 3, Grouting Pipe 3 is filled in the through hole 7 of part 6 under the limit plug, part under the limit plug 6 is filled in anchor hole mouth and compression, part 5 is not filled in first on the limit plug, then continue slip casting, the gas that slip casting is got rid of wedge shape space of part 5 tops under the limit plug is discharged, as shown in Figure 4.
5, treat that slurries 4 flow out from the top wedge shape space, illustrate that slurries are full, beyond the Great Wall part 5 on the limit plug of hard wedge structure, insert ready anchor pole 8 when extracting Grouting Pipe 4, then anchor pole is positioned and fills in the location, as shown in Figure 5, treats that slurries solidify the construction of then finishing grouting rock bolt.

Claims (1)

1. mortar anchor constructing method is characterized in that step is as follows:
1), arrange the position, hole of anchor pole (8), and form anchor hole (2) according to position and the angular hole-boring of design;
2), to the interior slip casting of anchor hole (2);
3), prepare limit plug, limit plug is made of the upper and lower two parts that can form the frustum shape, part (5) is the wedge structure of hard on the limit plug, and part (6) is made by elastomeric material under the limit plug, and part (6) is along having through hole (7) on the slip casting direction under the limit plug;
4), slip casting is about to extract Grouting Pipe (3) when full out, Grouting Pipe (3) filled in the through hole (7) of part (6) under the limit plug, then part (6) under the limit plug is filled in the anchor hole mouth, and compresses;
5), continue slip casting, treat that slurries (4) wedge shape space of part (6) top under the limit plug flows out, part (5) on the limit plug of wedge structure is extracted Grouting Pipe (3) beyond the Great Wall, inserts simultaneously anchor pole (8);
6), treat that slurries (4) solidify the construction of then finishing grouting rock bolt.
CN 201110114074 2011-05-04 2011-05-04 Mortar anchor constructing method Active CN102182480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110114074 CN102182480B (en) 2011-05-04 2011-05-04 Mortar anchor constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110114074 CN102182480B (en) 2011-05-04 2011-05-04 Mortar anchor constructing method

Publications (2)

Publication Number Publication Date
CN102182480A CN102182480A (en) 2011-09-14
CN102182480B true CN102182480B (en) 2013-03-13

Family

ID=44568758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110114074 Active CN102182480B (en) 2011-05-04 2011-05-04 Mortar anchor constructing method

Country Status (1)

Country Link
CN (1) CN102182480B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797491A (en) * 2012-08-04 2012-11-28 河南理工大学 System and method for monitoring dynamic disaster of coal mine with fiber bragg gratings
CN105201513A (en) * 2015-09-11 2015-12-30 重庆工程职业技术学院 Shaft construction method for rail transit
CN107119682B (en) * 2017-04-25 2019-03-12 温州鸿越建设工程有限公司 A kind of soil nail wall and its construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2290119A (en) * 1994-06-07 1995-12-13 Jennmar Corp Flexible rock bolt
WO2007015614A1 (en) * 2005-08-03 2007-02-08 Jong Duck Shin Preceding tension type lock bolt and construction method using the same
CN1982651A (en) * 2005-12-14 2007-06-20 招金矿业股份有限公司大尹格庄金矿 Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
KR20070087945A (en) * 2006-02-17 2007-08-29 원연호 Cement mortar type rock bolt
CN201137141Y (en) * 2007-12-26 2008-10-22 成都现代万通锚固技术有限公司 Hollow grouting anchoring-bolt capable of measuring length and discharging gas
CN201377333Y (en) * 2009-04-02 2010-01-06 唐忠明 Expansion type recyclable rock bolt
CN201412173Y (en) * 2009-06-25 2010-02-24 中冶集团华冶资源开发有限责任公司 Grouting device for anchor rod hole
CN101768960A (en) * 2008-12-31 2010-07-07 新疆维吾尔自治区送变电工程公司 Bored concrete pile construction method of permafrost layer
CN201539270U (en) * 2009-08-20 2010-08-04 陕西省公路勘察设计院 Novel prestressed supporting device
KR20100130768A (en) * 2009-06-04 2010-12-14 주식회사 비젼테크 Cap for preventing mortar from leaking

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2290119A (en) * 1994-06-07 1995-12-13 Jennmar Corp Flexible rock bolt
WO2007015614A1 (en) * 2005-08-03 2007-02-08 Jong Duck Shin Preceding tension type lock bolt and construction method using the same
CN1982651A (en) * 2005-12-14 2007-06-20 招金矿业股份有限公司大尹格庄金矿 Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
KR20070087945A (en) * 2006-02-17 2007-08-29 원연호 Cement mortar type rock bolt
CN201137141Y (en) * 2007-12-26 2008-10-22 成都现代万通锚固技术有限公司 Hollow grouting anchoring-bolt capable of measuring length and discharging gas
CN101768960A (en) * 2008-12-31 2010-07-07 新疆维吾尔自治区送变电工程公司 Bored concrete pile construction method of permafrost layer
CN201377333Y (en) * 2009-04-02 2010-01-06 唐忠明 Expansion type recyclable rock bolt
KR20100130768A (en) * 2009-06-04 2010-12-14 주식회사 비젼테크 Cap for preventing mortar from leaking
CN201412173Y (en) * 2009-06-25 2010-02-24 中冶集团华冶资源开发有限责任公司 Grouting device for anchor rod hole
CN201539270U (en) * 2009-08-20 2010-08-04 陕西省公路勘察设计院 Novel prestressed supporting device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
拱部超长径向系统砂浆锚杆施工技术;王瑞萍;《西部探矿工程》;20050525(第05期);45-46 *
王瑞萍.拱部超长径向系统砂浆锚杆施工技术.《西部探矿工程》.2005,(第05期),

Also Published As

Publication number Publication date
CN102182480A (en) 2011-09-14

Similar Documents

Publication Publication Date Title
CN102182480B (en) Mortar anchor constructing method
CN206319886U (en) Tunnel lining structure
CN106968140B (en) The construction method of structure is repaired in a kind of non-fragment orbit railway tunnel arch
CN201771514U (en) Concealed tunneling structure with pile foundation
CN203307776U (en) Concrete face rock fill dam toe board structure
CN101864990A (en) Water intercepting and conducting device for shaft of vertical well
CN202039879U (en) Combined type mortar bolt sealing locating plug
CN206916543U (en) Structure is repaired in a kind of non-fragment orbit railway tunnel arch
CN105089687B (en) Bolt grouting support process system
CN201649099U (en) Grout injector metal casting
CN103966981B (en) Force transferring structure and the construction method thereof of arch dam is built on weathering rock mass
CN204921007U (en) Process systems is strutted in stock slip casting
CN202851052U (en) A delay self-expanding capsule and paste body combination hole sealing device for drilled holes of gas extraction
CN202330191U (en) Rock seepage test device under water pressure difference
CN202220617U (en) Drilling extraction hole plugging device
CN205475098U (en) Panel rock -fill dam seepage prevention structure
CN201723251U (en) Vertical shaft water intercepting and guiding device
CN104018475B (en) A kind of embedded penstock backfill grouting structure and grouting process thereof
CN104141286A (en) Construction adit blocking structure
CN204899958U (en) Antiskid anchor rope
CN204570705U (en) Three-dimensional post jacking structure is held in a kind of artificial grouting layer method stake
CN210975737U (en) Reservoir dam body culvert pipe transformation structure
CN102797483A (en) Pile casing and water-rich strata shield pile casing receiving method
CN202500597U (en) An apparatus for periodically performing high-pressure gas fracturing and improving air permeability and drainage effect through multiple holes
CN205530380U (en) Dam body buffer structure with keep apart face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant