CN218715678U - Fence for highway engineering construction - Google Patents

Fence for highway engineering construction Download PDF

Info

Publication number
CN218715678U
CN218715678U CN202222892446.2U CN202222892446U CN218715678U CN 218715678 U CN218715678 U CN 218715678U CN 202222892446 U CN202222892446 U CN 202222892446U CN 218715678 U CN218715678 U CN 218715678U
Authority
CN
China
Prior art keywords
fixed
hole
engineering construction
mounting
cup jointed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222892446.2U
Other languages
Chinese (zh)
Inventor
魏福平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Meishuo Construction Engineering Co ltd
Original Assignee
Jiangsu Meishuo Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Meishuo Construction Engineering Co ltd filed Critical Jiangsu Meishuo Construction Engineering Co ltd
Priority to CN202222892446.2U priority Critical patent/CN218715678U/en
Application granted granted Critical
Publication of CN218715678U publication Critical patent/CN218715678U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a rail is used in highway engineering construction, its technical scheme main points are: the guardrail comprises two fixed boxes, wherein a plurality of guardrail bodies are arranged between the two fixed boxes; dust fall subassembly, dust fall subassembly sets up the top surface of fixed case, a dust for reducing highway engineering construction production, supporting shoe through setting up, the activity ring, fixed frame, the spliced pole, the restriction piece, restriction hole and first spring are mutually supported, make the locating piece separation of supported hole on the supporting shoe and fixed roof face, the staff rotates outlet pipe and atomizer ninety degrees, supporting shoe through setting up, a spring, fixed case, locating piece and supported hole are mutually supported, can determine the angle of water pipe and atomizer, through the water pump that sets up, the connecting pipe, outlet pipe and atomizer mutually support, make the dust that produces subside in highway engineering construction, reach the dust fall effect dust effect to producing the dust in the highway engineering construction.

Description

Fence for highway engineering construction
Technical Field
The utility model relates to a rail technical field, concretely relates to rail is used in highway engineering construction.
Background
Fence is the guardrail, from the wooden fence that appears earliest, is the barrier that people set up in order to captivate various livestock, develops to present now, and the rail appears with different outward appearance forms often in our life, has very extensive usage and connotation, and highway engineering fence is the main equipment that guarantees highway maintenance operation normal clear and maintainer safety, and the maintenance work of especially going on night needs the rail more to inform pedestrian and vehicle, make it make in advance to keep away from, maintains constructor and pedestrian's safety.
For example, chinese patent publication No. CN211898058U discloses a movable warning fence for highway engineering, which is provided with a solar panel, a storage battery, an LED strip, a thermal infrared detector, and a buzzer, wherein the solar panel stores collected electric energy in the storage battery for use by the LED strip, the thermal infrared detector, and the buzzer, the LED strip makes a warning fence body more conspicuous, when a person approaches the warning fence body, the thermal infrared detector transmits a signal to a controller, and the controller sends a signal to make the buzzer work, so as to improve a warning effect.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a rail is used in highway engineering construction, solved because the staff can be with warning rail body around the outside at construction site when using warning rail body to carry out highway engineering construction, and can excavate the road surface at the in-process of highway engineering construction, it can produce a large amount of dusts to excavate the road surface, because the block of warning rail body, construction site's dust is difficult to the effluvium, lead to the staff to be under construction in the dust, cause the disease easily, be unfavorable for the staff to use the problem of rail.
The above technical purpose of the present invention can be achieved by the following technical solutions:
a fence for construction of highway engineering, comprising: the guardrail comprises two fixed boxes, wherein a plurality of guardrail bodies are arranged between the two fixed boxes; dust fall subassembly, the dust fall subassembly sets up the top surface of fixed case for reduce the dust that highway engineering construction produced, the dust fall subassembly includes: two outlet pipes, two the outlet pipe all sets up the top surface of fixed case, circular through-hole has been seted up to the top surface of fixed case, the fixed water pump that has cup jointed of interior circle wall of circular through-hole, the fixed connecting pipe that has cup jointed of interior circle wall of the apopore of water pump, the excircle wall of connecting pipe with the activity of interior circle wall of outlet pipe is cup jointed, the fixed atomizer that has cup jointed of interior circle wall of outlet pipe, the fixed solid fixed ring that has cup jointed of excircle wall of outlet pipe, the excircle wall fixed mounting of solid fixed ring has two connecting plates, the bottom surface fixed mounting of connecting plate has fixed frame, the inside fixed mounting of fixed frame has the spliced pole, the excircle wall activity of spliced pole has the movable ring, the excircle wall fixed mounting of movable ring has the supporting shoe, the supported hole has been seted up to the top surface of supporting shoe, the top surface fixed mounting of fixed case has a plurality of locating piece, the supported hole with the locating piece activity cup joints, the excircle wall activity of spliced pole cup joints first spring, the one end of first spring with the top surface fixed connection of movable ring, the other end and the inside top surface fixed connection of fixed frame, the excircle fixed block of fixed ring, the both sides of movable ring cup joint the limited piece and the limited hole.
In order to avoid the outlet pipe to drop, as the utility model discloses a rail is used in highway engineering construction, the preferred, the fixed sealing ring that has cup jointed of interior circle wall of outlet pipe, the mounting groove has been seted up to the excircle wall of connecting pipe, the excircle wall of mounting groove with the activity of the interior circle wall of sealing ring cup joints.
In order to transport fixed case and railing body, as the utility model discloses a rail is used in highway engineering construction, the preferred, one side fixed mounting of fixed case has a plurality of mounting bracket, the railing body with the mounting bracket activity is cup jointed, the both sides of railing body have all been seted up and have been supported the groove, the joint post has been cup jointed in the interior circle wall activity of supporting the groove, the inside fixed mounting who supports the groove has the second spring, the one end of second spring with the one end fixed connection of joint post, the joint hole has all been seted up to the both sides of mounting bracket, the excircle wall of joint post with the interior circle wall activity in joint hole is cup jointed.
In order to keep fixed case and railing body stable, as the utility model discloses a rail is used in highway engineering construction, the preferred, the bottom surface fixed mounting of fixed case has the base, the top surface fixed mounting of fixed case has the battery, is located leftwards one side fixed mounting of fixed case has the PLC controller, the battery with the water pump all with PLC controller electric connection.
In order to learn the inside residual water yield of fixed incasement portion, conduct the utility model discloses a rail is used in highway engineering construction, the preferred, the mounting hole has been seted up to one side of fixed case, the fixed cover in inside of mounting hole has connect the transparent plate.
In order to reach the restriction effect to atomizer, conduct the utility model discloses a rail is used in highway engineering construction, the preferred, the restriction cover has been cup jointed to the excircle wall of outlet pipe is fixed.
In order to add water toward the inside of fixed case, as the utility model discloses a rail is used in highway engineering construction, the preferred, circular through-hole has been seted up to one side of fixed case, the fixed inlet tube that has cup jointed of interior circle wall of circular through-hole, the stopper has been cup jointed in the activity of the interior circle wall of inlet tube.
To sum up, the utility model discloses mainly have following beneficial effect:
through the supporting shoe that sets up, the activity ring, fixed frame, the spliced pole, the restriction piece, restriction hole and first spring are mutually supported, make the supporting shoe on the supporting shoe with the locating piece separation of fixed roof surface and restrict the removal of activity ring, the staff rotates ninety degrees outlet pipe and atomizer, through the supporting shoe that sets up, a spring, the fixed box, locating piece and supporting shoe mutually support, can determine the angle of water pipe and atomizer, through the water pump that sets up, the connecting pipe, outlet pipe and atomizer mutually support, make the dust that produces subside in highway engineering construction, reach the dust fall effect to producing the dust in the highway engineering construction, be convenient for the staff uses fixed box and railing body to carry out highway engineering construction.
Through the joint post that sets up, support groove, second spring, joint hole and mounting bracket mutually support, can take off the railing body from the inside of mounting bracket to with railing body and fixed case separation, the staff of being convenient for transports fixed case and railing body.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the supporting groove structure of the present invention;
fig. 3 is a schematic structural view of the fixing ring of the present invention;
fig. 4 is a schematic view of the structure of the water outlet pipe of the present invention;
fig. 5 is a partial structural view of a in fig. 3.
Reference numerals: 1. a fixed box; 2. a base; 3. a fixing ring; 4. a support block; 5. a water pump; 6. a confinement shield; 7. a handrail body; 8. a movable ring; 9. mounting holes; 10. a transparent plate; 11. a first spring; 12. connecting columns; 13. a mounting frame; 14. a clamping hole; 15. clamping the column; 16. a support groove; 17. a second spring; 18. a water outlet pipe; 19. a connecting plate; 20. a fixing frame; 21. a water inlet pipe; 22. a plug; 23. an atomizing spray head; 24. a seal ring; 25. mounting grooves; 26. a connecting pipe; 27. a limiting block; 28. a limiting aperture; 29. a support hole; 30. and (7) positioning the blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3, 4 and 5, a fence for road engineering construction, two fixed boxes 1, a plurality of rail bodies 7 are arranged between the two fixed boxes 1, the fixed boxes 1 are of a hollow rectangular structure, a top surface of the fixed box 1 is provided with a dust fall component for reducing dust generated by road engineering construction, the dust fall component comprises two water outlet pipes 18, the two water outlet pipes 18 are both arranged on the top surface of the fixed box 1, the top surface of the fixed box 1 is provided with a circular through hole, an inner circular wall surface of the circular through hole is fixedly sleeved with a water pump 5, an inner circular wall surface of a water outlet hole of the water pump 5 is fixedly sleeved with a connecting pipe 26, an outer circular wall surface of the connecting pipe 26 is movably sleeved with an inner circular wall surface of the water outlet pipe 18, the inner circular wall surface of the water outlet pipe 18 is fixedly sleeved with an atomizing nozzle 23, an outer circular wall surface of the water outlet pipe 18 is fixedly sleeved with a fixed ring 3, the outer circular wall surface of the fixed ring 3 is fixedly provided with two connecting plates 19, a bottom surface of the connecting plate 19 is fixedly provided with a fixed frame 20, an inner part of the fixed frame 20 is fixedly provided with a connecting post 12, an outer circular wall surface of the connecting post 12 is movably sleeved with a movable ring 8, an outer circular wall surface of the fixed box is provided with a supporting block 4, an outer circular supporting block, two ends of the movable ring 14, a spring limiting block 15 is provided with a first movable spring limiting block, two ends of the movable spring limiting block 15, a first movable spring limiting block 15 is provided on two ends of the movable spring limiting fixed block 9 and a first movable spring limiting block 15 is provided on two ends of the fixed block 9, the staff moves up supporting block 4, the upward movement drives movable ring 8 to move up along connecting post 12 in fixed frame 20 and simultaneously makes first spring 11 compressed, movable ring 8 moves up and also can drive limiting block 27 to move inside limiting hole 28, limiting block 27 can limit the movement of movable ring 8, supporting block 4 moves up and makes support hole 29 on supporting block 4 separate from locating block 30 on the top surface of fixed box 1, the limitation of locating block 30 is lost, the staff rotates outlet pipe 18 and drives atomizer 23 to rotate, outlet pipe 18 rotates and also makes fixed ring 3 drive connecting plate 19 and fixed frame 20 to rotate, fixed frame 20 rotates and takes supporting block 4 to rotate, the staff rotates outlet pipe 18 ninety degrees, then the staff loosens supporting block 4, the effort of first spring 11 makes movable ring 8 drive supporting block 4 to move down, supporting block 4 moves down and makes other locating blocks 30 on fixed box 1 enter the inside of support hole 29 on supporting block 4, thereby the angles of water pipe 18 and atomizer 23 are determined, through water pump 5 that sets up, water pump 5 transports the inside of fixed box 1 to the inside of supporting block 26, water of fixed box 23 can pass through connecting pipe 23 and make the atomizer produce the dust settling effect of highway engineering, the highway engineering dust settling work can be carried out through connecting pipe 7 of construction work, the highway engineering dust settling work.
Referring to fig. 1, 2, 3 and 4, a sealing ring 24 is fixedly sleeved on an inner circular wall surface of a water outlet pipe 18, a mounting groove 25 is formed in an outer circular wall surface of a connecting pipe 26, the outer circular wall surface of the mounting groove 25 is movably sleeved with the inner circular wall surface of the sealing ring 24, the water outlet pipe 18 is of an L-shaped structure, the water outlet pipe 18 is rotated to drive the sealing ring 24 to rotate inside the mounting groove 25 on the connecting pipe 26 through the arranged water outlet pipe 18, the sealing ring 24 can limit the water outlet pipe 18 to prevent the water outlet pipe 18 from falling off, a plurality of mounting frames 13 are fixedly mounted on one side of a fixing box 1, a handrail body 7 is movably sleeved with the mounting frames 13, supporting grooves 16 are formed in two sides of the handrail body 7, clamping columns 15 are movably sleeved on the inner circular wall surfaces of the supporting grooves 16, second springs 17 are fixedly mounted inside the supporting grooves 16, one ends of the second springs 17 are fixedly connected with one ends of the clamping columns 15, the mounting frame 13 is of a U-shaped structure, the clamping holes 14 are formed in two sides of the mounting frame 13, the outer circular wall surface of each clamping column 15 is movably sleeved with the inner circular wall surface of each clamping hole 14, through the arranged clamping columns 15, an operator presses the clamping columns 15 to enable the clamping columns 15 to move backwards to enter the inside of the supporting groove 16 and enable the second springs 17 to be compressed, the operator moves the clamping columns 15 to the outside of the clamping holes 14 in the mounting frame 13, then the operator takes the handrail body 7 down from the inside of the mounting frame 13 to separate the handrail body 7 from the fixing box 1, the operator can conveniently transport the fixing box 1 and the handrail body 7, the base 2 is fixedly arranged on the bottom surface of the fixing box 1, the storage battery is fixedly arranged on the top surface of the fixing box 1, the PLC controller is fixedly arranged on one side of the fixing box 1 on the left side, and the storage battery and the water pump 5 are both electrically connected with the PLC controller, the battery, water pump 5 and PLC controller have been all to have the structure and do not do here and give unnecessary details, base 2 through the setting, base 2 can increase fixed case 1's weight, thereby it is stable to keep fixed case 1 and railing body 7, mounting hole 9 has been seted up to one side of fixed case 1, the fixed transparent plate 10 that has cup jointed in inside of mounting hole 9, the fixed restriction cover 6 that has cup jointed of excircle wall of outlet pipe 18, restriction cover 6 through the setting, restriction cover 6 can restrict atomizer 23's the scope of spraying, reach the restriction effect to atomizer 23, circular through-hole has been seted up to one side of fixed case 1, inlet tube 21 has been cup jointed to the fixed interior wall of circular through-hole, stopper 22 has been cup jointed in the activity of the interior wall of inlet tube 21, inlet tube 21 is L shape structure, stopper 22 through the setting, water addition staff takes off stopper 22 from the inside of inlet tube 21 and pours water into the inside of inlet tube 21, be convenient for the staff toward the inside of fixed case 1.
The working principle is as follows: referring to fig. 1 to 5, through the supporting block 4, the worker moves the supporting block 4 upwards, the upward movement drives the movable ring 8 to move upwards in the fixed frame 20 along the connecting column 12, and simultaneously the first spring 11 is compressed, the movable ring 8 also drives the limiting block 27 to move inside the limiting hole 28 when moving upwards, the limiting block 27 can limit the movement of the movable ring 8, the supporting block 4 moves upwards to separate the supporting hole 29 on the supporting block 4 from the positioning block 30 on the top surface of the fixed box 1, the limitation of the positioning block 30 is lost, the worker rotates the water outlet pipe 18 to drive the atomizer 23 to rotate, the water outlet pipe 18 also drives the fixed ring 3 to drive the connecting plate 19 and the fixed frame 20 to rotate, the fixed frame 20 rotates to drive the supporting block 4 to rotate, the worker rotates the supporting block 18 ninety degrees, then the worker loosens the supporting block 4, the movable ring 8 drives the supporting block 4 to move downwards by the action force of the first spring 11, the supporting block 4 moves downwards to make other positioning blocks 30 on the fixed box 1 enter the inside of the supporting hole 29 on the supporting block 4, thereby determining the angles of the water pipe 18 and the atomizer 23, the dust can be sprayed out from the water pump 5, and the water pump 23, the water pump 23 can be used by the water pump 7 in the construction work tank to generate the dust settling effect of the construction work of the road.
Through the arranged water outlet pipe 18, the rotation of the water outlet pipe 18 drives the sealing ring 24 to rotate in the mounting groove 25 of the connecting pipe 26, the sealing ring 24 can limit the water outlet pipe 18, the water outlet pipe 18 is prevented from falling off,
through the joint post 15 that sets up, the staff presses down joint post 15 and makes joint post 15 move backward get into the inside of supporting groove 16 and make second spring 17 compressed simultaneously, the staff removes joint post 15 to mounting bracket 13 on the outside of joint hole 14, then the staff takes off railing body 7 from mounting bracket 13's inside, thereby with railing body 7 and the separation of fixed case 1, be convenient for the staff transports fixed case 1 and railing body 7, base 2 through the setting, base 2 can increase the weight of fixed case 1, thereby it is stable to keep fixed case 1 and railing body 7, stopper 22 through the setting, the staff takes off and pours water into the inside of inlet tube 21 from the inside of inlet tube 21 with stopper 22, be convenient for the staff adds water toward the inside of fixed case 1.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a rail is used in highway engineering construction which characterized in that includes:
the guardrail comprises two fixed boxes (1), wherein a plurality of railing bodies (7) are arranged between the two fixed boxes (1);
dust fall subassembly, the dust fall subassembly sets up the top surface of fixed case (1) for reduce the dust that highway engineering construction produced, the dust fall subassembly includes: two outlet pipes (18), two outlet pipes (18) all set up the top surface of fixed case (1), circular through-hole has been seted up to the top surface of fixed case (1), water pump (5) have been cup jointed to the interior circle wall of circular through-hole is fixed, connecting pipe (26) have been cup jointed to the interior circle wall of the apopore of water pump (5), the excircle wall of connecting pipe (26) with the activity of the interior circle wall of outlet pipe (18) is cup jointed, the interior circle wall of outlet pipe (18) is fixed and has been cup jointed atomizer (23), the excircle wall of outlet pipe (18) is fixed and has been cup jointed solid fixed ring (3), the excircle wall fixed mounting of solid fixed ring (3) has two connecting plates (19), the bottom surface fixed mounting of connecting plate (19) has fixed frame (20), the inside fixed mounting of fixed frame (20) has spliced pole (12), the activity of the excircle wall of spliced pole (12) has cup jointed solid fixed ring (8), the excircle wall fixed mounting of solid ring (8) has supporting shoe (4), supporting shoe (29) has been seted up to the top surface of supporting shoe (4), the top surface fixed mounting of fixed case (1) has a plurality of locating piece (30), support hole (29) with the activity cup joint of fixed block (30), first movable ring (11) spring cup joint, the one end of first spring (11) with the top surface fixed connection of activity ring (8), the other end of first spring (11) and the inside top surface fixed connection of fixed frame (20), the excircle wall fixed mounting of activity ring (8) has two restriction pieces (27), restriction hole (28) have all been seted up to the both sides of fixed frame (20), restriction piece (27) with restriction hole (28) activity cup joints.
2. The fence for road engineering construction according to claim 1, wherein: the fixed sealing ring (24) that has cup jointed of interior circle wall of outlet pipe (18), mounting groove (25) have been seted up to the excircle wall of connecting pipe (26), the excircle wall of mounting groove (25) with the activity of interior circle wall of sealing ring (24) is cup jointed.
3. The fence for road engineering construction according to claim 1, wherein: one side fixed mounting of fixed case (1) has a plurality of mounting bracket (13), railing body (7) with mounting bracket (13) activity is cup jointed, the both sides of railing body (7) have all been seted up and have been supported groove (16), joint post (15) have been cup jointed in the activity of the interior circle wall of supporting groove (16), the inside fixed mounting who supports groove (16) has second spring (17), the one end of second spring (17) with the one end fixed connection of joint post (15), joint hole (14) have all been seted up to the both sides of mounting bracket (13), the excircle wall of joint post (15) with the activity of the interior circle wall of joint hole (14) is cup jointed.
4. The fence for road engineering construction according to claim 1, wherein: the bottom surface fixed mounting of fixed case (1) has base (2), the top surface fixed mounting of fixed case (1) has the battery, is located the left one side fixed mounting of fixed case (1) has the PLC controller, the battery with water pump (5) all with PLC controller electric connection.
5. The fence for road engineering construction according to claim 1, wherein: one side of the fixed box (1) is provided with a mounting hole (9), and a transparent plate (10) is fixedly sleeved in the mounting hole (9).
6. The fence for road engineering construction according to claim 1, wherein: and the outer circle wall surface of the water outlet pipe (18) is fixedly sleeved with a limiting cover (6).
7. The fence for road engineering construction according to claim 1, wherein: a circular through hole is formed in one side of the fixed box (1), a water inlet pipe (21) is fixedly sleeved on the inner circle wall surface of the circular through hole, and a plug (22) is movably sleeved on the inner circle wall surface of the water inlet pipe (21).
CN202222892446.2U 2022-11-01 2022-11-01 Fence for highway engineering construction Active CN218715678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222892446.2U CN218715678U (en) 2022-11-01 2022-11-01 Fence for highway engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222892446.2U CN218715678U (en) 2022-11-01 2022-11-01 Fence for highway engineering construction

Publications (1)

Publication Number Publication Date
CN218715678U true CN218715678U (en) 2023-03-24

Family

ID=85598133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222892446.2U Active CN218715678U (en) 2022-11-01 2022-11-01 Fence for highway engineering construction

Country Status (1)

Country Link
CN (1) CN218715678U (en)

Similar Documents

Publication Publication Date Title
CN211245937U (en) House building land for worker dust device
CN218715678U (en) Fence for highway engineering construction
CN211500055U (en) Safety device is used in construction in room
CN214061409U (en) Municipal works urban road guardrail that can spray water smoke
CN214552123U (en) A dust device for civil engineering
CN216839205U (en) Regular watering equipment for construction site
CN114405193A (en) Road and bridge construction sprays dust device
CN210411272U (en) Underground tunnel Hufen groove embedded part production device
CN113628405A (en) A security protection patrol device that steadiness is high for wisdom community
CN212802824U (en) Auxiliary supporting device of dust-settling guardrail for automatic atomization maintenance of railway continuous beam
CN212613603U (en) Scaffold with single protection machanism
CN210976853U (en) Construction guardrail structure
CN215138257U (en) Building engineering construction place air dust device
CN214914521U (en) Construction is with enclosing fender
CN216498369U (en) Environmental protection dust collecting equipment of building engineering construction
CN218458990U (en) Dust device for house construction
CN216092816U (en) Spray dust removal device with flow guide structure for constructional engineering
CN218206188U (en) Assembled temporary enclosure for construction of constructional engineering
CN214862279U (en) Building device is built in energy-concerving and environment-protective type room
CN218373577U (en) Foundation structure curing means is used in road and bridge construction
CN212369810U (en) Multi-steering dust falling device for construction site construction
CN220336611U (en) Municipal works foundation ditch rail guard
CN212478772U (en) Safety protective guard is used in civil construction
CN211215956U (en) Dust device is used in concrete mixing plant environmental protection
CN216062529U (en) Dust device is used in highway construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant