- CN211398151U CN211398151U CN201922206319.0U CN201922206319U CN211398151U CN 211398151 U CN211398151 U CN 211398151U CN 201922206319 U CN201922206319 U CN 201922206319U CN 211398151 U CN211398151 U CN 211398151U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- nut
- aluminium mould
- fitting
- mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses an anchor built-in fitting fixing device of jib gallows based on aluminium mould, including aluminium mould and mounting, the mounting includes the cylinder, be provided with the external screw thread on the cylinder surface, the cylinder passes aluminium mould and first nut threaded connection, the mounting is hollow structure, and inside is provided with can dismantle the connecting rod of being connected with the cylinder, connecting rod and anchor built-in fitting threaded connection, the anchor built-in fitting with the cylinder is arranged in respectively the both sides face of aluminium mould. The novel mounting of equipment on the aluminium mould, the anchor built-in fitting that will assemble rather than being connected need not the later stage and punches, stops dust and noise pollution, and the process is simple, the simple operation, and is pollution-free, firm in connection, stability is strong, reduces the high altitude and prevents that the line from beating the support, saves high altitude construction, and is safer.
Description
Technical Field
The utility model belongs to the technical field of civil engineering construction, concretely relates to anchor built-in fitting fixing device of jib gallows based on aluminium mould.
Background
In the construction of the existing building engineering, the installation of bridges such as water supply and drainage, ventilation pipelines, fire fighting pipelines and the like usually starts to carry out large-area construction after the main structure is finished. Firstly, iron pieces are embedded in the construction stage of a main body structure, and a suspender hanger is welded on an embedded iron frame for installation after the main body construction is finished; and secondly, after the main structure is constructed, punching and installing metal expansion bolts to connect the hanger rod hanger for installation. The traditional process is complicated in procedure, large in danger coefficient, not suitable for aluminum mould construction, and not only consumes manpower and material resources, but also has certain damage to reinforcing steel bars, structures and the like.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem be: an anchoring embedded part fixing device of a suspender hanger based on an aluminum mould is provided. The novel mounting of equipment on the aluminium mould, the anchor built-in fitting that will assemble again need not the later stage and punches rather than being connected, stops dust and noise pollution, and the process is simple, the simple operation, and is pollution-free, firm in connection, stability is strong, reduces the high altitude and prevents that the line from beating the support, saves high altitude construction, and is safer.
The utility model adopts the technical scheme as follows:
the utility model provides an anchor built-in fitting fixing device of jib gallows based on aluminium mould, includes aluminium mould and mounting, the mounting includes the cylinder, be provided with the external screw thread on the cylinder surface, the cylinder passes aluminium mould and first nut threaded connection, the mounting is hollow structure, and inside is provided with can dismantle the connecting rod of being connected with the cylinder, connecting rod and anchor built-in fitting threaded connection, the anchor built-in fitting with the cylinder is arranged in respectively the both sides face of aluminium mould.
Preferably, the first nut is a hexagonal nut.
Preferably, the fixing member is a circular plate nut, and the circular plate nut comprises a circular plate and a cylinder.
Preferably, the connecting rod is a screw rod, the inner surface of the cylinder is provided with an internal thread matched with the screw rod in a threaded manner, and the screw rod is connected with the cylinder in a threaded manner.
Preferably, the anchoring embedded part is a lengthened nut.
Preferably, the lengthened nut is a hexagonal lengthened nut.
Preferably, the screw is a hexagon socket head cap screw.
The utility model discloses an anchor built-in fitting fixing device of jib gallows based on aluminium mould, set up the mounting on aluminium mould, and fix it on aluminium mould with first nut, connect the connecting rod that can dismantle the connection with the mounting, and connecting rod and anchor built-in fitting threaded connection, after waiting to pour the concrete, demolish the aluminium mould back, with anchor built-in fitting pre-buried in the concrete, avoided the later stage structurally to punch, can stop dust and noise pollution, and prevent to destroy the later stage pipeline trend, fix the mounting on aluminium mould simultaneously, form the turnover construction, a large amount of manpowers have been practiced thrift, physics and simple installation. Furthermore, the utility model discloses an anchor built-in fitting adopts extension nut, when the installation of jib gallows, only need adopt threaded connection can, need not the welding stent, stopped light pollution, dust pollution and to operating personnel's health radiation that the welding machine produced to the electric energy has been practiced thrift.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the fixing member;
FIG. 3 is a schematic view of a first nut;
FIG. 4 is a schematic structural view of the connecting rod, wherein FIG. 4b is a sectional view A-A of FIG. 4 a; FIG. 4c is a cross-sectional view B-B of FIG. 4 a;
FIG. 5 is a schematic structural view of an anchoring embedment.
Wherein, the names corresponding to the reference numbers are:
1-aluminum die, 2-anchoring embedded part, 3-connecting rod, 4-fixing part, 41-cylinder, 42-disc, 5-first nut and 6-concrete layer.
Detailed Description
The present invention will be further described with reference to the following description and examples, which include but are not limited to the following examples.
Example 1
The utility model provides an anchor built-in fitting fixing device of jib gallows based on aluminium mould, as shown in fig. 1, fig. 2, includes aluminium mould 1 and mounting 4, mounting 4 includes cylinder 41, be provided with the external screw thread on the cylinder 41 surface, cylinder 41 passes aluminium mould 1 and first nut 5 threaded connection, mounting 41 is hollow structure, is provided with connecting rod 3 that can dismantle the connection in, connecting rod 3 and anchor built-in fitting 2 threaded connection, anchor built-in fitting 2 with cylinder 41 is arranged in respectively the both sides face of aluminium mould 1. The utility model discloses an anchor built-in fitting fixing device of jib gallows based on aluminium mould, including aluminium mould 1 and mounting 4, mounting 4 includes cylinder 41, and is provided with the external screw thread on the cylinder 41 surface, the cylinder passes aluminium mould and 5 threaded connection of first nut, can fix mounting 4 detachable on the aluminium mould 1, mounting 4 is hollow structure, and inside is provided with can dismantle the connecting rod 3 of connection, connecting rod 3 and 2 threaded connection of anchor built-in fitting, and after concrete pouring finished, concrete layer 6 was arranged in to anchor built-in fitting 2, then demolishs connecting rod 3 from cylinder 41, and swivel joint pole 3 afterwards demolishs it from anchor built-in fitting 2, demolishs aluminium mould 1 again afterwards, and mounting 4 stays on aluminium mould 1, can realize reuse. The specific implementation mode of the device comprises the following steps: firstly, assembling an aluminum die 1 in a main body pre-embedding stage, then paying off and positioning a pre-embedding hole by using an instrument and marking the pre-embedding hole, and then drilling a hole at the marked place by using a pistol drill; secondly, penetrating the cylinder 41 of the fixing part 4 into the opening to enable the cylinder 41 to be arranged on the outer side surface of the aluminum die 1, and rotationally fastening the cylinder 41 with the external thread of the first nut 5 to enable the cylinder to be firmly fixed on the aluminum alloy template to form a novel fixing part; thirdly, connecting the connecting rod 3 with the anchoring embedded part 2 in a threaded manner, wherein the anchoring embedded part 2 is arranged on the inner side surface of the aluminum mould 1; thirdly, the connecting rod 3 and the cylinder 41 are detachably and fixedly connected, and the connection is stable; then, checking the pre-embedding condition of each point position, whether the novel fixing piece is fastened, the connection condition of the anchoring pre-embedded piece and the like; then, a concrete layer 6 is poured into the inner side surface of the aluminum mold 1. After concrete layer 6 reaches intensity, demolish connecting rod 3 of being connected with cylinder 41 can be dismantled, then unscrew connecting rod 3 out anchor built-in fitting 2, demolish aluminium mould 1 again, and novel mounting stays on the aluminum alloy template, repeatedly usable. And finally, assembling the hanger rod and the hanger bracket, and installing. By adopting the anchoring embedded part fixing device, the device is applied to the pre-embedding fixation of the anchoring embedded part, and compared with the pre-embedding fixation of the traditional anchoring embedded part, the device generally performs paying-off at the bottom of a beam plate after main body pouring and form removal, determines the position of a hanging point, and utilizes an electric hammer to drill holes and install expansion bolts to connect a support; or pre-embedding iron parts and welding a suspender hanger at the later stage. This application is fixed mounting 4 on aluminium mould 1, forms the turnover construction, need not repeat fixed point location again, has practiced thrift the time limit for a project, and has practiced thrift a large amount of manpowers, material resources and simple installation. Meanwhile, after the concrete is poured, the anchoring embedded part 2 can be fixed in the concrete layer 6, and one-time embedding is adopted, so that secondary drilling is not needed. Meanwhile, the construction operation is simple and easy, the installation is rapid and accurate, and the whole body is attractive after the forming. And the later stage is avoided to punch on the structure, dust and noise pollution are avoided, the health of operating personnel is facilitated, and the method accords with civilized construction management and environmental protection. In addition, the pipeline has reasonable trend and can well correspond to a completion drawing. And by adopting the traditional process, a large amount of pipelines are repaired in the later period, the pipelines bypass too much, the bad condition of the pipeline trend is not clear at all after decoration is finished, and the inconvenience is caused to the work of later-period maintenance and the like. In addition, the paying-off and punching are not needed, and the operation is simplified.
Example 2
Based on the above embodiment 1, as shown in fig. 3, the first nut 5 is a hexagonal nut. In this embodiment, the first nut 5 is a hexagon nut, and the fastening force of the hexagon nut is large, so that the fixing member 4 can be fixedly connected to the aluminum die 1. Further, the selection of the first nut 5 is not limited to the hexagonal nut, and any suitable nut may be used.
Example 3
Based on the above embodiment 1 or 2, as shown in fig. 2, the fixing member 4 is a circular plate nut including a circular plate 42 and a cylinder 41. In this embodiment, the fixing member 4 is a circular plate nut, the circular plate nut includes a circular plate 42 and a cylinder 41, the cylinder 41 plays a role of fixed connection, the circular plate 42 plays a role of blocking an aluminum mold hole, the circular plate nut can be a three-hole circular plate nut commonly used in the market, and an external thread is arranged on the cylinder 41 of the three-hole circular plate nut. However, the disc nut is not limited to the above-described three-hole disc nut.
Example 4
Based on the above embodiment 3, as shown in fig. 4, the connecting rod 3 is a screw, the inner surface of the cylinder 41 is provided with an internal thread matching with the screw 4, and the screw is in threaded connection with the cylinder 41. In this embodiment, the connecting rod 3 is a screw, and the inner surface of the cylinder 41 is provided with an internal thread matching with the screw thread, so that the connecting rod 3 and the cylinder 41 are connected by a thread, but the connecting mode of the connecting rod 3 and the cylinder 41 is not limited to the above one, and a detachable connecting mode such as a pin connection can be adopted.
Example 5
Based on the above embodiment 4, as shown in fig. 5, the anchoring embedded part 2 is an elongated nut. In this embodiment, anchor built-in fitting 5 chooses for use the extension nut, can realize with 3 threaded connection of connecting rod, when anchor built-in fitting 5, the extension nut is fixed in concrete layer 6 promptly, and connecting rod 3 takes out from the extension nut, when hoist and mount jib gallows, can use the pre-buried extension nut of lead screw butt joint to realize threaded connection, and the process is simple, and one shot forming, need not the welding stent again, stopped the light pollution that the welding machine produced, dust pollution and operating personnel's health radiation to the electric energy has been practiced thrift. And the device does not need to be payed off for punching, is simple to operate, saves the time of high-altitude operation and is safer. Meanwhile, the bracket is simple to mount and is beneficial to the subsequent process.
Example 6
Based on the above embodiment 5, as shown in fig. 5, the extended nut is a hexagonal extended nut. In this embodiment, select for use hexagonal extension nut, because the fastening force of hexagonal extension nut is great, can guarantee the steadiness of connecting.
Example 7
Based on the above examples 4-6, the screw is a socket head cap screw, as shown in fig. 4. In this embodiment, the screw rod chooses for use the hexagon socket head cap screw, can make things convenient for external use instrument to screw in the screw rod through the hexagon socket head and screw out, and the hexagon socket head cap structure can prevent that external use instrument from skidding when rotatory, and the convenience is to the rotation of screw rod. In addition, the screw is not limited to the structure of the inner hexagonal screw, and an inner linear screw and the like can be selected.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are all covered by the protection scope of the present invention. The invention extends to any novel feature or any novel combination of features disclosed in this specification, and to any novel method or process steps or any novel combination of features disclosed.
Claims (7)
1. The utility model provides an anchor built-in fitting fixing device of jib gallows based on aluminium mould which characterized in that, includes aluminium mould and mounting, the mounting includes the cylinder, be provided with the external screw thread on the cylinder surface, the cylinder passes aluminium mould and first nut threaded connection, the mounting is hollow structure, and inside is provided with can dismantle the connecting rod of being connected with the cylinder, connecting rod and anchor built-in fitting threaded connection, the anchor built-in fitting with the cylinder is arranged in respectively the both sides face of aluminium mould.
2. The device as claimed in claim 1, wherein the first nut is a hexagonal nut.
3. The anchoring embedded part fixing device of the aluminum die based hanger rod hanger according to claim 1 or 2, wherein the fixing member is a circular plate nut, and the circular plate nut comprises a circular disc and a cylinder.
4. The device as claimed in claim 3, wherein the connecting rod is a threaded rod, the inner surface of the cylinder is provided with an internal thread matching with the thread of the threaded rod, and the threaded rod is in threaded connection with the cylinder.
5. The aluminum die based boom hanger anchoring embedded part fixing device as claimed in claim 4, wherein said anchoring embedded part is an extension nut.
6. The anchoring embedded part fixing device for the aluminum die based hanger rod hanger according to claim 5, wherein the extension nut is a hexagonal extension nut.
7. The device for fixing the anchoring embedded part of the aluminum die-based suspender hanger of any one of claims 4 to 6, wherein the screw is a hexagon socket head cap screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922206319.0U CN211398151U (en) | 2019-12-10 | 2019-12-10 | Anchoring embedded part fixing device of suspender hanger based on aluminum mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922206319.0U CN211398151U (en) | 2019-12-10 | 2019-12-10 | Anchoring embedded part fixing device of suspender hanger based on aluminum mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211398151U true CN211398151U (en) | 2020-09-01 |
Family
ID=72232811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922206319.0U Active CN211398151U (en) | 2019-12-10 | 2019-12-10 | Anchoring embedded part fixing device of suspender hanger based on aluminum mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211398151U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112196869A (en) * | 2020-09-24 | 2021-01-08 | 浙江中车电车有限公司 | Bolt mounting structure for car roof battery |
-
2019
- 2019-12-10 CN CN201922206319.0U patent/CN211398151U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112196869A (en) * | 2020-09-24 | 2021-01-08 | 浙江中车电车有限公司 | Bolt mounting structure for car roof battery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201217619Y (en) | Repeatedly-usable assembled tower crane attachment support | |
CN210658721U (en) | Concrete embedded part | |
CN211398151U (en) | Anchoring embedded part fixing device of suspender hanger based on aluminum mould | |
JP2009024340A (en) | Protective member of fitting for scaffold | |
CN107268978B (en) | The fixed device of towering structure constructor's row ladder sustaining wall and construction method | |
CN212224604U (en) | Wall connecting assembly for connecting outer wall scaffold and wall structure | |
CN211279058U (en) | Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting | |
CN112282076A (en) | Single-screw auxiliary embedded groove-shaped embedded part mounting structure and mounting method | |
CN215671022U (en) | Pre-embedded type mounting device for aluminum alloy template | |
CN206591839U (en) | A kind of reinforcing bar posting having enough to meet the need | |
CN215977746U (en) | Pre-buried steel sheet convenient to dismouting on concrete structure | |
CN205134546U (en) | But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization | |
CN218668471U (en) | Wall-attached device | |
CN210067407U (en) | Scaffold wall connecting piece | |
CN206571799U (en) | A kind of hollow bolt | |
CN207080169U (en) | A kind of wall attaching parts for bridge construction safety climbing ladder | |
CN216641418U (en) | Preformed hole reinforcing steel bar template fixer | |
CN217631371U (en) | Building embedded part | |
CN215217615U (en) | On-spot sighting rod is used in building engineering management | |
CN218479517U (en) | Climb wall support bolt positioner that attaches of frame | |
CN221093525U (en) | Assembled building tower machine connection structure | |
CN204876566U (en) | Simple and easy claw formula links wall spare | |
CN205990753U (en) | Exterior wall scaffold tapered cup nut wall-connecting piece | |
CN219196687U (en) | Wall connecting assembly convenient to disassemble | |
CN211998447U (en) | Lifting appliance device for mounting and dismounting prestressed concrete T-beam steel formwork |
Legal Events