CN218621822U - Stores pylon assembled operation platform - Google Patents
Stores pylon assembled operation platform Download PDFInfo
- Publication number
- CN218621822U CN218621822U CN202222489423.7U CN202222489423U CN218621822U CN 218621822 U CN218621822 U CN 218621822U CN 202222489423 U CN202222489423 U CN 202222489423U CN 218621822 U CN218621822 U CN 218621822U
- Authority
- CN
- China
- Prior art keywords
- tripod
- platform
- support
- awl
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a rack assembly type operating platform; it is characterized in that; the platform comprises a climbing cone, an adjusting supporting leg and a tripod hanging frame; climb the awl pre-buried in the concrete body, climb the awl and twist the atress bolt, the upper end girder of tripod stores pylon has the support and hangs the mouth, hangs the mouth through this support and directly hangs on climbing the awl bolt, and the lower extreme of tripod stores pylon sets up the regulation landing leg. The utility model discloses the purpose adopts the adjustable assembly operation platform of quick installation assembled in the asynchronous construction of pier shaft tie beam (cable tower crossbeam), carries out the construction of rod iron system, staple bolt system or bracket system on operation platform. According to the invention, the operation platform is installed quickly, so that the time of high-altitude operation is reduced, and the operation space of the installation support is increased to realize high-efficiency and safe construction of the support.
Description
Technical Field
The utility model relates to an assembly operation platform construction field specifically says to a stores pylon assembled operation platform.
Background
The design of the bridge pier body or the tower column mostly adopts the design with variable cross section and slope, and the construction mostly adopts the hydraulic creeping formwork asynchronous construction process, namely, the pier body or the tower column is firstly constructed and then the tie beam or the cross beam is constructed. The construction of the tie beam or the cross beam mostly adopts an embedded steel bar method, a hoop method, a floor bracket method, an embedded steel bracket method and the like; the problems of the existing operation mode are as follows: the construction of most supports needs to be operated by adopting personnel to take the hanging cage, the high-altitude operation time is long, the hoisting equipment needs special equipment, the construction operation space in the hanging cage is limited, and the safety risk is high and is extremely inconvenient.
SUMMERY OF THE UTILITY MODEL
Therefore, in order to solve the above-mentioned deficiencies, the present invention provides a rack-mount type operation platform; the method aims to adopt a quick-mounting assembly type adjustable assembly operation platform in the asynchronous construction of a pier body tie beam (a cable tower beam) and carry out the construction of a steel bar system, a hoop system or a bracket system on the operation platform. The utility model discloses an operation platform's quick installation reduces high altitude construction's time, increases the operating space of installing support and realizes high efficiency, the safe construction of support.
The utility model is realized in such a way that a hanging rack assembly type operating platform is constructed, which is characterized in that; the platform support comprises a climbing cone, an adjusting supporting leg and a tripod hanging frame; climb the awl pre-buried in the concrete body, climb the awl and twist the atress bolt, the upper end girder of tripod stores pylon has the support and hangs the mouth, hangs the mouth through this support and directly hangs on climbing the awl bolt, and the lower extreme of tripod stores pylon sets up the regulation landing leg.
The hanging rack assembly type operating platform is characterized in that the hanging rack assembly type operating platform comprises a rack body; the adjusting supporting leg is provided with an external thread and can be movably screwed into the lower end part of the tripod hanging rack.
The hanging rack assembly type operating platform is characterized in that the hanging rack assembly type operating platform comprises a rack body; the three-leg hanging rack is integrally made of channel steel.
The hanging rack assembly type operating platform is characterized in that the hanging rack assembly type operating platform is provided with a rack; and a limiting plate is arranged on the side surface of the main beam at the upper end of the tripod hanging frame.
The utility model has the advantages of as follows: the utility model provides a rack assembly type operating platform; the purpose is that adopt the adjustable assembly operation platform of quick installation assembled in the asynchronous construction of pier shaft tie beam (cable tower crossbeam), carry out the construction of rod iron system, staple bolt system or bracket system on operation platform. According to the invention, the operation platform is installed quickly, so that the time of high-altitude operation is reduced, and the operation space of the installation support is increased to realize high-efficiency and safe construction of the support.
Drawings
FIG. 1 is a schematic view of the bracket structure of the present invention;
FIG. 2 is a schematic view of the position of the corbel hanging opening of the present invention;
fig. 3 is a schematic view of the adjusting leg of the present invention;
FIGS. 4-6 are schematic views of the platform applied to the upper end of the bracket;
fig. 7 is a schematic view of the present invention corresponding to the concrete body.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 7, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a rack-assembled operating platform through improvement, which can be implemented as shown in the figure as follows; the platform support comprises a climbing cone 1, an adjusting supporting leg 2 and a tripod hanging frame 3;
climb 1 pre-buried at the concrete body of awl, climb 1 wrong income atress bolt of awl, the upper end girder of tripod stores pylon 3 has support string mouth 3A, hangs mouthful 3A directly on climbing the awl bolt through this support, and the lower extreme of tripod stores pylon 3 sets up adjusts landing leg 2.
Meanwhile, the adjusting supporting leg 2 is provided with an external thread which can be movably screwed into the lower end part of the tripod hanging frame 3.
Meanwhile, the three-leg hanging rack 3 is integrally made of channel steel.
Meanwhile, the side face of the upper end girder of the tripod hanging frame 3 is provided with a limiting plate 4, and the platform on the upper part can be limited and protected through the limiting plate 4.
The following describes the installation process of the rack-mounted operating platform:
1, embedding a climbing cone: under the position of a pier body tie beam (a tower column cross beam), before the template is in place, the climbing cone is fixed on the template by using bolts, and for a special positioning size, the embedded part is fixed with the panel by using positioning bolts and is hoisted together with the template. And coating grease in a gap between the creeping cone and the bolt so as to facilitate the removal of the bolt, and winding a layer of plastic film on the outer surface of the cone so as to facilitate the removal of the cone.
2, dismantling the template: and after pouring is finished, removing the template.
3, mounting a bolt: and screwing the stressed bolt into the climbing cone.
4, mounting a tripod: the assembled tripod is manufactured in a factory, the support legs of the support are adjusted to enable the tripod to be consistent with the slope of the pier body or the tower column, the climbing formwork integrally passes through the embedded part and is installed under the climbing formwork lifting platform, the tripod is directly hung on the climbing cone bolt, and the safety pin is installed after the installation.
5, platform installation: the assembly type operation platform is processed in a factory, before a beam or a cross beam is constructed, the platform is directly hoisted to the tripod and tied with a bolt, and the whole operation platform is constructed. For the adjusting supporting leg, the finish-rolled deformed steel bar connecting plate (shown in figure 2) can be supported on the wall without being embedded and directly and manually rotated.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (4)
1. A hanging rack assembly type operating platform is characterized in that; the platform comprises a climbing cone (1), an adjusting supporting leg (2) and a tripod hanging frame (3); climb awl (1) pre-buried in the concrete body, climb awl (1) and twist the atress bolt, the upper end girder of tripod stores pylon (3) has support string mouth (3A), hangs mouthful (3A) through this support and directly hangs on climbing the awl bolt, and the lower extreme of tripod stores pylon (3) sets up adjusts landing leg (2).
2. The rack-mounted operations platform of claim 1; the adjusting supporting leg (2) is provided with an external thread and can be movably screwed into the lower end part of the tripod hanging rack (3).
3. The rack-mounted operations platform of claim 1; the three-foot hanger (3) is integrally made of channel steel.
4. The rack-mounted operations platform of claim 1; a limiting plate (4) is arranged on the side surface of the main beam at the upper end of the tripod hanging frame (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222489423.7U CN218621822U (en) | 2022-09-20 | 2022-09-20 | Stores pylon assembled operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222489423.7U CN218621822U (en) | 2022-09-20 | 2022-09-20 | Stores pylon assembled operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218621822U true CN218621822U (en) | 2023-03-14 |
Family
ID=85466875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222489423.7U Active CN218621822U (en) | 2022-09-20 | 2022-09-20 | Stores pylon assembled operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218621822U (en) |
-
2022
- 2022-09-20 CN CN202222489423.7U patent/CN218621822U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205077845U (en) | Hydraulic intelligent climbing operation scaffold for core barrel well of building | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN202090591U (en) | Lift type climbing formwork of building operations | |
CN101177959A (en) | Curtain wall unit hanging equipment and construction method thereof | |
CN103422668A (en) | Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof | |
CN204899185U (en) | Adhere to formula lift high altitude construction device | |
CN217028004U (en) | Annular hanging basket suspension device for curtain wall construction of super high-rise building | |
CN109252656B (en) | High-rise building climbing template and assembling, pouring and lifting method | |
CN218621822U (en) | Stores pylon assembled operation platform | |
CN203452375U (en) | Hydraulic self-jacking oblique creeping formwork | |
CN117005664A (en) | Electric translation type hanging basket | |
CN105776092A (en) | Stretching type basket device and construction method thereof | |
CN213174742U (en) | Top bracing steel stand structure | |
CN216552977U (en) | Obliquely-folded outer vertical surface climbing frame obliquely-climbing device | |
CN101457587A (en) | Template mutual-lifting type climbing formwork device and method | |
CN215107152U (en) | High-altitude lateral angle control overhanging operation platform | |
CN108590171A (en) | A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs | |
CN210798994U (en) | Concrete structure wall body unilateral template structure | |
CN114197860A (en) | Quick-construction double-layer creeping formwork system and creeping formwork construction method | |
CN112942777A (en) | Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method | |
CN111851980A (en) | Elevator shaft attached lifting protection platform and application method thereof | |
CN218028889U (en) | Jacking hydraulic climbing formwork | |
CN114427290B (en) | Super high-rise reinforced concrete core tube aluminum mould climbing frame and construction method | |
CN208950274U (en) | A kind of architectural engineering overhanging scaffold | |
CN220434178U (en) | Temporary shelving device for aluminum alloy template outer wall back edge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |