CN211824377U - Combined soft foundation treatment construction equipment - Google Patents
Combined soft foundation treatment construction equipment Download PDFInfo
- Publication number
- CN211824377U CN211824377U CN202020532693.XU CN202020532693U CN211824377U CN 211824377 U CN211824377 U CN 211824377U CN 202020532693 U CN202020532693 U CN 202020532693U CN 211824377 U CN211824377 U CN 211824377U
- Authority
- CN
- China
- Prior art keywords
- observation
- bottom plate
- fixedly connected
- construction equipment
- bevel gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a modular construction equipment is handled to soft base, comprising a base plate, the first observation pole of fixedly connected with of department in the middle of the upper end of bottom plate, the upper end of first observation pole is equipped with the jack, the lateral wall all is equipped with the fluting about the jack, the jack interpolation is equipped with second observation pole, be equipped with the adjustment mechanism that highly adjusts that is used for second observation pole in the jack, four inserted bars of lower extreme fixedly connected with of bottom plate, be equipped with in the bottom plate and be used for carrying out the fixed establishment fixed to the inserted bar. The utility model discloses the convenience is adjusted the second observation pole and is better to the fixed effect of subsiding the observation board.
Description
Technical Field
The utility model relates to a soft basic treatment facility technical field especially relates to a modular soft basic treatment construction equipment.
Background
The settlement observation is that observation is carried out according to observation points arranged on the building and fixed measuring points, the settlement degree is measured and expressed by data, the observation points are arranged on more than one layer of building and building design requirements, the settlement observation is required to be arranged on manual work, soil foundations and the like, the observation and the recording are carried out according to the time or the layer progress in the construction until the completion, and the settlement observation plate belongs to one of soft foundation treatment equipment.
The existing settlement observation plate is easily inclined or even lifted due to the extrusion of soil to the inserted bar after being buried under the ground, and the relative height between the two observation bars is inconvenient to adjust and fix, so that the use effect is poor.
Therefore, a combined type soft foundation treatment construction device is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that settlement observation board produces the relative height between slope and two observation poles easily among the prior art and is not convenient for adjust, and a modular soft basic treatment construction equipment who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a modular construction equipment is handled to soft base, includes the bottom plate, the first observation pole of fixedly connected with of department in the middle of the upper end of bottom plate, the upper end of first observation pole is equipped with the jack, the lateral wall all is equipped with the fluting about the jack, the jack interpolation is equipped with second observation pole, be equipped with the adjustment mechanism who is used for highly adjusting second observation pole in the jack, four inserted bars of lower extreme fixedly connected with of bottom plate, be equipped with in the bottom plate and be used for carrying out the fixed establishment fixed to the inserted bar.
Preferably, adjustment mechanism include with second observation pole lower extreme fixed connection's diaphragm, the below of diaphragm is equipped with the lifter plate, the both ends of lifter plate all set up through fluting and extending to first observation pole outward, the lower extreme of lifter plate rotates and is connected with the screw thread sleeve, the lateral wall threaded connection of screw thread sleeve and first observation pole, through two bolt fixed connection between lifter plate and the diaphragm.
Preferably, fixing mechanism includes four through-holes that set up respectively on four inserted bars, be equipped with two-way threaded rod in the through-hole, the equal thread bush in both ends of two-way threaded rod is equipped with the screw thread piece, two the screw thread piece all with through-hole inside wall sliding connection, it is equipped with the limiting plate to rotate the cover outward, two the limiting plate all with through-hole inside wall fixed connection, be equipped with the pivot in the through-hole, be connected through bevel gear group transmission between pivot and the two-way threaded rod, be equipped with the cavity in the bottom plate, four the upper end of pivot all rotates to run through inserted bar and bottom plate and is connected with the rotation of cavity inside wall, four the pivot is located the part in the cavity and is connected through the drive mechanism transmission between two liang, one of them the upper end.
Preferably, the bevel gear set comprises a first bevel gear and a second bevel gear which are meshed with each other, the first bevel gear is coaxially and fixedly connected with the rotating shaft, and the second bevel gear is coaxially and fixedly connected with the bidirectional threaded rod.
Preferably, the transmission mechanism comprises two belt pulleys, the two belt pulleys are respectively and fixedly connected with the two rotating shafts in a coaxial manner, and the two belt pulleys are in transmission connection through a belt.
Preferably, the first observation rod and the bottom plate are fixedly welded through a plurality of triangular fixing plates.
Compared with the prior art, the beneficial effects of the utility model are that:
1. by arranging the adjusting mechanism, the threaded sleeve is rotated to drive the lifting plate to lift, the lifting plate drives the transverse plate to lift, the transverse plate drives the second observation rod to lift, and after the bottom plate is embedded, the position of the second observation rod can be calibrated and adjusted, so that the observation reference is adjusted, and the observation result is more accurate;
2. through setting up fixed establishment, through rotating the turning handle, four pivots of turning handle mediation are rotated, and four pivots drive four two-way threaded rod and rotate, and four two-way threaded rod drive two screw thread pieces relative movement for two screw thread pieces extend the through-hole, thereby with two screw thread pieces and soil joint, avoid the inserted bar to be extruded because of the extrusion force of soil itself, and is better to the fixed effect of subsiding the observation board.
The utility model discloses the convenience is adjusted the second observation pole and is better to the fixed effect of subsiding the observation board.
Drawings
Fig. 1 is a front perspective view of a combined soft foundation treatment construction equipment provided by the utility model;
FIG. 2 is an enlarged view taken at A in FIG. 1;
fig. 3 is a schematic view of a top view structure of the combined soft foundation treatment construction equipment provided by the utility model.
In the figure: the device comprises a base plate 1, a first observation rod 2, a jack 3, a slot 4, a second observation rod 5, an adjusting mechanism 6, an inserted rod 7, a fixing mechanism 8, a transverse plate 9, a lifting plate 10, a threaded sleeve 11, a bolt 12, a through hole 13, a bidirectional threaded rod 14, a threaded block 15, a limiting plate 16, a rotating shaft 17, a bevel gear set 18, a cavity 19, a transmission mechanism 20, a rotating handle 21, a first bevel gear 22, a second bevel gear 23, a belt pulley 24 and a triangular fixing plate 25.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a modular construction equipment is handled to soft base, comprising a base plate 1, the first observation pole 2 of department's fixedly connected with in the middle of the upper end of bottom plate 1, the upper end of first observation pole 2 is equipped with jack 3, the lateral wall all is equipped with fluting 4 about jack 3, jack 3 interpolation is equipped with second observation pole 5, be equipped with in the jack 3 and be used for carrying out the adjustment mechanism 6 of adjusting the height of second observation pole 5, it is worth mentioning that, adjustment mechanism 6 includes the diaphragm 9 with 5 lower extreme fixed connection of second observation pole, the below of diaphragm 9 is equipped with lifter plate 10, the both ends of lifter plate 10 all set up through fluting 4 and extending to first observation pole 2 outward, the lower extreme of lifter plate 10 rotates and is connected with threaded sleeve 11, threaded sleeve 11 and the lateral wall threaded connection of first observation pole 2.
In the utility model, the lifting plate 10 is fixedly connected with the transverse plate 9 through two bolts 12, the lower end of the bottom plate 1 is fixedly connected with four insertion rods 7, a fixing mechanism 8 for fixing the insertion rods 7 is arranged in the bottom plate 1, further, the fixing mechanism 8 comprises four through holes 13 respectively arranged on the four insertion rods 7, a bidirectional threaded rod 14 is arranged in the through hole 13, both ends of the bidirectional threaded rod 14 are all provided with threaded holes matched with the bidirectional threaded rod 14, the thread turning directions in the two threaded holes are opposite, the two threaded blocks 15 are both in sliding connection with the inner side wall of the through hole 13, a limiting plate 16 is rotatably sleeved outside the bidirectional threaded rod 14, the two limiting plates 16 are both fixedly connected with the inner side wall of the through hole 13, a rotating shaft 17 is arranged in the through hole 13, the rotating shaft 17 is in transmission connection with the bidirectional threaded rod 14 through a bevel gear set 18, it should be noted that the bevel gear group 18 includes a first bevel gear 22 and a second bevel gear 23 that mesh with each other.
The utility model discloses in, first bevel gear 22 and the coaxial fixed connection of pivot 17, second bevel gear 23 and the coaxial fixed connection of two-way threaded rod 14, be equipped with cavity 19 in the bottom plate 1, the upper end of four pivot 17 is all rotated and is run through inserted bar 7 and bottom plate 1 and is connected with the rotation of cavity 19 inside wall, four pivot 17 lie in the part of cavity 19 two liang between be connected through the transmission of drive mechanism 20, it is worth mentioning that, drive mechanism 20 includes two belt pulleys 24, two belt pulleys 24 respectively with the coaxial fixed connection of two pivot 17, connect through belt transmission between two belt pulleys 24, the upper end of one of them inserted bar 7 is rotated and is run through bottom plate 1 and coaxial fixedly connected with turning handle 21, it is required to explain, through polylith triangle fixed plate 25 fixed welding between first observation pole 2 and the bottom plate 1.
The utility model discloses when burying underground, insert the inserted bar 7 below the ground, then rotate the turning handle 21, turning handle 21 drives one of them pivot 17 and rotates, one of them pivot 17 drives other three pivots 17 through a plurality of belt pulleys 24 and belt and rotates, four pivots 17 drive four first bevel gears 22 and rotate, four first bevel gears 22 drive four second bevel gears 23 and rotate, second bevel gear 23 drives four two-way threaded rods 14 and rotates, each two-way threaded rod 14 all drives two screw thread blocks 15 relative movement, until suitable position can, then bury bottom plate 1 underground can.
The utility model discloses when using, rotate threaded sleeve 11, threaded sleeve 11 drives lifter plate 10 and goes up and down, and lifter plate 10 drives 5 lifts of second observation pole, until suitable height can.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a modular construction equipment is handled to soft base, includes bottom plate (1), its characterized in that, the first observation pole of fixedly connected with (2) of department in the middle of the upper end of bottom plate (1), the upper end of first observation pole (2) is equipped with jack (3), lateral wall all is to be equipped with fluting (4) about jack (3), jack (3) interpolation is equipped with second observation pole (5), be equipped with in jack (3) and be used for highly adjusting adjustment mechanism (6) to second observation pole (5), four inserted bars (7) of lower extreme fixedly connected with of bottom plate (1), be equipped with in bottom plate (1) and be used for fixing fixed establishment (8) to inserted bar (7).
2. The combined soft foundation treatment construction equipment according to claim 1, wherein the adjusting mechanism (6) comprises a transverse plate (9) fixedly connected with the lower end of the second observation rod (5), a lifting plate (10) is arranged below the transverse plate (9), two ends of the lifting plate (10) are arranged outside the first observation rod (2) through a slot (4) and extend to the outside of the first observation rod (2), a threaded sleeve (11) is rotatably connected to the lower end of the lifting plate (10), the threaded sleeve (11) is in threaded connection with the outer side wall of the first observation rod (2), and the lifting plate (10) is fixedly connected with the transverse plate (9) through two bolts (12).
3. The combined type soft foundation treatment construction equipment as claimed in claim 1, wherein the fixing mechanism (8) comprises four through holes (13) respectively arranged on four insertion rods (7), a two-way threaded rod (14) is arranged in each through hole (13), two ends of each two-way threaded rod (14) are respectively provided with a threaded block (15) in a threaded sleeve manner, the two threaded blocks (15) are respectively connected with the inner side wall of each through hole (13) in a sliding manner, a limiting plate (16) is rotatably sleeved outside each two-way threaded rod (14), the two limiting plates (16) are respectively connected with the inner side wall of each through hole (13) in a fixed manner, a rotating shaft (17) is arranged in each through hole (13), the rotating shaft (17) is in transmission connection with the two-way threaded rods (14) through a bevel gear set (18), a cavity (19) is arranged in each bottom plate (1), and the upper ends of the four rotating shafts (17) are respectively rotatably connected with the inner side walls of the The four rotating shafts (17) are arranged in the cavity (19) and are in transmission connection with each other through a transmission mechanism (20), and the upper end of one of the inserting rods (7) rotatably penetrates through the bottom plate (1) and is coaxially and fixedly connected with a rotating handle (21).
4. The combined soft foundation treatment construction equipment as claimed in claim 3, wherein the bevel gear set (18) comprises a first bevel gear (22) and a second bevel gear (23) which are meshed with each other, the first bevel gear (22) is coaxially and fixedly connected with the rotating shaft (17), and the second bevel gear (23) is coaxially and fixedly connected with the bidirectional threaded rod (14).
5. The combined soft foundation treatment construction equipment according to claim 3, wherein the transmission mechanism (20) comprises two belt pulleys (24), the two belt pulleys (24) are respectively and fixedly connected with the two rotating shafts (17) coaxially, and the two belt pulleys (24) are in transmission connection through a belt.
6. The combined soft foundation treatment construction equipment according to claim 1, wherein the first observation rod (2) and the bottom plate (1) are fixedly welded by a plurality of triangular fixing plates (25).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020532693.XU CN211824377U (en) | 2020-04-13 | 2020-04-13 | Combined soft foundation treatment construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020532693.XU CN211824377U (en) | 2020-04-13 | 2020-04-13 | Combined soft foundation treatment construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211824377U true CN211824377U (en) | 2020-10-30 |
Family
ID=73142575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020532693.XU Expired - Fee Related CN211824377U (en) | 2020-04-13 | 2020-04-13 | Combined soft foundation treatment construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211824377U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113418444A (en) * | 2021-07-05 | 2021-09-21 | 新余学院 | Method and device for deeply detecting non-excavation deeply-buried underground pipeline |
-
2020
- 2020-04-13 CN CN202020532693.XU patent/CN211824377U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113418444A (en) * | 2021-07-05 | 2021-09-21 | 新余学院 | Method and device for deeply detecting non-excavation deeply-buried underground pipeline |
CN113418444B (en) * | 2021-07-05 | 2022-11-01 | 新余学院 | Non-excavation of degree of depth detection buries underground piping device deeply |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211824377U (en) | Combined soft foundation treatment construction equipment | |
CN212104001U (en) | Quick drilling sampler for building foundation | |
CN215569092U (en) | Monitoring devices is used in supervision is built in room | |
CN210269254U (en) | Multifunctional engineering investigation construction equipment | |
CN214005668U (en) | Building composite pile foundation structure | |
CN213837630U (en) | Portable scaffold frame that building engineering used | |
CN112323808A (en) | Anti-falling device of shallow foundation pit supporting plate | |
CN219470959U (en) | Foundation pit supporting structure | |
CN215482857U (en) | Drainage tubular pile composite foundation treatment device | |
CN111764398A (en) | Foundation pit supporting and reinforcing device | |
CN213417787U (en) | Rod pit tamping device for electric power engineering | |
CN217208040U (en) | But municipal administration piping lane construction is with push bench of height-adjusting | |
CN213576225U (en) | Non-excavation prosthetic tractive device of municipal drainage pipe | |
CN214695600U (en) | Pile extractor for hydraulic engineering | |
CN219691026U (en) | Adjustable scaffold | |
CN214249028U (en) | Full-automatic foundation pit real-time monitoring lifting equipment | |
CN115162399B (en) | Quick anchoring and attaching structure device for foundation | |
CN209949830U (en) | Portable earth boring machine | |
CN221212305U (en) | Existing railway pier side drilling device | |
CN211496065U (en) | Gantry frame convenient to disassemble and assemble and used for stacking assembly line | |
CN212674486U (en) | Sampling device is checied in national soil resource basic farmland | |
CN215629905U (en) | Double-shaft bidirectional stirring pile for soft soil foundation | |
CN221167555U (en) | Real estate construction warning device | |
CN217480902U (en) | Portable temporary supporting device for house building construction | |
CN220909160U (en) | Reinforcing steel bar support device for building foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201030 Termination date: 20210413 |