CN218680819U - Multistage steep bank pipeline water delivery irrigation equipment - Google Patents

Multistage steep bank pipeline water delivery irrigation equipment Download PDF

Info

Publication number
CN218680819U
CN218680819U CN202222951558.0U CN202222951558U CN218680819U CN 218680819 U CN218680819 U CN 218680819U CN 202222951558 U CN202222951558 U CN 202222951558U CN 218680819 U CN218680819 U CN 218680819U
Authority
CN
China
Prior art keywords
pipeline
wall
conduit
water delivery
delivery irrigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222951558.0U
Other languages
Chinese (zh)
Inventor
罗钰平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222951558.0U priority Critical patent/CN218680819U/en
Application granted granted Critical
Publication of CN218680819U publication Critical patent/CN218680819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a multistage abrupt bank pipeline water delivery irrigation equipment belongs to the irrigation technique field, and the bottom of pipeline slot is provided with first gravel stone bed course, and the fixed surface of first gravel stone bed course lays conduit and sleeve pipe, and the fixed surface of conduit installs the valve, cup joints through the elbow is sealed between conduit and the sleeve pipe, and the both ends of pipeline slot all are provided with the brick and build a wall, the inner wall of brick wall is fixed to bond has cement mortar to smear, and this multistage abrupt bank pipeline water delivery irrigation equipment sets up through this structure and can solve current farmland abrupt bank, mountain terraced fields and high slope landscape and lay the conduit and can't resume its original topography's construction technological problem after burying underground the conduit to through wall body, reinforced concrete apron and the operation hole that sets up, not only increased user's use travelling comfort, the staff of being convenient for in time discovers the seepage problem of conduit in addition, have certain use value.

Description

Multistage steep bank pipeline water delivery irrigation equipment
Technical Field
The utility model relates to an irrigate technical field, more specifically say, relate to a multistage abrupt bank pipeline water delivery irrigation equipment.
Background
The water delivery irrigation equipment is the device that is used for carrying the water source, as the novel high-efficient underground water delivery irrigation equipment that publication number CN207070707U discloses, but the ubiquitous water pipe at different levels of among the general water pipe irrigation process meets the abrupt bank in farmland, burying underground of mountain terraced fields and high slope ecological gardens, connect, overhaul, and be difficult to resume original topography scheduling problem after the water pipe is buried underground, the pipe connection section is buried underground simultaneously, the timely seepage problem of discovery linkage segment of staff of being not convenient for, may cause a large amount of wastes of water resource. Therefore, a multi-stage steep bank pipeline water delivery irrigation device is designed to solve the problems.
SUMMERY OF THE UTILITY MODEL
Problem to exist among the prior art, the utility model aims to provide a multistage abrupt bank pipeline water delivery irrigation equipment, this multistage abrupt bank pipeline water delivery irrigation equipment can solve current farmland abrupt bank through this structure setting, mountain area terraced fields and high slope landscape lay water pipeline, and can't resume the construction technology difficult problem of its original topography after burying water pipeline underground, and through the wall body that sets up, reinforced concrete apron and operation hole, user's use travelling comfort has not only been increased, and the staff of being convenient for in time discovers the seepage problem of water pipeline, certain use value has.
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a multistage abrupt bank pipeline water delivery irrigation equipment, includes the pipeline slot, the bottom of pipeline slot is provided with first gravel bed course, the fixed surface of first gravel bed course lays conduit and sleeve pipe, conduit's fixed surface installs the valve, cup joint through the elbow is sealed between conduit and the sleeve pipe, the both ends of pipeline slot all are provided with the brick and lay the wall, the inner wall fixed bond of brick wall has cement mortar to wipe one's face, the upper portion contact connection of brick wall has reinforced concrete apron, the side fixedly connected with nozzle stub of brick wall, the central point of nozzle stub puts and is equipped with the through-hole, it has the operation to surround between the brick wall, the side of operation hole is equipped with and keeps off wind wall and boss with brick wall fixed connection, the side of keeping off the wind wall is provided with the ladder, this multistage abrupt bank pipeline water delivery irrigation equipment sets up through this structure can solve behind current abrupt bank, mountain terraced fields and the landscape lays conduit and the unable difficult problem of recovering its original topography to construction technology through setting up, steel apron and operation wall, and operation person's convenient to use value has not only found the seepage of the wall in time.
Furthermore, one end of the water conveying pipeline and one end of the sleeve are provided with connecting parts, the inner walls of the connecting parts are in contact connection with the inner walls of the elbows and are fastened through the flange plates, the included angle of each elbow is 120 degrees, the elbows are convenient to seal and fix between the conveying pipeline and the sleeve, and the included angle of each elbow can be set according to actual needs.
Furthermore, the reinforced concrete cover plate is formed by prefabricating a reinforcing steel bar frame and concrete slurry, and the surface of the reinforced concrete cover plate is provided with a ventilation hole which is convenient for ventilation in the operation pit.
Further, the first gravel stone cushion layer is formed by tamping the backfilled crushed soil at the bottom of the pipeline trench, so that the laying of the conveying pipeline and the casing pipe is facilitated.
Further, the water conveying pipeline is made of PE pipelines, PVC pipelines or ball-milling cast iron pipes.
Further, the bottom in operation hole has been laid second grit stone bed course, and second grit stone bed course can avoid the inside raise dust in operation hole or leak and produce muddy water, is equipped with the blowdown hole, has improved inside clean and tidy, the sewage discharge of being convenient for simultaneously.
Compared with the prior art, the utility model has the advantages of:
(1) This scheme can solve current farmland abrupt bank, mountain area terraced fields and high slope landscape and lay the conduit through this structural setting and bury the construction technology difficult problem that can't resume its original topography behind the conduit underground.
(2) This scheme is built a wall or reinforced concrete face wall, reinforced concrete apron and operation hole through the brick that sets up, has not only increased user's use travelling comfort, and the staff of being convenient for in time discovers conduit's seepage problem moreover, has certain use value.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side view of the pipeline trench and brick wall structure of the present invention;
fig. 3 is a top view of the operation pit structure of the present invention.
The reference numbers in the figures illustrate:
1 pipeline slot, 2 first gravel stone bed course, 3 conduit, 4 brick walling, 5 sleeve pipes, 6 cement mortar plaster, 7 second gravel stone bed course, 8 elbows, 9 valves, 10 reinforced concrete apron, 11 ventilation holes, 12 operation pits, 13 short pipes, 14 through-holes, 15 wind-break walls, 16 ladders, 17 bosses.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-3, a multi-stage steep-sill pipeline water delivery irrigation device comprises a pipeline groove 1, a first gravel cushion layer 2 is arranged at the bottom of the pipeline groove 1, the first gravel cushion layer 2 can make the bottom of the pipeline groove 1 not easy to collapse, so that the laying stability of a water pipeline 3 and a sleeve 5 is ensured, the surface of the first gravel cushion layer 2 is fixedly provided with the water pipeline 3 and the sleeve 5, the number of the water pipeline 3 and the sleeve 5 is set according to actual needs, not only is the separation and the movement transportation convenient, but also the laying of the whole water pipeline is convenient, the surface of the water pipeline 3 is fixedly provided with a valve 9, the valve 9 is positioned inside an operation pit 12 and used for controlling the opening and the closing of the water pipeline, the water pipeline 3 and the sleeve 5 are in sealing sleeve joint through an elbow 8, one end of the pipeline groove 1 is provided with a brick wall 4 or a concrete wall, the brick wall 4 can support the end face of the pipeline groove 1, the inner wall of the brick wall 4 is fixedly bonded with a cement mortar plastering surface 6, the cement mortar plastering surface 6 ensures that the inside of the operation pit 12 is clean and tidy, the upper part of the brick wall 4 is in contact connection with a reinforced concrete cover plate 10, the side surface of the brick wall 4 is fixedly connected with a short pipe 13, the central position of the short pipe 13 is provided with a through hole 14, the short pipe 13 is convenient for the connection of a water pipeline 3, a sleeve 5 and an elbow 8, the operation pit 12 is surrounded between the brick walls 4, the side surface of the operation pit 12 is provided with a wind-blocking wall 15 and a boss 17 which are fixedly connected with the brick wall 4, the wind-blocking wall 15 leads the inside of the operation pit 12 to be ventilated and has the function of wind shielding, the boss 17 can prevent soil from entering the operation pit 12, the side surface of the wind-blocking wall 15 is provided with a step 16, and the step 16 is convenient for a user to quickly climb to a high place from a low position, or from high down into the operating pit 12.
One end of water pipe 3 and sleeve 5 is equipped with connecting portion, and the inner wall of connecting portion is connected with the inner wall contact of elbow 8, and fasten through the ring flange, the contained angle of elbow 8 is 120, elbow 8 is convenient for sealed fixed between pipeline 3 and the sleeve 5, and the contained angle of elbow 8 can set up according to actual need, first gravel bed course 2 is tamped through backfilling the hack to pipeline slot 1 bottom and is formed, be convenient for lay of pipeline 3 and sleeve 5, the material of water pipe 3 is the PE pipeline, PVC pipeline or ball-milling cast iron pipe.
In this embodiment, can solve current farmland steep bank, mountain area terrace and high slope landscape and lay conduit 3 and bury the construction technical difficult problem that can't resume its original topography behind conduit 3 underground through this structural setting.
Example 2
Referring to fig. 1-3, a multi-stage steep-sill pipeline water delivery irrigation device comprises a pipeline groove 1, a first gravel cushion layer 2 is arranged at the bottom of the pipeline groove 1, the first gravel cushion layer 2 can make the bottom of the pipeline groove 1 not easy to collapse, so that the laying stability of a water pipeline 3 and a sleeve 5 is ensured, the surface of the first gravel cushion layer 2 is fixedly provided with the water pipeline 3 and the sleeve 5, the number of the water pipeline 3 and the sleeve 5 is set according to actual needs, not only is the separation and the movement transportation convenient, but also the laying of the whole water pipeline is convenient, the surface of the water pipeline 3 is fixedly provided with a valve 9, the valve 9 is positioned inside an operation pit 12 and used for controlling the opening and the closing of the water pipeline, the water pipeline 3 and the sleeve 5 are in sealing sleeve joint through an elbow 8, one end of the pipeline groove 1 is provided with a brick wall 4 or a concrete wall, the brick wall 4 can support the end face of the pipeline groove 1, the inner wall of the brick wall 4 is fixedly bonded with a cement mortar plastering surface 6, the cement mortar plastering surface 6 ensures that the inside of the operation pit 12 is clean and tidy, the upper part of the brick wall 4 is in contact connection with a reinforced concrete cover plate 10, the side surface of the brick wall 4 is fixedly connected with a short pipe 13, the central position of the short pipe 13 is provided with a through hole 14, the short pipe 13 is convenient for the connection of a water pipeline 3, a sleeve 5 and an elbow 8, the operation pit 12 is surrounded between the brick walls 4, the side surface of the operation pit 12 is provided with a wind-blocking wall 15 and a boss 17 which are fixedly connected with the brick wall 4, the wind-blocking wall 15 leads the inside of the operation pit 12 to be ventilated and has the function of wind shielding, the boss 17 can prevent soil from entering the operation pit 12, the side surface of the wind-blocking wall 15 is provided with a step 16, and the step 16 is convenient for a user to quickly climb to a high place from a low position, or from high down into the operating pit 12.
Reinforced concrete apron 10 adopts the reinforcing bar frame to form with the concrete slurry is prefabricated, reinforced concrete apron 10's surface is provided with ventilation hole 11, ventilation hole 11 is convenient for operate the ventilation in hole 12, second grit stone bed course 7 has been laid to the bottom of operation hole 12, second grit stone bed course 7 can avoid operating 12 inside raise dust in hole or leaking and produce muddy water, is equipped with the blowdown hole, has improved inside clean and tidy, the sewage discharge of being convenient for simultaneously.
In the embodiment, through the wall body 4, the reinforced concrete cover plate 10 and the operation pit 12, the use comfort of a user is improved, and the worker can find the leakage problem of the water conveying pipeline in time conveniently, so that the water conveying pipeline has a certain use value.
This multistage steep bank pipeline water delivery irrigation equipment is when setting up, earlier carry out the excavation of pipeline slot 1 on ground, and the operation hole 12 of one end intercommunication is put in order, pile up brick wall 4 in the pit slot after that, thereby form operation hole 12, then lay second gravel stone bed course 7 with operation hole 12 bottom, after that, clear up and tamp pipeline slot 1 bottom and form first gravel stone bed course 2, then lay conduit 3 and sleeve pipe 5, and connect it fixedly through elbow 8, close prefabricated reinforced concrete apron 10 in the upper end of brick wall 4 at last, can solve current farmland steep bank through this structural setting, hydraulic pipeline 3 is laid to mountain terraced fields and high slope landscape, and can't resume its construction technology difficult problem of original topography behind burying conduit 3 underground, and through wall body 4 that sets up, reinforced concrete apron 10 and operation hole 12, user's use comfort has not only been increased, and the staff of being convenient for in time discovers the seepage problem of conduit, certain use value has.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (6)

1. The utility model provides a multistage steep bank pipeline water delivery irrigation equipment, includes pipeline slot (1), its characterized in that: the bottom of pipeline slot (1) is provided with first gravel bed course (2), the fixed surface of first gravel bed course (2) has laid conduit (3) and sleeve pipe (5), the fixed surface of conduit (3) installs valve (9), cup joint through elbow (8) is sealed between conduit (3) and sleeve pipe (5), the both ends of pipeline slot (1) all are provided with brick built wall (4), the inner wall of brick built wall (4) is fixed to bond has cement mortar to wipe one's face (6), the upper portion contact connection of brick built wall (4) has reinforced concrete apron (10), the side fixedly connected with nozzle stub (13) of brick built wall (4), the central point of nozzle stub (13) puts and is equipped with through-hole (14), it has closed operation hole (12) to encircle between brick built wall (4), the side of operation hole (12) is equipped with wind-stopping wall (15) and boss (17) of brick built wall (4) fixed connection, the side of wind-stopping wall (15) is provided with ladder (16).
2. The multi-stage scarp pipeline water delivery irrigation device of claim 1, characterized in that: one end of the water pipe (3) and one end of the sleeve (5) are provided with connecting parts, the inner walls of the connecting parts are in contact connection with the inner wall of the elbow (8) and are fastened through flange plates, and the included angle of the elbow (8) is 120 degrees.
3. The multi-stage scarp pipeline water delivery irrigation device of claim 1, characterized in that: the reinforced concrete cover plate (10) is formed by prefabricating a reinforcing steel frame and concrete slurry, and the surface of the reinforced concrete cover plate (10) is provided with a ventilation hole (11).
4. The multi-stage scarp pipeline water delivery irrigation device of claim 1, characterized in that: the first gravel stone cushion layer (2) is formed by tamping the backfilled crushed soil at the bottom of the pipeline groove (1).
5. The multi-stage scarp pipeline water delivery irrigation device of claim 1, characterized in that: the water conveying pipeline (3) is made of PE pipelines, PVC pipelines or ball-milling cast iron pipes.
6. The multi-stage scarp pipeline water delivery irrigation device of claim 1, characterized in that: and a second gravel stone cushion layer (7) is laid at the bottom of the operation pit (12).
CN202222951558.0U 2022-11-07 2022-11-07 Multistage steep bank pipeline water delivery irrigation equipment Active CN218680819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222951558.0U CN218680819U (en) 2022-11-07 2022-11-07 Multistage steep bank pipeline water delivery irrigation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222951558.0U CN218680819U (en) 2022-11-07 2022-11-07 Multistage steep bank pipeline water delivery irrigation equipment

Publications (1)

Publication Number Publication Date
CN218680819U true CN218680819U (en) 2023-03-24

Family

ID=85608165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222951558.0U Active CN218680819U (en) 2022-11-07 2022-11-07 Multistage steep bank pipeline water delivery irrigation equipment

Country Status (1)

Country Link
CN (1) CN218680819U (en)

Similar Documents

Publication Publication Date Title
CN110306616B (en) Construction method of sewage pipeline
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN218680819U (en) Multistage steep bank pipeline water delivery irrigation equipment
CN219080361U (en) Mountain-side abrupt slope terrain channel structure
CN214737880U (en) Combined type ditch for hydraulic engineering
CN217399744U (en) Basement side wall sluicing decompression structure
CN112458933B (en) Double-hole water diversion box culvert joining construction method
CN214143998U (en) Sewage collecting pipe network arrangement structure for households along river
CN212835785U (en) Green environmental protection cement blanket and escape canal structure
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
CN212454464U (en) A leaking stoppage processing structure for coal mining tunnel trickle
CN110863555B (en) Construction process for laying sewage collection pipeline in village and town areas
CN211623450U (en) Construction structure for treating water seepage of tunnel
CN103982707B (en) The most now spread concrete and surround soft pipe flow guide system
CN216973641U (en) Positioning prefabricated base
CN205677031U (en) A kind of sewage piece well
CN214194427U (en) Farmland irrigation ditch
CN212153647U (en) Drainage facility suitable for water source area protection district excavation highway section
CN210216655U (en) Steel casing brick drainage inspection shaft
CN215862025U (en) Pipe groove structure of water delivery pipeline in mountainous area
CN113445478B (en) Irrigation and drainage integrated field linear ditch module
CN217010218U (en) Cable trench process structure
CN221919717U (en) Prefabricated flushing valve overflow well
CN207944531U (en) A kind of band pedestal reinforced concrete drain pipe with flexible port
CN219327154U (en) Large-scale earthing basement roof drainage system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant