CN217105567U - Girder steel fixes a position hoist and mount otic placode fast - Google Patents

Girder steel fixes a position hoist and mount otic placode fast Download PDF

Info

Publication number
CN217105567U
CN217105567U CN202220698488.XU CN202220698488U CN217105567U CN 217105567 U CN217105567 U CN 217105567U CN 202220698488 U CN202220698488 U CN 202220698488U CN 217105567 U CN217105567 U CN 217105567U
Authority
CN
China
Prior art keywords
steel
hoisting
hoist
girder steel
mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220698488.XU
Other languages
Chinese (zh)
Inventor
李永雷
詹勇
陈友泉
王立安
常竞
王亚宇
雷文江
江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangxiao Steel Structure Jiangxi Co ltd
Original Assignee
Hangxiao Steel Structure Jiangxi Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangxiao Steel Structure Jiangxi Co ltd filed Critical Hangxiao Steel Structure Jiangxi Co ltd
Priority to CN202220698488.XU priority Critical patent/CN217105567U/en
Application granted granted Critical
Publication of CN217105567U publication Critical patent/CN217105567U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a girder steel fixes a position hoist and mount otic placode fast, traditional girder steel hoist and mount method is: the lug plates for hoisting are welded at the one-fourth to one-third length of the steel beam, the lug plates are connected with hoisting steel ropes to hoist the steel beam to the installation position, and the hoisting steel ropes can be detached to enable the crane to move to other positions for continuous use after the steel beam web bolts are installed and positioned, so that the crane occupies a longer time and directly influences the construction speed. The utility model discloses can fix a position when the hoist and mount girder steel in the twinkling of an eye well, lift by crane the steel cable and can demolish promptly and let the loop wheel machine move to other department and carry out the operation, thereby can reduce from this and occupy the loop wheel machine time and improve the construction speed, on the other hand, the installation of the accurate positioning girder steel of still being convenient for improves engineering installation quality, has apparent economic benefits.

Description

Girder steel fixes a position hoist and mount otic placode fast
Technical Field
The utility model relates to a building technical field particularly, is exactly a hoist and mount otic placode is fixed a position fast to girder steel.
Background
The utility model discloses the technique provides a girder steel fixes a position hoist and mount otic placode fast and is used for the handling installation of girder steel.
The traditional steel beam hoisting method comprises the following steps: the hoisting lug plate for hoisting is welded on one fourth to one third of the length of the steel beam, the lug plate is connected with a steel hoisting rope to hoist the steel beam to a mounting position, the steel hoisting rope can be detached after a steel beam web bolt is mounted and positioned, and the hoisting machine moves to the other position to continue to be used, so that the conventional construction method has two problems: (1) the steel lifting rope lifted by the crane cannot be immediately detached, so that the crane occupies a long time, and the construction speed is directly influenced. (2) The steel lifting rope lifts the steel beam to be in shaking, so that the accurate adjustment and positioning of the mounting bolt are difficult, the misalignment of the butt welding seam of the beam flange is easily caused, and the mounting quality is directly influenced.
For solving the problem, the utility model provides a pair of girder steel fixes a position hoist and mount otic placode fast, directly shelve the support girder steel on the post bracket through the hoist and mount otic placode, can demolish the steel lifting rope immediately, let the loop wheel move to its operation, save greatly and occupy the loop wheel time, accelerate the construction speed, can carry out the micro-adjustment for the installation that makes girder steel web bolt, make the flange butt weld can not take place the wrong limit, the overhanging tip at the hoist and mount otic placode is cut into the hypotenuse (the horizontal chord length of cutting the hypotenuse should be than overhanging section length 20mm), dispose wedge steel gasket pad simultaneously and prop up below the hoist and mount otic placode, adjust the installation height difference of girder steel through removing the very easy micro-adjustment of steel wedge position, the girder steel stability by hoist and mount otic placode supporting can not rock, the bolt construction installation of being convenient for.
Disclosure of Invention
The utility model discloses the technique is that solve the quick accurate positioning problem of girder steel, and the invention content mainly is:
1. the conventional hoisting lug plate is shifted to the end part of the steel beam from the inside of the steel beam, the hoisting lug plate is properly lengthened to enable the conventional hoisting lug plate to extend 50mm out of the steel beam, and the steel beam can be directly supported on a bracket of the column by the extending section of the hoisting lug plate, so that a hoisting steel rope can be immediately detached, the operation of the crane is accelerated, and the construction speed is also accelerated.
2. The overhanging section of the hoisting lug plate is cut into the bevel edge, the steel wedge piece with the same inclination is configured to support and cushion below the hoisting lug plate, the steel wedge piece is moved to perform small height adjustment on the installed steel beam, the problem of misalignment of beam flange butt welding seams can be solved, and excellent installation quality is obtained.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the description of the embodiments are briefly introduced below, and it is obvious for a person skilled in the art to obtain other drawings based on these drawings without any inventive work.
Figure 1 is the embodiment of the utility model provides a girder steel is fixed a position hoist and mount otic placode technical illustration fast.
Figure 2 is a diagram of the lifting ear plate and the steel wedge sheet of the utility model
Reference numerals: 1-lifting lug plates, 2-lifting holes, 3-steel wedges, 4-steel lifting ropes, 5-connecting plates, 6-bolts, 7-steel beams, 8-steel column brackets and 9-steel columns.
Detailed Description
【1】 The utility model discloses a diagram is schematic, and the diagram is mainly for explaining technical meaning, all does not draw according to the drawing proportion, and the specification and size of various concrete component parts has been given to the description of carrying out concrete implementation here, nevertheless can replace with other similar specifications and sizes completely, should not regard as this as the limitation to the protection scope of the utility model constitutes.
【2】 The utility model discloses a to having the bracket or being provided with being connected of steel column and girder steel of outer crown plate, nevertheless also can be used to the girder and be connected with the similar of secondary beam, should not regard as with this the utility model discloses a protection range constitutes the restriction.
【3】 Example (b): in order to make the technical solutions in the embodiments of the present invention better understood and make the above objects, technical features, and structural manners of the embodiments of the present invention concrete, the technical solutions in the embodiments of the present invention will be described in further detail with reference to the accompanying drawings.
1. Referring to fig. 1, the technical application method of the present invention is shown, the specific dimensions such as the structure of the embodiment design mainly depend on the dimension of the hoisting member, the length of the steel beam 7 hoisted by the embodiment is 8m, and the specification is H600 × 250 × 8 × 20.
2. The utility model discloses a hoist and mount otic placode 1 adopts the steel sheet preparation of 20mm thickness, and its size is 160X 220mm (height X length), apart from the intermediate position trompil hole 2 phi 40 of the inside edge 80mm department of hoist and mount otic placode 1, and the limit that the overhanging end of hoist and mount otic placode 1 has 80mm length is cut into the hypotenuse of 1: 10.
3. The steel wedge piece 3 designed by the utility model adopts a steel plate with the thickness of 16mm, the size of the steel plate is 100 multiplied by 100mm, one surface of the steel wedge piece 3 is made into a 1:10 inclined plane by adopting a mechanical planer, the thickest part of the steel wedge piece 3 is 16mm, and the thinnest part is 6.0 mm.
4. 160mm of hoisting otic placodes 1 are lapped at the center of the flange of the steel beam 7 in the length direction, wherein 140mm of straight edges are welded with the flange of the steel beam 7 through 20mm of double-faced fillet welds, and 60mm of inclined edges with the chord length of 80mm extend out of the edge of the steel beam 7.
5. This embodiment lifts by crane girder steel 7 of 8m length, pass hoist and mount hole 2 of hoist and mount otic placode 1 and pin 4 tip of steel lifting rope with the many hank steel cables of 20mm diameter, the contained angle of steel lifting rope 4 and girder steel 7 must not be less than 45, when girder steel 7 handling to 8 departments of steel column bracket, according to the on-the-spot condition add the plug steel wedge piece 3 below hoist and mount otic placode 1, make 7 edges of a wing of girder steel align the back with 8 edges of a wing of steel column bracket, can demolish steel lifting rope 4, accomplish the handling operation, move the loop wheel machine to its work, operate according to the order afterwards: connecting the steel beam 7 web plates through bolts 6 → detaching the steel wedge pieces 3 → cutting off the hoisting lug plates 1 → welding the butt welding seams of the upper and lower flanges of the steel beam 7, and completing the installation construction of the joint.
6. This embodiment proves the utility model discloses construction convenience, safety, can save the loop wheel machine expense for construction speed, and girder steel 7 mounted position precision is easy secure, can avoid this serious quality problems of girder steel 7 edge of a wing butt joint wrong limit, is worth popularizing and applying, has apparent economic benefits and social, is worth popularizing and applying.

Claims (2)

1. The utility model provides a girder steel fixes a position hoist and mount otic placode fast which characterized in that: the steel column bracket is characterized in that the hoisting lug plate (1) is welded at the end of the steel beam (7) and extends outwards for a small section, a hoisting hole (2) is formed in the hoisting lug plate (1) and used for installing a steel hoisting rope (4), the steel beam (7) is hoisted to the position of the steel column bracket (8), the hoisting lug plate (1) can directly support the steel beam (7) on the steel column bracket (8), and therefore the steel hoisting rope (4) can be timely dismantled to complete hoisting operation.
2. The steel beam quick positioning and hoisting ear plate of claim 1, characterized in that: the overhanging section of the hoisting ear plate (1) is cut into a bevel edge, and the positioning height difference of the steel beam (7) can be adjusted by moving the steel wedge (3) below the pad, so that the bolt (6) of the connecting plate (5) can be accurately positioned and smoothly installed.
CN202220698488.XU 2022-03-29 2022-03-29 Girder steel fixes a position hoist and mount otic placode fast Active CN217105567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220698488.XU CN217105567U (en) 2022-03-29 2022-03-29 Girder steel fixes a position hoist and mount otic placode fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220698488.XU CN217105567U (en) 2022-03-29 2022-03-29 Girder steel fixes a position hoist and mount otic placode fast

Publications (1)

Publication Number Publication Date
CN217105567U true CN217105567U (en) 2022-08-02

Family

ID=82604534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220698488.XU Active CN217105567U (en) 2022-03-29 2022-03-29 Girder steel fixes a position hoist and mount otic placode fast

Country Status (1)

Country Link
CN (1) CN217105567U (en)

Similar Documents

Publication Publication Date Title
CN103332611A (en) Fabrication method of arm support of crane
CN103216103A (en) Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof
CN111827125A (en) Accurate adjustment method and device for installation line shape of steel upright post of arch bridge
CN116100182A (en) Welding method for C-shaped marine LNG storage tank anti-moving block
CN217105567U (en) Girder steel fixes a position hoist and mount otic placode fast
CN211173170U (en) A appurtenance for girder steel installation
CN110512527A (en) The device and adjusting method precisely adjusted for prefabricated stand column verticality
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN114293783A (en) High-altitude large-span steel beam mounting method
CN218708597U (en) Vertical hoisting auxiliary tool
CN112681761A (en) Positioning and mounting device and mounting method for ultra-long external wall panel of assembly type factory building
CN207567998U (en) A kind of composite structure of steel plate shear force wall and steel column
CN115627806B (en) Pile leg lengthening process
CN219823358U (en) Hoisting guide component
CN215254455U (en) Fireproof hanging basket for high-altitude welding of steel structure
CN212885825U (en) Assembling tool in side
CN218622223U (en) Large-diameter pile foundation reinforcement cage positioning structure arranged on steel platform
CN218667903U (en) Assembled steel structure connecting mechanism
CN220011827U (en) TBM aircraft nose hoist and mount anchor clamps
CN103510712A (en) Right-angled-Z-shaped aerial butt-joint construction method of multi-layer H-shaped steel columns
CN219825229U (en) Quick pile cap of tearing open of landing stage construction
CN211569882U (en) Auxiliary tool for T-shaped beam hoisting assembly
CN220247216U (en) Auxiliary device for butt joint installation of inclined column
CN217371151U (en) High-precision one-side welding construction structure for large-section T-shaped steel beam
CN215035571U (en) Tool for placing tower head

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant