CN218713290U - A prefabricated assembled inspection shaft of concrete for burying pipeline underground - Google Patents
A prefabricated assembled inspection shaft of concrete for burying pipeline underground Download PDFInfo
- Publication number
- CN218713290U CN218713290U CN202221022639.6U CN202221022639U CN218713290U CN 218713290 U CN218713290 U CN 218713290U CN 202221022639 U CN202221022639 U CN 202221022639U CN 218713290 U CN218713290 U CN 218713290U
- Authority
- CN
- China
- Prior art keywords
- well body
- well
- precast concrete
- base plate
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a concrete prefabricated assembly type inspection well for underground embedded pipelines, which solves the problems of slow construction speed and low well body quality of the existing masonry inspection well; the well comprises a precast concrete base plate (1), a precast concrete cylindrical well body (3) and a precast concrete inverted funnel-shaped top well ring (6), wherein the precast concrete cylindrical well body (3) is connected with the precast concrete base plate (1) through butt joint of a connecting base plate annular rabbet (4) and a connecting well body annular rabbet (2); the prefabricated concrete inverted funnel-shaped top well ring is connected with a prefabricated concrete cylindrical well body (3) through the butt joint of a connecting well body annular rabbet (7) and a connecting well ring annular rabbet (5); the prefabricated concrete base plate (1), the prefabricated concrete cylindrical well body and the prefabricated concrete inverted funnel-shaped top well ring (6) are butted to form a closed well body; the rapid construction of underground buried pipeline assembly is realized.
Description
Technical Field
The utility model relates to an underground pipeline, in particular to underground bury prefabricated assembled inspection shaft in pipeline underground.
Background
The existing underground pipeline burying construction process comprises the following steps: firstly, excavating a pipeline laying groove, building inspection wells in the groove after the groove is excavated, then laying pipelines between the inspection wells to enable the pipelines and the inspection wells to be communicated together, and finally backfilling earthwork; the setting method of the inspection well has the defect of low construction speed, and the brick inspection well also has the problems of weak anti-permeability and easy occurrence of peripheral collapse cracks; in addition, the brick inspection well is wet operation, needs more machines and tools, occupies large material stacking area and is not beneficial to field management.
Disclosure of Invention
The utility model provides a prefabricated assembled inspection shaft of concrete for underground buries pipeline underground has solved the slow technical problem that does not have high with well body quality of construction speed that current inspection shaft exists of building by laying bricks or stones.
The utility model discloses a solve above technical problem through following technical scheme:
a prefabricated concrete assembly type inspection well for underground buried pipelines comprises a prefabricated concrete base plate, a prefabricated concrete cylindrical well body and a prefabricated concrete inverted funnel-shaped top well ring, wherein a lower annular rabbet for connecting the well body is arranged on the top end surface of the prefabricated concrete base plate; the prefabricated concrete cylindrical well body is connected with the prefabricated concrete base plate through the butt joint of the annular rabbet of the connecting base plate and the annular rabbet under the connecting well body; the prefabricated concrete inverted funnel-shaped top well ring is connected with the prefabricated concrete cylindrical well body through butt joint of the annular rabbet on the connecting well body and the annular rabbet of the connecting well ring; and the precast concrete base plate, the precast concrete cylindrical well body and the precast concrete inverted funnel-shaped top well ring are butted to form a closed well body.
The upper end of the prefabricated concrete inverted funnel-shaped top well ring is provided with a well cover, a left pipeline is connected to the circular through hole of the left connecting pipeline, and a right pipeline is connected to the circular through hole of the right connecting pipeline.
The utility model discloses a buried pipeline assembly's rapid construction underground, the installation of whole inspection shaft is swift, and the wholeness is good, and impervious ability is strong, the later stage maintenance cost that significantly reduces.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a longitudinal sectional view of the present invention;
fig. 3 is a schematic structural view of the precast concrete base plate 1 of the present invention;
fig. 4 is a schematic structural view of the precast concrete cylindrical well bore 3 of the present invention;
fig. 5 is a schematic structural view of the precast concrete inverted funnel-shaped top well ring 6 of the present invention.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings:
a precast concrete assembled manhole for underground buried pipelines comprises a precast concrete base plate 1, a precast concrete cylindrical well body 3 and a precast concrete inverted funnel-shaped top well ring 6, wherein a lower annular rabbet 2 connected with the well body is arranged on the top end surface of the precast concrete base plate 1, an annular rabbet 4 connected with the base plate is arranged on the lower bottom surface of the precast concrete cylindrical well body 3, an upper top surface of the precast concrete cylindrical well body 3 is provided with an annular rabbet 5 connected with the well ring, a left connecting pipeline circular through hole 9 and a right connecting pipeline circular through hole 11 are respectively arranged on the precast concrete cylindrical well body 3, and an upper annular rabbet 7 connected with the well body is arranged on the lower bottom surface of the precast concrete inverted funnel-shaped top well ring 6; the prefabricated concrete cylindrical well body 3 is connected with the prefabricated concrete base plate 1 through the butt joint of the annular rabbet 4 of the connecting base plate and the annular rabbet 2 under the connecting well body; the prefabricated concrete inverted funnel-shaped top well ring 6 is connected with the prefabricated concrete cylindrical well body 3 through butt joint of the annular rabbet 7 on the connecting well body and the annular rabbet 5 on the connecting well body; the precast concrete base plate 1, the precast concrete cylindrical well body 3 and the precast concrete inverted funnel-shaped top well ring 6 are butted to form a closed well body.
The upper end of the prefabricated concrete inverted funnel-shaped top well ring 6 is provided with a well cover 8, a left pipeline 10 is connected to the circular through hole 9 of the left connecting pipeline, and a right pipeline 12 is connected to the circular through hole 11 of the right connecting pipeline.
Two base plate hoisting rings 13 are arranged on the top end surface of the precast concrete base plate 1 so as to facilitate hoisting; two well hoisting rings 14 are symmetrically arranged on the outer side wall of the precast concrete cylindrical well 3; two walling crib hoisting rings 15 are arranged on the conical outer side wall of the prefabricated concrete inverted funnel-shaped top walling crib 6; after the measurement and the setting-out are carried out in the excavated groove, the prefabricated well can be directly hoisted and assembled.
Claims (2)
1. A precast concrete assembled manhole for underground buried pipelines comprises a precast concrete base plate (1), a precast concrete cylindrical well body (3) and a precast concrete inverted funnel-shaped top well ring (6), and is characterized in that a lower annular rabbet (2) for connecting the well body is arranged on the top end surface of the precast concrete base plate (1), a lower bottom surface of the precast concrete cylindrical well body (3) is provided with an annular rabbet (4) for connecting the base plate, an upper top surface of the precast concrete cylindrical well body (3) is provided with an annular rabbet (5) for connecting the well ring, a left side connecting pipeline circular through hole (9) and a right side connecting pipeline circular through hole (11) are respectively arranged on the precast concrete cylindrical well body (3), and a lower bottom surface of the precast concrete inverted funnel-shaped top well ring (6) is provided with an upper annular rabbet (7) for connecting the well body; the prefabricated concrete cylindrical well body (3) is connected with the prefabricated concrete base plate (1) through the butt joint of the annular rabbet (4) of the connecting base plate and the annular rabbet (2) under the connecting well body; the prefabricated concrete inverted funnel-shaped top well ring (6) is connected with the prefabricated concrete cylindrical well body (3) through butt joint of the annular rabbet (7) on the connecting well body and the annular rabbet (5) on the connecting well body; the prefabricated concrete base plate (1), the prefabricated concrete cylindrical well body (3) and the prefabricated concrete inverted funnel-shaped top well ring (6) are in butt joint to form a closed well body.
2. The prefabricated concrete manhole for underground buried pipes according to claim 1, wherein a manhole cover (8) is provided at an upper end of the prefabricated concrete inverted funnel-shaped top ring (6), a left pipe (10) is connected to the left connecting pipe circular through hole (9), and a right pipe (12) is connected to the right connecting pipe circular through hole (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221022639.6U CN218713290U (en) | 2022-04-29 | 2022-04-29 | A prefabricated assembled inspection shaft of concrete for burying pipeline underground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221022639.6U CN218713290U (en) | 2022-04-29 | 2022-04-29 | A prefabricated assembled inspection shaft of concrete for burying pipeline underground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218713290U true CN218713290U (en) | 2023-03-24 |
Family
ID=85581434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221022639.6U Active CN218713290U (en) | 2022-04-29 | 2022-04-29 | A prefabricated assembled inspection shaft of concrete for burying pipeline underground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218713290U (en) |
-
2022
- 2022-04-29 CN CN202221022639.6U patent/CN218713290U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104404983B (en) | A kind of ride well device and construction method thereof for jacking construction | |
CN105442532A (en) | Construction method for pile-head-expanded bored pile | |
CN108612086A (en) | A kind of crack geotechnical boring cast-in-place pile construction method | |
CN209987133U (en) | Circular prefabricated inspection shaft steel form of pin-connected panel | |
CN104153371A (en) | Grouting-to-stop-water construction method of underwater rubble bed | |
CN104988915A (en) | Prefabrication and installation method of detachable steel protection tube device and underwater connection beam | |
CN114150749A (en) | Construction method for non-stop connection of new and old sewage wells | |
CN104099946B (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN205776157U (en) | Assembled underground continuous wall | |
CN218713290U (en) | A prefabricated assembled inspection shaft of concrete for burying pipeline underground | |
CN101161947A (en) | Integration method of lagging pile and dewatering well for foundation ditch support | |
CN102425228A (en) | Multifunctional environment-friendly movable water tank | |
CN111535298A (en) | Seepage-proofing construction method for underground diaphragm wall | |
CN216973425U (en) | Inclined prefabricated steel pile foundation pit supporting system capable of being supported and excavated firstly | |
CN112726784B (en) | Full-prefabricated PC sewer inspection well component assembly structure and construction method | |
CN111733803B (en) | Dry operation one-column one-pile steel pipe composite pile concrete subsection construction method | |
CN212427155U (en) | Tongue-and-groove type prefabricated underground continuous wall structure | |
CN204080861U (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN211598516U (en) | Novel anti-slide pile pore-forming device | |
CN109183800B (en) | Construction process of preliminary grouting system | |
CN210315908U (en) | Immersed tube type inspection well | |
CN112726649A (en) | Construction method of H-shaped steel structure and continuous wall | |
CN103741724B (en) | A kind of prefabricated prestressed underground continuous wall joint | |
CN209975507U (en) | Upper-section drainage and lower-section non-drainage combined prefabricated pipe pile | |
CN207469238U (en) | Prefabricated flaring stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |