CN218563130U - Assembled elevator basis - Google Patents

Assembled elevator basis Download PDF

Info

Publication number
CN218563130U
CN218563130U CN202222392503.0U CN202222392503U CN218563130U CN 218563130 U CN218563130 U CN 218563130U CN 202222392503 U CN202222392503 U CN 202222392503U CN 218563130 U CN218563130 U CN 218563130U
Authority
CN
China
Prior art keywords
raft
side wall
plate
raft plate
structural member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222392503.0U
Other languages
Chinese (zh)
Inventor
闫国乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yida Express Beijing Elevator Co ltd
Original Assignee
Yida Express Beijing Elevator Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yida Express Beijing Elevator Co ltd filed Critical Yida Express Beijing Elevator Co ltd
Priority to CN202222392503.0U priority Critical patent/CN218563130U/en
Application granted granted Critical
Publication of CN218563130U publication Critical patent/CN218563130U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model belongs to the technical field of elevator equipment, in particular to an assembly type elevator foundation; it comprises a raft plate and a side wall; the raft plate is of a quadrilateral plate structure, and a steel bar structural member A is arranged inside the raft plate; the side wall is of a quadrilateral frame structure, the side wall is fixedly arranged on the upper end face of the raft plate, the plane where the side wall is located is parallel to the plane where the raft plate is located, a steel bar structural member B is arranged inside the side wall, and the steel bar structural member B is fixedly connected with the steel bar structural member A; four apex angle departments of side wall all are provided with the pre-buried festival of steel column, and the top of the pre-buried festival of steel column is stretched out by the up end of side wall. Raft board and side wall in this assembled elevator basis can prefabricate in the prefabricated factory, dig the back in the foundation ditch, alright with directly install fixedly in this assembled elevator basis hoist and mount to the foundation ditch to improve efficiency of construction and effectual reduction construction period, thereby effectively reduce the influence that causes resident's life.

Description

Assembled elevator basis
Technical Field
The utility model belongs to the technical field of elevator equipment, concretely relates to assembled elevator basis.
Background
In order to improve the convenience of life of people, elevators are additionally installed in a plurality of old communities so as to facilitate the traveling of people.
The existing elevator is additionally installed and constructed in front of a doorway of a residential building unit, a residential walking channel can be occupied, in the construction process of additionally installing an elevator foundation, the engineering involves multiple processes and process intermittence such as foundation pit excavation, formwork erection, reinforcement, embedded part hoisting, concrete pouring and waterproof construction, the duration of the construction period is long, the resident passage is seriously influenced, and particularly, residents with inconvenient actions such as old people and children are inconvenient to move.
In addition, when running into rainy season construction, the foundation ditch appears soaking the condition such as water and causes certain settlement influence to original building easily. Therefore, the invention provides an elevator foundation with short construction period, which is a technical problem to be solved urgently by technical personnel in the field.
SUMMERY OF THE UTILITY MODEL
In order to solve the above-mentioned problem that prior art exists, the utility model provides an assembly type elevator basis to the construction period duration of the basis of installing the elevator additional that exists among the solution prior art is longer, leads to resident's current technical problem who receives serious influence.
The utility model discloses a following technical scheme specifically realizes:
an assembled elevator foundation comprises raft plates and side walls;
the raft plate is of a quadrilateral plate structure, and a steel bar structural member A is arranged inside the raft plate;
the side walls are of quadrilateral frame structures, the side walls are fixedly arranged on the upper end faces of the raft plates, the planes of the side walls are parallel to the planes of the raft plates, and reinforcing steel bar structural members B are arranged inside the side walls and are fixedly connected with the reinforcing steel bar structural members A; four top corners of the side wall are provided with steel column embedded sections, and the top ends of the steel column embedded sections extend out of the upper end face of the side wall.
In order to better realize the utility model discloses, do further optimization in above-mentioned structure, the up end of raft is provided with the hoist and mount of being convenient for the rings of raft.
In order to better realize the utility model discloses, do further optimization in above-mentioned structure, the quantity of rings has four, four rings correspond the setting respectively and are in the position department of four apex angles of raft board.
In order to better realize the utility model discloses, do further optimization in above-mentioned structure, adjacent two the pre-buried festival of steel column passes through the connecting piece to be connected fixedly.
In order to better realize the utility model, further optimize in the above structure, this assembled elevator basis is still including being used for supporting the backup pad of raft.
In order to better realize the utility model discloses, do further optimization in above-mentioned structure, the up end of backup pad is provided with the contour line, the shape that the contour line encircleed with the shape phase-match of raft, the raft according to the contour line location is installed in the backup pad.
In order to better realize the utility model discloses, do further optimization in above-mentioned structure, the backup pad includes four plate bodys, four the plate body corresponds the setting respectively and is in four apex angle departments of raft board, and four the plane coincidence at the top surface place of plate body.
In order to better realize the utility model discloses, do further optimization in above-mentioned structure, the plate body with be provided with the steel sheet between the raft board, make all the plane coincidence at the top surface place of the pre-buried festival of steel column.
In order to better realize the utility model discloses, do further optimization in above-mentioned structure, the plate body with be provided with the cement paste layer between the raft board, make all the plane coincidence at the top surface place of the pre-buried festival of steel column.
In order to better realize the utility model, the structure is further optimized, and the side wall of the raft plate is provided with a steel frame positioning line.
To sum up, the utility model discloses following technological effect has:
raft board and side wall in this assembled elevator basis can prefabricate in the prefabricated factory, dig the back in the foundation ditch, alright with directly install fixedly in this assembled elevator basis hoist and mount to the foundation ditch to improve efficiency of construction and effectual reduction construction period, thereby effectively reduce the influence that causes resident's life.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a fabricated elevator foundation of the present invention;
fig. 2 is the utility model discloses a top view of backup pad in assembled elevator basis.
Description of the drawings:
1. a raft plate; 11. a hoisting ring; 12. a steel frame positioning line;
2. a side wall; 21. steel column pre-buried sections; 22. a connecting member;
3. a support plate; 31. a plate body; 32. a contour positioning line;
4. a steel frame connecting piece.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like are used in an orientation or positional relationship indicated based on the orientation or positional relationship shown in the drawings for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is also to be understood that the terms "mounted", "connected" and "connected", unless expressly specified or limited otherwise, are intended to be interpreted broadly, as meaning either a fixed connection or a removable connection, or an integral connection; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood as the case may be, by those of ordinary skill in the art.
Example (b):
as shown in fig. 1 and 2:
an assembly type elevator foundation comprises a raft 1 and side walls 2; wherein,
the raft plate 1 is of a quadrilateral plate structure, a steel bar structural member A is arranged inside the raft plate 1, and the shape of the steel bar structural member A is matched with that of the raft plate 1, so that the steel bar structural member A can effectively improve the strength of the raft plate 1;
the side wall 2 is of a quadrilateral frame structure, the side wall 2 is fixedly arranged on the upper end face of the raft plate 1, so that the raft plate 1 can effectively support the side wall 2, the plane of the side wall 2 is parallel to the plane of the raft plate 1, a steel bar structural member B is arranged inside the side wall 2, the shape of the steel bar structural member B is matched with that of the side wall 2, so that the strength of the side wall 2 can be effectively improved by the steel bar structural member B, and the steel bar structural member B and the steel bar structural member A are fixedly bound, so that the side wall 2 and the raft plate 1 are more stably connected;
steel column embedded sections 21 are arranged at four top corners of the side wall 2, and the top ends of the steel column embedded sections 21 extend out of the upper end surface of the side wall 2 so as to facilitate installation of elevator equipment; the side wall 2 can effectively improve the stability of the steel column embedded section 21, so that the elevator equipment can be stably installed on the assembled elevator foundation.
Raft 1 and side wall 2 in this assembled elevator basis can prefabricate in prefabricated factory, it can reduce the template and erect, reinforcement, built-in fitting hoist and mount and multiple processes such as concrete placement and waterproof construction, and dig well the back at the foundation ditch, alright transport this assembled elevator basis to the place of construction with direct, and send this assembled elevator basis to the foundation ditch through the mode of hoist and mount in and install fixedly, in order to improve the efficiency of construction of installing the elevator additional, and the effectual construction period who shortens this assembled elevator basis, thereby reduce the influence that the construction of installing the elevator additional caused resident's life.
In addition, this assembly type elevator foundation's construction period is shorter, and it can effectually avoid the foundation ditch the condition emergence of bubble water to prevent that original building from receiving the influence and appearing the condition of subsiding.
Preferably, the fabricated elevator foundation further comprises support plates 3 for supporting the rafts 1;
when the fabricated elevator foundation needs to be installed, a worker can dig a foundation pit firstly, and during the process of digging the foundation pit and cleaning the groove, the worker can adopt a level gauge to finely level the installation surface of the foundation pit;
after leveling is finished, a worker can place the support plate 3 into the foundation pit and enable the upper end face of the support plate 3 to be as high as the installation face of the foundation pit;
then, the staff can be with laying raft 1 in backup pad 3 to make all steel column pre-buried festival 21's top surface be in same level, just can expand follow-up processes such as earthwork backfill immediately, just accomplished the construction of this assembled elevator basis after above-mentioned process is accomplished.
Preferably, the support plate 3 comprises four plate bodies 31; wherein,
four plate bodies 31 all set up in the foundation ditch, and the position of four plate bodies 31 is corresponding with the position of four apex angles in raft 1 to make the erection that raft 1 can stabilize on backup pad 3.
It should be noted that, when the top surfaces of all the steel column embedded sections 21 are not at the same horizontal height, the worker may adjust the height of the top surface of the steel column embedded section 21 by additionally arranging a steel sheet between the plate body 31 and the raft 1, so that the top surfaces of all the steel column embedded sections 21 are at the same horizontal height, and the elevator equipment can be stably installed on the fabricated elevator foundation.
In addition, the space between the plate body 31 and the raft plate 1 can be filled with cement slurry;
specifically, when the staff adjusted the top surface of all steel column embedded sections 21 to same height, if the clearance between plate body 31 and raft 1 was great, the staff can adopt the mode of injection to fill the grout layer to the clearance between plate body 31 and the raft 1 to make being connected of raft 1 and plate body 31 more firm, and realize the packing to the clearance.
Optimally, the upper end surface of the support plate 3 is provided with a contour positioning line 32, and the surrounding shape of the contour positioning line 32 is matched with the shape of the raft plate 1;
in the process of hoisting the raft 1, when the raft 1 is falling to the ground, a worker needs to check whether the edge of the raft 1 is matched with the contour positioning line 32, and direct the crane to adjust the falling position by manual cooperation, so that the raft 1 can be accurately installed at a specified position.
Preferably, be provided with steelframe locating line 12 on raft 1's the lateral wall, steelframe locating line coincides with original architectural steelframe connecting piece 4's mounted position for the elevator equipment of installation on this assembled elevator basis can be accurate be connected fixedly with original architectural steelframe connecting piece 4, so that elevator equipment's installation convenience more.
Preferably, the raft plate 1 is provided with a hanging ring 11; wherein,
rings 11 set up the up end at raft 1 for this raft 1's hoist and mount convenience more, in order to accelerate this assembled elevator foundation construction efficiency.
In addition, the arrangement of the hoisting ring 11 facilitates the transportation and assembly of the assembly type elevator foundation.
Preferably, the number of the hanging rings 11 is four; wherein,
four rings 11 correspond the position department that sets up at four apex angles of raft 1 respectively for lifting device can be steady with this assembled elevator basis hang establish to the foundation ditch in install fixed, so that this assembled elevator basis's installation more convenient.
Optimized, foretell two adjacent steel column embedded sections 21 pass through connecting piece 22 and connect fixedly for steel column embedded section 21's structure is more firm, thereby the intensity on this assembled elevator basis of effectual improvement, and then the stability of the installation of improvement elevator equipment.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (9)

1. An assembly type elevator foundation, characterized in that: comprises a raft plate (1) and a side wall (2);
the raft plate (1) is of a quadrilateral plate structure, and a steel bar structural member A is arranged inside the raft plate (1);
the side wall (2) is of a quadrilateral frame structure, the side wall (2) is fixedly arranged on the upper end face of the raft plate (1), the plane where the side wall (2) is located is parallel to the plane where the raft plate (1) is located, a steel bar structural member B is arranged inside the side wall (2), and the steel bar structural member B is fixedly connected with the steel bar structural member A; steel column embedded sections (21) are arranged at four top corners of the side wall (2), and the top ends of the steel column embedded sections (21) extend out of the upper end face of the side wall (2);
and two adjacent steel column embedded sections (21) are connected and fixed through a connecting piece (22).
2. The rigged elevator foundation of claim 1, wherein: the upper end face of the raft plate (1) is provided with a hanging ring (11) which is convenient for hoisting the raft plate (1).
3. The rigged elevator foundation of claim 2, wherein: the number of the lifting rings (11) is four, and the four lifting rings (11) are respectively and correspondingly arranged at the positions of four top angles of the raft plate (1).
4. The fabricated elevator foundation of any one of claims 1-3, wherein: still include and be used for supporting backup pad (3) of raft board (1).
5. The rigged elevator foundation of claim 4, wherein: the upper end face of backup pad (3) is provided with contour positioning line (32), the shape that contour positioning line (32) encircle with the shape phase-match of raft (1), raft (1) is according to contour positioning line (32) location is installed on backup pad (3).
6. The rigged elevator foundation of claim 5, wherein: the supporting plate (3) comprises four plate bodies (31), four plate bodies (31) are correspondingly arranged at four top corners of the raft plate (1) respectively, and four planes where the top surfaces of the plate bodies (31) are superposed.
7. The rigged elevator foundation of claim 6, wherein: steel sheets are arranged between the plate body (31) and the raft plate (1), so that the planes of the top surfaces of all the steel column embedded sections (21) coincide.
8. The rigged elevator foundation of claim 6, wherein: and a cement paste layer is arranged between the plate body (31) and the raft plate (1), so that the planes of the top surfaces of all the steel column embedded sections (21) coincide.
9. The rigged elevator foundation of claim 1, wherein: and steel frame positioning lines (12) are arranged on the side walls of the raft plates (1).
CN202222392503.0U 2022-09-08 2022-09-08 Assembled elevator basis Active CN218563130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222392503.0U CN218563130U (en) 2022-09-08 2022-09-08 Assembled elevator basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222392503.0U CN218563130U (en) 2022-09-08 2022-09-08 Assembled elevator basis

Publications (1)

Publication Number Publication Date
CN218563130U true CN218563130U (en) 2023-03-03

Family

ID=85311972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222392503.0U Active CN218563130U (en) 2022-09-08 2022-09-08 Assembled elevator basis

Country Status (1)

Country Link
CN (1) CN218563130U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116446442A (en) * 2023-05-16 2023-07-18 中国建筑第四工程局有限公司 Elevator foundation structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116446442A (en) * 2023-05-16 2023-07-18 中国建筑第四工程局有限公司 Elevator foundation structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN111945891B (en) Ring truss high-altitude in-situ splicing construction method
CN111980019B (en) Construction method of steel pipe pile cofferdam for locking notch of main bridge bearing platform of super-large bridge
CN111980020A (en) Construction method of double-wall steel suspension box cofferdam of main bridge bearing platform of super-large bridge
CN204570711U (en) A kind of assembled steel reinforced concrete cofferdam
CN218563130U (en) Assembled elevator basis
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN209873873U (en) Prefabricated assembled power pipeline working well
CN114673169A (en) Multi-layer large-span deep foundation pit cover-excavation forward-backward combined construction method for urban core area
CN110106867A (en) Manual digging pile construction method between railcar station track
CN111305218A (en) Construction method for foundation pit excavation
CN110306707A (en) It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN110093945B (en) Pit with elevator steel structure
CN207862964U (en) A kind of land bearing platform construction system
CN115324104A (en) Permanent and temporary combined assembly type station and construction method thereof
CN210134592U (en) Waterproof node structure of prefabricated roofing concrete slab roofing gutter
CN210194657U (en) Foundation of prefabricated substation distribution device building
CN212689007U (en) Support system for subway standard station house
CN208087094U (en) A kind of inclined-plane cell cube Lift-on/Lift-off System
CN212176685U (en) Instrument formula foundation ditch hangs step ladder
CN211714541U (en) Special handling frame for installing shear wall template in elevator shaft
CN211172070U (en) Assembled type suspended wall retaining wall structure of reinforced concrete member
CN209620106U (en) A kind of prefabricated square cable active well bottom plate and borehole wall plate integral connecting structure
CN110158627A (en) A kind of basis in prefabricated transformer substation power distribution unit building and construction method
CN215055616U (en) Consolidate effectual floor reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant