CN218541154U - Energy-saving ceiling keel connecting structure - Google Patents
Energy-saving ceiling keel connecting structure Download PDFInfo
- Publication number
- CN218541154U CN218541154U CN202222954197.5U CN202222954197U CN218541154U CN 218541154 U CN218541154 U CN 218541154U CN 202222954197 U CN202222954197 U CN 202222954197U CN 218541154 U CN218541154 U CN 218541154U
- Authority
- CN
- China
- Prior art keywords
- energy
- saving
- adjusting screw
- threaded sleeve
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides an energy-saving furred ceiling fossil fragments connection structure. Energy-saving furred ceiling fossil fragments connection structure includes: the hanging piece is detachably and fixedly arranged on the ceiling through an expansion bolt; the threaded sleeve is detachably and fixedly arranged on the hanging piece through a bolt piece; the clamping piece is detachably and fixedly buckled on the hoisting keel through a positioning bolt; the adjusting screw is installed on the threaded sleeve in an adjustable threaded mode, and a connecting mechanism is arranged between the adjusting screw and the clamping piece. The utility model provides an energy-saving furred ceiling fossil fragments connection structure has and can carry out great degree recycle after the building is demolishd, reduces extravagantly, and comparatively green ensures use strength's advantage.
Description
Technical Field
The utility model relates to a building connection structure technical field especially relates to an energy-saving furred ceiling fossil fragments connection structure.
Background
The ceiling keel is a ceiling made of keel frames and plasterboards, and light steel or wood is generally selected as a main material of the ceiling in order to reduce the self gravity of the keel in the prior art.
Because the connection structure of current furred ceiling fossil fragments passes the fossil fragments nail on the ceiling through the screw, adopts the bolt mounting to need set up the bolt hole at each mounted position before the operation for fossil fragments are difficult to reuse after the building is demolishd, have caused the waste of resource, green environmental protection inadequately, set up the hole on fossil fragments simultaneously, have destroyed the structure, make fossil fragments intensity weaken.
Therefore, it is necessary to provide a new energy-saving ceiling keel connecting structure to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide an energy-saving furred ceiling fossil fragments connection structure that has and can carry out great degree recycle after the building is demolishd, reduce extravagantly, comparatively green ensures use intensity.
In order to solve the technical problem, the utility model provides an energy-saving ceiling keel connection structure includes: the hanging piece is detachably and fixedly arranged on the ceiling through an expansion bolt; the threaded sleeve is detachably and fixedly arranged on the hanging piece through a bolt piece; the clamping piece is detachably and fixedly buckled on the hoisting keel through a positioning bolt; the adjusting screw is installed on the threaded sleeve in an adjustable threaded mode, and a connecting mechanism is arranged between the adjusting screw and the clamping piece.
Preferably, the connecting mechanism comprises a ball head and a ball seat, the ball head is fixedly mounted at the top of the clamping piece, and the ball seat is movably mounted on the ball head and is fixedly connected with the bottom end of the adjusting screw rod.
Preferably, a plurality of operating rods are fixedly mounted outside the ball seat, and a tool screwing block is fixedly sleeved on the adjusting screw rod.
Preferably, the hoisting keel is nailed with an iron nail, the threaded sleeve is fixedly provided with a steel wire rope, and the free end of the steel wire rope is fixedly provided with a hanging ring hung on the iron nail.
Preferably, the hanging piece, the threaded sleeve, the clamping piece and the adjusting screw are all made of light alloy materials.
Preferably, the inner wall of the clamping piece is provided with a friction mechanism, and the steel wire rope is arranged on the threaded sleeve in an adjustable manner through a lifting lug.
Compared with the prior art, the utility model provides an energy-saving ceiling keel connection structure has following beneficial effect:
the utility model provides an energy-saving furred ceiling fossil fragments connection structure:
1. the lifting piece installed through the expansion bolt can be disassembled when being detached, the threaded sleeve is installed on the lifting piece through the bolt piece, different lengths can be replaced according to needs when the lifting piece is used, the use is flexible, the clamping piece is installed on the lifting keel in a butting mode through the positioning bolt, punching is not needed in the fixing process, subsequent recycling is facilitated, the lifting piece is environment-friendly and green, the adjusting screw can be matched with the positioning length of the threaded sleeve, and flexible adjustment can be conducted according to the needs of the lifting keel;
2. the length of the screw rod can be adjusted flexibly through cooperation of the ball head of the connecting mechanism and the ball seat, the length can be adjusted through manual operation of the operating rod, the tool screwing block can rotate through a tool, and the operation mode is flexible;
3. through iron nail, rings and wire rope's cooperation, in use plays the effect of insurance, and the accident appears in the prevention, hangs through the lightweight and makes things convenient for personnel's operation in use with adjusting screw, reduces personnel's physical demands, can improve the centre gripping stable through friction mechanism, and friction mechanism can be concave-convex structure, also can be the friction thing of spraying or addition, and wire rope adjustable length uses in a flexible way.
Drawings
Fig. 1 is a schematic front sectional view of a preferred embodiment of an energy-saving ceiling keel connecting structure provided by the present invention;
FIG. 2 is an enlarged schematic view of portion A shown in FIG. 1;
FIG. 3 is an enlarged schematic view of a portion B shown in FIG. 1;
fig. 4 is an enlarged structural view of a portion C shown in fig. 1.
The reference numbers in the figures: 1. a ceiling; 2. an expansion bolt; 3. a hanger; 4. a threaded sleeve; 5. a bolt member; 6. hoisting a keel; 7. a fastener; 8. positioning the bolt; 9. adjusting the screw rod; 10. a ball head; 11. a ball seat; 12. an operating lever; 13. a tool twisting block; 14. iron nails; 15. a wire rope; 16. a lifting ring.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1-4, wherein fig. 1 is a schematic structural diagram of a preferred embodiment of an energy-saving ceiling keel connecting structure according to the present invention; FIG. 2 is an enlarged schematic view of portion A shown in FIG. 1; FIG. 3 is an enlarged schematic view of the portion B shown in FIG. 1; fig. 4 is an enlarged structural view of a portion C shown in fig. 1. Energy-saving furred ceiling fossil fragments connection structure includes: a hanging piece 3 detachably and fixedly arranged on the ceiling 1 through an expansion bolt 2; a threaded sleeve 4, wherein the threaded sleeve 4 is detachably and fixedly arranged on the hanging piece 3 through a bolt piece 5; the clamping piece 7 is detachably and fixedly buckled on the hoisting keel 6 through a positioning bolt 8; adjusting screw 9, the adjustable screw thread of adjusting screw 9 is installed on the threaded sleeve 4, adjusting screw 9 with be equipped with coupling mechanism between the fastener 7, the piece 3 that hangs through the installation of expansion bolts 2 is detachable when demolising, threaded sleeve 4 passes through bolt piece 5 and installs on hanging piece 3, can change different length as required when using, and it is nimble to use, fastener 7 contradicts through positioning bolt 8 and installs on hoist and mount fossil fragments 6, and the fixing process need not to punch, convenient follow-up recycle, comparatively environmental protection green, adjusting screw 9 can cooperate threaded sleeve 4 location length, need carry out nimble regulation according to hoist and mount fossil fragments 6.
The connecting mechanism comprises a ball head 10 and a ball seat 11, the ball head 10 is fixedly arranged at the top of the clamping piece 7, the ball seat 11 is movably arranged on the ball head 10 and is fixedly connected with the bottom end of the adjusting screw 9, and the ball head 10 and the ball seat 11 are cooperated with each other through the connecting mechanism, so that the adjusting screw 9 is flexible in length adjustment.
A plurality of operating levers 12 are fixedly mounted on the outer portion of the ball seat 11, a tool screwing block 13 is fixedly arranged on the adjusting screw rod 9 in a sleeved mode, the length can be adjusted through manual operation of the operating levers 12 conveniently, the tool screwing block 13 can be rotated by using a tool, and the operation mode is flexible.
The last nail of hoist and mount fossil fragments 6 has iron nail 14, fixed mounting has wire rope 15 on the threaded sleeve 4, wire rope 15's free end fixed mounting hangs and establishes rings 16 on the iron nail 14, through iron nail 14, rings 16 and wire rope 15's cooperation, in use plays the effect of insurance, and the accident appears in the prevention.
Hang a 3, threaded sleeve 4, fastener 7 and adjusting screw 9 and be lightweight alloy material, hang a 3, threaded sleeve 4, fastener 7 and adjusting screw 9 convenience of personnel's operation in use through lightweight, reduce personnel's physical demands.
The inner wall of fastener 7 is equipped with friction mechanism, wire rope 15 can carry the adjustment through the lug and set up on the threaded sleeve 4, can improve the centre gripping through friction mechanism and stabilize, and friction mechanism can be concave-convex structure, also can be the friction thing of spraying or addition, and wire rope 15 adjustable length uses in a flexible way.
The utility model provides an energy-saving furred ceiling fossil fragments connection structure's theory of operation as follows:
when the ceiling is hung, firstly, the hanging piece 3 is fixed on the ceiling 1 through the expansion bolt 2, then the threaded sleeve 4 is installed on the hanging piece 3 through the bolt piece 5, then the hoisting keel 6 is supported and clamped on the clamping piece 7, and after clamping, the positioning bolt 8 is rotated by adopting a tool to abut against the hoisting keel 6, so that fixing is completed;
after the fixing is finished, the angle of the hoisting keel 6 is adjusted as required, the ball seat 11 can be rotated by holding the operating rod 12 by hand during the adjustment, so that the adjusting screw 9 is rotated, the height of the adjusting screw 9 and the threaded sleeve 4 is adjusted, and a tool can be adopted to rotate the tool screwing block 13;
finally, nails 14 are nailed at other positions of the hoisting keel 6, so that a hoisting ring 16 is hung on the nails 14, and then the steel wire rope 15 is tightened and fixed to complete the operation;
when the hoisting keel 6 is disassembled, the use strength is basically not influenced due to the small quantity of iron nails 14, and the hoisting keel can be freely spliced and reused when being reused.
Compared with the prior art, the utility model provides an energy-saving furred ceiling fossil fragments connection structure has following beneficial effect:
the utility model provides an energy-saving furred ceiling fossil fragments connection structure, it is removable when demolising to hang 3 through expansion bolts 2 installation, threaded sleeve 4 passes through bolt spare 5 and installs on hanging 3, can change different length as required when using, it is nimble to use, fastener 7 is contradicted through positioning bolt 8 and is installed on hoist and mount fossil fragments 6, fixed process need not to punch, make things convenient for follow-up recycle, comparatively environmental protection green, adjusting screw 9 can cooperate threaded sleeve 4 location length, adjust in a flexible way according to hoist and mount fossil fragments 6 needs, cooperation through coupling mechanism bulb 10 and ball seat 11, it is comparatively nimble when adjusting screw 9 adjustment length, be convenient for manual operation through action bars 12 to adjust length, the instrument is twisted piece 13 and is used the instrument and is rotated, the operation is nimble, through iron nail 14, rings 16 and wire rope 15's cooperation, in use plays the effect of insurance, the prevention accident appears, through lightweight hanging 3, threaded sleeve 4, fastener 7 and adjusting screw 9 make things convenient for personnel to operate, reduce personnel's physical demands, can improve the stable centre gripping through friction mechanism, friction mechanism can be the structure, also can be spraying or the unsmooth thing of friction of the spraying, adjustable length, use is nimble.
It should be noted that the device structure and the accompanying drawings of the present invention mainly describe the principle of the present invention, and in the technology of this design principle, the settings of the power mechanism, the power supply system, the control system, etc. of the device are not completely described, and the details of the power mechanism, the power supply system, and the control system can be clearly known on the premise that those skilled in the art understand the principle of the present invention.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.
Claims (6)
1. The utility model provides an energy-saving furred ceiling fossil fragments connection structure which characterized in that includes:
the hanging piece is detachably and fixedly arranged on the ceiling through an expansion bolt;
the threaded sleeve is detachably and fixedly arranged on the hanging piece through a bolt piece;
the clamping piece is detachably and fixedly buckled on the hoisting keel through a positioning bolt;
the adjusting screw is installed on the threaded sleeve in an adjustable threaded mode, and a connecting mechanism is arranged between the adjusting screw and the clamping piece.
2. The energy-saving ceiling keel connecting structure according to claim 1, wherein the connecting mechanism comprises a ball head and a ball seat, the ball head is fixedly arranged on the top of the clamping piece, and the ball seat is movably arranged on the ball head and is fixedly connected with the bottom end of the adjusting screw rod.
3. The energy-saving ceiling keel connecting structure according to claim 2, wherein a plurality of operating rods are fixedly installed outside the ball seats, and tool screwing blocks are fixedly sleeved on the adjusting screw rods.
4. The energy-saving ceiling keel connecting structure according to claim 1, wherein an iron nail is nailed on the hoisting keel, a steel wire rope is fixedly installed on the threaded sleeve, and a hanging ring hung on the iron nail is fixedly installed at the free end of the steel wire rope.
5. The energy-saving ceiling keel connecting structure according to claim 1, wherein the hanging piece, the threaded sleeve, the clamping piece and the adjusting screw are all made of light-weight alloy materials.
6. The energy-saving suspended ceiling keel connecting structure according to claim 4, wherein the inner wall of the fastener is provided with a friction mechanism, and the steel wire rope is arranged on the threaded sleeve in a lifting and adjusting way through a lifting lug.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222954197.5U CN218541154U (en) | 2022-11-07 | 2022-11-07 | Energy-saving ceiling keel connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222954197.5U CN218541154U (en) | 2022-11-07 | 2022-11-07 | Energy-saving ceiling keel connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218541154U true CN218541154U (en) | 2023-02-28 |
Family
ID=85261650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222954197.5U Active CN218541154U (en) | 2022-11-07 | 2022-11-07 | Energy-saving ceiling keel connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218541154U (en) |
-
2022
- 2022-11-07 CN CN202222954197.5U patent/CN218541154U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105435391B (en) | Safety belt suspension device | |
CN205382615U (en) | Adjustable cable suspension device of roof installation usefulness is decorated to large -span | |
CN201771198U (en) | Fixture for installing safety rope | |
CN207048062U (en) | A kind of Novel free drilling steel construction Quick Connect Kit | |
CN218541154U (en) | Energy-saving ceiling keel connecting structure | |
CN211449900U (en) | High-efficient installation device of exhaust pipe | |
CN209443757U (en) | A kind of fashioned iron suspension scaffold steel wire rope drawknot device | |
CN205276653U (en) | Furred ceiling jib installation device | |
CN216042602U (en) | Reinforced diagonal brace of aluminum alloy template pulling-on piece system | |
CN110552500B (en) | Turnover supporting device special for suspended formwork and construction method thereof | |
CN211398151U (en) | Anchoring embedded part fixing device of suspender hanger based on aluminum mould | |
CN211775828U (en) | Novel aluminum template form removal tool | |
CN212078409U (en) | Suspended ceiling component | |
CN207846825U (en) | A kind of construction and decoration indoor suspended ceiling adjustable tension device | |
CN213204960U (en) | Fastening device, elevation control support and high-low cross-mold template support | |
CN218541392U (en) | Simple tool for efficiently fixing ceiling screw | |
CN207846824U (en) | A kind of adjustable hanger rod component of construction and decoration indoor suspended ceiling | |
CN206220511U (en) | Screw supporting system for shaped building template | |
CN218814387U (en) | Detachable pre-buried anchoring device | |
CN221314034U (en) | Portable mounting tool for suspended ceiling suspender | |
CN206737237U (en) | Suspension arrangement | |
CN208586759U (en) | A kind of suspended ceiling embedded part | |
CN216588482U (en) | Workover rig guy rope safety rope telescopic connection device | |
CN215054453U (en) | Tool for mounting and fixing ceiling suspender | |
CN205855778U (en) | A kind of suspender of Diesel engine machinery injection pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |