CN218623379U - Concrete pouring device for construction engineering construction - Google Patents
Concrete pouring device for construction engineering construction Download PDFInfo
- Publication number
- CN218623379U CN218623379U CN202221483543.XU CN202221483543U CN218623379U CN 218623379 U CN218623379 U CN 218623379U CN 202221483543 U CN202221483543 U CN 202221483543U CN 218623379 U CN218623379 U CN 218623379U
- Authority
- CN
- China
- Prior art keywords
- construction
- concrete pouring
- pouring device
- install
- legs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a concrete placement device for building engineering construction, including two landing legs, two install the mounting panel on the landing leg, install straight round pin lead screw module on the mounting panel lower wall, straight round pin lead screw module removes to serve and installs the fixed block, the embedded discharging pipe that is equipped with of fixed block, the embedded sealed lid that is equipped with of discharging pipe discharge gate, the utility model relates to a concrete placement assistance technology field realizes automatic horizontal pouring, need not the manual work and in focus area reciprocating traction movement, and the liberation manpower improves work efficiency, need not the loop wheel machine and hoists, improves the security.
Description
Technical Field
The utility model relates to a concrete placement assists technical field, specifically is concrete placement device for building engineering construction.
Background
The concrete pouring equipment is a device for pouring concrete, is used in the building industry, is used for pouring the stirred concrete into a built building frame, can effectively reduce the input of manpower, and improves the working efficiency.
When concrete pouring is carried out, two workers are required to pull the discharge pipe, the discharge pipe is continuously moved to pour in a pouring area, time and labor are wasted, the pouring pipe is further hoisted by a crane, the steel wire is broken to damage the pouring pipe, the workers are injured by smashing, potential safety hazards exist, and accordingly, the deep research is carried out on the problems, and the tunnel is generated.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a concrete placement device for building engineering construction has solved current when carrying out concrete placement, needs two staff to carry out pulling of discharging pipe to continuous removing pouring in the region of pouring, wastes time and energy, and pour the pipe and still need the loop wheel machine hoist and mount, and the steel wire bursts apart and can lead to pouring the pipe damage, still can injure the staff by a crashing object, has the technical problem of potential safety hazard.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: concrete placement device for building engineering construction, including two landing legs, two install the mounting panel on the landing leg, install straight round pin lead screw module on the mounting panel lower wall, straight round pin lead screw module removes to serve and installs the fixed block, the embedded discharging pipe that is equipped with of fixed block, the embedded sealed lid that is equipped with of discharging pipe discharge gate.
Preferably, the discharge pipe is provided with a connector at one side of the fixed block.
Preferably, two rollers are respectively assembled on two side walls of the two support legs.
Preferably, the storage batteries are embedded in the two side walls of the two supporting legs and above the roller respectively.
Preferably, two handles are respectively assembled on the front walls of the two legs.
Preferably, the solar charging panel is mounted on the upper wall of the mounting plate.
Advantageous effects
The utility model provides a concrete placement device is used in building engineering construction. The device has the advantages that automatic transverse pouring is achieved, manual reciprocating traction movement in a focal distance area is not needed, manpower is liberated, work efficiency is improved, hoisting is not needed, and safety is improved.
Drawings
Figure 1 is the utility model discloses concrete placement for building engineering construction device's schematic structure.
Fig. 2 is the concrete placement for building engineering construction device's main structure sketch map of looking.
Fig. 3 is concrete placement for building engineering construction device's side view section structure schematic.
Fig. 4 is the concrete placement device for building engineering construction looks sideways at the schematic structure drawing.
In the figure: 1-a support leg; 2-mounting a plate; 3-straight pin screw rod module; 4, fixing blocks; 5, discharging the material pipe; 6-sealing cover; 7-a connector; 8-a roller; 9-a storage battery; 10-a handle; 11-solar charging panel.
Detailed Description
Example (b):
referring to fig. 1-4, which are schematic structural diagrams of an embodiment of the present invention, a concrete pouring device for construction engineering includes two support legs 1, a mounting plate 2 is installed on the two support legs 1, a straight pin screw module 3 is installed on the lower wall of the mounting plate 2, a fixed block 4 is installed on the moving end of the straight pin screw module 3, a discharging pipe 5 is embedded in the fixed block 4, and a sealing cover 6 is embedded in the discharging port of the discharging pipe 5; a connector 7 is arranged on the discharge pipe 5 and positioned on one side of the fixed block 4; two side walls of the two supporting legs 1 are respectively provided with two rollers 8; the storage batteries 9 are respectively embedded on the two side walls of the two supporting legs 1 and above the rollers 8; two handles 10 are respectively arranged on the front walls of the two legs 1; the upper wall of the mounting plate 2 is provided with a solar charging plate 11;
in actual use: the device is moved to a pouring area by a worker and is installed, the two supporting legs 1 are located on two sides of the pouring area, the worker connects a pouring hose to the connector 7, after connection is finished, the sealing cover 6 is pulled out, a power supply is switched on, power is supplied by the storage battery 9, the worker controls and operates the connection through the programmable controller which is installed on the worker and matched with the connection, the moving end of the straight pin screw rod module 3 installed on the installation plate 2 drives the fixing block 4 to move in a reciprocating mode, so that the discharging pipe 5 installed on the fixing block 4 is driven to move in a reciprocating mode to carry out transverse automatic pouring, after transverse pouring is finished, the two workers pull the supporting legs 1 of the handle 10 to start moving through the roller 8 installed on the supporting legs, stop after moving for a set distance, and wait for continuous pouring;
the staff need not to pull and pours the pipe, only need stimulate this device removal can, automatic pouring, it is fast to pour the effect, the security is high, install solar charging panel 11 on mounting panel 2 through install on it with it assorted solar energy conversion subassembly charge in to battery 9, increase battery 9 duration, pour the back that finishes, 6 knot of sealed lid back discharging pipe 5 are sealed and are prevented that the concrete from dripping and spill, influence operational environment, when carrying out the concrete placement in next region, stimulate this device through gyro wheel 8 remove can, when need not to pour, dismantle the separation with landing leg 1 and mounting panel 2, be convenient for deposit, do not account for the space.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. Concrete placement device for building engineering construction, including two landing legs (1), its characterized in that, two install mounting panel (2) on landing leg (1), install straight round pin lead screw module (3) on mounting panel (2) lower wall, install fixed block (4) on straight round pin lead screw module (3) removal end, embedded discharging pipe (5) of being equipped with in fixed block (4), it is equipped with sealed lid (6) to inlay in discharging pipe (5) discharge gate.
2. Concrete pouring device for construction of construction work according to claim 1, characterized in that a connector (7) is mounted on the tapping pipe (5) and on the side of the fixing block (4).
3. Concrete pouring device for the construction of building works according to claim 1, characterized in that two rollers (8) are fitted on both side walls of the two legs (1), respectively.
4. The concrete pouring device for construction of building engineering according to claim 1, characterized in that batteries (9) are embedded on both side walls of the two legs (1) and above the rollers (8), respectively.
5. Concrete pouring device for the construction of construction works according to claim 1, characterized in that two handles (10) are fitted respectively on the front walls of the two legs (1).
6. The concrete pouring device for construction of construction work according to claim 1, wherein a solar charging plate (11) is mounted on the upper wall of the mounting plate (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221483543.XU CN218623379U (en) | 2022-06-14 | 2022-06-14 | Concrete pouring device for construction engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221483543.XU CN218623379U (en) | 2022-06-14 | 2022-06-14 | Concrete pouring device for construction engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218623379U true CN218623379U (en) | 2023-03-14 |
Family
ID=85457296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221483543.XU Active CN218623379U (en) | 2022-06-14 | 2022-06-14 | Concrete pouring device for construction engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218623379U (en) |
-
2022
- 2022-06-14 CN CN202221483543.XU patent/CN218623379U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109680953B (en) | Discharging and mixing vibrating device for self-moving regenerated block | |
CN111188497A (en) | Autoclaved aerated concrete wallboard mounting construction machine tool and using method thereof | |
CN218623379U (en) | Concrete pouring device for construction engineering construction | |
CN209670291U (en) | A kind of wall tile stickers machine people | |
CN211644394U (en) | Installation device of ditch cable duct cover plate | |
CN209917968U (en) | Recovery unit is smashed to waste material for production of electric smelting zirconium corundum brick | |
CN105800527A (en) | Material hoist for building construction | |
CN113529724B (en) | Foundation pit concrete pouring construction method | |
CN213171212U (en) | A hoisting apparatus for building engineering | |
CN212176617U (en) | Evaporate and press aerated concrete wallboard installation construction machines | |
CN211998554U (en) | Foundation ditch construction device that unearths | |
CN209760237U (en) | Concrete placement device for hydraulic engineering | |
CN212374769U (en) | Simple and easy upper and lower material feeding unit for building engineering | |
CN201169499Y (en) | Portable crane | |
CN104860212A (en) | Micro crane | |
CN111015920A (en) | Concrete pouring mechanism and method | |
CN215402732U (en) | Crawler-type hoisting equipment for hoisting large-warehouse surface template | |
CN214495380U (en) | Waste steel bucket lifting device | |
CN213204868U (en) | Plastering device for building external wall | |
CN214365042U (en) | Building materials hoisting device for building construction | |
CN203978496U (en) | A kind of integral support mobile system | |
CN217025102U (en) | Material loading machine for construction | |
CN212503705U (en) | Assembled building element hoist device | |
CN213625702U (en) | Pipe gallery roof construction trolley and trolley set | |
CN219567313U (en) | Remote automatic slag discharging equipment suitable for large-size foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |