CN212837079U - Rail guard for construction - Google Patents

Rail guard for construction Download PDF

Info

Publication number
CN212837079U
CN212837079U CN202020460553.6U CN202020460553U CN212837079U CN 212837079 U CN212837079 U CN 212837079U CN 202020460553 U CN202020460553 U CN 202020460553U CN 212837079 U CN212837079 U CN 212837079U
Authority
CN
China
Prior art keywords
dwang
rod
guardrail
tip
backup pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020460553.6U
Other languages
Chinese (zh)
Inventor
周汝贵
黄泽巍
韦德礼
侯德文
蒋文臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Metallurgical Construction Co ltd
Original Assignee
Guangxi Construction Engineering Group Metallurgical Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group Metallurgical Construction Co ltd filed Critical Guangxi Construction Engineering Group Metallurgical Construction Co ltd
Priority to CN202020460553.6U priority Critical patent/CN212837079U/en
Application granted granted Critical
Publication of CN212837079U publication Critical patent/CN212837079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a protective guard for building construction, which comprises a mounting plate (2) positioned in a vertical rod (1), an adjusting mechanism and a limiting mechanism; adjustment mechanism includes pivot (4) and guardrail bar (5), pivot (4) and guardrail bar (5) tip and middle part fixed connection, be located pivot (4) and the inside sliding connection of spout (3) of guardrail bar (5) tip, spout (3) are located mounting panel (2) middle part, and pass through bolt (8) fixed connection between mounting panel (2) and pole setting (1), pole setting (1) and mounting panel (2) bottom respectively with bottom plate (6) and fixed block (7) fixed connection, improve the operation convenience.

Description

Rail guard for construction
Technical Field
The utility model relates to a rail guard specifically is a rail guard for construction belongs to construction application technical field.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The construction method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the construction operation place is called a building construction site or a construction site, and is also called a construction site.
The building construction refers to the production activity in the engineering construction implementation stage, and for the protective guard for building construction, because carry out building construction, especially need use the protective guard to protect when higher area is under construction, traditional protective guard is mostly fixed, is difficult to carry out effectual regulation according to the needs in place when carrying out the field installation, is unfavorable for carrying out the regulation of distance between each pole setting of protective guard, is unfavorable for the transport of each part of protective guard when carrying out the installation, increases the labour. Therefore, a guard rail for building construction is proposed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rail guard for construction just in order to solve above-mentioned problem.
The utility model realizes the purpose through the following technical proposal, and the protective guard for building construction comprises a mounting plate, an adjusting mechanism and a limiting mechanism which are positioned inside a vertical rod;
the adjusting mechanism comprises a rotating shaft and a guardrail rod, the rotating shaft is fixedly connected with the end part and the middle part of the guardrail rod, the rotating shaft positioned at the end part of the guardrail rod is connected with the inner part of a chute in a sliding way, the chute is positioned in the middle part of the mounting plate, the mounting plate is fixedly connected with the upright rod through a bolt, and the bottom ends of the upright rod and the mounting plate are respectively fixedly connected with the bottom plate and the fixing block;
stop gear includes screw rod and dwang, the inside through connection of screw rod and bottom plate and fixed block, screw rod tip and nut threaded connection, the pole setting outer wall is seted up flutedly, the recess is inside to be connected with the dwang rotation, and the dwang tip rotates with the backup pad to be connected, the backup pad is inside to be pegged graft with the bolt.
Preferably, the cross section of the vertical rod is of an H-shaped structure, the inside of the vertical rod is respectively connected with the two mounting plates in an embedded mode, and each mounting plate is fixedly connected with the vertical rod through two bolts.
Preferably, the number of guardrail bars is four, and every two guardrail bar middle parts all rotate through the pivot and connect, and lie in wherein the pivot of one end of guardrail bar all with the inside sliding connection of spout.
Preferably, the two sides of the bottom plate are respectively attached to and connected with the two fixing blocks, the bottom plate and the two fixing blocks are connected with the screw in an inserting mode, and the nut at the end portion of the screw is in contact with the side wall of the fixing block.
Preferably, the dwang is located inside the recess, the length of dwang is the same with the length of recess, and the backup pad length of dwang tip is the same with the thickness of pole setting.
Preferably, the bottom plate, the fixing block and the supporting plate are fixedly connected with the fixing rod, the middle of the supporting plate is connected with the bolt in a penetrating mode, and the end portion of the bolt extends into the slot formed in the top end of the mounting plate.
The utility model has the advantages that:
1. the utility model has simple structure and convenient operation, can adjust the protection effect of the protective guard according to the danger degree of the construction environment by limiting the vertical rod and the mounting plate and conveniently adjusting the distance between the vertical rods according to the field requirement through the design of the adjustable rotating shaft between the mounting plates, thereby improving the practicability of the protective guard;
2. the utility model discloses a dwang and backup pad set up the support dynamics that can improve the rail guard, avoid appearing collapsing and cause the problem of incident, can carry on the dwang spacing when carrying, make things convenient for the transport of each part of rail guard, improve the operation convenience.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic view of the interior of the present invention;
FIG. 2 is a schematic view of the external structure of the present invention;
fig. 3 is a schematic side view of the present invention.
In the figure: 1. pole setting, 2, mounting panel, 3, spout, 4, pivot, 5, guardrail bar, 6, bottom plate, 7, fixed block, 8, bolt, 9, dead lever, 10, screw rod, 11, nut, 12, recess, 13, dwang, 14, backup pad, 15, bolt, 16, slot.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the embodiments described below are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Referring to fig. 1-3, a protective fence for building construction includes an installation plate 2 located inside a vertical rod 1, an adjusting mechanism and a limiting mechanism;
the adjusting mechanism comprises a rotating shaft 4 and a guardrail rod 5, the rotating shaft 4 is fixedly connected with the end part and the middle part of the guardrail rod 5, the rotating shaft 4 positioned at the end part of the guardrail rod 5 is connected with the inner part of a chute 3 in a sliding way, the chute 3 is positioned in the middle part of an installation plate 2, the installation plate 2 is fixedly connected with an upright rod 1 through a bolt 8, and the bottom ends of the upright rod 1 and the installation plate 2 are respectively fixedly connected with a bottom plate 6 and a fixing block 7;
stop gear includes screw rod 10 and dwang 13, the inside through connection of screw rod 10 and bottom plate 6 and fixed block 7, 10 tip and 11 threaded connection of nut of screw rod, 1 outer wall of pole setting has seted up recess 12, the recess 12 is inside to be rotated with dwang 13 and is connected, and 13 tip of dwang rotates with backup pad 14 to be connected, backup pad 14 is inside to be pegged graft with bolt 15.
The section of the vertical rod 1 is in an H-shaped structure, the interior of the vertical rod 1 is respectively embedded and connected with two mounting plates 2, and each mounting plate 2 is fixedly connected with the vertical rod 1 through two bolts 8; the number of the guardrail rods 5 is four, the middle parts of every two guardrail rods 5 are rotatably connected through the rotating shaft 4, and the rotating shaft 4 positioned at one end of each guardrail rod 5 is slidably connected with the inner part of the sliding groove 3; two sides of the bottom plate 6 are respectively attached to and connected with the two fixing blocks 7, the bottom plate 6 and the two fixing blocks 7 are inserted into the screw 10, and the nut 11 at the end of the screw 10 is in contact with the side walls of the fixing blocks 7; the rotating rod 13 is positioned in the groove 12, the length of the rotating rod 13 is the same as that of the groove 12, and the length of the supporting plate 14 at the end part of the rotating rod 13 is the same as that of the upright rod 1; the bottom plate 6, the fixing block 7 and the supporting plate 14 are fixedly connected with the fixing rod 9, the middle of the supporting plate 14 is connected with the bolt 15 in a penetrating mode, and the end portion of the bolt 15 extends into the slot 16 formed in the top end of the mounting plate 2.
The utility model discloses when using, peg graft mounting panel 2 inside pole setting 1, and through screwing up bolt 8, fix mounting panel 2 inside pole setting 1 through bolt 8, pass bottom plate 6 and fixed block 7 with screw rod 10 again, and screw up nut 11, realize further fixed, improve the fastness, after the operation is accomplished, when adjusting the position between two pole settings 1, make guardrail bar 5 slide in spout 3 is inside, conveniently adjust the distance between pole setting 1, can effectively adjust according to the construction condition in place, shorten the distance between pole setting 1 and can reduce the hole between each guardrail bar 5, improve the protecting effect, can adjust at will according to construction environment dangerous degree, improve the practicality of guardrail, take out dwang 13 from recess 12 is inside, make dwang 13 rotate to the inclined position after, backup pad 14 contact ground, with bottom plate 6, Dead lever 9 of fixed block 7 and backup pad 14 bottom inserts the fixed of ground realization rail guard, the slope through dwang 13 and backup pad 14 sets up the stability that improves the rail guard, the problem of avoiding appearing collapsing, when the transport, only need rotate dwang 13 to inside recess 12, rotate backup pad 14 to the top of pole setting 1 again, and peg graft inside slot 16 with bolt 15, carry on spacingly to dwang 13 and backup pad 14, conveniently carry, improve the operation convenience, assemble during also facilitating the use.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (6)

1. The utility model provides a rail guard for construction which characterized in that: comprises a mounting plate (2) positioned in a vertical rod (1), an adjusting mechanism and a limiting mechanism;
the adjusting mechanism comprises a rotating shaft (4) and a guardrail rod (5), the rotating shaft (4) is fixedly connected with the end part and the middle part of the guardrail rod (5), the rotating shaft (4) positioned at the end part of the guardrail rod (5) is slidably connected with the inner part of a sliding chute (3), the sliding chute (3) is positioned in the middle part of a mounting plate (2), the mounting plate (2) is fixedly connected with a vertical rod (1) through a bolt (8), and the bottom ends of the vertical rod (1) and the mounting plate (2) are fixedly connected with a bottom plate (6) and a fixing block (7) respectively;
stop gear includes screw rod (10) and dwang (13), screw rod (10) and bottom plate (6) and fixed block (7) inside through connection, screw rod (10) tip and nut (11) threaded connection, pole setting (1) outer wall is seted up fluted (12), recess (12) inside rotates with dwang (13) and is connected, and dwang (13) tip rotates with backup pad (14) and is connected, backup pad (14) inside is pegged graft with bolt (15).
2. The guard rail for construction according to claim 1, wherein: the cross section of the vertical rod (1) is of an H-shaped structure, the inside of the vertical rod (1) is respectively connected with the two mounting plates (2) in an embedded mode, and each mounting plate (2) is fixedly connected with the vertical rod (1) through two bolts (8).
3. The guard rail for construction according to claim 1, wherein: the quantity of guardrail bar (5) is four, and every two guardrail bar (5) middle parts all rotate through pivot (4) and connect, and lie in guardrail bar (5) wherein pivot (4) of one end all with spout (3) inside sliding connection.
4. The guard rail for construction according to claim 1, wherein: the bottom plate (6) both sides are connected with two fixed block (7) laminating respectively, all peg graft with screw rod (10) between bottom plate (6) and two fixed block (7), and nut (11) the contact of screw rod (10) tip has fixed block (7) lateral wall.
5. The guard rail for construction according to claim 1, wherein: dwang (13) are located inside recess (12), the length of dwang (13) is the same with the length of recess (12), and backup pad (14) length of dwang (13) tip is the same with the thickness of pole setting (1).
6. The guard rail for construction according to claim 1, wherein: bottom plate (6), fixed block (7) and backup pad (14) all with dead lever (9) fixed connection, backup pad (14) middle part and bolt (15) through connection, and inside slot (16) that bolt (15) tip extended to mounting panel (2) top and seted up.
CN202020460553.6U 2020-04-01 2020-04-01 Rail guard for construction Expired - Fee Related CN212837079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020460553.6U CN212837079U (en) 2020-04-01 2020-04-01 Rail guard for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020460553.6U CN212837079U (en) 2020-04-01 2020-04-01 Rail guard for construction

Publications (1)

Publication Number Publication Date
CN212837079U true CN212837079U (en) 2021-03-30

Family

ID=75113550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020460553.6U Expired - Fee Related CN212837079U (en) 2020-04-01 2020-04-01 Rail guard for construction

Country Status (1)

Country Link
CN (1) CN212837079U (en)

Similar Documents

Publication Publication Date Title
CN212837079U (en) Rail guard for construction
CN211523849U (en) Building guardrail for civil engineering
CN212054092U (en) Fender is enclosed with monitoring formula to building engineering construction
CN213114310U (en) Bridge construction supporting equipment in field of bridge engineering
CN211773756U (en) Slope protection protector for civil engineering
CN107681961A (en) A kind of solar-cell panel support of ease of assembly
DE102005008064A1 (en) Tracking device for solar collector e.g. Photovoltaic module, solar thermal module has bearing supports whereby collector medium is pivoted with axis of rotation over angle range of at least one hundred sixty degree
CN217076793U (en) Tower crane installation adjusting base
CN214996049U (en) Concrete cast-in-place board template fixed bolster
CN112563934A (en) Power transmission and transformation framework column
CN219840349U (en) Electric power iron tower frame for electric power maintenance
CN212298225U (en) Measuring instrument fixing support for high-rise frame steel structure
CN212743606U (en) Aluminum profile fence
CN210177996U (en) Construction adjustable rail guard is built in room
CN212389064U (en) Mounting member for building construction
CN112432660A (en) Online monitoring device and monitoring method for safety of steel supporting structure
CN219864441U (en) Protective guard for house construction engineering
CN220889434U (en) A stull structure for scaffold
CN217557920U (en) Guardrail for construction worker
CN220184810U (en) Simple protective fence for construction site
CN218264285U (en) Assembled building frame
CN109723228A (en) A kind of indoor construction pin-connected panel stair temporary guard rail
CN220080936U (en) Safety ladder cage with adjustable protective guard
CN220868750U (en) Cantilever scaffold for building construction
CN218479575U (en) Device for adjusting verticality of vertical structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210330