CN218643262U - Highway construction keeps apart stake convenient to installation - Google Patents

Highway construction keeps apart stake convenient to installation Download PDF

Info

Publication number
CN218643262U
CN218643262U CN202223234044.XU CN202223234044U CN218643262U CN 218643262 U CN218643262 U CN 218643262U CN 202223234044 U CN202223234044 U CN 202223234044U CN 218643262 U CN218643262 U CN 218643262U
Authority
CN
China
Prior art keywords
stake
connecting plate
isolation
convenient
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223234044.XU
Other languages
Chinese (zh)
Inventor
张竹琳
刘况景
冯晓程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu New Era Public Utilities Construction Co ltd
Original Assignee
Jiangsu New Era Public Utilities Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu New Era Public Utilities Construction Co ltd filed Critical Jiangsu New Era Public Utilities Construction Co ltd
Priority to CN202223234044.XU priority Critical patent/CN218643262U/en
Application granted granted Critical
Publication of CN218643262U publication Critical patent/CN218643262U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses a highway construction isolation pile convenient to installation relates to highway construction technical field, and its technical scheme main points are including: the embedded installation part is provided with a plurality of connecting blocks at equal intervals in the length direction, and first thread grooves are formed in the connecting blocks; keep apart the stake, its bottom is last to be fixed be provided with the threaded body of first thread groove looks adaptation, keep apart the stake and set up to the multilateral body, the cover is equipped with the connecting plate on keeping apart the surface of stake, just connecting plate detachable sets up on pre-buried installation department, and the effect is that not only the installation is swiftly convenient, when follow-up needs are demolishd this isolation stake, the operation is also very simple, perhaps keeps apart the stake and leads to keeping apart the stake after receiving violent collision and warp and can not continue to use, and it is also very convenient to change the isolation stake.

Description

Highway construction isolation pile convenient to installation
Technical Field
The utility model relates to a highway construction technical field, more specifically say, it relates to a highway construction isolation pile convenient to installation.
Background
The highway engineering refers to the work of investigation, measurement, design, construction, maintenance, management and the like of a highway structure. The highway engineering structure includes: roadbeds, pavements, bridges, culverts, tunnels, drainage systems, safety protection facilities, greening and traffic monitoring facilities, and houses, workshops and other service facilities used for construction, maintenance and monitoring.
Some isolation piles can be installed during highway construction, the passing of some vehicles is limited through the isolation column, and some existing isolation piles are directly fixedly installed on the road surface through bolts, so that the isolation piles are extremely troublesome to later maintenance or replacement, and are inconvenient to detach and install.
Therefore, the present application provides a road construction isolation pile convenient to install in order to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
To the not enough of prior art existence, the utility model aims to provide a highway construction isolation pile convenient to installation.
In order to achieve the above purpose, the utility model provides the following technical scheme: a road construction spacer pile convenient to install, comprising:
the embedded installation part is provided with a plurality of connecting blocks at equal intervals in the length direction, and first thread grooves are formed in the connecting blocks;
keep apart the stake, fixed be provided with on its bottom with the thread body of first thread groove looks adaptation, keep apart the stake and set up to the multilateral body, the cover is equipped with the connecting plate on keeping apart the surface of stake, just connecting plate detachable sets up on pre-buried installation department.
Preferably, the connecting plate is provided with a bolt in a threaded manner, and the embedded installation part is provided with a second thread groove matched with the bolt.
Preferably, the lower surface of the connecting plate is fixedly provided with an inserting rod, and the connecting block is provided with a jack matched with the inserting rod.
Preferably, the isolation piles are provided with fluorescent parts at equal intervals in the height direction.
Preferably, a handle is fixedly arranged at the top end of the isolation pile.
Compared with the prior art, this practicality possesses following beneficial effect: through equidistant being provided with first thread groove on pre-buried installation department length direction, keep apart the preliminary fixed of stake through the corpus of screw and the first thread groove threaded connection who sets up on the bottom of stake, keep apart the stake and set up to the multilateral body, the cover is equipped with the connecting plate on the surface of keeping apart the stake, can be with keeping apart stake fixed mounting on pre-buried installation department after fixing the connecting plate on pre-buried installation department, not only the installation is swiftly convenient, when follow-up needs are demolishd this isolation stake, the operation is also very simple, perhaps keep apart the stake and receive to lead to keeping apart the stake after violent collision and warp and can not continue the use, it is also very convenient to change the isolation stake.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a schematic view of a split structure of the pre-buried installation part and the isolation pile in the utility model;
fig. 3 is a schematic structural view of the lower surface of the middle connecting plate of the present invention.
1. Embedding an installation part; 2. a connecting plate; 3. isolating piles; 4. a bolt; 5. connecting blocks; 6. a first thread groove; 7. a second thread groove; 8. a jack; 9. a threaded body; 10. a fluorescent moiety; 11. a handle; 12. a polygonal through hole; 13. and (4) inserting the rod.
Detailed Description
An embodiment of the road construction isolation pile convenient to install according to the present invention is further described with reference to fig. 1 to 3.
A road construction spacer pile convenient to install, comprising:
the road construction method comprises the following steps that an embedded installation part 1 is fixedly installed in a road in the road construction process, the upper surface of the embedded installation part 1 and the surface of the road are located on the same horizontal plane, a plurality of connecting blocks 5 are arranged in the length direction at equal intervals, and first thread grooves 6 are formed in the connecting blocks 5; an isolation pile 3, a thread body 9 matched with the first thread groove 6 is fixedly arranged on the bottom end of the isolation pile 3, when the isolation pile 3 is installed, firstly, the isolation pile 3 is preliminarily fixed on the pre-embedded installation part 1 through the thread body 9 arranged on the bottom end of the isolation pile 3 and the first thread groove 6 in thread fit, the isolation pile 3 is arranged to be a polygonal body, a connecting plate 2 is sleeved on the outer surface of the isolation pile 3, the connecting plate 2 is detachably arranged on the pre-embedded installation part 1, a polygonal through hole 12 matched with the cross section shape of the isolation pile 3 is arranged on the connecting plate 2, after the isolation pile 3 is preliminarily fixed, the connecting plate 2 is sleeved on the outer surface of the isolation pile 3, and as the isolation pile 3 is a polygonal body, the connecting plate 2 can limit the circumferential direction of the isolation pile 3 after being sleeved on the isolation pile 3, can prevent to keep apart stake 3 and continue to rotate and make the flank of a thread 9 and the separation of first thread groove 6, the screw thread is provided with bolt 4 on connecting plate 2, set up the second thread groove 7 with bolt 4 looks adaptation on the pre-buried installation department 1, can be with connecting plate 2 fixed mounting on pre-buried installation department 1 through bolt 4 and 7 threaded connection of second thread groove, and then fix isolation stake 3 on pre-buried installation department 1, not only the installation is swift convenient under this mode, when follow-up needs demolish this isolation stake 3, the operation is also very simple, or isolation stake 3 receives to lead to isolation stake 3 to warp after violent collision and can not continue to use, it is also very convenient to change isolation stake 3, fixed mounting has inserted bar 13 on the lower surface of connecting plate 2, set up the jack 8 with inserted bar 13 looks adaptation on connecting block 5.
Keep apart equidistant fluorescence portion 10 that is provided with on 3's the direction of height, when night, light is comparatively dim, pedestrian on the road and the place ahead that the vehicle that traveles failed timely discovery road are provided with keeps apart stake 3, bring the unnecessary loss for people easily, and be provided with fluorescence portion 10 on this keep apart the surface of stake 3 and can have certain light at night so that people timely see to react, the fixed handle 11 that is provided with on 3's the top of isolation stake, so that the staff carries isolation stake 3.
The above description is only the preferred embodiment of the present invention, the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the present invention all belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the present disclosure may be made by those skilled in the art without departing from the spirit of the present disclosure.

Claims (5)

1. The utility model provides a highway construction keeps apart stake convenient to installation which characterized in that: the method comprises the following steps:
the embedded installation part (1) is provided with a plurality of connecting blocks (5) at equal intervals in the length direction, and first thread grooves (6) are formed in the connecting blocks (5);
keep apart stake (3), fixed threaded body (9) that are provided with first thread groove (6) looks adaptation on its bottom, keep apart stake (3) and set up to the multilateral body, the cover is equipped with connecting plate (2) on the surface of keeping apart stake (3), just connecting plate (2) detachable sets up on pre-buried installation department (1).
2. A road construction spacer pile convenient to install according to claim 1, wherein: the connecting plate (2) is provided with a bolt (4) in a threaded manner, and the embedded installation part (1) is provided with a second thread groove (7) matched with the bolt (4).
3. A road construction spacer pile convenient to install according to claim 1, wherein: the lower surface of the connecting plate (2) is fixedly provided with an inserting rod (13), and the connecting block (5) is provided with an inserting hole (8) matched with the inserting rod (13).
4. A road construction insulation pile convenient to install according to claim 1, wherein: the isolation piles (3) are provided with fluorescent parts (10) at equal intervals in the height direction.
5. A road construction spacer pile convenient to install according to claim 1, wherein: and a lifting handle (11) is fixedly arranged on the top end of the isolation pile (3).
CN202223234044.XU 2022-11-30 2022-11-30 Highway construction keeps apart stake convenient to installation Active CN218643262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223234044.XU CN218643262U (en) 2022-11-30 2022-11-30 Highway construction keeps apart stake convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223234044.XU CN218643262U (en) 2022-11-30 2022-11-30 Highway construction keeps apart stake convenient to installation

Publications (1)

Publication Number Publication Date
CN218643262U true CN218643262U (en) 2023-03-17

Family

ID=85500931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223234044.XU Active CN218643262U (en) 2022-11-30 2022-11-30 Highway construction keeps apart stake convenient to installation

Country Status (1)

Country Link
CN (1) CN218643262U (en)

Similar Documents

Publication Publication Date Title
CN218643262U (en) Highway construction keeps apart stake convenient to installation
CN213203900U (en) Fixed knot of intelligence parking stake constructs
CN213625370U (en) Road guardrail convenient to installation
CN211080314U (en) Municipal administration well lid can be used in emergency
CN211690084U (en) Pavement additional paving structure using existing waveform guard bar
CN211312282U (en) Warning device is used in road and bridge construction
CN210104472U (en) Antiskid steel plate temporary pavement
CN215104793U (en) Civil engineering road and bridge crack reinforced structure
CN212375746U (en) Emergency turn warning board convenient to replace based on municipal road
CN218373473U (en) Road junction marking post and warning pile
CN217733731U (en) Bridge auxiliary supporting mechanism
CN212769284U (en) High-stability steel structure upright post for preventing settlement of elevator shaft
CN214882789U (en) Novel road shoulder building plate for highway engineering
CN215925536U (en) Template and reinforcement integrated device for concrete road construction
CN217053105U (en) A support for fixing antiglare shield of isolation cement mound
CN220121339U (en) Piezoelectric sensor triggering pedestrian crossing signal lamp structure
CN217129592U (en) Large-dip-angle water-rich goaf grouting device under viaduct
CN217203744U (en) Road sealing device for traffic engineering maintenance
CN214116399U (en) Town road guardrail
CN217999186U (en) Protector is used in town road construction
CN213175124U (en) Combined fence for road and bridge engineering construction
CN212562785U (en) Novel municipal works safety protection device
CN212688760U (en) Deceleration strip of making an uproar falls in municipal administration illumination
CN218375781U (en) Fender structure is enclosed in construction
CN216663783U (en) Expansion joint notch concrete prefabrication module convenient to installation is dismantled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant