CN212689007U CN202020929349.4U CN202020929349U CN212689007U CN 212689007 U CN212689007 U CN 212689007U CN 202020929349 U CN202020929349 U CN 202020929349U CN 212689007 U CN212689007 U CN 212689007U
Authority
CN
China
Prior art keywords
retaining wall
roof
construction
additional structure
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020929349.4U
Other languages
Chinese (zh)
Inventor
崔寿凯
李享
裴鸿斌
杨晨
李卓朋
刘艳磊
韩佩育
吴艳泽
刘浩洋
王镜博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202020929349.4U priority Critical patent/CN212689007U/en
Application granted granted Critical
Publication of CN212689007U publication Critical patent/CN212689007U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a subway standard station room is with support system, including major structure (1), additional structure (2), ground wall (3) and retaining wall (7), the additional structure includes SMW worker's method stake (4), is under construction crown beam (10) on SMW worker's method stake, one end props up first steel shotcrete (6) on crown beam and is under construction at ground wall and SMW worker's method between the stake foundation slab (9); the retaining wall construction is on major structure's roof, and the retaining wall is located one side that major structure is close to additional structure, and additional structure's first steel shotcrete's the other end props up on the retaining wall, makes additional structure's roof be located the retaining wall top, additional structure's roof can directly link to each other with major structure's roof. The utility model discloses a lift additional structure roof, needn't stay and establish the post-cast strip, the roof construction joint quantity that significantly reduces weak position quality and hides, can effectively improve the efficiency of construction simultaneously, reduces construction cost.

Description

Support system for subway standard station house
Technical Field
The utility model relates to a subway deep basal pit construction structures especially relates to a subway standard station is support system for room.
Background
In the subway foundation pit engineering, an underground continuous wall is a common supporting structure type as the enclosure of a main structure foundation pit of a station. In order to connect the auxiliary structures of the station such as the gateway and the wind pavilion to the station hall layer, the underground continuous wall of the main enclosure structure is inevitably removed. Due to the planar arrangement of the auxiliary structure foundation pit of the station, the inner support of the auxiliary structure in the existing construction is usually supported on the underground continuous wall of the main structure of the station. In the process that the auxiliary structure is in butt joint communication with the station main body, unreasonable chiseling of the underground continuous wall of the main structure can easily cause failure of the support system in the auxiliary structure, and the safety of foundation pit engineering is seriously threatened.
Disclosure of Invention
An object of the utility model is to provide a subway standard station is support system for room through lifting additional structure roof, needn't stay and establish the post-cast strip, and the roof construction joint quantity that significantly reduces weak position quality and hides, can effectively improve the efficiency of construction simultaneously, reduces construction cost.
The utility model discloses a realize like this:
a supporting system for a standard subway station house comprises a main structure, an auxiliary structure, a ground connecting wall and a retaining wall, wherein the auxiliary structure comprises an SMW construction method pile, a crown beam constructed on the SMW construction method pile, a first steel support with one end supported on the crown beam and a foundation slab constructed between the ground connecting wall and the SMW construction method pile; the retaining wall construction is on major structure's roof, and the retaining wall is located one side that major structure is close to additional structure, and additional structure's first steel shotcrete's the other end props up on the retaining wall, makes additional structure's roof be located the retaining wall top, and additional structure's roof can directly link to each other with major structure's roof.
And a second steel support is arranged in the auxiliary structure, the second steel support is connected between the ground connecting wall and the SMW construction method pile, and the second steel support is positioned between the foundation bottom plate and the first steel support.
And a retaining wall buttress is arranged between the side face of the retaining wall and the top plate of the main body structure, and the retaining wall buttress is positioned on the side face of the retaining wall far away from the accessory structure.
The retaining wall buttress is a strip-shaped structure with a triangular cross section, and the retaining wall buttress is long with the retaining wall.
To sum up, the utility model discloses a prop up the first steel shotcrete of additional structure on the retaining wall on the main structure roof of construction and the crown beam at SMW worker method stake top, lift the roof of additional structure, after the foundation slab construction of additional structure is accomplished, can directly break off the ground wall according to the construction section, can directly link to each other with the roof of main structure when constructing the roof of additional structure, needn't set up the post-cast strip, greatly reduce roof construction joint quantity, reduce weak position quality hidden danger; simultaneously, compare and break off ground wall even according to the width of cloth, the utility model discloses can save a large amount of time, and the installation segmentable of supporting the support body is gone on as required, has reduced the extravagant and lease time of unnecessary, effectively reduces construction cost.
Drawings
Fig. 1 is a schematic structural diagram of the support system for the subway standard station house of the present invention;
FIG. 2 is a sectional view of the supporting system for the standard subway station house of the present invention;
fig. 3 is the utility model discloses subway standard station is construction flow chart of support system for room.
In the figure, 1 a main structure, 2 auxiliary structures, 3 ground connection walls, 4 SMW construction method piles, 5 second steel supports, 6 first steel supports, 7 retaining walls, 8 retaining wall buttresses, 9 foundation slabs and 10 crown beams.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to fig. 1 and 2, the support system for the standard subway station comprises a main body structure 1, an auxiliary structure 2, a diaphragm Wall 3 and a retaining Wall 7, wherein the auxiliary structure 2 comprises SMW (Soil Mixing Wall) construction piles 4, crown beams 10 constructed on the SMW construction piles 4, first steel supports 6 with one ends supported on the crown beams 10 and a foundation slab 9 constructed between the diaphragm Wall 3 and the SMW construction piles 4; retaining wall 7 is under construction on the roof of major structure 1, and retaining wall 7 is located the major structure 1 and is close to one side of additional structure 2, and the other end of the first steel shotcrete 6 of additional structure 2 props up on retaining wall 7, makes the roof of additional structure 2 be located retaining wall 7 top, and the roof of additional structure 2 can directly link to each other with the roof of major structure 1, realizes that the roof of additional structure 2 once is under construction and targets in place.
And a second steel support 5 is arranged in the auxiliary structure 2, the second steel support 5 is connected between the diaphragm wall 3 and the SMW construction method pile 4, and the second steel support 5 is positioned between the foundation bottom plate 9 and the first steel support 6, so that the structural stability of the auxiliary structure 2 during construction can be improved.
And a retaining wall buttress 8 is arranged between the side surface of the retaining wall 7 and the top plate of the main body structure 1, and the retaining wall buttress 8 is positioned on the side surface of the retaining wall 7 far away from the auxiliary structure 2, so that the strength of the retaining wall 7 can be improved, and effective support is provided for the first steel support 6 of the auxiliary structure 2.
Retaining wall buttress 8 be triangle-shaped's rectangular form structure for the cross-section, retaining wall buttress 8 leads to long with retaining wall 7, ensures that retaining wall buttress 8 can provide even, stable support to retaining wall 7.
The utility model discloses a 6 props up retaining wall 7 and the top of SMW worker method stake 4 on the roof beam 10 of 1 roof of main structure construction with the first steel shotcrete of additional structure 2, lift the roof of additional structure 2 (lift highly according to concrete construction conditions and confirm through the accurate calculation), can directly link to each other with main structure 1's roof when constructing the roof of additional region 2, needn't reserve and establish the back casting area, the roof construction joint quantity that significantly reduces, reduce weak position quality hidden danger, a large amount of time has been saved, and the installation segmentable of support frame bodies such as first steel shotcrete 6 goes on as required, unnecessary waste and lease time have been reduced, effectively reduce construction cost.
Referring to fig. 3, the construction process of the present invention specifically includes: constructing an SMW construction method pile 4 → a crown beam 10 on the SMW construction method pile 4 → a retaining wall 7 on a top plate of a main structure 1 → excavation of a foundation pit earthwork, installing a first steel support 6 → excavation of the earthwork to the base elevation, constructing a cushion layer → binding of a foundation bottom plate 9 reinforcing steel bar, embedding H-shaped steel → pouring of concrete of the foundation bottom plate 9, reserving a post-pouring zone of 1-1.5m → dismantling a second steel support 5 → side wall construction → a skip cabin method framing and removing a ground connecting wall 3 → erecting a full-space support, constructing a top plate of an auxiliary structure 2 in place once → dismantling the first steel support 6 → sealing of the bottom plate post-pouring zone → earthing and backfilling, and finishing construction.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the scope of the present invention, therefore, any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention should be included in the scope of the present invention.

Claims (4)

1. A subway standard station is braced system for room, characterized by: the auxiliary structure (2) comprises an SMW construction method pile (4), a crown beam (10) constructed on the SMW construction method pile (4), a first steel support (6) with one end supported on the crown beam (10) and a foundation slab (9) constructed between the ground connection wall (3) and the SMW construction method pile (4); the retaining wall (7) is constructed on the top plate of the main structure (1), the retaining wall (7) is located on one side, close to the auxiliary structure (2), of the main structure (1), the other end of the first steel support (6) of the auxiliary structure (2) is supported on the retaining wall (7), the top plate of the auxiliary structure (2) is located above the retaining wall (7), and the top plate of the auxiliary structure (2) can be directly connected with the top plate of the main structure (1).
2. The support system for the subway standard station room as claimed in claim 1, wherein: and a second steel support (5) is arranged in the auxiliary structure (2), the second steel support (5) is connected between the ground connecting wall (3) and the SMW construction method pile (4), and the second steel support (5) is positioned between the foundation bottom plate (9) and the first steel support (6).
3. The support system for the subway standard station room as claimed in claim 1, wherein: and a retaining wall buttress (8) is arranged between the side surface of the retaining wall (7) and the top plate of the main body structure (1), and the retaining wall buttress (8) is positioned on the side surface of the retaining wall (7) far away from the auxiliary structure (2).
4. The support system for the subway standard station room as claimed in claim 3, wherein: retaining wall buttress (8) be triangle-shaped's rectangular form structure for the cross-section, retaining wall buttress (8) lead to long with retaining wall (7).
CN202020929349.4U 2020-05-28 2020-05-28 Support system for subway standard station house Active CN212689007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020929349.4U CN212689007U (en) 2020-05-28 2020-05-28 Support system for subway standard station house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020929349.4U CN212689007U (en) 2020-05-28 2020-05-28 Support system for subway standard station house

Publications (1)

Publication Number Publication Date
CN212689007U true CN212689007U (en) 2021-03-12

Family

ID=74889874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020929349.4U Active CN212689007U (en) 2020-05-28 2020-05-28 Support system for subway standard station house

Country Status (1)

Country Link
CN (1) CN212689007U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235951A (en) * 2021-06-16 2021-08-10 浙江吉通地空建筑科技有限公司 Installation method and connection structure of section steel support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235951A (en) * 2021-06-16 2021-08-10 浙江吉通地空建筑科技有限公司 Installation method and connection structure of section steel support

Similar Documents

Publication Publication Date Title
US11384501B2 (en) Method for sealing post-cast strip in foundation with no gap
CN110499779B (en) Construction method of air duct structure sharing side wall with subway station
KR100313720B1 (en) Composite Underground Structure Construction Method
CN212689007U (en) Support system for subway standard station house
CN114673169A (en) Multi-layer large-span deep foundation pit cover-excavation forward-backward combined construction method for urban core area
CN210562287U (en) Compound assembled underground structure
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN211900603U (en) Face combination shield structure hole of hoist enclosed construction forever
CN208650067U (en) Underground increasing layer excavates new supporting structure
CN113585336A (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN110566237B (en) Subway interval stop line large section undercut construction is first propped up into hole reinforced structure
CN112922033A (en) Temporary underground plugging structure for water supply and drainage engineering
CN214657060U (en) Supporting structure for covering and digging top of foundation pit
KR200219236Y1 (en) A mold assembly for reinforced concrete girders execution
CN219930992U (en) Support changing structure of foundation pit supporting system
CN211714178U (en) Prefabricated reinforced concrete house frame
CN218265180U (en) Assembled stadium stand
CN220503948U (en) Permanent-facing combined construction pavement structure for descending plate construction of underground structure
CN216920378U (en) Assembled underground well soil retaining device
CN114606951B (en) Intelligent assembled inverted hanging structure in foundation pit and construction method thereof
CN212689384U (en) Basement supports and trades and props structure
CN213597021U (en) Construction elevator installation basis in foundation ditch
CN217758854U (en) Supporting construction of supplementary foundation ditch in subway station
CN217325470U (en) Basement outer wall post-cast strip department assembled retaining wall
CN215254559U (en) Prefabricated formwork system for pouring basement wallboard structure