CN218541457U - Hanging basket for constructional engineering - Google Patents

Hanging basket for constructional engineering Download PDF

Info

Publication number
CN218541457U
CN218541457U CN202222160884.XU CN202222160884U CN218541457U CN 218541457 U CN218541457 U CN 218541457U CN 202222160884 U CN202222160884 U CN 202222160884U CN 218541457 U CN218541457 U CN 218541457U
Authority
CN
China
Prior art keywords
flower basket
hanging flower
mount pad
inner frame
steel cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222160884.XU
Other languages
Chinese (zh)
Inventor
吕文腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222160884.XU priority Critical patent/CN218541457U/en
Application granted granted Critical
Publication of CN218541457U publication Critical patent/CN218541457U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model provides a hanging flower basket for building engineering, including slide rail, the hanging flower basket of two symmetries, the symmetry the upper end swing joint of slide rail has the mount pad, the upper end symmetry of mount pad is equipped with the bracing piece, and is symmetrical the front end of bracing piece is equipped with the pulley, and the upper end is equipped with the support, and the end is equipped with the link, pulley swing joint has the steel cable, the steel cable end is equipped with the couple, and passes the support and be connected with the link, the top that the one end of steel cable runs through the hanging flower basket is connected with the lifting machine, the inside at the hanging flower basket is fixed to the lifting machine, and this structural design convenience need not dismantle and reinstall whole hanging flower basket again at the different horizontal position during operation of same height, has saved the time of construction, has improved the efficiency of construction.

Description

Hanging basket for constructional engineering
Technical Field
The utility model relates to a hanging flower basket technical field specifically is a hanging flower basket for building engineering.
Background
Hanging flower basket for building engineering is a promotion hanging flower basket that construction used, constitute by work platform and rail guard etc, traditional scaffold frame can be replaced to the construction hanging flower basket, can alleviate intensity of labour, improve work efficiency, and can used repeatedly's novel aerial work equipment, possess better result of use, and manufacturing cost is lower, wide application in each field, current hanging flower basket if need carry out the during operation at the different horizontal position of co-altitude when using need reinstall and remove the trouble that whole hanging flower basket is more, so need a hanging flower basket that can use at the construction of during operation lateral shifting.
For example, application No.: the patent of CN201920465142.3, including work platform, work platform's upper surface fixed mounting has the rail guard all around, the last fixed surface of rail guard installs the control electronic box, the inboard fixed surface of rail guard installs the receiver, work platform's lower surface four corners position slidable mounting has the universal wheel, one side fixed surface of work platform installs the guard plate, the last fixed surface of control electronic box installs waterproof box.
Although this design has and to accomodate daily cup by the person of facilitating the use, is convenient for during operation drinking water like this, and it can conveniently accomodate various use tools, saves the time of taking from top to bottom to can prevent that the use tool that stretches out from dropping and breaking or pounding the biology below, can descend to rock the impact force to the wall in the buffering of rubber brush simultaneously, and can improve advantages such as waterproof performance of waterproof box.
However, this design does not work at the same height but at different levels, requiring the entire basket apparatus to be moved and reinstalled.
An object of the utility model is to provide a need not dismantle the installation again to whole hanging flower basket again on the during operation of same high different positions of being convenient for, the time of having saved the construction has improved the efficiency of construction to solve the problem mentioned in the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
For realizing the above-mentioned purpose, the utility model provides a hanging flower basket that construction used, including slide rail, hanging flower basket, the symmetry of two symmetries the upper end swing joint of slide rail has the mount pad, the upper end symmetry of mount pad is equipped with the bracing piece, and the symmetry the front end of bracing piece is equipped with the pulley, and the upper end is equipped with the support, and the end is equipped with the link, pulley swing joint has the steel cable, the steel cable end is equipped with the couple, and passes the support and be connected with the link, the top that the one end of steel cable runs through the hanging flower basket is connected with the lifting machine, the inside at the hanging flower basket is fixed to the lifting machine, can remove different horizontal positions under same height through this design, convenient construction.
Preferably, sliding grooves are formed in the inner sides of the sliding rails symmetrically, sliding blocks are arranged on two sides of the mounting seat and matched with the sliding grooves, and the whole hanging basket device can move left and right through the design.
Preferably, one side of mount pad is equipped with the motor, the output fixedly connected with lead screw of motor, be equipped with the screw hole in the mount pad, the lead screw cooperatees with the screw hole, can drive whole device through this design and remove.
Preferably, the hanging basket comprises an outer frame, the inner wall of the inner frame is fixedly provided with a tool box and a folding stool, the folding stool is connected with the inner wall of the inner frame through a hinge, the front end of the folding stool is provided with a fixing column, the inner wall of the inner frame is provided with a groove, the groove is matched with the fixing column, and a comfortable mode is provided for a worker to have a rest through the design.
Preferably, the symmetry one side fixedly connected with fixed plate that the slide rail deviates from mutually, the fixed plate upper end is connected with a plurality of counter weight stones, and the top layer at the building is fixed to the strutting arrangement with the hanging flower basket that can be stable through this design.
Preferably, the upper end four corners symmetry of internal frame is equipped with the support column, and is symmetrical support column upper end fixedly connected with sunshading board, the lower extreme of sunshading board is equipped with the fan, through this design, can let the staff guarantee constructor's construction environment under the environment of burning sun, prevents that constructor from taking place the degree of progress of accident and influence construction because of the high temperature.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a set up the mount pad, a slide rail, the bracing piece, including a motor, an end cap, a controller, and a cover plate, the lead screw, the fixed plate, the steel cable, a support, the couple, the link, cooperation between the hanging flower basket can realize that whole hanging flower basket removes at the different horizontal position of same height, need not dismantle whole device when the horizontal position that removes the hanging flower basket and installing again, the time of construction has been saved, the efficiency of construction is improved, through setting up bradyseism spring one, the internal frame, outer frame, the mounting bracket, the supporting leg, bradyseism spring two, bradyseism spring three, cooperation between the installation piece can reduce rocking that produces when horizontal position removes to a certain extent, through setting up the sunshading board, folding stool, cooperation between the fan can provide comfortable rest environment for constructor when constructor has a rest, prevent constructor heatstroke under the burning sun condition to a certain extent.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the cross-sectional structure of the hanging basket of the present invention;
fig. 3 is a schematic structural view of the cushioning support assembly of the present invention.
In the figure: A. a hanging basket; 1. an outer frame; 2. an inner frame; 3. a mounting seat; 4. a slide rail; 5. a cushioning support assembly; 6. a hoist; 11. a support pillar; 12. a sun visor; 121. a fan; 13. a first cushioning spring; 21. a tool box; 22. a folding stool; 221. fixing a column; 222. a hinge; 31. a steel cord; 32. a rotating shaft; 33. a support bar; 41. a screw rod; 42. a motor; 43. a fixing plate; 51. a second damping spring; 52. a mounting frame; 53. supporting legs; 54. a third cushioning spring; 55. and (7) installing the block.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described more fully with reference to the accompanying drawings, in which several embodiments of the present invention are shown, but the present invention can be implemented in different forms, and is not limited to the embodiments described in the text, but rather, these embodiments are provided to make the disclosure of the present invention more thorough and comprehensive.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may be present, and when an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present, as the terms "vertical", "horizontal", "left", "right" and the like are used herein for descriptive purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, and the terms used herein in the specification of the present invention are for the purpose of describing particular embodiments only and are not intended to limit the present invention, and the term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the lifting device comprises two symmetrical slide rails 4 and a hanging basket a, wherein the upper ends of the symmetrical slide rails 4 are movably connected with a mounting base 3, the upper ends of the mounting base 3 are symmetrically provided with support rods 33, the front ends of the symmetrical support rods 33 are provided with pulleys 32, the upper ends of the support rods 33 playing a certain labor-saving role are provided with a support, the tail ends of the support rods are provided with hanging rings, the pulleys 32 are movably connected with steel ropes 31, the tail ends of the steel ropes 31 are provided with hooks and penetrate through the support to be connected with the hanging rings, one ends of the steel ropes 31 penetrate through the top of the hanging basket a to be connected with a lifting machine 6, and the lifting machine 6 is fixed inside the hanging basket a.
Referring to fig. 2 and 3 again, the tool box 21 and the foldable stool 22 are fixed to the inner wall of the inner frame 2, the foldable stool 22 is connected to the inner wall of the inner frame 2 by a hinge 222, a fixing post 221 is provided at the front end of the foldable stool 22, a groove is provided in the inner wall of the inner frame 2, the groove is matched with the fixing post 221, and the structure can provide comfortable rest for constructors.
Please refer to fig. 1 again, a fixing plate 43 is fixedly connected to a side of the symmetrical slide rails 4, which is away from each other, and a plurality of counterweight stones are connected to an upper end of the fixing plate 43.
Please refer to fig. 2, the four corners of the upper end of the inner frame 2 are symmetrically provided with the support pillars 11, the upper ends of the symmetrical support pillars 11 are fixedly connected with the sun shield 12, and the lower ends of the sun shield 12 are provided with the electric fans 121, so that the structure can provide relatively comfortable construction environment for constructors in a burning sun environment, and prevent the constructors from heatstroke to a certain extent.
Example 1:
when the device is needed, a constructor strides into the hanging basket A, then the hoister 6 is started, the hoister 6 drives the steel rope 31 to move upwards, meanwhile, the steel rope 31 drives the hanging basket A to move upwards, the hoister 6 stops moving when reaching a construction position, the hanging basket A can be stopped at the position needing construction at the moment, the tool box 21 is placed on the inner wall of the inner frame 2, the folding stool 22 and the tool box 21 can be used for placing various tools, when the constructor wants to rest after working for a long time, the folding stool 22 in the hanging basket A can be put down through the hinge 222, the folding stool 22 is folded through the hinge 222 after the rest is finished, and then the folding stool 22 is fixed in the inner frame 2 through the matching of the fixing column 221 on the folding stool 22 and the groove in the inner wall of the inner frame 2.
Example 2:
when constructors need to construct at different positions at the same height, the motor 42 is started, the motor 42 drives the screw rod 41 to rotate, the screw rod 41 drives the installation seat 3 to move left and right, the installation seat 3 drives the supporting rod 33 to move, the supporting rod 33 drives the steel rope 31 to move, and the steel rope 31 drives the hanging basket A to move.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above-mentioned manner, if the method and the technical solution of the present invention are adopted, the present invention can be directly applied to other occasions without substantial improvement, and the present invention is within the protection scope of the present invention.

Claims (6)

1. The utility model provides a hanging flower basket for building engineering which characterized in that: slide rail (4), hanging flower basket (A) including two symmetries, the symmetry the upper end swing joint of slide rail (4) has mount pad (3), the upper end symmetry of mount pad (3) is equipped with bracing piece (33), the symmetry the front end of bracing piece (33) is equipped with pulley (32), and the upper end is equipped with the support, and the end is equipped with the link, pulley (32) swing joint has steel cable (31), steel cable (31) end is equipped with the couple, and passes the support and be connected with the link, the top that hanging flower basket (A) was run through to the one end of steel cable (31) is connected with lifting machine (6), the inside at hanging flower basket (A) is fixed in lifting machine (6).
2. A gondola for construction engineering according to claim 1, characterized in that: the symmetrical inner side of the sliding rail (4) is provided with sliding grooves, and the two sides of the mounting seat (3) are provided with sliding blocks matched with the sliding grooves.
3. A gondola for construction engineering according to claim 1, characterized in that: one side of mount pad (3) is equipped with motor (42), the output fixedly connected with lead screw (41) of motor (42), be equipped with the screw hole in mount pad (3), lead screw (41) cooperate with the screw hole.
4. A gondola for construction engineering as claimed in claim 1, characterized in that: the hanging basket (A) comprises an inner frame (2), a tool box (21) and a folding stool (22) are fixedly arranged on the inner wall of the inner frame (2), the folding stool (22) is connected with the inner wall of the inner frame (2) through a hinge (222), a fixing column (221) is arranged at the front end of the folding stool (22), a groove is formed in the inner wall of the inner frame (2), and the groove is matched with the fixing column (221).
5. A gondola for construction engineering according to claim 1, characterized in that: symmetrical one side fixedly connected with fixed plate (43) that slide rail (4) deviate from mutually, fixed plate (43) upper end is connected with a plurality of counterweight stones.
6. A gondola for construction engineering as claimed in claim 4, characterized in that: support columns (11) are symmetrically arranged at four corners of the upper end of the inner frame (2), the upper ends of the support columns (11) are symmetrically fixedly connected with a sun shield (12), and a fan (121) is arranged at the lower end of the sun shield (12).
CN202222160884.XU 2022-08-17 2022-08-17 Hanging basket for constructional engineering Active CN218541457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222160884.XU CN218541457U (en) 2022-08-17 2022-08-17 Hanging basket for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222160884.XU CN218541457U (en) 2022-08-17 2022-08-17 Hanging basket for constructional engineering

Publications (1)

Publication Number Publication Date
CN218541457U true CN218541457U (en) 2023-02-28

Family

ID=85271542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222160884.XU Active CN218541457U (en) 2022-08-17 2022-08-17 Hanging basket for constructional engineering

Country Status (1)

Country Link
CN (1) CN218541457U (en)

Similar Documents

Publication Publication Date Title
CN111980391A (en) Integral hoisting platform and building method of building outer facade construction platform
CN110331849B (en) Exterior wall operation device for building construction and operation method thereof
CN218541457U (en) Hanging basket for constructional engineering
CN205604697U (en) Hook type high -place operation hanging basket
CN210457310U (en) High-efficient safe building material hoisting device
CN111894285A (en) Portable curtain wall construction auxiliary device
CN111825029A (en) Multifunctional self-adaptive maintenance platform and operation method thereof
CN206053824U (en) A kind of electric power overhaul ladder
CN213868841U (en) Building construction safety platform
CN111186800A (en) Portable power maintenance device
CN211813299U (en) Lifting device for construction is decorated and is used
CN211847056U (en) Mast type aerial work platform
CN210366899U (en) Lifting platform
CN112919338A (en) Large-scale exhibit of industrial design promotes installation device
CN112681701A (en) Scaffold for building construction
CN218562943U (en) Construction platform convenient to remove
CN216129301U (en) Electromechanical device elevating gear for interior decoration
CN211813309U (en) Multi-functional lifting device of architectural equipment
CN220223474U (en) Assembled building construction lift platform
CN219469560U (en) Hoisting device with protection mechanism for installing solar photovoltaic panel
CN218842867U (en) Movable bridge arch rib support frame
CN215055158U (en) Exterior wall coating construction platform
CN220768779U (en) House building construction platform
CN214090863U (en) Platform for building decoration
CN215918531U (en) Material lifting device for building decoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant