CN218708597U - Vertical hoisting auxiliary tool - Google Patents
Vertical hoisting auxiliary tool Download PDFInfo
- Publication number
- CN218708597U CN218708597U CN202222690483.5U CN202222690483U CN218708597U CN 218708597 U CN218708597 U CN 218708597U CN 202222690483 U CN202222690483 U CN 202222690483U CN 218708597 U CN218708597 U CN 218708597U
- Authority
- CN
- China
- Prior art keywords
- workpiece
- lifted
- bearing beam
- hole
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
A vertical hoisting auxiliary tool belongs to the technical field of equipment manufacturing and mainly comprises a bearing beam, hoisting holes, a correction plate, positioning holes, a connecting plate and the like, wherein the bearing beam and the correction plate are vertically welded with each other, and the specific size can be flexibly adjusted according to the size and the structural form of a workpiece to be hoisted; the correcting plate is vertically contacted with the inner side face of a workpiece to be hoisted, the adjusting hole is mainly connected with the workpiece to be hoisted through the connecting bolt assembly, the connecting plate is mainly used for fixing the workpiece to be hoisted, and the hoisting hole is formed in the bearing beam and is mainly used for installing a hoisting tool. The utility model discloses to the characteristic to vertical hoisting designs in the installation, has effectively avoided the focus unbalanced and askew drawing to drag, guarantee installation quality and operational safety nature, reliability to one side.
Description
Technical Field
The utility model relates to a hoist device technical field, concretely relates to hoist and mount auxiliary fixtures.
Background
Oxygen boosting side-blown furnace system is multilayer platform mechanism, be mostly nonstandard equipment because of corollary equipment, and it has special-shaped spare to assist, the big and degree of difficulty coefficient of hoist and mount work load is higher in the installation, especially copper water jacket, the steel water jacket, the installation quality of uptake flue etc., the direct production efficiency and the cost of deciding the operation of later stage blow-in, hoist and mount in the traditional meaning, more or less can cause the dislocation of different degrees, need lean on the chain block, auxiliary facilities such as hydraulic jack finely tune, hardly ensure the installation clearance and require the allowed range.
Disclosure of Invention
In order to realize perpendicular accurate hoist and mount, the utility model aims to solve the problem of steel structure spare vertical hoisting, ensure the quality and the efficiency of installation.
In order to realize the above purpose, the utility model discloses a technical scheme include: the clamping tool comprises a horizontally arranged bearing beam, a horizontally arranged connecting plate, a vertically arranged correcting plate and a connecting bolt assembly for detachably connecting a support of a workpiece to be lifted, wherein the middle part of the bearing beam is provided with a hoisting hole connected with a hoisting rope, one end of the bearing beam is connected with the connecting plate, the other end of the bearing beam is connected with the correcting plate, and the connecting plate is provided with an adjusting hole for adjusting the distance L from the correcting plate to the inner side surface of the workpiece to be lifted; when the clamping tool is in a hoisting state, the correcting plate is tightly matched with the inner side surface of the workpiece to be hoisted, and the connecting bolt assembly is fixedly connected with the support of the workpiece to be hoisted.
After the clamping tool is lifted and the connecting bolt assembly is disassembled, the correcting plate and the inner side surface of the workpiece to be lifted can freely form clearance fit.
When the device is used, the bearing beam is arranged at the upper end of a workpiece to be lifted, and the inner side of the correction plate is vertically contacted with the inner side surface of the workpiece to be lifted; when the bearing beam moves to a position where the connecting plate corresponds to a support outside a workpiece to be lifted, the adjusting hole and the mounting hole on the horizontal plane of the support form a bolt assembling hole for connecting a connecting bolt assembly of the workpiece to be lifted to penetrate through the bolt assembling hole, and the clamping tool is tightly matched with the workpiece to be lifted.
The adjusting holes are oblong holes.
The length direction of the oblong hole is consistent with that of the bearing beam.
The mounting hole of the support is a circular or kidney-shaped hole; when the mounting hole of the support is a waist-shaped hole, the length direction of the waist-shaped hole is vertical to the length direction of the bearing beam.
The workpiece to be lifted is provided with two supports, the number of the clamping tools is two, and one clamping tool is correspondingly assembled with one support.
The hoisting holes are arranged on the bearing beam and connected with a hoisting tool; the connecting hole is arranged on the connecting plate and is connected with a workpiece to be hoisted. The correcting plate is vertically connected with the inner side face of the workpiece to be hoisted, and the workpiece to be hoisted is guaranteed to be always in a vertical state after being hoisted. The connecting plate is connected with the horizontal plane of the support of the workpiece to be hoisted, so that the upper surface of the workpiece to be hoisted is ensured to be horizontal. The utility model discloses can ensure to wait to hoist and mount the work piece and plan erection joint's part, horizontal plane, perpendicular can accurate butt joint, safe and reliable. The utility model provides a difficult problem of especially vertical hoisting butt joint of traditional hoist and mount, improve installation quality and efficiency, safe and reliable, stable in structure are reliable simultaneously.
Drawings
Fig. 1 is one of the schematic structural diagrams of the present invention;
FIG. 2 is a top view of FIG. 1;
FIG. 3 is a state diagram of the use of FIG. 1;
FIG. 4 is a top view of FIG. 3 (without bolts);
FIG. 5 is a top view of the work piece to be lifted;
fig. 6 is a second schematic structural diagram of the present invention.
Detailed Description
In fig. 1-3, the utility model discloses a spandrel girder 5 that the level set up, connecting plate 2 that the level set up, correction plate 4 of vertical setting, be used for can dismantle the connecting bolt subassembly 3 of connecting the support 11 of waiting to lift by crane work piece 1, spandrel girder 5 middle part has the hole for hoist 51 of being connected with lifting rope 6, and spandrel girder 5 one end is connected with connecting plate 2, and correction plate 4 is connected to the spandrel girder 5 other end, is equipped with regulation hole 21 on the connecting plate 2. The hoisting hole 51 is arranged on the bearing beam 5 and connected with a hoisting tool; the adjusting holes (also called connecting holes) 21 are arranged on the connecting plate 2 and are connected with the workpiece 1 to be hoisted. The correction plate 4 is vertically and tightly matched with the inner side surface of the workpiece 1 to be hoisted, so that the workpiece 1 to be hoisted is always in a vertical state after being hoisted. The connecting plate 2 is connected with the horizontal surface of a support 11 of the workpiece 1 to be hoisted, and the upper surface of the workpiece 1 to be hoisted is ensured to be horizontal. Under the assistance of adjusting hole 21, adjustable correcting plate 4 to with wait to hoist the interval L of 1 medial surface of work piece, when interval L =0mm, correcting plate 4 to with wait to hoist 1 medial surface tight fit, adjusting hole corresponds with the support 11 connecting hole 21 of waiting to hoist the 1 outside of work piece on connecting plate 2 and forms a bolt pilot hole, be used for connecting wait to hoist 1 connecting bolt subassembly 3 of work piece and wear to adorn in bolt pilot hole department, behind the assembly connecting bolt subassembly 3, the centre gripping frock with wait to hoist 1 tight fit of work piece, can lift by crane the operation.
In fig. 4, a support 11 is arranged on the left side of the workpiece 1 to be lifted, and when the workpiece 1 to be lifted is lifted, a group of novel models is adopted.
In fig. 5, the workpiece 1 to be lifted is a water jacket of an oxygen-enriched side-blown converter, the length and width of the water jacket are 1000 × 1000mm, the thickness of the water jacket is 130mm, the weight of the water jacket is 1-3 tons, two supports 11 are arranged on the left side of the workpiece 1 to be lifted, mounting holes are formed in each support 11, and the mounting holes are vertically-arranged vertically-long circular holes 12. When the workpiece 1 to be lifted is lifted, two sets of novel models are needed.
In fig. 6, the left end of the bearing beam 5 is provided with a concave part, the right end of the connecting plate 2 is arranged at the concave part of the bearing beam 5, and the lower surface of the connecting plate 2 is flush with the lower surface of the bearing beam 5. The concave part increases the welding area of the connecting plate 2 and the bearing beam 5, so that the connecting plate 2 and the bearing beam 5 are connected more stably.
The processing steps of the utility model are as follows:
step one): blanking the bearing beam 5, cutting by using a Q345B steel plate with the thickness of 18-20 mm in a plasma mode, and punching a 45-degree welding groove by using a grinding machine;
step two): blanking the connecting plate 2 and the correcting plate 4, cutting edges needing to be welded by using a Q235B steel plate with the thickness of 18-20 mm in a plasma mode, punching a 45-degree welding groove by using a grinding machine, and polishing the edges which do not need to be welded smoothly by using the grinding machine;
step three): splicing step by step, and performing carbon dioxide gas shielded welding and full welding (in order to prevent overheating deformation during welding, a mode of staggered welding of two surfaces is adopted);
step four): drilling a hoisting hole 51 with phi 22mm and a connecting hole 21.
Claims (7)
1. The utility model provides a vertical hoisting auxiliary fixtures which characterized in that: the clamping tool comprises at least one clamping tool for clamping a workpiece (1) to be lifted, the clamping tool comprises a horizontally arranged bearing beam (5), a horizontally arranged connecting plate (2), a vertically arranged correcting plate (4) and a connecting bolt assembly (3) for detachably connecting a support (11) of the workpiece (1) to be lifted, a hoisting hole (51) connected with a hoisting rope is formed in the middle of the bearing beam (5), one end of the bearing beam (5) is connected with the connecting plate (2), the other end of the bearing beam (5) is connected with the correcting plate (4), and an adjusting hole (21) for adjusting the distance L between the correcting plate (4) and the inner side face of the workpiece (1) to be lifted is formed in the connecting plate (2); when the clamping tool is in a hoisting state, the correcting plate (4) is tightly matched with the inner side surface of the workpiece to be hoisted, and the connecting bolt assembly (3) is fixedly connected with the support (11) of the workpiece (1) to be hoisted.
2. The vertical hoisting auxiliary tool according to claim 1, characterized in that: after the clamping tool finishes lifting and the connecting bolt assembly (3) is disassembled, the correcting plate (4) and the inner side surface of the workpiece to be lifted can freely form clearance fit.
3. The vertical hoisting auxiliary tool according to claim 1, characterized in that: when the device is used, the bearing beam (5) is arranged at the upper end of the workpiece (1) to be lifted, and the inner side of the correcting plate (4) is vertically contacted with the inner side surface of the workpiece (1) to be lifted; when the bearing beam (5) moves to the connecting plate (2) and corresponds to the support (11) on the outer side of the workpiece (1) to be lifted, the adjusting hole (21) and the mounting hole on the horizontal plane of the support (11) form a bolt assembling hole for connecting the workpiece (1) to be lifted and the connecting bolt assembly (3) penetrating through the bolt assembling hole, and the clamping tool is tightly matched with the workpiece (1) to be lifted.
4. The vertical hoisting auxiliary tool according to claim 1, characterized in that: the adjusting holes (21) are long circular holes.
5. The vertical hoisting auxiliary tool according to claim 4, characterized in that: the length direction of the oblong hole is consistent with that of the bearing beam (5).
6. The vertical hoisting auxiliary tool according to claim 1, characterized in that: the mounting hole (12) of the support (11) is a circular or kidney-shaped hole; when the mounting hole (12) of the support (11) is a waist-shaped hole, the length direction of the waist-shaped hole is vertical to the length direction of the bearing beam (5).
7. The vertical hoisting auxiliary tool according to claim 1, characterized in that: the workpiece (1) to be lifted is provided with two supports, the number of the clamping tools is two, and one clamping tool is correspondingly assembled with one support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222690483.5U CN218708597U (en) | 2022-10-13 | 2022-10-13 | Vertical hoisting auxiliary tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222690483.5U CN218708597U (en) | 2022-10-13 | 2022-10-13 | Vertical hoisting auxiliary tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218708597U true CN218708597U (en) | 2023-03-24 |
Family
ID=85583360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222690483.5U Active CN218708597U (en) | 2022-10-13 | 2022-10-13 | Vertical hoisting auxiliary tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218708597U (en) |
-
2022
- 2022-10-13 CN CN202222690483.5U patent/CN218708597U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110901851A (en) | Ship large-scale equipment broadside installation device | |
CN111827125A (en) | Accurate adjustment method and device for installation line shape of steel upright post of arch bridge | |
CN218708597U (en) | Vertical hoisting auxiliary tool | |
CN211173170U (en) | A appurtenance for girder steel installation | |
CN211496607U (en) | Steel beam hoisting clamp | |
CN113084423B (en) | Welding positioning fixture for frame of telescopic boom forklift | |
CN210914945U (en) | Hoisting device for upper structure of aluminum electrolytic cell | |
CN218667903U (en) | Assembled steel structure connecting mechanism | |
CN217105567U (en) | Girder steel fixes a position hoist and mount otic placode fast | |
CN218538947U (en) | Electric shovel circular rail bracket | |
CN212953894U (en) | Small upright column hoisting auxiliary device | |
CN219548822U (en) | Detachable lifting lug assembly | |
CN218622223U (en) | Large-diameter pile foundation reinforcement cage positioning structure arranged on steel platform | |
CN214692881U (en) | Hook head direction fixing device of crane hook | |
CN214291023U (en) | Steel column bottom/top plate auxiliary milling device for manufacturing steel structure | |
CN220809760U (en) | Be used for side pushing body auxiliary installation instrument | |
CN217417929U (en) | Overturning fixture for liquid rocket engine | |
CN112340619B (en) | Modular assembly method of crane | |
CN215035571U (en) | Tool for placing tower head | |
CN216662224U (en) | Lifting appliance manhole matching device convenient for automatic unhooking | |
CN218204960U (en) | Structure convenient to installation of precast beam component | |
CN217701194U (en) | Large-scale hydraulic forging press crossbeam components of a whole that can function independently structure | |
CN217167222U (en) | Welding tool | |
CN217972201U (en) | Outer cylinder bottom hoisting accessory of stand | |
CN217947352U (en) | Steel column hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |