CN218667190U - Bridge prefabricated baffle installation protector - Google Patents

Bridge prefabricated baffle installation protector Download PDF

Info

Publication number
CN218667190U
CN218667190U CN202223199496.9U CN202223199496U CN218667190U CN 218667190 U CN218667190 U CN 218667190U CN 202223199496 U CN202223199496 U CN 202223199496U CN 218667190 U CN218667190 U CN 218667190U
Authority
CN
China
Prior art keywords
baffle
rods
installation
bridge
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223199496.9U
Other languages
Chinese (zh)
Inventor
宋杰
欧才平
张凯杰
何续斌
国辉
陈栋华
李玉宏
崔恒兴
孙犇
崔刚
谢中文
陈鹏
高志东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Jiangsu CRRC Urban Development Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Jiangsu CRRC Urban Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway First Engineering Group Co Ltd, Jiangsu CRRC Urban Development Co Ltd filed Critical Second Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Priority to CN202223199496.9U priority Critical patent/CN218667190U/en
Application granted granted Critical
Publication of CN218667190U publication Critical patent/CN218667190U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge prefabricated baffle installation protection device, which comprises a connecting frame, a movable wheel and a protection basket; the connecting frame comprises a connecting frame body which is vertically arranged on the outer side of the installed baffle and a clamping frame body which is arranged on the top of the installed baffle and clamped on the top of the installed baffle; the protection basket is laid along the extending direction of waiting to install the baffle, and the bottom of protection basket and all around are provided with the protection and enclose the fender. The utility model discloses a fragment that the protection basket of bridge body bottom produced in to the work progress, the welding slag is collected, prevent that fragment, welding slag from dropping to leading to the fact the influence to it on the existing line, the well protective expense of having avoided a large amount of traffic to dredged, the driving safety of construction area has been ensured, reduce the construction risk, combine to remove wheel and link realization protection basket's removal simultaneously, make this protector can shift along with the installation of waiting to install the baffle, protective structure has been simplified, avoid causing the influence to the bridge floor construction.

Description

Bridge prefabricated baffle installation protector
Technical Field
The utility model belongs to the technical field of the bridge construction, especially, relate to a prefabricated baffle installation protector of bridge.
Background
In the construction of the existing viaduct, the prefabricated baffle is used as a part of a bridge deck system and is generally installed by independent hoisting, namely, the prefabricated baffle is connected with the existing bridge deck through a cast-in-place block for forming. However, in the process of installing the baffle, the installation position of the baffle needs to be roughened, and the connecting steel bars between the baffle and the flange plate of the bridge need to be adjusted, but concrete fragments, welding slag and the like often can be generated in the process of roughening the beam surface and adjusting the steel bars to fall under the bridge, and in the process of constructing the baffle of the bridge crossing the existing road and the channel, safety protection measures need to be carried out on the lower part of the bridge. At present, in the construction process of a bridge deck baffle, measures such as road sealing and navigation are often adopted to avoid safety risks caused by falling of sundries such as bridge surface concrete fragments under a bridge in order to avoid safety accidents caused by falling of the sundries. However, when the bridge is positioned below the high-speed or channel, the handling procedure is complicated, and the construction period is greatly prolonged. For example, in a bridge baffle installation protector that is described in utility model with patent number CN206503078U, realize protector's removal with the help of devices such as portal crane, protect the baffle installation on the whole bridge floor for whole work progress receives the restriction, and occupies bridge floor large-scale machinery portal crane, has reduced construction cycle to a certain extent, but has increased construction cost and construction degree of difficulty.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that not enough among the above-mentioned prior art is directed against, provide a prefabricated baffle installation protector of bridge, fragment, welding slag that the protection basket through bridge body bottom produced in to the work progress are collected, prevent that fragment, welding slag from dropping to leading to the fact the influence to it on the existing line, have avoided the well protective expense of a large amount of traffic to drench, have ensured construction area's driving safety, reduce the construction risk, combine simultaneously to remove wheel and link realization the removal of protection basket for this protector can shift along with the installation of waiting to install the baffle, has simplified protective structure, avoids causing the influence to the bridge floor construction.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a prefabricated baffle of bridge installation protector which characterized in that: the bridge comprises a connecting frame arranged on an installed baffle, moving wheels arranged at the top of the connecting frame and matched with the installed baffle, and a protective basket arranged at the bottom of the connecting frame and extending to the bottom of a bridge body, wherein the connecting frame and the protective basket are integrally formed;
the connecting frame comprises a connecting frame body vertically arranged on the outer side of the installed baffle and a clamping frame body arranged on the top of the installed baffle and clamped on the top of the installed baffle, and the connecting frame body and the clamping frame body are integrally formed;
the protective basket is arranged along the extending direction of the baffle to be installed, and the bottom and the periphery of the protective basket are provided with protective enclosing baffles.
Foretell bridge prefabrication baffle installation protector, its characterized in that: the connection support body includes that the connection montant and a plurality of average level of two vertical settings set up two connect the horizontal pole of connection between the montant, it is a plurality of to connect the montant connect horizontal pole integrated into one piece.
Foretell bridge prefabrication baffle installation protector, its characterized in that: the clamping frame body comprises an installation component which is horizontally arranged at the top of the installed baffle and is fixedly connected with the top end of the connecting vertical rod and a clamping component which is arranged on the inner side of the installed baffle and is connected with the installation component; the mounting assembly and the clamping assembly are integrally formed.
Foretell bridge prefabrication baffle installation protector, its characterized in that: the mounting assembly comprises two first mounting rods which are horizontally arranged at the tops of the mounted baffles and a plurality of second mounting rods which are horizontally arranged between the two first mounting rods, the first mounting rods and the second mounting rods are integrally formed, and the moving wheel is mounted on the second mounting rods; the moving wheel is installed on the second installation rod through an installation frame, and a buckle is arranged on the moving wheel.
Foretell bridge prefabrication baffle installation protector, its characterized in that: the subassembly that clamps includes that two equal vertical settings are in the inboard montant and the level setting of clamping of installation baffle are two the bottom that clamps the montant and with the horizontal pole that clamps of the inboard butt of installation baffle, clamp the montant with clamp horizontal pole integrated into one piece.
Foretell bridge prefabrication baffle installation protector, its characterized in that: the protective basket comprises a supporting frame and a plurality of protective rods, wherein the supporting frame is horizontally arranged at the bottom of the connecting frame body and is distributed along the extending direction of the baffle to be installed, the protective rods are vertically arranged on the supporting frame, and the supporting frame and the protective rods are integrally formed; and protection enclosing barriers are uniformly distributed between the two adjacent protection rods on the supporting frame.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses a fragment, the welding slag that the protection basket that sets up in bridge body bottom produced in to the work progress are collected, prevent that fragment, welding slag from dropping to leading to the fact the influence to it on the existing line, have avoided protection expense in a large amount of traffic are dredged, have ensured construction area's driving safety, reduce the construction risk, combine simultaneously to remove wheel and link realization the removal of protection basket makes this protector can shift along with the installation of waiting to install the baffle, has simplified protective structure, avoids causing the influence to the bridge floor construction.
2. The utility model discloses the bottom of protection basket with all set up the protection all around and enclose the fender, can prevent that fragment, welding slag from striking out the protection basket when dropping, increase the protection dynamics.
To sum up, the utility model discloses a fragment, the welding slag that the protection basket of bridge body bottom produced in to the work progress are collected, prevent that fragment, welding slag from dropping to leading to the fact the influence to it on the existing line, have avoided protection expense in a large amount of traffic are dredged, have ensured the driving safety of construction area, reduce the construction risk, combine simultaneously to remove wheel and link and realize the removal of protection basket for this protector can shift along with the installation of waiting to install the baffle, has simplified protective structure, avoids causing the influence to the bridge floor construction.
The technical solution of the present invention is further described in detail by the accompanying drawings and embodiments.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a right side view of the present invention.
Description of reference numerals:
1-installed baffle; 2, connecting a frame body; 2-1-connecting a vertical rod;
2-connecting the cross bar; 3-moving wheels; 4-a bridge body;
5, a protective basket; 6, clamping the frame body; 6-1 — a first mounting bar;
6-2-a second mounting bar; 7, clamping a vertical rod; 8, clamping the cross rod;
9-a baffle to be installed; 10-a guard bar; 11-protective enclosure;
12-a support frame.
Detailed Description
As shown in fig. 1 and fig. 2, the present invention comprises a connecting frame disposed on an installed baffle 1, a moving wheel 3 disposed on the top of the connecting frame and engaged with the installed baffle 1, and a protective basket 5 disposed on the bottom of the connecting frame and extending to the bottom of a bridge body 4, wherein the connecting frame and the protective basket 5 are integrally formed;
the connecting frame comprises a connecting frame body 2 vertically arranged on the outer side of the installed baffle 1 and a clamping frame body 6 arranged at the top of the installed baffle 1 and clamped at the top of the installed baffle 1, and the connecting frame body 2 and the clamping frame body 6 are integrally formed;
the protective basket 5 is arranged along the extending direction of the baffle 9 to be installed, and the bottom and the periphery of the protective basket 5 are provided with protective enclosing baffles 11.
Fragment, welding slag that produce in the work progress are collected through the protection basket 5 that sets up in 4 bottoms of bridge body, prevent that fragment, welding slag from dropping and causing the influence to it on existing line, have avoided protection expense in a large amount of traffic discongests, have ensured construction area's driving safety, reduce the construction risk, combine to remove wheel 3 and link simultaneously and realize the removal of protection basket 5 for this protector can shift along with the installation of treating erection baffle 9, has simplified protective structure, avoids causing the influence to the bridge floor construction.
In addition, the bottom and the periphery of the protective basket 5 are provided with protective surrounding baffles 11, so that the protective basket 5 can be prevented from being impacted when fragments and welding slag fall, and the protective force is increased.
It should be noted that the installed baffle 1 and the baffle 9 to be installed are installed along the extending direction of the bridge body 4.
As shown in fig. 1, in this embodiment, the connecting frame body 2 includes two connecting vertical rods 2-1 vertically arranged and a plurality of connecting horizontal rods 2-2 horizontally arranged between the two connecting vertical rods 2-1, and the connecting vertical rods 2-1 and the plurality of connecting horizontal rods 2-2 are integrally formed.
In practical use, the main function of the connecting frame body 2 is to connect the clamping frame body 6 and the protective basket 5, so that the protective basket 5 has the characteristic of being movable and can move according to the position of a baffle 9 to be installed in subsequent installation.
As shown in fig. 2, in this embodiment, the clamping frame body 6 includes an installation component horizontally disposed on the top of the installed baffle 1 and fixedly connected to the top end of the connecting vertical rod 2-1, and a clamping component disposed inside the installed baffle 1 and connected to the installation component; the mounting assembly and the clamping assembly are integrally formed.
As shown in fig. 1 and 2, in this embodiment, the mounting assembly includes two first mounting rods 6-1 horizontally disposed on top of the mounted baffle 1 and a plurality of second mounting rods 6-2 horizontally disposed between the two first mounting rods 6-1, the first mounting rods 6-1 and the second mounting rods 6-2 are integrally formed, and the moving wheel 3 is mounted on the second mounting rods 6-2; the moving wheel 3 is installed on the second installation rod 6-2 through an installation frame, and a buckle is arranged on the moving wheel 3.
During practical use, one end of the first installation rod 6-1 is fixedly connected with the top end of the vertical connecting rod 2-1, the other end of the first installation rod 6-1 is connected with the clamping component, the clamping component is connected with the connecting frame body 2, and the connecting frame body 2 is prevented from falling off from the installed baffle 1 to cause potential safety hazards.
As shown in fig. 2, in this embodiment, the clamping assembly includes two vertical clamping rods 7 that are all vertically disposed inside the installed baffle 1 and a clamping cross rod 8 that is horizontally disposed at two bottoms of the vertical clamping rods 7 and abutted against the inside of the installed baffle 1, and the vertical clamping rods 7 and the clamping cross rod 8 are integrally formed.
When the protective device is actually used, the protective device is connected with the installed baffle 1 by abutting the clamping cross rod 8 and the inner side of the installed baffle 1, so that the protective device is prevented from falling off from the installed baffle 1 in the working process; without affecting the movement of the moving wheel 3 on the mounted blind 1.
As shown in fig. 1 and 2, in this embodiment, the protective basket 5 includes a supporting frame 12 horizontally disposed at the bottom of the connecting frame body 2 and arranged along the extending direction of the baffle 9 to be installed, and a plurality of protective rods 10 vertically disposed on the supporting frame 12, and the supporting frame 12 and the protective rods 10 are integrally formed; and protective enclosing barriers 11 are uniformly distributed between the support frame 12 and the adjacent two protective rods 10.
During the actual use, the carriage 12 is along the extending direction of treating installing the baffle 9 is laid, and extends to the bottom of bridge body 4 utilizes guard bar 10 will carriage 12 encloses, encloses the fender 11 at last and all encloses the fender to the bottom of protection basket 5 with all around utilizing the protection, plays the guard action.
The above, only be the preferred embodiment of the utility model discloses a it is not right to make any restriction the utility model discloses all according to the utility model discloses any simple modification, change and the equivalent structure change of technical essence to what above embodiment was made all still belong to the technical scheme's of the utility model protection within range.

Claims (6)

1. The utility model provides a prefabricated baffle of bridge installation protector which characterized in that: the bridge protection device comprises a connecting frame arranged on an installed baffle (1), a moving wheel (3) arranged at the top of the connecting frame and matched with the installed baffle (1), and a protection basket (5) arranged at the bottom of the connecting frame and extending to the bottom of a bridge body (4), wherein the connecting frame and the protection basket (5) are integrally formed;
the connecting frame comprises a connecting frame body (2) which is vertically arranged on the outer side of the installed baffle (1) and a clamping frame body (6) which is arranged on the top of the installed baffle (1) and clamped on the top of the installed baffle (1), and the connecting frame body (2) and the clamping frame body (6) are integrally formed;
the protective basket (5) is arranged along the extending direction of the baffle (9) to be installed, and the bottom and the periphery of the protective basket (5) are provided with protective enclosing baffles (11).
2. The bridge prefabrication baffle installation protection device of claim 1, characterized in that: the connecting frame body (2) comprises two vertical connecting vertical rods (2-1) and a plurality of connecting transverse rods (2-2) which are arranged between the two connecting vertical rods (2-1) in an even level mode, and the connecting vertical rods (2-1) and the connecting transverse rods (2-2) are integrally formed.
3. The bridge prefabrication baffle installation protector of claim 2, characterized in that: the clamping frame body (6) comprises an installation component which is horizontally arranged at the top of the installed baffle (1) and is fixedly connected with the top end of the connecting vertical rod (2-1) and a clamping component which is arranged on the inner side of the installed baffle (1) and is connected with the installation component; the mounting component and the clamping component are integrally formed.
4. The bridge prefabrication baffle installation protection device of claim 3, characterized in that: the mounting assembly comprises two first mounting rods (6-1) which are horizontally arranged on the top of the mounted baffle (1) and a plurality of second mounting rods (6-2) which are horizontally arranged between the two first mounting rods (6-1), the first mounting rods (6-1) and the second mounting rods (6-2) are integrally formed, and the moving wheel (3) is mounted on the second mounting rods (6-2); the moving wheel (3) is installed on the second installation rod (6-2) through an installation frame, and a buckle is arranged on the moving wheel (3).
5. The bridge prefabrication baffle installation protection device of claim 3, characterized in that: the subassembly that clamps includes that two equal vertical settings are in installed baffle (1) inboard vertical pole (7) and the level setting of clamping are two the bottom that clamps vertical pole (7) and with horizontal pole (8) of clamping of the inboard butt of installed baffle (1), clamp vertical pole (7) with horizontal pole (8) integrated into one piece clamps.
6. The bridge prefabrication baffle installation protection device of claim 1, characterized in that: the protective basket (5) comprises a supporting frame (12) which is horizontally arranged at the bottom of the connecting frame body (2) and is distributed along the extending direction of the baffle (9) to be installed and a plurality of protective rods (10) which are vertically arranged on the supporting frame (12), and the supporting frame (12) and the protective rods (10) are integrally formed; and protection enclosing barriers (11) are uniformly distributed between the support frame (12) and the two adjacent protection rods (10).
CN202223199496.9U 2022-11-30 2022-11-30 Bridge prefabricated baffle installation protector Active CN218667190U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223199496.9U CN218667190U (en) 2022-11-30 2022-11-30 Bridge prefabricated baffle installation protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223199496.9U CN218667190U (en) 2022-11-30 2022-11-30 Bridge prefabricated baffle installation protector

Publications (1)

Publication Number Publication Date
CN218667190U true CN218667190U (en) 2023-03-21

Family

ID=85543407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223199496.9U Active CN218667190U (en) 2022-11-30 2022-11-30 Bridge prefabricated baffle installation protector

Country Status (1)

Country Link
CN (1) CN218667190U (en)

Similar Documents

Publication Publication Date Title
CN101489854B (en) Center frame in crawler travel device and method for manufacturing center frame
CN218667190U (en) Bridge prefabricated baffle installation protector
CN201560399U (en) Anti-electric shock, waterproof and anti-fall device of hanging basket for construction of overpass crossing over electrified railways
KR20080001191U (en) A Fens of Roads
CN210049095U (en) Bridge guardrail
JP3996818B2 (en) Work truck for tunnel widening work
KR101718139B1 (en) On-gutter installed type supporting sturucture for roadside vehicle barrier
CN206090298U (en) Bridge safety guardrail
CN216428100U (en) Frame type movable guardrail
KR102021853B1 (en) Pillar reinforcement apparatus for dike
CN112982157B (en) Urban bridge guardrail for preventing vehicles from falling into river
CN215976980U (en) Energy-absorbing buffering protection type height limiting frame
CN211948145U (en) Road and bridge protection fence capable of reducing impact force
JP2899611B2 (en) Guard fence and its reinforcement device
CN212670318U (en) Bridge protection breast board installation operation car
CN213326398U (en) Overhead traveling crane conductive angle iron protection device
CN220521131U (en) Noise barrier for preventing snow falling
JP7444385B1 (en) Installation structure of work scaffolding for overpass
CN209763900U (en) Over-and-under type blasting protector
CN210971340U (en) Servo wheel set device of guardrail machine
CN210507220U (en) Highway combination formula double cross beam removes steel guardrail
CN217710314U (en) Bridge guardrail welding trolley for preventing welding slag from falling
CN215561947U (en) Bridge anticollision barrier construction platform
CN216993893U (en) Full protection device of heavy-load walking drive system and engineering machine
CN209989650U (en) Electric rail dismantling device for shield region

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant