CN218621822U - Stores pylon assembled operation platform - Google Patents

Stores pylon assembled operation platform Download PDF

Info

Publication number
CN218621822U
CN218621822U CN202222489423.7U CN202222489423U CN218621822U CN 218621822 U CN218621822 U CN 218621822U CN 202222489423 U CN202222489423 U CN 202222489423U CN 218621822 U CN218621822 U CN 218621822U
Authority
CN
China
Prior art keywords
tripod
platform
support
awl
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222489423.7U
Other languages
Chinese (zh)
Inventor
唐小灵
高红亮
李强
曾强
李鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Srbg Bridge Engineering Co ltd
Original Assignee
Srbg Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Srbg Bridge Engineering Co ltd filed Critical Srbg Bridge Engineering Co ltd
Priority to CN202222489423.7U priority Critical patent/CN218621822U/en
Application granted granted Critical
Publication of CN218621822U publication Critical patent/CN218621822U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a rack assembly type operating platform; it is characterized in that; the platform comprises a climbing cone, an adjusting supporting leg and a tripod hanging frame; climb the awl pre-buried in the concrete body, climb the awl and twist the atress bolt, the upper end girder of tripod stores pylon has the support and hangs the mouth, hangs the mouth through this support and directly hangs on climbing the awl bolt, and the lower extreme of tripod stores pylon sets up the regulation landing leg. The utility model discloses the purpose adopts the adjustable assembly operation platform of quick installation assembled in the asynchronous construction of pier shaft tie beam (cable tower crossbeam), carries out the construction of rod iron system, staple bolt system or bracket system on operation platform. According to the invention, the operation platform is installed quickly, so that the time of high-altitude operation is reduced, and the operation space of the installation support is increased to realize high-efficiency and safe construction of the support.

Description

Stores pylon assembled operation platform
Technical Field
The utility model relates to an assembly operation platform construction field specifically says to a stores pylon assembled operation platform.
Background
The design of the bridge pier body or the tower column mostly adopts the design with variable cross section and slope, and the construction mostly adopts the hydraulic creeping formwork asynchronous construction process, namely, the pier body or the tower column is firstly constructed and then the tie beam or the cross beam is constructed. The construction of the tie beam or the cross beam mostly adopts an embedded steel bar method, a hoop method, a floor bracket method, an embedded steel bracket method and the like; the problems of the existing operation mode are as follows: the construction of most supports needs to be operated by adopting personnel to take the hanging cage, the high-altitude operation time is long, the hoisting equipment needs special equipment, the construction operation space in the hanging cage is limited, and the safety risk is high and is extremely inconvenient.
SUMMERY OF THE UTILITY MODEL
Therefore, in order to solve the above-mentioned deficiencies, the present invention provides a rack-mount type operation platform; the method aims to adopt a quick-mounting assembly type adjustable assembly operation platform in the asynchronous construction of a pier body tie beam (a cable tower beam) and carry out the construction of a steel bar system, a hoop system or a bracket system on the operation platform. The utility model discloses an operation platform's quick installation reduces high altitude construction's time, increases the operating space of installing support and realizes high efficiency, the safe construction of support.
The utility model is realized in such a way that a hanging rack assembly type operating platform is constructed, which is characterized in that; the platform support comprises a climbing cone, an adjusting supporting leg and a tripod hanging frame; climb the awl pre-buried in the concrete body, climb the awl and twist the atress bolt, the upper end girder of tripod stores pylon has the support and hangs the mouth, hangs the mouth through this support and directly hangs on climbing the awl bolt, and the lower extreme of tripod stores pylon sets up the regulation landing leg.
The hanging rack assembly type operating platform is characterized in that the hanging rack assembly type operating platform comprises a rack body; the adjusting supporting leg is provided with an external thread and can be movably screwed into the lower end part of the tripod hanging rack.
The hanging rack assembly type operating platform is characterized in that the hanging rack assembly type operating platform comprises a rack body; the three-leg hanging rack is integrally made of channel steel.
The hanging rack assembly type operating platform is characterized in that the hanging rack assembly type operating platform is provided with a rack; and a limiting plate is arranged on the side surface of the main beam at the upper end of the tripod hanging frame.
The utility model has the advantages of as follows: the utility model provides a rack assembly type operating platform; the purpose is that adopt the adjustable assembly operation platform of quick installation assembled in the asynchronous construction of pier shaft tie beam (cable tower crossbeam), carry out the construction of rod iron system, staple bolt system or bracket system on operation platform. According to the invention, the operation platform is installed quickly, so that the time of high-altitude operation is reduced, and the operation space of the installation support is increased to realize high-efficiency and safe construction of the support.
Drawings
FIG. 1 is a schematic view of the bracket structure of the present invention;
FIG. 2 is a schematic view of the position of the corbel hanging opening of the present invention;
fig. 3 is a schematic view of the adjusting leg of the present invention;
FIGS. 4-6 are schematic views of the platform applied to the upper end of the bracket;
fig. 7 is a schematic view of the present invention corresponding to the concrete body.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 7, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a rack-assembled operating platform through improvement, which can be implemented as shown in the figure as follows; the platform support comprises a climbing cone 1, an adjusting supporting leg 2 and a tripod hanging frame 3;
climb 1 pre-buried at the concrete body of awl, climb 1 wrong income atress bolt of awl, the upper end girder of tripod stores pylon 3 has support string mouth 3A, hangs mouthful 3A directly on climbing the awl bolt through this support, and the lower extreme of tripod stores pylon 3 sets up adjusts landing leg 2.
Meanwhile, the adjusting supporting leg 2 is provided with an external thread which can be movably screwed into the lower end part of the tripod hanging frame 3.
Meanwhile, the three-leg hanging rack 3 is integrally made of channel steel.
Meanwhile, the side face of the upper end girder of the tripod hanging frame 3 is provided with a limiting plate 4, and the platform on the upper part can be limited and protected through the limiting plate 4.
The following describes the installation process of the rack-mounted operating platform:
1, embedding a climbing cone: under the position of a pier body tie beam (a tower column cross beam), before the template is in place, the climbing cone is fixed on the template by using bolts, and for a special positioning size, the embedded part is fixed with the panel by using positioning bolts and is hoisted together with the template. And coating grease in a gap between the creeping cone and the bolt so as to facilitate the removal of the bolt, and winding a layer of plastic film on the outer surface of the cone so as to facilitate the removal of the cone.
2, dismantling the template: and after pouring is finished, removing the template.
3, mounting a bolt: and screwing the stressed bolt into the climbing cone.
4, mounting a tripod: the assembled tripod is manufactured in a factory, the support legs of the support are adjusted to enable the tripod to be consistent with the slope of the pier body or the tower column, the climbing formwork integrally passes through the embedded part and is installed under the climbing formwork lifting platform, the tripod is directly hung on the climbing cone bolt, and the safety pin is installed after the installation.
5, platform installation: the assembly type operation platform is processed in a factory, before a beam or a cross beam is constructed, the platform is directly hoisted to the tripod and tied with a bolt, and the whole operation platform is constructed. For the adjusting supporting leg, the finish-rolled deformed steel bar connecting plate (shown in figure 2) can be supported on the wall without being embedded and directly and manually rotated.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (4)

1. A hanging rack assembly type operating platform is characterized in that; the platform comprises a climbing cone (1), an adjusting supporting leg (2) and a tripod hanging frame (3); climb awl (1) pre-buried in the concrete body, climb awl (1) and twist the atress bolt, the upper end girder of tripod stores pylon (3) has support string mouth (3A), hangs mouthful (3A) through this support and directly hangs on climbing the awl bolt, and the lower extreme of tripod stores pylon (3) sets up adjusts landing leg (2).
2. The rack-mounted operations platform of claim 1; the adjusting supporting leg (2) is provided with an external thread and can be movably screwed into the lower end part of the tripod hanging rack (3).
3. The rack-mounted operations platform of claim 1; the three-foot hanger (3) is integrally made of channel steel.
4. The rack-mounted operations platform of claim 1; a limiting plate (4) is arranged on the side surface of the main beam at the upper end of the tripod hanging frame (3).
CN202222489423.7U 2022-09-20 2022-09-20 Stores pylon assembled operation platform Active CN218621822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222489423.7U CN218621822U (en) 2022-09-20 2022-09-20 Stores pylon assembled operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222489423.7U CN218621822U (en) 2022-09-20 2022-09-20 Stores pylon assembled operation platform

Publications (1)

Publication Number Publication Date
CN218621822U true CN218621822U (en) 2023-03-14

Family

ID=85466875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222489423.7U Active CN218621822U (en) 2022-09-20 2022-09-20 Stores pylon assembled operation platform

Country Status (1)

Country Link
CN (1) CN218621822U (en)

Similar Documents

Publication Publication Date Title
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN202090591U (en) Lift type climbing formwork of building operations
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN204899185U (en) Adhere to formula lift high altitude construction device
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN218621822U (en) Stores pylon assembled operation platform
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN117005664A (en) Electric translation type hanging basket
CN105776092A (en) Stretching type basket device and construction method thereof
CN213174742U (en) Top bracing steel stand structure
CN216552977U (en) Obliquely-folded outer vertical surface climbing frame obliquely-climbing device
CN101457587A (en) Template mutual-lifting type climbing formwork device and method
CN215107152U (en) High-altitude lateral angle control overhanging operation platform
CN108590171A (en) A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs
CN210798994U (en) Concrete structure wall body unilateral template structure
CN114197860A (en) Quick-construction double-layer creeping formwork system and creeping formwork construction method
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN111851980A (en) Elevator shaft attached lifting protection platform and application method thereof
CN218028889U (en) Jacking hydraulic climbing formwork
CN114427290B (en) Super high-rise reinforced concrete core tube aluminum mould climbing frame and construction method
CN208950274U (en) A kind of architectural engineering overhanging scaffold
CN220434178U (en) Temporary shelving device for aluminum alloy template outer wall back edge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant