- CN218712893U CN218712893U CN202222950886.9U CN202222950886U CN218712893U CN 218712893 U CN218712893 U CN 218712893U CN 202222950886 U CN202222950886 U CN 202222950886U CN 218712893 U CN218712893 U CN 218712893U
- Authority
- CN
- China
- Prior art keywords
- building pile
- main part
- pile main
- building
- lead screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a building pile component is used in building construction engineering construction, including first building pile main part and second building pile main part, the top of first building pile main part is provided with second building pile main part, the intermediate position department of first building pile main part inside wall evenly is provided with first bracing piece, multiunit the relative one end of first bracing piece is provided with first lead screw jointly, the surface of first lead screw is provided with the slip nut, the surface of slip nut evenly is provided with the transfer line, the position department that is close to the transfer line bottom first building pile main part inside wall all is provided with the gag lever post. The utility model discloses, through adjusting mutually supporting between pole, adjusting gear, second lead screw, second bracing piece and the second building pile main part, can adjust the distance between first building pile main part and the second building pile main part according to the user demand when carrying out the use, and then can adjust the height between the pile body according to the building demand, improve equipment's practicality.
Description
Technical Field
The utility model belongs to the technical field of the construction, in particular to building pile component is used in construction of building engineering.
Background
The building pile is a force transmission component which transmits all or part of load of a building to foundation soil and has certain rigidity and bending resistance, and the size of the cross section of the force transmission component is far smaller than the length of the force transmission component. The foundation device is mainly used for driving into soil to support the upper building, and is widely applied to the field of constructional engineering.
Current building pile component main construction is underground when using, and general building pile surface does not possess and prevents subsiding the structure, consequently can take place to subside when the upper portion bears too heavily to influence construction safety, and can not carry out the altitude mixture control problem to building pile according to the construction demand when using, and then reduce building pile's practicality
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a building pile component is used in construction of building engineering, has solved current building pile and has not possessed and prevent subsiding and the problem of inconvenient height-adjusting.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a building pile component is used in engineering construction is built in room, is including first building pile main part and second building pile main part, the top of first building pile main part is provided with second building pile main part, the intermediate position department of first building pile main part inside wall evenly is provided with first bracing piece, multiunit the relative one end of first bracing piece is provided with first lead screw jointly, the surface of first lead screw is provided with slip nut, slip nut's surface evenly is provided with the transfer line, the position department that first building pile main part inside wall bottom is close to the transfer line all is provided with the gag lever post, multiunit the equal swing joint of one end of gag lever post is on the surface of transfer line, the position department that the interior bottom of first building pile main part inside wall is close to the transfer line all is provided with the installation pole, the surface of installation pole is provided with drive gear, drive gear's surface transmission is connected the bottom surface of transfer line, one side on installation pole surface is provided with the barb piece.
Further, the upper portion of first building pile main part inside wall evenly is provided with the dead lever, the multiunit the relative one end of dead lever is provided with the second lead screw jointly, the surface of second lead screw is provided with second slip nut, the surface of second slip nut evenly is provided with the second bracing piece, the multiunit the opposite one end of second bracing piece all sets up the inside wall of second building pile main part, the inside intermediate position department of second lead screw is provided with the regulation pole, the bottom of adjusting the pole is provided with adjusting gear, adjusting gear's surface transmission is respectively connected the intermediate position department of second lead screw bottom with the intermediate position department on first lead screw upper portion.
Furthermore, one end of the limiting rod is provided with a sliding shaft, and the surface of the transmission rod is provided with a limiting groove which is matched with the corresponding moving track of the sliding shaft.
Furthermore, a rack matched with the movable track corresponding to the position of the transmission gear is arranged on the bottom surface of the transmission rod.
Further, the shape of barb piece is sickle, just the inside of first building pile main part bottom is provided with the opening with the corresponding activity orbit looks adaptation in barb piece position.
Furthermore, a connecting groove matched with the adjusting gear in size corresponding to the position of the adjusting gear is formed in the middle position of the upper portion of the first screw rod and the middle position of the bottom of the second screw rod, and insections matched with the adjusting gear are formed in the inner side wall of the connecting groove.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. this device is through adjusting mutually supporting between pole, first lead screw, transfer line, drive gear, installation pole and the barb piece, and in the barb piece can insert earth when using, and then improve the stability that first building pile main part was pour, slows down subsiding of first building pile main part, effectively improves construction safety.
2. This device can adjust the distance between first building pile main part and the second building pile main part according to the user demand when carrying out the use through adjusting mutually supporting between pole, adjusting gear, second lead screw, second slip nut, second bracing piece and the second building pile main part, and then can adjust the height between the pile body according to the building demand, improve equipment's practicality.
Drawings
Fig. 1 is a schematic sectional view of the present invention.
Fig. 2 is a schematic view of the transmission rod of the present invention.
In the figure: 1. a first building pile body; 2. a second building pile body; 3. a first support bar; 4. a first lead screw; 5. a first slip nut; 6. a transmission rod; 7. a limiting rod; 8. mounting a rod; 9. a transmission gear; 10. a barb block; 11. fixing the rod; 12. a second screw rod; 13. a second slip nut; 14. a second support bar; 15. adjusting a rod; 16. and adjusting the gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the embodiment discloses a building pile component for building engineering construction, which comprises a first building pile main body 1 and a second building pile main body 2, wherein the second building pile main body 2 is movably installed at the top of the first building pile main body 1, first support rods 3 are uniformly installed at the middle positions of the inner side wall of the first building pile main body 1, a first screw rod 4 is installed at the opposite ends of a plurality of groups of first support rods 3 in a rotating manner, a sliding nut 5 is connected on the surface of the first screw rod 4 in a sliding manner, furthermore, threads are arranged on the surface of the first screw rod 4, and the grain direction of the screw thread is clockwise, the inner side wall of the sliding nut 5 is provided with an internal screw thread matched with the surface screw thread of the first screw rod 4, referring to fig. 2, six groups of transmission rods 6 are uniformly arranged on the surface of the sliding nut 5, the positions of the bottom of the inner side wall of the first building pile main body 1, which are close to the transmission rods 6, are all provided with limiting rods 7, one end of each group of limiting rods 7 is movably connected on the surface of the transmission rod 6, specifically, one end of each limiting rod 7 is provided with a sliding shaft, and the surface of the transmission rod 6 is provided with a limit groove which is matched with the movable track corresponding to the position of the sliding shaft, the inner bottom of the inner side wall of the first building pile body 1 is rotatably provided with an installation rod 8 at the position which is close to the transmission rod 6, the surface of the installation rod 8 is provided with a transmission gear 9, the surface of the transmission gear 9 is in transmission connection with the surface of the bottom of the transmission rod 6, furthermore, the surface of the bottom of the transmission rod 6 is provided with a rack which is matched with the movable track corresponding to the position of the transmission gear 9, one side of the surface of the installation rod 8 is provided with an barb block 10, particularly, the barb block 10 is in a sickle shape, and the inside of 1 bottom of first building pile main part is provided with the opening with barb piece 10 corresponding movable track looks adaptation in position.
Preferably, the fixed rods 11 are uniformly installed on the upper portion of the inner side wall of the first building pile main body 1, a plurality of groups of fixed rods 11 are installed on the second lead screw 12 in a manner of rotating relative to one end of each group of fixed rods 11, the surface of the second lead screw 12 is provided with a second sliding nut 13, further, the surface of the second lead screw 12 is provided with threads, the thread direction of each thread is counterclockwise, the inner side wall of each group of second supporting rods 14 is provided with internal threads matched with the threads on the surface of the second lead screw 12, a second supporting rod 14 is uniformly installed on the surface of each second sliding nut 13, the inner side wall of each group of second supporting rods 14 is installed on the inner side wall of the second building pile main body 2, the installation stability of the second building pile main body 2 is improved, an adjusting rod 15 is sleeved on the middle position inside the second lead screw 12, an adjusting gear 16 is installed at the bottom of the adjusting rod 15, specifically, the surface of the adjusting gear 16 is in a transmission connection with the middle position of the bottom of the second building pile main body 12 and the middle position of the upper portion of the first lead screw 4 respectively, the middle position of the upper portion of the first lead screw 4 and the middle position of the bottom of the second lead screw 12 are provided with connecting grooves matched with the adjusting gear 16, and the connecting grooves matched with the inner side walls of the adjusting gear 16.
The use process of the device is as follows: beat first building pile main part 1 into in the earth ground, then manual push down adjusts pole 15, and then adjust pole 15 passes through the intermediate position department of adjusting gear 16 joint on first lead screw 4 upper portion, manual rotation adjusts pole 15 afterwards, adjust pole 15 drives first lead screw 4 through adjusting gear 16 and rotates, and then slip nut 5 drives drive gear 9 through transfer line 6 and rotates, and then drive gear 9 drives barb piece 10 through installation pole 8 and shifts out first building pile main part 1 inside and inserts in earth, adjust the columnar height according to the construction demand afterwards, manual pulling adjusts pole 15, make adjusting gear 16 break away from the intermediate position department on first lead screw 4 upper portion, the joint is in the intermediate position department of second lead screw 12 bottom, manual rotation adjusts pole 15 this moment, adjust pole 15 drives second lead screw 12 through adjusting gear 16 and rotates, and then second slip nut 13 drives second building pile main part 2 through second bracing piece 14 and shifts up, thereby change the columnar height as required, cast-in-place concrete at the surface of first building pile main part 1 and second building pile main part 2 afterwards.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building pile component is used in building engineering construction which characterized in that: including first building pile main part (1) and second building pile main part (2), the top of first building pile main part (1) is provided with second building pile main part (2), the intermediate position department of first building pile main part (1) inside wall evenly is provided with first bracing piece (3), the multiunit the relative one end of first bracing piece (3) is provided with first lead screw (4) jointly, the surface of first lead screw (4) is provided with slip nut (5), the surface of slip nut (5) evenly is provided with transfer line (6), the position department that first building pile main part (1) inside wall bottom is close to transfer line (6) all is provided with gag lever post (7), the multiunit the equal swing joint of one end of gag lever post (7) is on the surface of transfer line (6), the position department that the interior bottom of first building pile main part (1) inside wall is close to transfer line (6) all is provided with installation pole (8), the surface of installation pole (8) is provided with drive gear (9), the surface drive connection of drive gear (9) is in the bottom surface of transfer line (6), installation pole (8) is provided with thorn piece (10) one side.
2. The construction pile member for building construction according to claim 1, characterized in that: the upper portion of first building pile main part (1) inside wall evenly is provided with dead lever (11), the multiunit the relative one end of dead lever (11) is provided with second lead screw (12) jointly, the surface of second lead screw (12) is provided with second slip nut (13), the surface of second slip nut (13) evenly is provided with second bracing piece (14), the multiunit the opposite one end of second bracing piece (14) all sets up the inside wall of second building pile main part (2), the inside intermediate position department of second lead screw (12) is provided with adjusts pole (15), the bottom of adjusting pole (15) is provided with adjusting gear (16), the surface of adjusting gear (16) is the transmission respectively and is connected the intermediate position department of second lead screw (12) bottom with the intermediate position department on first lead screw (4) upper portion.
3. The building pile member for house construction engineering construction according to claim 1, characterized in that: one end of the limiting rod (7) is provided with a sliding shaft, and the surface of the transmission rod (6) is provided with a limiting groove which is matched with the corresponding movable track of the sliding shaft.
4. The building pile member for house construction engineering construction according to claim 1, characterized in that: and a rack which is matched with the movable track corresponding to the position of the transmission gear (9) is arranged on the bottom surface of the transmission rod (6).
5. The building pile member for house construction engineering construction according to claim 1, characterized in that: the shape of barb piece (10) is sickle-shaped, just the inside of first building pile main part (1) bottom is provided with the opening with barb piece (10) position corresponding activity orbit looks adaptation.
6. The building pile member for house construction engineering construction according to claim 2, characterized in that: the middle position of the upper portion of the first screw rod (4) and the middle position of the bottom of the second screw rod (12) are both provided with connecting grooves which are matched with the adjusting gear (16) in size and correspond to the positions of the adjusting gear, and the inner side walls of the connecting grooves are provided with insections matched with the adjusting gear (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222950886.9U CN218712893U (en) | 2022-11-04 | 2022-11-04 | Building pile component for building engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222950886.9U CN218712893U (en) | 2022-11-04 | 2022-11-04 | Building pile component for building engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218712893U true CN218712893U (en) | 2023-03-24 |
Family
ID=85609025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222950886.9U Active CN218712893U (en) | 2022-11-04 | 2022-11-04 | Building pile component for building engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218712893U (en) |
-
2022
- 2022-11-04 CN CN202222950886.9U patent/CN218712893U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218712893U (en) | Building pile component for building engineering construction | |
CN214740166U (en) | Building outer wall reinforced structure | |
CN215977843U (en) | Wind-resistant structure for assembled steel structure house | |
CN215406082U (en) | Deep foundation pit internal supporting mechanism for building construction | |
CN216277253U (en) | Intelligence construction is with protection warning fence | |
CN112314240B (en) | Modularization planting technique device that adapts to many curved surfaces | |
CN206591794U (en) | A kind of scaffold easy to use | |
CN214784974U (en) | Three-dimensional ecological wall of housing construction | |
CN212316956U (en) | Slope protection net for mountain body protection with adjustable | |
CN201167818Y (en) | Movable device for hanging boxing sandbag in residence | |
CN211824377U (en) | Combined soft foundation treatment construction equipment | |
CN113738127A (en) | Building engineering is with energy-concerving and environment-protective steel construction stabilising arrangement | |
CN216999659U (en) | High strength foundation pile for civil engineering | |
CN211228522U (en) | Adjustable prestressed support pile structure | |
CN212837079U (en) | Rail guard for construction | |
CN220986846U (en) | Warmhouse booth stand with adjustable high resistance to compression | |
CN215927265U (en) | Concrete pipe pile digging device in industrial and civil buildings | |
CN218521818U (en) | Additional strengthening for water conservancy construction cofferdam | |
CN219343161U (en) | Mountain region photovoltaic power generation screw pile and manual piling tool | |
CN218563554U (en) | Safe garden ladder for garden design | |
CN216075172U (en) | Building slope reinforcement improvement device for municipal engineering | |
CN212389064U (en) | Mounting member for building construction | |
CN220014734U (en) | Ground-inserted plastic fence | |
CN214659061U (en) | Building outer wall reinforcing apparatus | |
CN216426619U (en) | Building engineering assembled support structure |
Legal Events