CN218711884U - Permeable pavement brick for recycling decoration garbage - Google Patents

Permeable pavement brick for recycling decoration garbage Download PDF

Info

Publication number
CN218711884U
CN218711884U CN202222931892.XU CN202222931892U CN218711884U CN 218711884 U CN218711884 U CN 218711884U CN 202222931892 U CN202222931892 U CN 202222931892U CN 218711884 U CN218711884 U CN 218711884U
Authority
CN
China
Prior art keywords
interlocking
cavity
decoration
pavement brick
permeable pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222931892.XU
Other languages
Chinese (zh)
Inventor
滕叶
张学峰
黄源宾
吴健
韩文松
郑晓光
戴腾
水亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Liming Resources Reuse Co ltd
Shanghai Pudong Environmental Protection Development Co ltd
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Liming Resources Reuse Co ltd
Shanghai Pudong Environmental Protection Development Co ltd
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Liming Resources Reuse Co ltd, Shanghai Pudong Environmental Protection Development Co ltd, Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Liming Resources Reuse Co ltd
Priority to CN202222931892.XU priority Critical patent/CN218711884U/en
Application granted granted Critical
Publication of CN218711884U publication Critical patent/CN218711884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a decoration rubbish recycles permeable pavement brick belongs to building material technical field. It includes structure and decorative body, the structure is the rectangle, its inside fixedly connected with blend stop, vacuole formation between blend stop and the structure, set up the hole of permeating water of vertical running through on the blend stop, the lateral wall of structure is provided with interlocking strip and the interlocking groove that is used for the interlocking to connect, the decorative body sets up in the cavity, and the decorative body constitutes for the colored glass waste material. The utility model discloses with material environmental protection, simple structure, the design of decorative body has promoted the sight on road surface, and interlocking strip and interlocking groove's design has realized the interlocking between the pavior brick, and then promotes the wholeness and the stability on road surface, has simplified the installation flow simultaneously, need not the manual work and has laid cement to can guarantee drainage function and road surface overall stability, helping hand sponge city construction and ecological civilization construction.

Description

Permeable pavement brick for recycling decoration garbage
Technical Field
The utility model relates to a decoration rubbish recycles permeable pavement brick belongs to building material technical field.
Background
With the accelerated promotion of urbanization construction, the colored glass is widely applied to building decoration, so that decoration garbage inevitably contains a large amount of colored glass waste. At present, the main treatment mode of color glass waste in China is heating roasting after crushing to prepare regenerated products such as glassware, glass mosaic, foam glass and the like. Because the existing treatment mode has high processing cost and large energy consumption, the resource utilization rate of the colored glass waste in China is low at present.
The road surface in sponge city need lay the brick that permeates water, and the brick that permeates water has advantages such as the water permeability is good, resistance to compression rupture intensity height. However, the existing permeable bricks are single in structure and color, and are bonded by cement during pavement, so that the construction is complicated.
Therefore, the decoration garbage such as the colored glass waste is applied to pavement of the sponge city, and the resource utilization rate of the decoration garbage is improved while the construction requirement of the sponge city is met. The permeable decorative pavement brick for the decoration garbage recycling is attractive in appearance and simple and convenient to install, and can actively promote the application of a regenerated product of the decoration garbage on pavement.
Disclosure of Invention
An object of the utility model is to provide a decoration rubbish is recycled and is permeated water decoration pavior brick when realizing decoration rubbish resource utilization such as colored glass waste material, solves the present pavior brick that permeates water outward appearance colour single, the loaded down with trivial details problem of mating formation.
The utility model discloses the technical problem that will solve takes following technical scheme to realize:
the utility model provides a decoration rubbish is recycled permeable pavement brick, includes structure and decorative body, the structure is the rectangle, its inside fixedly connected with blend stop, vacuole formation between blend stop and the structure, set up the hole of permeating water of vertical running through on the blend stop, the lateral wall of structure is provided with interlocking strip and the interlocking groove that is used for the interlocking to connect, the decorative body sets up in the cavity, and the decorative body constitutes for colored glass waste material.
As a preferred example, four cavities are provided, and four cavities are located at four corners of the top surface of the structure.
As a preferable example, the cavity of the cavity is a cuboid, the longitudinal section of the cavity is square, the side length is 6-9cm, the thickness is 2-3cm, the bottom surface of the cavity is a square with the side length of 8.5-12.5cm, and the side surfaces of the adjacent cavities are intersected to form an included angle of 45-80 degrees.
As a preferred example, the interlocking strips are provided in two, respectively provided on the upper half part and the lower half part of two adjacent side surfaces of the structure; the interlocking grooves are arranged in two and are respectively arranged on the upper half part and the lower half part of the other two adjacent side faces of the structure body.
As a preferable example, the water permeable holes are uniformly distributed in five, and are circular and have the diameter of 0.7-1.2cm.
As a preferable example, the decoration body is made of color glass waste materials sorted from decoration garbage by crushing to form decoration mortar, then the decoration mortar is poured into the cavity, and the decoration mortar is polished after being hardened and poured with the structure body for forming.
The beneficial effects of the utility model are that: the utility model has the advantages of environmental protection of materials and simple structure, and the ornamental value of the road surface is improved by the design of the decorative body; the grooves between the cavities can guide rainwater to the water permeable holes, and the design of the water permeable holes can ensure that the rainwater can be smoothly discharged into a foundation below, so that pedestrians can be prevented from slipping when walking in rainy days; the interlocking strips and the interlocking grooves are designed to realize interlocking among the pavement bricks, so that the integrity and stability of the pavement are improved, the installation process is simplified, and cement does not need to be laid manually; therefore, the decoration garbage can be recycled, the water permeable decoration pavement brick is low-carbon and environment-friendly in manufacturing process and attractive in appearance, the drainage function and the overall stability of the pavement can be guaranteed, and sponge city construction and ecological civilization construction are assisted.
Drawings
Fig. 1 is the utility model discloses pavior brick overall schematic diagram.
Fig. 2 is a schematic structural diagram of an embodiment of the present invention.
Fig. 3 is a schematic view of a decoration body according to an embodiment of the present invention.
Reference numerals: 1-structural body, 2-decorative body, 11-cavity, 12-water permeable hole, 13-interlocking strip and 14-interlocking groove.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand and understand, the present invention is further explained by combining the following specific drawings.
As shown in figure 1, the permeable decorative pavement brick for recycling decoration garbage comprises a structural body 1 and a decorative body 2, wherein the structural body 1 of the pavement brick is made of decoration garbage recycled aggregate concrete, and the decorative body 2 is formed by crushing, mixing and pouring mortar, molding and polishing color glass waste sorted from the decoration garbage.
As shown in FIG. 2, the pavior tile structure 1 comprises a cavity 11, water permeable holes 12, interlocking strips 13 and interlocking grooves 14. Specifically, a cross-shaped barrier strip is fixedly connected inside the structural body 1, a cavity 11 is formed between the barrier strip and the structural body 1,4 cavities 11 are positioned at 4 corners of the top surface of the pavement brick structural body 1, the cavity of each cavity 11 is a cuboid, the longitudinal section of each cavity is a square, the side length is 6-9cm, the thickness is 2-3cm, and the bottom surface of each cavity 11 is a square with the side length of 8.5-12.5 cm; the 5 water permeable holes 12 have the diameter of 0.2-1.7cm and penetrate through the pavement brick structure 1 along the vertical direction.
As shown in fig. 2, 4 sides of the pavior brick structure 1 are respectively provided with 1 interlocking strip 13 or interlocking groove 14, and 2 interlocking strips 13 are respectively arranged on the upper half part and the lower half part of 2 adjacent sides; the 2 interlocking grooves 14 are respectively arranged on the other 2 adjacent side faces, the height is the same as that of the interlocking strips 13 on the opposite side faces, in one specific embodiment, the cross sections of the interlocking strips 13 are dovetail-shaped, and the cross sections of the interlocking grooves 14 are also dovetail-shaped, so that the interlocking strips 13 and the interlocking grooves 14 with the same height can be seamlessly spliced, for example, a brick A and a brick B are spliced into a whole in pairs through the interlocking strips 13 and the interlocking grooves 14, then a brick C and a brick D are spliced into a whole in pairs, the whole formed by the bricks A and B and the whole formed by the bricks C and D slide into the interlocking grooves 14 through the interlocking strips 13 and the interlocking grooves 14 for splicing, finally pavement laying is completed, the integrity and the stability of the pavement are improved, meanwhile, the installation process is simplified, cement does not need to be laid manually, the steps are only one of the splicing method, the installation feasibility is required to be explained, and various splicing methods can be adopted according to the field situation during actual operation.
As shown in fig. 3, the decorative body 2 is a cuboid after being poured and molded, the size of the cuboid is the same as the size of the cavity 11, the cavity 11 is filled with decorative mortar after being poured, the height of the decorative body 2 is flush with the top of the structural body 1, in another implementation, in order to facilitate pouring of the mortar, the upper edges of the structural body 1 and the barrier strips are made into inclined planes, so that the opening of the cavity 11 is rectangular and funnel-shaped.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that various changes and modifications may be made without departing from the spirit and scope of the invention, and such changes and modifications fall within the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a decoration rubbish is recycled permeable pavement brick, includes structure (1) and decorative body (2), its characterized in that: the utility model discloses a decorative structure, including structural body (1), the structure is characterized in that structural body (1) is the rectangle, its inside fixedly connected with blend stop, vacuole (11) are formed between blend stop and the structural body (1), set up vertical hole (12) of permeating water that runs through on the blend stop, the lateral wall of structural body (1) is provided with interlocking strip (13) and interlocking groove (14) that are used for the interlocking to connect, decorate body (2) and set up in cavity (11), and decorate body (2) and constitute for colored glass waste.
2. The finishing waste recycling water permeable pavement brick according to claim 1, wherein: the number of the cavities (11) is four, and the four cavities (11) are located at four corners of the top surface of the structure body (1).
3. The decoration garbage recycling water permeable pavement brick according to claim 2, wherein: the cavity body of the cavity (11) is a cuboid, the longitudinal section of the cavity is square, the side length is 6-9cm, the thickness is 2-3cm, the bottom surface of the cavity (11) is square with the side length of 8.5-12.5cm, and the side surfaces of the adjacent cavities (11) are intersected to form an included angle of 45-80 degrees.
4. The finishing waste recycling water permeable pavement brick according to claim 1, wherein: the two interlocking strips (13) are respectively arranged on the upper half part and the lower half part of two adjacent side surfaces of the structure body (1); the two interlocking grooves (14) are respectively arranged on the upper half part and the lower half part of the other two adjacent side surfaces of the structure body (1).
5. The finishing waste recycling water permeable pavement brick according to claim 1, wherein: five water permeable holes (12) are uniformly distributed, and the water permeable holes are circular and have the diameter of 0.7-1.2cm.
6. The finishing waste recycling water permeable pavement brick according to claim 1, wherein: the decorative body (2) is made of color glass waste materials sorted from decoration garbage through crushing to form decoration mortar, the decoration mortar is poured into the cavity (11), and the decoration mortar is polished after being hardened and poured with the structure body (1) for forming.
CN202222931892.XU 2022-11-04 2022-11-04 Permeable pavement brick for recycling decoration garbage Active CN218711884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222931892.XU CN218711884U (en) 2022-11-04 2022-11-04 Permeable pavement brick for recycling decoration garbage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222931892.XU CN218711884U (en) 2022-11-04 2022-11-04 Permeable pavement brick for recycling decoration garbage

Publications (1)

Publication Number Publication Date
CN218711884U true CN218711884U (en) 2023-03-24

Family

ID=85604739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222931892.XU Active CN218711884U (en) 2022-11-04 2022-11-04 Permeable pavement brick for recycling decoration garbage

Country Status (1)

Country Link
CN (1) CN218711884U (en)

Similar Documents

Publication Publication Date Title
CN100545400C (en) A kind of mosaic wall decoration board and preparation method thereof
CN105437354B (en) The method of binding face tile when a kind of prefabricated concrete floor and wallboard
CN204343622U (en) A kind of syndeton of combined floor
CN102828599B (en) Mosaic tiles, its preparation method and making mould
CN218711884U (en) Permeable pavement brick for recycling decoration garbage
CN203452212U (en) Building wall surface heat insulation system and building wall body
CN205875499U (en) Exempt from water ash laid dry auto -lock wall brick
CN104612343A (en) Method for constructing extruded polystyrene board molding of building outer wall
CN207685622U (en) It is a kind of to can be used for the permeable floor tile in part
CN203129402U (en) Self-insulating building block
CN207130999U (en) Heat insulation decoration integrated plate
CN101597946A (en) A kind of sunset red stone natural color composite bricks
CN205576671U (en) Combined type PC stone material structure
CN208578056U (en) A kind of assembling concrete cushion cap template
CN203716391U (en) Novel building block
CN203247750U (en) Assembled type cement brick
CN203270410U (en) Stone-inlaid permeable building block
CN107098726A (en) Cementitious composite brick with resin and glassy layer
CN204001557U (en) Assembled ceramic tile
CN201276794Y (en) Composite roof tile plate
CN216552648U (en) Double-sided splitting decorative building block
CN2545283Y (en) Impervious exterior wall blocks
CN215167109U (en) Glazed fair-faced wall brick with tenon and groove structure
CN218779847U (en) Tenon fourth of twelve earthly branches anchor wall ceramic tile
CN203113593U (en) Novel cement brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant