CN203222807U - Flat foundation specialized for gas film building - Google Patents

Flat foundation specialized for gas film building Download PDF

Info

Publication number
CN203222807U
CN203222807U CN 201320027937 CN201320027937U CN203222807U CN 203222807 U CN203222807 U CN 203222807U CN 201320027937 CN201320027937 CN 201320027937 CN 201320027937 U CN201320027937 U CN 201320027937U CN 203222807 U CN203222807 U CN 203222807U
Authority
CN
China
Prior art keywords
flat foundation
air film
special
foundation
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320027937
Other languages
Chinese (zh)
Inventor
崔艳军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Broadwell Shenzhen Technology Co ltd
Original Assignee
Bode Vecchi (beijing) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bode Vecchi (beijing) Technology Co Ltd filed Critical Bode Vecchi (beijing) Technology Co Ltd
Priority to CN 201320027937 priority Critical patent/CN203222807U/en
Application granted granted Critical
Publication of CN203222807U publication Critical patent/CN203222807U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a flat foundation specialized for a gas film building and the flat foundation specialized for the gas film building is a reinforced concrete structure surrounding peripheral ground of a building. The cross-section of the flat foundation specialized for the gas film building is a flat rectangle; a width of the cross-section is over three times greater than a height. The flat foundation specialized for gas film building reduces cost and shortens construction period. For large construction areas or under terrible weather conditions like frequent strong wind, stability of gas film building can be further enhanced by pressing heavy objects on the flat foundation.

Description

Air film is built special-purpose flat foundation
Technical field
The utility model relates to a kind of structural member, especially relates to a kind of air film and builds special-purpose flat foundation.
Background technology
The basis is the part of building, and its main effect is with the vertical load of building, is delivered on the ground.What the routine building basis was subjected to is downward pressure, and the air film building foundation then is to be subjected to pulling force that air film makes progress and horizontal pulling force.This makes the basis of air film building require the resistance to plucking ability to be eager to excel, and center of gravity is firm, can overturning under the lateral pull effect.Conventional air film building foundation is generally concrete dwarf wall, need deep-cut, and foundation bottom is bigger, is embedded in undergroundly, resists above-mentioned pulling force with this.Build this novel low cost, short environment protection architecture of construction period for air film, cost and the engineering time on basis have occupied very big ratio.
The utility model content
The utility model provides a kind of air film to build special-purpose flat foundation, and in order to solve problems such as air film construction cost, engineering time, its technical characterictic is as described below:
Described air film is built special-purpose flat foundation and is the reinforced concrete structure around ground around the building, and its cross section is flat rectangle, and width is greater than highly more than three times.
The end face that described air film is built special-purpose flat foundation is provided with in order to the fixing pre-embedded bolt of angle steel.
Described air film is built special-purpose flat foundation and is adopted the steel concrete cast-in-site, and its reinforcement manner is board-like arrangement of reinforcement.
Described air film is built fixedly membrane material between special-purpose flat foundation and the angle steel.
Described air film is provided with counterweight above building special-purpose flat foundation.
Described air film is built special-purpose flat foundation and has been reduced cost, has shortened the duration.Big and weather conditions are badly such as under the more environment of strong wind weather for building area, can also be on flat foundation ballast to strengthen its soundness.
Description of drawings
Fig. 1 is the embodiment schematic diagram that air film that the utility model provides is built special-purpose flat foundation.
The specific embodiment
As shown in Figure 1, work plane 1 after smooth is to build special-purpose flat foundation 2 with the air film of concrete cast, described air film is built the inside of special-purpose flat foundation 2 and is adopted board-like arrangement of reinforcement, end face is pre-embedded bolt 21, in order to fixing angle steel 4, between pre-embedded bolt 21 and angle steel 4, membrane material 3 is arranged fixedly, on air film is built special-purpose flat foundation 2, also be provided with counterweight 5.
The basis that described air film is built special-purpose flat foundation 2 is tabular, is in order to reduce cost and to improve the duration, not needing to dig foundation ditch.Cross section is flat rectangle, and width w is greater than height h more than three times, and concrete size comprehensively determines according to conditions such as the building area of air film building, basic suffered pulling force sizes, and computational methods are not at the row of the utility model discussion.
Its job step is as described below: the smooth and Ramming operation on the ground of at first constructing, after the work plane 1 smooth compacting with construction, base position is built steel form around project site, reinforcement manner is board-like arrangement of reinforcement, carry out concrete cast basis then, pre-buried for fixing bolt 21 at basic end face, the basis reaches design strength can carry out conventional installation and the debugging of air film building later on.
For strengthening the degree that is built on the rock, more as building region, place strong wind weather, can also pile ballast on the basis, it can be the earthwork in the building construction process, the difficult megalith that rolls that heap is pressed thing, and special concrete or other material counterweights of making.

Claims (5)

1. air film is built special-purpose flat foundation, it is characterized in that: described air film is built special-purpose flat foundation and is the reinforced concrete structure around ground around the building, and its cross section is flat rectangle, and width is greater than highly more than three times.
2. air film according to claim 1 is built special-purpose flat foundation, it is characterized in that: the end face that described air film is built special-purpose flat foundation is provided with in order to the fixing pre-embedded bolt of angle steel.
3. air film according to claim 1 is built special-purpose flat foundation, it is characterized in that: described air film is built special-purpose flat foundation and is adopted the steel concrete cast-in-site, and its reinforcement manner is board-like arrangement of reinforcement.
4. air film according to claim 1 is built special-purpose flat foundation, it is characterized in that: described air film is built fixedly membrane material between special-purpose flat foundation and the angle steel.
5. air film according to claim 1 is built special-purpose flat foundation, it is characterized in that: described air film is provided with counterweight above building special-purpose flat foundation.
CN 201320027937 2013-01-18 2013-01-18 Flat foundation specialized for gas film building Expired - Lifetime CN203222807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320027937 CN203222807U (en) 2013-01-18 2013-01-18 Flat foundation specialized for gas film building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320027937 CN203222807U (en) 2013-01-18 2013-01-18 Flat foundation specialized for gas film building

Publications (1)

Publication Number Publication Date
CN203222807U true CN203222807U (en) 2013-10-02

Family

ID=49249814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320027937 Expired - Lifetime CN203222807U (en) 2013-01-18 2013-01-18 Flat foundation specialized for gas film building

Country Status (1)

Country Link
CN (1) CN203222807U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016101907A1 (en) * 2014-12-26 2016-06-30 深圳市博德维环境技术股份有限公司 Air film building and basement thereof
CN106223712A (en) * 2016-09-23 2016-12-14 深圳市博德维环境技术股份有限公司 Pneumatic membrane building base fixture and pneumatic membrane building
CN106759908A (en) * 2016-08-19 2017-05-31 北京约顿气膜建筑技术股份有限公司 Pneumatic membrane building anchor
WO2018054316A1 (en) * 2016-09-23 2018-03-29 深圳市博德维环境技术股份有限公司 Bottom fixing device for air film building, and air film building
WO2022237144A1 (en) * 2021-05-11 2022-11-17 百穰新能源科技(深圳)有限公司 Gas storage reservoir, energy storage device, and control method and mounting method for gas storage reservoir

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016101907A1 (en) * 2014-12-26 2016-06-30 深圳市博德维环境技术股份有限公司 Air film building and basement thereof
US10119264B2 (en) 2014-12-26 2018-11-06 Broadwell (Shenzhen) Technology Co., Ltd Air-supported membrane structure dome and foundation thereof
CN106759908A (en) * 2016-08-19 2017-05-31 北京约顿气膜建筑技术股份有限公司 Pneumatic membrane building anchor
CN106223712A (en) * 2016-09-23 2016-12-14 深圳市博德维环境技术股份有限公司 Pneumatic membrane building base fixture and pneumatic membrane building
WO2018054316A1 (en) * 2016-09-23 2018-03-29 深圳市博德维环境技术股份有限公司 Bottom fixing device for air film building, and air film building
CN106223712B (en) * 2016-09-23 2019-02-01 深圳市博德维环境技术股份有限公司 Pneumatic membrane building base fixture and pneumatic membrane building
WO2022237144A1 (en) * 2021-05-11 2022-11-17 百穰新能源科技(深圳)有限公司 Gas storage reservoir, energy storage device, and control method and mounting method for gas storage reservoir

Similar Documents

Publication Publication Date Title
CN203222807U (en) Flat foundation specialized for gas film building
CN201915422U (en) Counterfort retaining wall on high slope
CN102286980A (en) Steel truss foundation pit supporting structure
CN202117068U (en) Micropile plate-type composite foundation
CN201428139Y (en) Steel lattice framework tower-type crane foundation structure
CN201486566U (en) Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN108999204A (en) A kind of skirt-type adds partition diaphram wall-stake composite type base
CN201581394U (en) Large pile toe grout-injection precast pile
CN216713040U (en) Full-prefabricated pier type portal inclined support pile structure system
CN204849788U (en) Small-size slag yard slope protection structure of water and electricity engineering
CN213804905U (en) Bailey beam suspension structure
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN110206020B (en) Prefabricated snowflake type concrete steel sheet pile and construction method thereof
CN204919582U (en) Collar tie beam is assembled to portable steel sheet case of special prefabricated filling of air film building
CN101148889B (en) Compressed-air caisson anchor pile supporting device
CN205329735U (en) Foundation ditch excavation closes on existing shallow foundation protection architecture
CN206815278U (en) A kind of assembled integral revetment structure on soft soil foundation
CN203049588U (en) Pit-in-pit cylindrical mould
CN204112858U (en) The prefabricated enclosure wall of a kind of prestressed concrete
CN201826326U (en) Foundation of deep-excavation tower crane
CN203080540U (en) Iron tower foundation of power transmission line
CN204728347U (en) High rock slope steel structure platform
CN205369301U (en) Supporting structure of subway transfer section lid digs and props against making interval board
CN204715784U (en) A kind of suspension type foundation ditch People's Bank of China's steel ladder cage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200628

Address after: The central Shenzhen city of Guangdong Province, 518057 Keyuan Road, Nanshan District science and Technology Park No. 15 Kexing Science Park Building 2 unit B floor 12 No. 3

Patentee after: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.

Address before: 100080 Beijing City, Haidian District Road No. 8 5 storey 511 square

Patentee before: Buildair (Beijing) Technology Co.,Ltd.

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: 518000 b1-603, building B, Kexing Science Park, 15 Keyuan Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.

Address before: 518057 No.3, 12 / F, unit 2, building B, Kexing Science Park, No.15 Keyuan Road, Central District, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: BROADWELL (SHENZHEN) TECHNOLOGY Co.,Ltd.

CP02 Change in the address of a patent holder
CX01 Expiry of patent term

Granted publication date: 20131002

CX01 Expiry of patent term