CN218713158U - Structure of landslide is prevented to high earthwork - Google Patents
Structure of landslide is prevented to high earthwork Download PDFInfo
- Publication number
- CN218713158U CN218713158U CN202223041834.6U CN202223041834U CN218713158U CN 218713158 U CN218713158 U CN 218713158U CN 202223041834 U CN202223041834 U CN 202223041834U CN 218713158 U CN218713158 U CN 218713158U
- Authority
- CN
- China
- Prior art keywords
- breast board
- earthwork
- breast
- bolt
- threaded holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Abstract
The utility model discloses a structure of high earthwork landslide prevention belongs to rail protector field, pile up the district including the earthwork, the front and back side that the district was piled up to the earthwork is equipped with first breast board, the side is equipped with the second breast board about the district is piled up to the earthwork, interconnect into the mouth type between first breast board and the second breast board, the inboard bottom of side is connected with the first bearing structure of a plurality of in first breast board and the second breast board, the outside of first breast board and second breast board is equipped with the second bearing structure of a pair of symmetry, the cooperation through first bearing structure and second bearing structure improves the stability of first breast board and second breast board, strengthen the protectiveness of the district is piled up to inboard earthwork to first breast board and second breast board, the outside upper end of first breast board and second breast board is equipped with a plurality of net clamp structure, can clip dust screen or waterproof cloth through net clamp structure, make closed dust screen or waterproof cloth cover whole earthwork pile up the district, prevent that the earthwork from producing the pollution, avoid the earthwork to receive the rainwater invasion and attack on the slope.
Description
Technical Field
The utility model relates to a rail protector field, in particular to structure of landslide is prevented to high earthwork.
Background
When the earthwork is used for building construction, the workload of digging, filling and transporting is usually calculated by cubic meters, sometimes called as earthwork for short, the dug earthwork is usually piled up to form a hill, sometimes the piled hill is also referred to as earthwork, because the dug earthwork is usually transported away, when the engineering needing to be refilled is involved, the dug earthwork needs to be piled up nearby, so that the subsequent refilling operation is convenient, the existing piling mode usually adopts a mode of gradually piling up to form a conical hill, but when the height of the earthwork reaches a certain degree, landslide is easy to generate, and certain danger exists.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a structure of high earthwork landslide prevention which can effectively solve the problems in the background art.
In order to achieve the above purpose, the utility model adopts the technical proposal that:
the utility model provides a high earthwork landslide prevention's structure, piles up the district including the earthwork, the front and back side that the district was piled up to the earthwork is equipped with first breast board, the side is equipped with the second breast board about the district is piled up to the earthwork, interconnect into the mouth type between first breast board and the second breast board, the outside bottom is connected with the first bearing structure of a plurality of in first breast board and the second breast board, the outside of first breast board and second breast board is equipped with the second bearing structure of a pair of symmetry, the outside upper end of first breast board and second breast board is equipped with a plurality of net and presss from both sides the structure.
Preferably, a plurality of first threaded holes are formed in the edge positions of the two ends of the first breast board from bottom to top, a plurality of second threaded holes are formed in the edge positions of the two ends of the second breast board from bottom to top, the two ends of the first breast board are mutually attached to the two ends of the second breast board, the first threaded holes and the second threaded holes are horizontally located on the same central line, first bolts penetrate through the first threaded holes, and the first bolts penetrate through the second threaded holes and are connected with first nuts.
Preferably, first bearing structure is including the fixed plate, the fixed plate wholly is the L type, the fixed plate passes through the welding mode and connects in first breast board and second breast board inside and outside bottom, be connected with the backup pad through the welding mode on the diaphragm of fixed plate, the backup pad wholly is the triangle size and is connected with the diaphragm and the vertical plate of fixed plate.
Preferably, the second bearing structure is including the fixed block, the fixed block is whole to be the U type, the fixed block is fixed in the outside of first breast board and second breast board through welded mode, the inboard of fixed block is equipped with the connecting block, through wearing to be equipped with the second bolt between fixed block and the connecting block, the other end of second bolt is connected with the second nut, second bolt and second nut are equipped with about two sets of fixed block and connecting block of wearing to locate, the outside of connecting block is connected with the bracing piece of downward sloping, the other end of bracing piece is connected with the ground plate, two round holes have been seted up to both sides on the ground plate, and are equipped with the anchor nail in the round hole.
Preferably, the net presss from both sides the structure including the base, the base passes through welding mode fixed connection in the outside upper end of first breast board and second breast board, the third screw hole has been seted up to base outside one end, wear to be equipped with the third bolt in the third screw hole, be equipped with the clamping piece between third bolt and the base, the hole has been seted up to the centre of clamping piece, the third bolt passes hole and base threaded connection.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses in, the stability of first breast board and second breast board is improved through first bearing structure and second bearing structure's cooperation, and the first breast board of reinforcing and second breast board pile up the protectiveness in district to inboard earthwork, can clip closed dust screen or tarpaulin through the net clamp structure, make closed dust screen or tarpaulin cover whole earthwork and pile up the district, prevent that the earthwork from producing dust pollution, avoid the earthwork to receive rainwater invasion and attack and produce the landslide.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an exploded view of the junction between the first breast board and the second breast board of the present invention;
fig. 3 is a schematic structural view of the first support structure of the present invention;
fig. 4 is a schematic structural view of a second support structure of the present invention;
fig. 5 is a schematic structural view of the net clip structure of the present invention.
In the figure: 1. an earthwork accumulation area; 2. a first breast board; 3. a second breast board; 4. a first support structure; 5. a second support structure; 6. a net clip structure; 7. a first threaded hole; 8. a second threaded hole; 9. a first bolt; 10. a first nut; 11. a fixing plate; 12. a support plate; 13. a fixed block; 14. connecting blocks; 15. a support bar; 16. a ground plate; 17. anchoring the bolts; 18. a second bolt; 19. a second nut; 20. a base; 21. a third threaded hole; 22. a clip; 23. a hole; 24. and a third bolt.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in figures 1-5, a structure of high earthwork landslide prevention, pile up district 1 including the earthwork, the front and back side that district 1 was piled up to the earthwork is equipped with first breast board 2, the left and right sides that district 1 was piled up to the earthwork is equipped with second breast board 3, interconnect between first breast board 2 and the second breast board 3 and become the mouth type, the inboard bottom in first breast board 2 and the second breast board 3 is connected with a plurality of first bearing structure 4, the outside of first breast board 2 and second breast board 3 is equipped with a pair of symmetrical second bearing structure 5, the outside upper end of first breast board 2 and second breast board 3 is equipped with a plurality of net and presss from both sides structure 6.
In this embodiment, the edge positions of the two ends of the first breast board 2 are provided with a plurality of first threaded holes 7 from bottom to top, the edge positions of the two ends of the second breast board 3 are provided with a plurality of second threaded holes 8 from bottom to top, the two ends of the first breast board 2 are mutually attached to and connected with the two ends of the second breast board 3, the first threaded holes 7 and the second threaded holes 8 are horizontally positioned on the same central line, a first bolt 9 penetrates through the first threaded holes 7, the first bolt 9 penetrates through the second threaded holes 8 and is connected with a first nut 10, and therefore, the first breast board 2 and the second breast board 3 can be conveniently installed, connected and subsequently detached by people through the connection mode of a plurality of groups of first bolts 9 and first nuts 10;
in this embodiment, in order to improve the support stability of the first breast board 2 and the second breast board 3, the inner side and outer side bottoms of the first breast board 2 and the second breast board 3 are connected with a plurality of first support structures 4, each first support structure 4 comprises a fixing plate 11, the fixing plate 11 is integrally L-shaped, the fixing plate 11 is connected to the inner side and outer side bottoms of the first breast board 2 and the second breast board 3 in a welding manner, a transverse plate of the fixing plate 11 is connected with a support plate 12 in a welding manner, the support plate 12 is integrally connected with a transverse plate and a vertical plate of the fixing plate 11 in a triangular shape, and the support performance of the fixing plate 11 is enhanced by the arrangement of the support plate 12;
in the embodiment, in order to further improve the support stability of the first breast board 2 and the second breast board 3, a pair of symmetrical second support structures 5 is arranged on the outer sides of the first breast board 2 and the second breast board 3, the second support structure 5 comprises a fixed block 13, the fixed block 13 is integrally U-shaped, the fixed block 13 is fixed on the outer sides of the first breast board 2 and the second breast board 3 by welding, a connecting block 14 is arranged on the inner side of the fixed block 13, a second bolt 18 is arranged between the fixed block 13 and the connecting block 14 by penetrating, the other end of the second bolt 18 is connected with a second nut 19, the second bolt 18 and the second nut 19 are arranged in an upper group and a lower group by penetrating through the fixed block 13 and the connecting block 14, the outer side of the connecting block 14 is connected with a support rod 15 which inclines downwards, the other end of the support rod 15 is connected with a ground plate 16, two round holes are arranged on two sides of the ground plate 16, and an anchor 17 is arranged in the round hole, the ground plate 17 is nailed in the ground plate, so as to enhance the ground catching performance of the ground plate 16, thereby improving the support degree of the second support structure 5, and facilitating the subsequent connection of people and the second breast board 5;
in this embodiment, the net clip structure 6 is including base 20, base 20 passes through welding mode fixed connection in the outside upper end of first breast board 2 and second breast board 3, third screw hole 21 has been seted up to base 20 outside one end, wear to be equipped with third bolt 24 in the third screw hole 21, be equipped with clamping piece 22 between third bolt 24 and the base 20, hole 23 has been seted up to the centre of clamping piece 22, third bolt 24 passes hole 23 and base 20 threaded connection, press from both sides the four corners and the border of closed dust screen or tarpaulin and between clamping piece 22 and the base 20 through third bolt 24 like this, avoid dust screen or tarpaulin to receive the condition that the corner lifted that appears in strong wind twitch, thereby can be better dustproof take shelter from rain, prevent the landslide.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a structure of landslide is prevented to high earthwork, piles up district (1), its characterized in that including the earthwork: the front and rear sides of the earthwork accumulation area (1) are provided with first breast boards (2), the left and right sides of the earthwork accumulation area (1) are provided with second breast boards (3), the first breast boards (2) and the second breast boards (3) are connected into a mouth, the inner and outer sides of the first breast boards (2) and the second breast boards (3) are connected with a plurality of first supporting structures (4), the outer sides of the first breast boards (2) and the second breast boards (3) are provided with a pair of symmetrical second supporting structures (5), and the outer sides of the first breast boards (2) and the second breast boards (3) are provided with a plurality of net clamping structures (6).
2. The high-earth landslide prevention structure of claim 1, wherein: the edge positions at the two ends of the first breast board (2) are provided with a plurality of first threaded holes (7) from bottom to top, the edge positions at the two ends of the second breast board (3) are provided with a plurality of second threaded holes (8) from bottom to top, the two ends of the first breast board (2) are mutually attached and connected with the two ends of the second breast board (3), the first threaded holes (7) and the second threaded holes (8) are horizontally located on the same central line, first bolts (9) are arranged in the first threaded holes (7) in a penetrating mode, and the first bolts (9) penetrate through the second threaded holes (8) and are connected with first nuts (10).
3. The structure of a high earth landslide prevention of claim 1, wherein: first bearing structure (4) are including fixed plate (11), fixed plate (11) wholly is the L type, fixed plate (11) are connected in first breast board (2) and second breast board (3) inboard bottom through welding mode, be connected with backup pad (12) through welding mode on the diaphragm of fixed plate (11), backup pad (12) wholly is the diaphragm and the vertical edition of triangle size and fixed plate (11) and is connected.
4. The high-earth landslide prevention structure of claim 1, wherein: second bearing structure (5) is including fixed block (13), fixed block (13) wholly is the U type, fixed block (13) are fixed in the outside of first breast board (2) and second breast board (3) through welded mode, the inboard of fixed block (13) is equipped with connecting block (14), through wearing to be equipped with second bolt (18) between fixed block (13) and connecting block (14), the other end of second bolt (18) is connected with second nut (19), second bolt (18) and second nut (19) are equipped with about two sets of wearing to locate fixed block (13) and connecting block (14), the outside of connecting block (14) is connected with bracing piece (15) of downward sloping, the other end of bracing piece (15) is connected with ground plate (16), two round holes have been seted up to both sides on ground plate (16), and are equipped with anchor nail (17) in the round hole.
5. The high-earth landslide prevention structure of claim 1, wherein: net presss from both sides structure (6) including base (20), base (20) are through welding mode fixed connection in the outside upper end of first breast board (2) and second breast board (3), third screw hole (21) have been seted up towards outside one end in base (20), wear to be equipped with third bolt (24) in third screw hole (21), be equipped with between third bolt (24) and base (20) clamping piece (22), hole (23) have been seted up to the centre of clamping piece (22), third bolt (24) pass hole (23) and base (20) threaded connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223041834.6U CN218713158U (en) | 2022-11-16 | 2022-11-16 | Structure of landslide is prevented to high earthwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223041834.6U CN218713158U (en) | 2022-11-16 | 2022-11-16 | Structure of landslide is prevented to high earthwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218713158U true CN218713158U (en) | 2023-03-24 |
Family
ID=85620070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223041834.6U Active CN218713158U (en) | 2022-11-16 | 2022-11-16 | Structure of landslide is prevented to high earthwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218713158U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117761290A (en) * | 2024-02-22 | 2024-03-26 | 中国地质调查局成都地质调查中心(西南地质科技创新中心) | Rainfall-induced lower rock slope collapse influence simulation test device |
-
2022
- 2022-11-16 CN CN202223041834.6U patent/CN218713158U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117761290A (en) * | 2024-02-22 | 2024-03-26 | 中国地质调查局成都地质调查中心(西南地质科技创新中心) | Rainfall-induced lower rock slope collapse influence simulation test device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218713158U (en) | Structure of landslide is prevented to high earthwork | |
CN206785409U (en) | A kind of unsymmetrial loading tunnel | |
CN205975658U (en) | Steel platform tower crane foundation | |
CN202208904U (en) | Semi-mobile combined flood-control dam | |
CN209779548U (en) | gravity type flood control wall capable of being quickly installed and detached | |
CN203222807U (en) | Flat foundation specialized for gas film building | |
CN211773338U (en) | Hydraulic engineering slope net | |
CN110492832A (en) | A kind of photovoltaic power generation structure applied to breakwater | |
CN212865983U (en) | Structure for preventing soil erosion and water loss | |
CN210562015U (en) | Water conservancy ditch safety net device | |
CN2571827Y (en) | Plate constructured dam type subdyke | |
CN208167639U (en) | A kind of hydraulic engineering ecological supporting structure | |
CN209323536U (en) | A kind of foundation pit supporting construction | |
CN213867634U (en) | Ecological slope protection structure of river channel dam | |
CN212452674U (en) | Oblique supporting structure | |
CN210216529U (en) | Building reinforcing and deviation rectifying structure | |
CN217027120U (en) | A foundation ditch protector for building engineering | |
CN217174581U (en) | Backplate is kept apart to rubbish that municipal works flood prevention was used | |
CN217460226U (en) | Can have enough to meet need pin-connected panel landing stage steel apron | |
CN208949904U (en) | A kind of water conservancy construction cofferdam device | |
CN213773183U (en) | Novel protection network for hydraulic engineering | |
CN216586575U (en) | Building excavation supporting device | |
CN220790835U (en) | Multifunctional comprehensive enclosure supporting structure | |
CN103835279A (en) | Construction method of hung-bag-shaped high vertical sediment retaining net fixing mobile dune | |
CN211143115U (en) | Novel implanted stiff skeleton pile plate retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |